HomeMy WebLinkAboutGRD95-0048 Cancelled - GRD Application - 12/4/1995 r V
SIN NOUN ROND DES
DT.- NOVEMBER 17, 1995
TO: ALAN TAHJA/PUBLIC WORKS
FR: CHRIS77AE HERTH/BUILDING C'J�
RE: LAND MODIFICATION PERMIT FOR KENNETH A. VANBUSKIRK
AT YOUR CONVEYANCE COULD YOU REVIEW THE FOLLOWING APPLICATION FOR
LAND MODIFICATION FOR COMMENTS AND CONDITIONS.
WHEN COMPLETED PLEASE RETURN FILE TO BUILDING FOR COMPLETION.
THANK YOU IN ADVANCE.
D MASON COUNTY GRDgS
OCT 2 5 .1995 LAND MODIFICATION PERMIT
Grading, Excavation, Fill, Slopes, Drainage
'-k�A{ '�` �!r'! �11y���� '�` Department of General Services
~�[77 6�W`Ledar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628
PLEASE PRINT
#1 Owner /KeAbV M A• A4NBaSK/AA-.— Phone#;2 Fire District#
Site Address ME <D 811 SAND gjtL AvAli City 8,64641,y- St W-4 zip 98-s a8
Owner Address iV�,3/ P.*11S FR,Qi7 Xmj> City get-64/-0-- St !NA` Zip 9RS-a 8
Describe Work
cSiT o S
c T
#2 Contractor Name t -F Contractor Reg#
Address Expiration Date
City St Zip Phone#
#3 Engineer's Name S Phone#
Address City St Zip
Parcel No.la320 - 3 - ObG/D �'� < C'f LA)-t
Legal Description Lie weS� `Ia�'`�� �( Tn� /✓�'j"7'� �3Ci1
sc� iy�� Sw YY s E av� Ta3lI; A21&t�
"w#5 Number of cubic yards to be excavated:
-� Number of cubic yards to be filled: < c2
Number of cubic yards to be graded:
#6 Will this be a balanced cut and fill entirely within the site?
Yes No f
If No: Will fill be brought on site? Yes ✓ No
Where does imported fill originate from? c.[._ X014D l2 b T
l 1( L VQ I - &bl"c g
Does fill contain an potentially hazy s materia ? C
Yes o 7
#7 Will excavated materials be taken off site?Yes No
If Yes: Where will excavated materials be taken?
#8 Briefly describe existing terrain, vegetation, and improvements on subject site?
S
'ay Cy
&"- .<ro o
#9 Total size of area to be cleared acres/sq ft
Size of area to be cleared on slopes over 10% AC/SF
#10 Has a soils report been completed on the subject site? ZZ
If yes, include copy with application.
#11 Is the subject site within 200 feet of a designated shoreline A10
kA
#12 Does the subject site contain any of the following features? /nel �'River Lake Wetlands Saltwater yydM 1-1,5r
Slope greater than 15% Soft compressible soils
Seasonal Runoff None f
#13 Will the proposed land surface modification change the points
where storm water or groundwater enters or exits the site? //6r
c. wCcJ d�POW r..�ykc�i ✓uH+
r #14 Will the proposed land surface modification change the quality,
quantity, or velocity of storm water/groundwater? N U if
#15 What methods, if any, will be utilized to minimize erosion and
possible sedimentation into nearby waters during and after
construction?
#16 Will this land modification result in the redirection of any surface
water runoff onto adjacent properties? Alo
#17 Will surface or subsurface runoff be collected or controlled by
interceptors, curtain drains, or other water collection devices
once this land modification has been completed? N
s #18 Will the land be replanted upon completion? YES
If yes, with what types of plants? F—
��
#19 Will this modification result in slopes steeper than those currently
on the site? 0 If so, how steep?
Show following on the site plan
Lot Dimensions 33o`l qay Flood Zones
Existing Structures Fences )cXX r
Structure Setbacks Driveways —'
Water Lines Nho —'! Frirewlirwz
Drainage Plan Topography
Septic Systems Wells W
Proposed Improvements Easements.-- Indicate Directional by (N, S, E, W)
Name of Flanking Street in relation to plot plan
Name of Fronting Street PJc logo MN D ►�II ���{m,�
APPLICANT TO DRAW SITE PLAN BELOW yZy,
211
330
_ I
JL-
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED
WITHIN 180 DAYS OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT
ANYTIME AFTER WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS IN-
SPECTION.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED
MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I
RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU-
ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED
MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE
CONFORMANCE THEREWITH. NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT
MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING
THE BUILDING DEPARTMENT. DEPARTMENT.
X OWNER X BY
DATE �G' c� I S DATE
FOR OFFICIAL USE ONLY:Accepted by: Date: Qq r S" '
- -- - - --: ---- - ---- -------------- ------------ -- - -- --
DEPARTMENTAL REVIEW
Planning APP COND APP HOLD
Building
Environmental
Other
Special Conditions z- Q FEES
Grading Permit $ I l
Plan Review 2—
Site Inspection
Violation
+Fee
Other(`��r c I C1 t
TOTAL FEES $
Page No. 1 CASE HISTORY FOR CASE NO.: GRD95-0048
KENNETH VANBUSKIRK
...............
12/04/95
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
GRDA010 Application received / / / / 10/26/95 10/26/95 KW
GRDA040 RLC Checklist Review / / / / 11/01/95 DONE HRF 11/01/95 TMJ
GRDA100 Building review 11/21/95 / / 11/30/95 applicant has cancelled and will apply CANC TLG 12/04/95 TLG
at a later date
GRDA120 Engineering review 11/17/95 / / 11/21/95 PER REQUEST OF THE BUILDING DEPARTMENT I DONE AAT 11/21/95 TW
SENT THIS PERMIT TO ALAN TAHJA FOR
REVIEW.
RETURN TO BUILDING WHEN COMPLETED WITH
REVIEW PLEASE, THANKS CPH
GRDA560 Permit cancelled / / / / 12/04/95 as per Alan Borden TLG 12/04/95 TLG