Loading...
HomeMy WebLinkAboutGRD2019-00001 1100 cy - GRD Inspections - 9/14/2022 l 615 W.Alder St.Bldg 8,SHELTON,WA 98584 i \`,i MASON COUNTY SHELTON:360�27-9670,EXT 352 COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Budding.Pimmmg.Environmental Hcwlth,Community Health . ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit httpJ/www.co.mason.wa.us/community-services/bid-inspection.php Permit Number GRD2019-00001 Date Issued 09/24/2019 Issued By Project LAND MODIFICATION PERMIT 1100 CUBIC YARDS Site Address Applicant CEDARLAND FOREST RESOURCES Contractor Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,8t Type Permit Type GRADING Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.— PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other o Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us F 9-00001 GRADING ESCRIPTION: LAND MODIFICATION PERMIT 1100 CUBIC ISSUED: 09/24/2019 ESS: EXPIRES: 03/22/2020 PARCEL: 122174200130 APPLICANT: CEDARLAND FOREST RESOURCES OWNER: CEDARLAND PO BOX 2264 PO BOX 2264 GIG HARBOR,WA 98335 GIG HARBOR,WA 98335 253-208-7686 FEES: Paid Due Planning Stormwater Review $300.00 $0.00 Planning Review Fee $240.00 $0.00 Grading Plan Review Fees $80.00 $0.00 Grading Permit Fee $354.00 $0.00 State Fee-Residential $6.50 $0.00 Totals : $980.50 $0.00 REQUIRED INSPECTIONS 3rd Party Inspection Report BLD-Final Inspection CONDITIONS " ALL CLEARING,CUTTING, GRADING, EXCAVATING, TERRACING, FILLING AND SIMILIAR WORK WILL BE REGULATED BY THE REQUIREMENTS PURSUANT TO THE MASON COUNTY GRADING PERMIT STANDARDS ADOPTED BY RESOLUTION 141-96 and MASON COUNTY CODE, TITLE 14, CHAPTER 14.44. " Access Roads to the site must not be degraded as a result of work. " Grading work shall adhere to both the geo-technical report and SEPA conditions. NOTE: Stormwater plan has not been approved to date. Stormwater plan has been forwarded to Loretta Swanson in Public Works for review on February 27, 2019. No grading work shall commence until Public Works has approved said stormwater plan. Printed by:Nicole Norris on:09/24/2019 11:44 AM Page 1 of 3 C � JAI Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GRADING GRD2O19-00001 * Ecology Letter dated August 22, 2019 Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damages aquatic habitat and are considered to be pollutants. * A recorded (Mason County Auditors Office) Declaration of Covenants Associated with Privately Maintained Stormwater Facilities to be executed prior to permit being finalized. * The stormwater drainage plan should be incorporated into the site-plans and be a condition of permit issuance * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. * All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * All culverts shall be maintained in perpetuity to ensure that drainage will not overflow. * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given some other equivalent type of protection against erosion. * A 20 foot wide fire apparatus access road is required to extend within 150 feet of any portion of the exterior walls of the building. An unobstructed vertical clearance of 13 feet, 6 inches is required. Dead-end fire apparatus access roads longer than 150 feet are required to have an approved turnaround. The maximum grade of a fire apparatus access road is 14%. * The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical report or assessment. All applicable recommendations and specifications shall be applied to the development on this site. Any deviation requires stamped written approval from the registered design professional responsible for the report/assessment, and may require special inspection by same. Structures and/or land modifications (grading, cuts, fills, etc.) required in the geotechnical report/assessment, may require a separate permit. The geotechnical report/assessment shall remain attached to the approved building plans. * The owner/applicant shall provide to Mason County inspection reports prepared by the engineer record, complying with the requirements as noted in Chapter 14.44, section 14.44.220 through 14.44.230. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. * Approved per site plan and topographic cross-section. Printed by:Nicole Norris on:09/24/2019 11:44 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GRADING GRD2019-00001 Compliance with an approved Storm Water Plan shall be subject to an on site inspection, or inspections, by the engineer of record or an authorized representative. Said inspection(s)shall be performed in accordance with the approved plan, and prior to any modification that would make a determination of compliance impossible. Inspection reports shall be submitted to verify all engineering requirements have been completed in accordance with the approved storm water plan. Reports shall be submitted to the Mason County Department of Community Development prior to each corresponding inspection and final permit approval. Copies of all special inspection reports shall be made available at time of inspection. When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. Work must be done in the dry to help prevent disturbance of unstable soil layers and uncontrollable mass wasting. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisio s of ny other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: tCl WMJ Printed by:Nicole Norris on:09/24/2019 11:44 AM Page 3 of 3