Re: Geotechnical Report
Proposed Berger Residence—417 NE Bear Creek DeWatto Road
Belfair,Washington
Dear Mr. Coates and Mr. Lynch:
This letter report presents the results of our geotechnical investigations and analyses for
the proposed Berger residence located at 417 NE Bear Creek DeWatto Road in Belfair,
Washington. The purpose of out work was to conduct subsurface investigations and
provide geotechnical recommendations for foundation support of the proposed
residence. Our work was conducted in general accordance with our letter of agreement
dated August 15,2006 and included project coordination, information review, a site
reconnaissance,geotechnical explorations,analyses,meetings with you, and preparation
of this letter report.
Site and Project Description
The subject property is an approximately 1.2 acre parcel that is irregular-shaped but
roughly rectangular, oriented northeast to southwest. The property is accessed by a
gravel road that extends south of NE DeWatto Road and enters the property via a gravel
driveway on the northeast side of the site. The parcel is located in an area that slopes
moderately down to the southeast. A level area has been excavated on the west central
portion of the site to create a building pad. The building pad was apparently
constructed by cutting and filling across the original site grade.
Current project plans call for construction of a single-story residence on the level area
that has been graded on the property. No significant additional site excavation or
grading is anticipated as a part of the proposed residential development. The Site and
Exploration Plan presented on Figure 1 shows the general configuration of the proposed
residence.
P011 INC B%) lWILDING I12 ISI:NRNh0KIVF BAINBRIDC&ISI_.4VD. WAS111NGION '06_S4_), h73
Site Investigations ^
The existing site conditions were assessed by conducting a'site visit and test pit
explorations on September 12, 2006. Our site work and observations occurred
following a period of prolonged warm,dry weather. During our site work we observed
site topography,vegetation, drainage, and subsurface soil and groundwater conditions as
described below.
Tonographv
As previously described, the subject property is located in an area that slopes
moderately down to the southeast. Slope grades in the area range from 10 to 20 degrees
(18 to 36 percent)with locally steeper and flatter areas generally where grading has
occurred for residential development. In the central portion of the subject property, a
level area had been created by cutting and filling. The level area is oval shaped,
approximately 50 feet wide and over 100 feet long as shown on Figure 1. Cut and fill
heights based on visual observations appear to be a maximum 5 to 6 feet high. The cut
and fill slopes are generally steep with average grades of 45 to 35 degrees,respectively.
Vegetation
Site vegetation around the proposed building envelope ranges from relatively
undisturbed forest conditions on the perimeter of the property, to the central cleared
building envelope,to disturbed forest conditions on the east side of the site where the
access drive and on-site wastewater treatment system have been installed. Forested
areas consist of established conifer and deciduous trees and a variable understory of
sword ferns, woody shrubs and groundcover. Hydrophytic(water loving)vegetation is
located on the slope immediately above the building pad to the northwest. Uniformly
aged sapling alder trees along with an understory of hydrophytic vegetation is also
located on the slope below and southeast of the building pad.
Drainage
Standing surface water was observed on the level building pad at the time of our visit.
The water was generally located on the northwest side of the pad, adjacent to the cut
slope. Daylighting groundwater seepage was observed on the cut slope. Since our site
work occurred at the end of the dry summer season, it appears the origin of the standing
surface water is the daylighting groundwater seepage from the cut slope. The
hydrophytic (water-loving) vegetation observed on the slope indicates that prolonged,
wet soil conditions are likely present on the site northwest and southeast of the building
pad.
A shallow curtain drain was reportedly installed on the northwest side of the level area
near the toe of the cut slope. A 4-inch diameter PVC pipe was observed on the
southwest edge of the level area,reportedly the discharge pipe for the curtain drain.
The curtain drain discharged into a broad natural drainage area on the slope that
Ceotechnical Report Project No. 061327-5
Proposed Berger Residence page 2 of 7 October 4, 2006
Bey'air, Washington - Myers Biodpnamics, Inc.
descends to the southwest. At the time of our site visit, water flow from the curtain
drain discharge pipe was estimated at one-quarter of a gallon per minute.
Generalized Subsurface Soil and Groundwater Conditions
Subsurface conditions for the project site were explored by advancing six test pit
explorations on September 12,2006. The explorations were located on the proposed
building pad area at the approximate locations shown on Figure 1.
Soil conditions observed in the test pits generally consisted of a layer of surface fill
ranging from 2 to 6 feet thick. Although test pits on the northwest side of the building
pad were in a cut area,it appeared that the original site excavation was lower,with
subsequent fill placement. Below the fill, several test pits on the south side of the site
exhibited a layer of topsoil,covered by the fill. Below the fill and topsoil, site soils
were composed of medium dense to dense granular soils ranging from sand and gravel to
silty fine sand. The approximate fill and topsoil thickness and depth to medium dense
native soils at each of the test pit locations are shown on Figure.1.
Groundwater was encountered in all the test pits, except TT-4. Evidence of seasonal
groundwater was also observed in TP-4. Groundwater seepage was observed generally
below the level of the fill and topsoil at depths of 2 to 6 feet below existing grade as
shown on Figure 1. Soil staining indicated that groundwater levels are likely higher
during the wet season. Groundwater conditions will likely change depending on the
season, precipitation, and other on-site and off-site factors.
Slope Stability Evaluation
_ Observation of the site indicated that the moderately steep slopes are underlain by
granular soils in a medium dense to dense condition. These soils have a low risk of
slope instability and are suitable for support of the proposed residence assuming
adequate burial of foundations. The fill placed on the southeast side of the site to form
the relatively level building envelope is in a loose condition and underlain at times by
topsoil. In our opinion, the loose fill located on the southeast side of the site has a
relatively high risk of erosion and a moderate risk of localized soil slumps(small
landslides). This opinion is based on the relatively loose condition of the fill,the steep
fill slope,the presence of topsoil below the fill, and groundwater. However, if surface
water and shallow groundwater can be controlled and routed away from the fill, risk of
slope instability can be significantly reduced. Also, shaving back the crest of the steep
fill slope and/or establishing vegetation can help reduce shallow slope instability risk.
Geotechnica!Report Project No. 061327-5
Proposed Berger Residence page 3 of*7 October 4, 2006
Belfair, Washington - Myers Biodynan:ics, Inc.
Geotechnical Engineering Recommendations
Geotechnical engineering recommendations presented in the following sections are based
on the results of subsurface exploratioQs and our understanding of the proposed project
at the time this report was prepared. Recommendations include foundation support,
lateral resistance,drainage,and vegetation management considerations.
Foundation Support
For slope stability considerations, we recommend foundation support for the proposed
residence and deck be provided by embedment in the medium dense or denser granular
soils located below the fill and buried topsoil. Depth to suitable foundations soils at the
test pit locations is shown on Figure 1. An allowable bearing pressure for spread
footing foundations of 2,000 pounds per square foot(psf)is recommended for the
medium dense or denser site soils. Once exposed, spread footing foundation subgrade
soils should be compacted to a firm condition. If soft, wet,loose,or organic soils are
present,they should be overexcavated and the footings extended down to firm native
soil. We recommend a minimum width for spread footing foundations of 24 inches for
isolated footings and 18 inches for continuous(wall)footings. Allowable soil bearing
pressures may be increased by one-third to include short-term loads such as seismic or
wind loading. Spread footings should be embedded at least 18 inches below adjacent
finished grades or in the medium dense or denser native soils as shown on Figure 1,
whichever is deeper. Foundation drainage systems should be provided for all spread
footings as recommended below.
Due to the relatively large depth to suitable foundation soils(6 feet)on the southeast
side of the site,drilled pier foundations could be considered for residential foundation
support. Drilled piers should extend a minimum 5 feet into the medium dense granular
soils on the southeast, northeast, and southwest sides of the proposed residence (total
pier depth below existing grade of approximately 9 1/2 to 11 feet at the test pit
locations). Elsewhere, a minimum 2 feet of penetration into the suitable foundations
soils is recommended for the northwest side of the residence and the office and garage
area(pier depth below existing grade of 4 to 4 1/2 feet). We recommend a maximum
allowable soil bearing pressure of 5,000 psf for the pier foundations assuming a
minimum 5 feet of penetration into the medium dense or denser native soil. The
recommended pier bearing pressure assumes pier diameters of 18 to 24 inches.
We anticipate total settlement of spread footings and drilled piers will be I-ineh or less
and differential settlement between foundation elements will be less than 1/2-inch. This
assumes proper subgrade preparation and foundation construction techniques are
utilized. The majority of settlement is expected to occur during construction as the
loads are applied.
It is imperative that the bottom of the footing and/or drilled pier foundations be free of
loose soil or slough prior to concrete placement to avoid excessive settlement. If
Geotechnical Report Project No. 061327-5
Proposed Berger Residence page 4 of 7 October 4, 2006
Belfair, Washington - Myers Biodynamics, Inc.
groundwater is present, drilled piers may require casing to maintain an open hole. Also,
concrete should be placed by tremmie method if groundwater is present.
Lateral Resistance
Lateral loads may be resisted by a combination of friction along the base of foundations
and by passive soil resistance against buried foundations. We recommend shallow
footings founded on native granular site soils be designed using an ultimate coefficient of
base friction of 0.40. Passive soil resistance for compacted backfill around footings or
for the portion of drilled piers embedded in undisturbed native soils be calculated based
on an equivalent fluid of 280 pcf. The passive value includes a factor of safety of 1.5 to
reduce the magnitude of lateral movement required to fully mobilize passive resistance.
Passive resistance in the upper 1 foot should be ignored. On the southeast side of the
residence we recommend ignoring passive resistance for the full height of the fill and
topsoil. Passive resistance of the embedded portion of the drilled piers in the native soil
can be assumed to act over 2 pier diameters. Due to the potential for loss of ground on
the down slope side of the residence foundations, we recommend the foundations be
capable of resisting lateral loads from soil retained behind the foundation subgrade wall
or drilled piers. We recommend using an equivalent fluid of 55 pct which assumes "at-
rest" conditions when the top of the foundation wall is restrained. At-rest earth
pressures can be assumed to act over one pier diameter.
Drainage Considerations
Control of surface water runoff and groundwater on the subject property that flows
toward the fill slope is an important mitigation measure to help reduce erosion and
slope instability risks. We recommend site surface water runoff from roof, driveway,
and other areas be collected,and routed to a suitable discharge location such as the
existing natural drainage on the southwest portion of the property, southwest of the
proposed residence, or other suitable discharge locations. Appropriate energy
dissipation and/or erosion control measures should be utilized at the pipe discharge
locations.
We recommend subsurface drainage be provided for footings and behind any foundation
subgrade walls. Footing drains should be constructed at the exterior edge(around the
perimeter) of the proposed structures. In addition, if continuous spread footing
foundations are used for the residence,we recommend that subgrade wall drainage also
be installed on the northwest, inboard side of the foundations along the southeast side
of the residence. This additional drainage is recommended because the foundations will
be required to step down below the fill/topsoil and could be subject to a buildup of
hydrostatic forces from groundwater. We recommend footing and subgrade wall drains
consist of perforated PVC pipe surrounded by at least 6 inches of drain gravel. For the
subgrade wall on the inboard, southeast side of the residence,the drain gravel or other
drainage material such as a geocomposite drain mat should extend for the full height of
the subgrade wall. The drain gravel should be surrounded by a suitable filter fabric, such
Ceotechnical Report Project No. 061327-5
Proposed Berger Residence page 5 of 7 October 4, 2006
Bel(air, Washington Myers Biodynamics, Inc.
� f
as Mirafi 140N, with a 12-inch minimum overlap. Clean-outs should be provided to
extend.the useful life of all drainage systems.
In addition to footing and subgrade wall drains, we recommend re-installation of a
surface swale and groundwater interceptor trench(curtain drain)along the northwest
side of the building pad. The purpose of the curtain drain is to capture and route
surface water from the daylighting groundwater on the cut slope and to intercept
groundwater at depth below the fill that could adversely affect slope stability. We
recommend that the curtain drain extend a minimum 6 feet below the existing grade on
the level portion of the site. The bottom of the curtain drain should be sloped down
towards the proposed discharge location(s). The curtain drain should be composed of
perforated PVC pipe with a minimum 6-inch drain gravel surrounding the pipe and
extending up to near the finished site grade. The-drain gravel should be fully surrounded
by suitable filter fabric with a 12-inch overlap. The top of the trench could have a
separate,`additional layer of filter fabric and a layer of gravel to line the surface swale
and allow for future removal of surface gravel if it becomes clogged by fine soil particles.
The swale and curtain drain should transition to q catC h asiifi d tightline discharie t
pipe prior to routing the water onto the natural site ramage Swale.
Vegetation Management and Fill Regrading °
Vegetation on the site can help reduce the rate and volume of surface water runoff.
Vegetation root systems also help to reinforce shallow slope soils and can reduce
erosion. We recommend establishing erosion control materials and native vegetation on
the fill slope face and crest. Maintain vegetation on the slope and use methods of
vegetation limbing and trimming,rather that clearing for view purposes. If possible,
regrade the fill slope to a flatter configuration by shaving back the top of the slope prior
to placing erosion control material and vegetation.
Recommendations for Additional Service
Prior to construction, we recommend geotechnical review of the project plans that
pertain to the foundation support and drainage to determine that they are consistent
with the recommendations presented herein. We also recommend that construction
consultation be performed to confirm that conditions encountered on the project site are
consistent with those indicated by the site explorations, to provide recommendations
should site conditions be revealed during construction that differ from those anticipated,
and to evaluate whether construction activities comply with project plans.
Geotechnical Report Project No. 061327-5
Proposed Berger Residence page 6 of 7 October 4, 2006
Belfair, Washington Myers Biodynamics. Inc.
Closure
This report was prepared for the exclusive use of Coates Design and other project team
members for specific application to the property identified herein. The data and report
should be provided•to prospective contractors for their information but the report
conclusions and interpretation should not be construed as a warranty of subsurface
conditions.
Within the limitations of scope, schedule, and budget, this report was prepared in
accordance with generally accepted geotechnical engineering principles and practices in
the area at the time this report was prepared. No other warranty, either expressed or
implied, is made. The conclusions and recommendations presented herein are based on
our understanding of the project as described in the report and conditions observed at
the time of our explorations.
If project plans change from those described in this report,we should be contacted and
retained to review the changed conditions. Also,we should be contacted to review our
work if. 1)there is a substantial lapse of time between submission of this report and the
start of construction; 2) conditions have changed due to natural causes or other
operations at the,site; or 3) conditions appear different from those described in our
report. The purpose of the review is to determine the applicability of the conclusions
and recommendations considering the time lapse or changed conditions.
We appreciate the opportunity to provide continued geotechnical engineering services
for you. Please contact our office at your convenience should you have any questions
or require additional services.
Sincerely Yours,
MYERS BIODYNAMICS, INC.
�� - --�,,:;'�� /�ry,./��-•_r fit;.
r�
e N. Myers, E.G.
Principal Geotechnical Engineer ' c
Attachments ---
Geotechnical Report Project No. 061327-5
Proposed Berger Residence page 7 of 7 October 4, 2006
Belfair, Washington - Myers Biodynamics Inc.
APPENDIX A
Appendix A
Field Exploration Program
Subsurface conditions for the project site were explored by excavating six test pit
explorations, TP-1 through TP-6, at the approximate locations shown on the Site and
Exploration Plan,Figure 1. Subsurface conditions observed in the explorations are
presented on the logs attached to this Appendix as Figures A-1 through A-6.
No survey control was present on the project site. The explorations were located in the
field by taping or pacing relative to the existing septic tank locations as shown on "Site
Plan, Berger Residence,417 NE Bear Creek Dewatto Road,Belfaii, WA prepared by
Coates Design dated August 24, 2006. No site topographic elevations were available for
the site but test pits were generally at a similar elevation on a level area previously graded
on the site. The location of the explorations should be considered accurate to the degree
implied by the method used.
A licensed engineering geologist/geotechnical engineer from Myers Biodynamics was
present throughout the field work to observe the explorations,obtain soil samples, and to
prepare field logs of the explorations. Soils were classified in general accordance with
ASTM D-2488 "Standard Practice for Description and Identification of Soils(Visual-
Manual Procedure)" and the Key to Soil Exploration Logs presented in this Appendix. A
legend for the logs describing symbols and abbreviations is also shown on the Key. The
exploration logs presented in this Appendix represent our interpretations and review of
the contents of the field logs.
Test Pit Explorations
The test pit explorations TP-1 through TP-6 were advanced to depths of 4-1/2 to 8 feet by
a track-mounted excavator on September 12,2006. The soils were classified and field
logs prepared. The relative density of the soils, shown in parenthesis on the logs, was
estimated in the field at the time of the explorations. Logs of the explorations are
presented on Figure A-1 through A-6 attached to this Appendix.
Groundwater conditions were noted during the field explorations. The groundwater level
at the time of digging(ATD) is shown on the test pit logs.
I
i
Geotechnical Report Project No.06 132 7-5
Proposed Berger Residence Appendix A October 4,2006
Beljair, Washington - Alyers Biodynamics. hic'
L�
Key to Soil Exploration Logs
Unified Soil Classification System
Sample Descriptions consist of the following: _ Well-graded gravels and
Minor constituents, major constituents; density or °m GW gravel-sand mixtures,little
m o or no fines
consistency,color, moisture,and additional comments o mcc H y Poorly gradedqravels and
including trace constituents. Soil classification is based — m m oa GP gravel-sandmlxtures,little
o L' Q c U or no tines
Z4 o'
on visual field soil sample observations and laboratory =S �
Silty gravels,
results on selected samples, where indicated on the m z GM gravel-sand-silt mixtures
logs. Soil classification is based on grain size,plastic- �; c�3 GC clayey gra vets,
= gravel-sand-clay mixtures
ity, color, density/consistency, and moisture. Visual- y Well-graded sands and
y
manual methods of ASTM D2488 were used as an a m m N SW gravely sands,little or no
s_._
_� a,my may Ira
identification guide.
a= m y ro Poorly graded sands and
wo v U S P gravelly sands,little or no
Soil Density and Consistency o o o fines
Soil density/consistency in borings is related to the a m� 3 H SM Silty sands,sand-silt
mixtures
Standard Penetration Test(SPT) as shown below. Soil SC clayey sands,sand clay
density/consistency estimates in test pits are based on y mixtures
visual observation and presented parenthetically on the h Inorganic silts,very fine
M L sands,rock flour,silty or
soil logs. o.y r clayey fine sands
m
z g U m Inorganic clays of low to
a— medium plasticity,gravely
Coarse-Grained Fine-Grained =z E CL clays,sandy clays,silty
m y clays,lean clays
Soil Density SPT Soil Consistency SPT* �� .,_
a OL Organic silts and organic
Very Loose 0-4 Very Soft 0-2 silty clays of low plasticity
Loose 4-10 Soft 2-4 y m
Medium Dense 10-30 Medium Stiff 4-8 m E H m M H Inorganic sous,micaceous
diatomaceous tine sand or
y U silty soils,elastic silts
Dense 30-50 Stiff 8-15
Very Dense >50 Very Stiff 15-30 CH Inorganic clays of high
e m m r plasticity,fat clays
Hard >30 i a "
'Standard Penetration Test measured in blows per foot E in i O H Organic clays medium
to high plasticity
Peat,muck and other
Highly Organic Soils Pt
Minor Constituents Estimated Percentage highly organic soils
Trace" 0-5%
Slightly(Silty, Sandy, etc.) 5-12%
Clayey, Silty, Sandy, Gravelly 12-30% Observation Well Symbols
Very(Silty, Sandy, etc.) 30-50% Bentonite
"Not identified as a Minor Constituent seal
8rr/92 v Ground Water Level:
Moisture = date of reading
ATD 0 ATD:At Time of Drilling
Dry Little to no perceptible moisture Sand pack and well
Slightly
y Some perceptible moisture,probably below optimum screen or hydrotip
Moist Moisture content probably near optimum Boring Symbols
most Much perceptible moisture,probably above optimum 2.0"dia.Split Spoon
Wet Visible free water S-1 24 Sampler(SPT)
27
3 3.25"dia. Split Barrel
Laboratory Test Symbols S-2 50 Ring Sampler
MC Moisture Content 50/4'
GS Grain Size classification S-3 3.0"dia. Thin Wall
AL Atterberg Limits P Tube Sampler
PP Pocket Penetrometer(compressive strength in TSF) P= Sampler pushed 'No sample recovery
TV Torvane(shear strength in TSF) Test Pit Symbols
CN Consolidation
TUU Triaxial Unconsolidated Undrained S-1 Sample number Grab Sample(jar or bag)
TCU Triaxial Consolidated Undrained
TCD Triaxial Consolidated Drained 5 Ground Water seepage
OU Unconfined Compression v Ground Water level observed in test pit excavation
DS Direct Shear
K Permeability Myers
CBR California Bearing Ratio Bindgnamics inc.
MD Moisture Density Curve - MH Roiling Bay Mercantile Building•11254 Sunrise Drive
N Nutrients TEL:20M42-6073 FAX 0SM42-3797
TEST PIT LOG T P 1 This log applies only to test pit location at the time of excavation. Subsurface conditions may differ at other
locations and may also change over time. This log is a simplified interpretation of the actual conditions.
Berger Residence
a Belfair, Washington
a 2 TEST PIT LOCATION: See Figure 1 SURFACE CONDITIONS:Crushed rock/surface water
0 u) DESCRIPTION COMMENTS
crushed rock surfacing surface water flowing into
test pit
1 — FILL: Gravelly Silty SAND: (loose to medium dense),
S-1 brown, very moist, trace to few organics
2-
s 2 Gravelly Sand to Slightly Silty Fine SAND,(loose to medium dense), gray,
very moist to wet, orange staining on north side of test pit
3-
S-3 Sand and Gravel,(medium dense), orange, wet trace groundwater seepage
from 3 foot depth to bottom
4— of test pit
Bottom of test pit at 4 112 foot depth
5— Completed and backfilled 9112106
6-
7-
8-
9-
10-
11 -
12-
13-
14-
15-
16-
17-
18-
Rolling Bay Mercantile Bldg.
Myers 11254 Sunrise Drive DATE 9/12/06 FIGURE A-1
40�* Biodynamics inc. Bainbridge Island WA 98110 ELEVATION(FT) IF
NO
MB Bus:(206)842-6073 FAX:(206)842 3797 U11kC10WC1 061327-5
TEST PIT LOG T P 2 This log applies only to test pit location at the time of excavation. Subsurface conditions may differ at other
locations and may also change over time. This log is a simplified interpretation of the actual conditions.
tz W Berger Residence
= J
Belfair, Washington
wa
a TEST PIT LOCATION: See Figure 1 SURFACE CONDITIONS:Crushed rock
o to DESCRIPTION COMMENTS
crushed rock surfacing
1 - S-1
FILL:Gravelly Silty SAND; (loose to medium dense), brown, very moist,
trace to few cobbles
2-
S_2 Gravelly SAND to Slightly Silty Fine SAND; (medium dense), gray, very
3— moist
4-
S-3 Very Gravelly SAND to Sandy GRAVEL; (medium dense), gray and trace groundwater seepage
orange, wet, few cobbles, trace boulders from 3'8"depth to bottom
5— of test pit
6-
7-
Bottom of test pit at 7 foot depth
8-
Completed and backfilled 9112106
9-
10-
11-
12-
13-
14-
15-
16-
17-
18-
Rolling Bay Mercantile Bldg. DATE 06 FIGURE
Myers 11254 Sunrise Drive 9/12/ A-2
Bainbridge Island WA 98110 ELEVATION(FT) PROJECT NO
Biodynamics inc. FAX:(206)842-3797 unknown 061327-5
MB BUS: (206)842-6073
TEST PIT LOG T P 3 This log applies only to test pit location at the time of excavation. Subsurface conditions may differ at other
locations and may also change over time. This log is a simplified interpretation of the actual conditions.
1z W Berger Residence
ii Belfair, Washington
wa TEST PIT LOCATION: See Figure 1 SURFACE CONDITIONS:Crushed rock
0 to DESCRIPTION COMMENTS
crushed rock surfacing
S-1 FILL: Gravelly Silty SAND; (loose), dark brown, moist Fill thickens to the south
1 — towards the slope crest
2- S-2
TOPSOIL:Slightly Gravelly Silty SAND;(loose), dark brown, moist
3-
s-3 Gravelly Slightly Silty SAND,(loose to medium dense), red brown, slightly
moist, trace to few gravel and cobbles, trace to few fine roots
4-
5- S-4 Slightly Silty Fine SAND;(loose to medium dense), red brown, moist, trace
organics, roots fine to 3"dia.
6-
Gravelly Slightly SAND; (medium dense), light brown, very moist, trace groundwater seepage from
to few cobbles and boulders 7 foot depth to bottom of
7— test pit
s-5 Very Gravelly SAND; (medium dense), brown to red brown, wet, trace
cobbles and boulders
8-
Bottom of test pit at 8 foot depth
s—
Completed and backfilled 9112106
10-
11 -
12-
13-
14-
15-
16-
17-
18-
Rolling Bay Mercantile Bldg.
Myers 11254 Sunrise Drive DATE 9/12/06 FIGURE A-3
_Biodynamics inc. Bainbridge Island WA 98110 ELEVATION(FT) PROJECT NO
MB BUS: (206)842-6073 FAX:(206)842-3797 unknown 061327-5
TEST PIT LOG T P 4 This log applies only to test pit location at the time of excavation. Subsurface conditions may differ at other
locations and may also change over time. This log is a simplified interpretation of the actual conditions.
IZ W Berger Residence
a Belfair, Washington
w a TEST PIT LOCATION: See Figure 1 SURFACE CONDITIONS:Crushed rock and grasses
o cn DESCRIPTION COMMENTS
crushed rock surfacing
1 FILL: Silty Gravelly SAND; (loose to medium dense), light gray brown to
S-1 brown to red brown, stained at bottom of layer, trace fine roots
2-
3-
4-
5— TOPSOIL:Slightly Gravelly Silty SAND;(loose), dark brown, very moist,
abundant organics, wood debris to 1 112"dia.
6—
S-2 Gravelly Slightly Silty to Silty SAND, (dense), light gray and brown, very
moist, stained and mottled
7—
Bottom of test pit at 7 foot depth
8—
Completed and backfilled 9112106
9-
10—
11 —
12—
13-
14—
15—
16—
17-
18—
Rolling Bay Mercantile Bldg.
Myers 11254 Sunrise Drive DATE 9/12/06 FIGURE A-4
Bindynamics inc. Bainbridge Island WA 98110 ELEVATION(Fr) PROJECT NO
#� '-MB BUS:(206)842-6073 FAX:(206)842-3797 unknown 061327-5
TEST PIT LOG T P 5 This log applies only to test pit location at the time of excavation. Subsurface conditions may differ at other
locations and may also change over time. This log is a simplified interpretation of the actual conditions.
W Berger Residence
a
Belfair, Washington
wa TEST PIT LOCATION: See Figure 1 SURFACE CONDITIONS: Crushed rock and grasses
o u) DESCRIPTION COMMENTS
crushed rock surfacing
1 FILL:Gravelly to Very Gravelly Silty SAND; (loose to medium dense),
gray brown to red brown, moist, trace cobbles, trace fine roots
2—
S-1
3-
4—
TOPSOIL:Slightly Gravelly Silty SAND, (loose), dark brown, very moist
trace fine roots
5— Gravelly to Very Gravelly Slightly Silty SAND; (medium dense to dense),
brown, very moist to wet, trace cobbles and boulders
6—
s 2 trace orange color at bottom of test pit trace groundwater seepage
foot 7— at 7 depth
Bottom of test pit at 7 foot depth
e—
Completed and backfilled 9112106
9-
10—
i
11 —
12—
13—
14—
I
15—
16—
17—
1a—
Rolling Bay Mercantile Bldg.
LMyers 11254 Sunrise Drive DATE 9/12/06 FIGURE �iw-5
Bindynamics inc. Bainbridge Island WA 98110 ELEVATION(FT) PROJECT NO
MB BUS: (206)842-6073 FAX:(206)842-3797 unknown 061327-5
TEST PIT LOG T P 6 This log applies only to test pit location at the time of excavation. Subsurface conditions may differ at other
locations and may also change overtime. This log is a simplified interpretation of the actual conditions.
1z W Berger Residence
= J
Belfair, Washington
wa
a TEST PIT LOCATION: See Plan SURFACE CONDITIONS: Crushed rock
o cn DESCRIPTION COMMENTS
crushed rock surfacing
1 FILUDISTURBED SOIL: Gravelly Silty SAND; (loose to medium dense),
S-1 brown and red brown, very moist, trace scattered roots
2-
occasional TOPSOIL lenses with trace roots from 2 112 to 3 foot depth
3-
Gravelly to Very Gravelly Slightly Silty SAND, (medium dense), brown,
s-2 very moist to wet
4- groundwater seepage at
bottom of test pit
Bottom of test pit at 4 112 foot depth
5_ Completed and backf fled 9112106
6-
7-
8-
9-
10-
11 -
12-
13-
14-
15-
16-
17-
18-
Rolling Bay Mercantile Bldg. DATE FIGURE
Myers 11254 Sunrise Drive 9/12/06 A-6
Biodynamics inc. Bainbridge Island WA 98110 ELEVATION(FT) PROJECT NO
MB Bus:(206)842-6073 FAX:(206)842-3797 ^ unknown 061327-5
r
}
� TP-1 � �J �
TP-2 (2'/2') (2�/2Q 3 Approximate Toe
— �Z 4' -- - of Cut Slope
aein
----------
TP-6 (2 1/2'/2 1/2')
Y- 4 1/2' LI) T
I
KiTCHEN
... i DININCo LIMNG
(�(� �r•\ / MAST BED
..----- _ _... _ .- - -- - --D --n _ -II TP-3 (2 1/2'/6)
TP-5 (4 1/2 /4 1/2') I ---- SZ 7
5 1/2' i i I
Approximate Crest '
/ n of Fill Slope i I
J
LEGEND: i i SFPT1C 1 g,X 2'
TP-1 Approximate Test Pit Exploration Location --------'--------'------�
(2'/29 Depth in feet below existing grade of(fill and topsoil/suitable Approximate Scale: 1
foundation soils)
-- -- 1 inch = 8 feet
NOTE: Plan based on "Berger Residence, 417 Bear Creek DeWatto Rd.Belfair, WA",
4' Depth in feet below existing grade to groundwater seepage observed 9/12/06 0 4 g Site Plan, Scheme B-2, Coates Design, 921 Hildebrand Ln., Suite 210,
Bainbridge Island, WA, 08124106.
FIGURE NO.
Myers GEOTECHNICAL REPORT 1
Biodynamics inc. Proposed Berger Residence SITE AND EXPLORATION PLAN PRQIECTN0.061327-5
N[B Rotting Bay Nor xntie RUIIAIng.11254 5unnc Drtw DATE V G J
Bainbridge Island. ;h g� 1110 Belfair, Washington October 2006