Loading...
HomeMy WebLinkAboutBLD2011-00531 Cancelled Mechanical - BLD Permit / Conditions - 4/3/2015 Inspection Line(J6U)42/-/262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 1� MECHANICAL PERMIT BLD2011-00531 OWNER: ROSANNA, EZELL RECEIVED: 6/29/2011 CONTRACTOR: HOOD CANAL HEATING & COOLING (360) 275-4992 4-ICENSE: HOODCHCO05DB EXP.. 3/ ISSUED: 6/29/2011 SITE ADDRESS: 1033 NE OLD BELFAIR HWY BELFAIR EXPIRES: 12/29/2011 PARCEL NUMBER: 123204290100 LEGAL DESCRIPTION: TR 10 OF N1/2 SE PCL 1 OF BLA#00-26 PROJECT DESCRIPTION: DIRECTIONS TO SITE: REPLACEMENT OF HEATPUMP AND FURNACE ST RT 3 TO BELFAIR, L ON ST RT 300, STRAIGHT AT 4 WAY STOP, FOLLOW OLD BELFAIR HWY TO SITE ADDRESS ON THE LEFT SIDE, SHARED EASEMENT WITH 1031 General Information Setback Information Front: Ft. Shoreline: Ft. Type of Use: SF Insp. Area: Rear: Ft. Slope: Ft. Type of Work: MEC Fire Dist.: 2 V Side 1: Ft. Valuation: Side 2: Ft. Mechanical Fixtures FEES Type Qty. Type By Date Amount Receipt Furnace<100K 1 Mechanical Permit Fee GMM 6/29/2011 $36.50 S120110000( Heat Pump 1 Mechanical Base Fee GMM 6/29/2011 $28.50 S120110000( Total $65.00 BLD2011-00531 Please refer to the following pages for conditions of this permit. Page 1 of 3 CASE NOTES FOR BLD2011-00531 CONDITIONS FOR BLD2011-00531 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at X 800-647-0�9 ` The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. l/ �__..- 2) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUM D RDS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE. X 3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revoc, t 4) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Count finances and building regulations. X !lam 5) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder-Lave prevented action from being taken. No more than one extension may be granted. X _ 6) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure these structures meet the setback conditions listed. X BLD2011-00531 Please refer to the following pages for conditions of this permit. Page 2 of 3 This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT: L?-Zt-"c DATE: t7 — z�— 1 t BLD2011-00531 Please refer to the following pages for conditions of this permit. Page 3 of 3 o CONCRETE Gas Piping MANUFACTURED HOME N o Interior-Date By m Footings!Setbacks EaAergr-Date By Ribbons o Date By Date By + c" IN SU LATI ONO w FoundetionWalls Set-up t3G SLAB INSULATION (n D Daly By Date By Date By Z FRAMING Floors FIRE DEPARTMENT D Date By Date BY Date By wails PLUMBING Date By DECKS t:as to BY Groundwork Vault TANKS Date gY Date By Date By Attic D.W.V Date By OTHER Date By DRYWALL Type: Date BY Water Line Date BY Type: IOU Date By Int.Brace Wall Date By y MECHANICAL Date ByFINAL INSPECTION co Fire Separation o fD Date By Date By Date By m O ° Pass or Request Inspect. c C Type of insp. Fail Date Date Done By Comments O 0 :3 v CD 0 M O 7 a o' N O N CD (D 3 N 0