Loading...
HomeMy WebLinkAboutBank Protection Using Hand-Placed Rock - PLN General - 5/23/1997 / 2✓ - 1-'5- 9/ 0-7f GARY YANDO,DIRECTOR �oN.STgTFO o A°u DEPARTMENT OF COMMUNITY DEVELOPMENT z o T z PLANNING -SOLID WASTE - UTILITIES N Y y BLDG. I • 411 N. 5TH� ST. e P.O. BOX 578 1864 SHELTON,WA 98584 • (360) 427-9670 May 23, 1997 Doris Small / Margie Schirato Department of Fish and Wildlife 502 High Street, Suite 108 Port Orchard, Washington 98366 RE: Betty Von Osten Bank Repair Proposal on Union River NE 1151 Old Belfair Highway, Belfair, WA. Dear Ms. Small or Schirato: I have reviewed the proposed work to provide bank protection to 40 to 45 feet of the left bank of the Union River using hand-placed rock along the bank (possibly some root wads if available) and riparian plantings. I have found the proposal does not directly affect the water or channel along the river; the work will be above the bottom of the river channel during the time of the work. For the reasons of using natural materials and no impacts to the waters of the river, the proposed work would be exempt from State Environmental Policy Act review and no SEPA checklist is needed for the project as proposed. Since the proposal involves work valued at less than $2500 value and not expanding an existing use, the planned work would be exempt from the requirement of a shoreline substantial development permit prior to construction. If you have questions concerning the proposal, please contact Allan Borden of the Department of Community Development at (360) 427-9670 or 275-4467, extension 365. Sincerely, Alla�_ ' o Shoreline Planner Recycled 1