HomeMy WebLinkAboutBLD2007-00567 Demo - BLD Permit / Conditions - 10/12/2007 ' Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2007-00567
OWNER: JONATHAN JOHNSON RECEIVED: 4/5/2007
CONTRACTOR: LICENSE: EXP: ISSUED: 4/12/2007
SITE ADDRESS: 991 NE OLD BELFAIR HWY BELFAIR EXPIRES: 10/12/2007
PARCEL NUMBER: 123204200010
LEGAL DESCRIPTION: N1/2 SE W OF RIVER EX TRS 2-4 &TR 1 OF N2/3 NE SW
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
DEMOLITION PERMIT FOR HOUSE. ST RT 3 TO BELFAIR, L ON ST RT 300, THEN TAKE OLD BELFAIR HWY TO
SITE ADDRESS ON THE LEFT SIDE
General Information Construction&Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: OTH Insp.Area: No.of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: DEM Fire Dist.: 2 No. of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline & Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: Union River
Rear: Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Rural
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Demolition Fee KKK 4/5/2007 $105.00 B12007000
Total $105.00
BLD2007-00567 Please referto the following pages for conditions of this permit. 1 of 2
CASE NOTES FOR
BLD2007-00567
CONDITIONS FOR
BLD2007-00567
1) W ity is not to be degraded to the detriment of the aquatic environment as a result of this project.
X
2) Prior to final approval, all upland areas disturbed ow, created by construction activities shall be seeded, vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting).
3) Apt e per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described prep and structure f view and inspection. f
OWNER OR AGENT: DATE:
BLD2007-00567 Please refer to the following pages for conditions of this permit. 2 of 2