Loading...
HomeMy WebLinkAboutBLD5618 Final Mobile Home - BLD Permit / Conditions - 8/5/1977 Leonhardt, Robert W. #5618 7-25-77 N 30 acres NE 1/4 SE 1/4 20-23-1 1 & 2/10 miles N Belfair on Old Belfair Hwy, last driveway before Newkirk Rd. on right. Mobile Home �K�G dam- �/�/�� � BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 r / DATE ISSUED 7AZS 7 y, PERMIT NO. OWNER NAME MAIL ADDRESS CITY&STATE ZIP PHONE DIRECTIONS Ju<w� frk Ong' ' tip/ /� �/ n TO JOB SITE • N 0 t" N t r yr Wa CY b•f T o r c LEGAL except portbov%wes �. C�fJ.r1 y hAl_ 1 F7(CF > O- .200 -IF-'{ /pSEE ATTACHED SHEET) W IV r / C , DESCR. !�G i T L F t S ' �'o G i i•, %^ East CONTRACTOR ME MAIL ADDRES TY&STATE ICENSE NO. PHONE A l o . 0. d a - ',Ps; CvA. USE OF BUILDING f Class of work: 9 NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE En REMOVE Describe work: k�) `I C': x v VY\ C S Vl L -e v Valuation of work: $ ,/3 Q PLAN CHECK FEE PERMIT FEE SPECIAL CONDITIONS: APPLICATION ACCEPTED BY PLANS CHECK BY APP ED FOR I S ANCE Type of ,y Occupancy Division B Const. i 7 Group I e k b►-A a F—a en i Size of Bldg.,Z¢X (S>• No. of Max. (Total) Sq. Ft. 119.2 Stories Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor In RESIDENCE X the State of Washington and I am aware of the MOBILE HOME �( ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. Firm PUBLIC WORKS By ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIREDFOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. which this permit is issued and that all work done will be in conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owner, A000 'OdlA AOr to. 1 — WORK IS COMMENCED. PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION M.O. CASH