Loading...
HomeMy WebLinkAboutBLD6177 Modular Home - BLD Permit / Conditions - 4/9/1980 Valley, Patrick #6177 4-9-80 Portion S 1/2 NW 1/2 NE 1/4 20-23-1 1 mile north of Belfair down old Highway. River side of road just past Union River bridge on right. 209 feet south of first drive past bridge fffi�U2 n (4-1- Contractor Modular Home Evergreen Modular $39,500.00 Z IZ -bZo�o C,.�3 m/s-6 �� BUIL...NG PERMIT APPLIC, 'ION ' MASON COUNTY P.O. Box 186 Shelton, Washington 98584 426-5593 DATE ISSUED '$e Q— PERMIT NO. 61ZZ nEC NAME MAIL ADDRESS CITY&STATE ZIP PHONE S E [DESCAL (❑ SE SHEET) E ATTACHED SH R. �►�lwo.�3, CONTRACTOR NAME MAIL ADDRES CITY&STATE LICENSE NO. PHONE ls��iGTt!v/�®D-.�,A.P �jG'�S--So%�ss+v�,s;.w ��, Ccii� c'v-.�'/'-GM-/�Zs�3�•� USE OF BUILDING � �` Class of work: ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: Valuation of work: $ DO PLAN CHECK FEE PERMIT FEE//,;F Co SPECIAL CONDITIONS: BEDROOMS DECKS CARPORT ❑ NOTICE BATHROOMS TOTAL SO. FT. GARAGE [] ATTACHED C] SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING NO. OF STORIES BASEMENT ❑ OR AIR CONDITIONING. TOTAL SO. FT. FIREPLACE ❑ DETACHED ❑ THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED CONTRACTOR AFFIDAVIT IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER I certify that I am a currently registered contractor in WORK IS COMMENCED. the State of Washington and I am aware of the ordinance requirements regulating the work for which FOR OFFICE USE ONLY the permit is issued and all work done will be in conformance therewith..(/) �,� �► PERMANENT ❑ SHORELINES ❑ Firm�����«�/ ��0�"'A�• /1�i�9<f' •.wit, SEASONAL Li FLOODPLAIN ❑ E.D. NO. S.E.P.A. ❑ By Special Approvals IN OUT YES APPROVED NO Lic. No. 'Z ' O� Date > ZONING y.Z�3C'7 PL OWNERS AFFIDAVIT HEALTH DEPT. �p PUBLIC WORKS I certify that I am exempt from the requirements of the FIRE MARSHAL contract or registration law RCW 18.27, and am aware �� $ of the Mason County ordinance requirements for BUILDING DEPT. which this permit is issued and that all work done will ROAD ACCESS be in conformance therewith. MOTOR VEHICLE PERMIT APPLICATION ACCEPTED BY PLANS CHECK BY APPR05fD FOR ISSUANCE BY Owner Date. �(�� PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH