Loading...
HomeMy WebLinkAboutBLD2003-00532 Final Garage - BLD Permit / Conditions - 9/19/2008 inspection Line (360)427-7262 loMASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext.352 Mason County.Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 t RESIDENTIAL BUILDING PERMIT BLD2003-00532 OWNER: STANLY BISHOP RECEIVED: 5/1/2003 CONTRACTOR: LICENSE: EXP: ISSUED: 5/29/2003 SITE ADDRESS: 790 NE OLD BELFAIR HWY BELFAIR EXPIRES: 11/29/2003 PARCEL NUMBER: 123204400030 LEGAL DESCRIPTION: TR 3 OF SE SE PROJECT DESCRIPTION: DIRECTIONS TO SITE: Garage 1 mile beyond Belfair Nursery on right side of road. 0�"y/ General Information Construction & Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: V-N Type of Use: SF Insp. Area. No. of Bathrooms: Occ. Group: U-1 Lot Size: Deck: Type of Work: ACC Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building: Garage-Detached 1,280 Valuation: Building Height: 16 Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline & Planning Information MalQ-: Length: Water Body: Ft. Front: W 105.0 Ft. Shoreline: Ft. SEPA Model: Width: Ft. Rear: E 57.0 Ft. Slope: Ft. Shoreline Desig.: Side 1: N 14.0 Ft. Year: Serial No.: Side 2: S 159.0 Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES • Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee KKK 5/1/2003 $293.70 B12003 Planning Review Fee KKK 5/1/2003 $150600 B12003 EH Plan Review ADR 5/5/2003 $35.00 B1M03 Building State Fee RLS 5/15/2003 $4.50 612003 Building Permit Fee RLS 5/15/2003 $451685 B12003 Demolition Fee RLS 5/15/2003 $56.80 B12003 Total $991.85 BLD2003-00532 Please refer to the following pages for conditions of this permit 1 of 4 CASE NOTES FOR B LD2003-00 b32 CONDITIONS FOR B LD2003-00632 1) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X� 2) Approved per dimensions and setbacks on submitted site plan. X 3) Proposed structure(s) Must maintain a minimum of a 5' setback from all property lines, easements and 25'from all County and State Road right of ways. X 4) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 5) Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering shoreline waters. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand, silt, and soil will damage aquatic habitat and are considered pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology pursuant to WAC 173-201A-110. A short-term water quality standards modification may be issued if the proponent agrees to a number of specific construction practices and techniques designed to minimize water quality impacts. All areas disturbed or newly created by construction activities must be revegetated using bioengineering techru'ques, clean durable riprap, or some other equivalent type of protection against erosion when other measures are not practical. X 6) All upland areas disturbed or newly create y construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 7) Temporary erosion control measures must be implemented to prevent.water quality degrada of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X 8) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X BLD2003-00532 Please refer to the following pages for conditions of this permit. 2 of 4 9) ,In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contractor fail to post the addre s on site prior to requesting inspections. X 10) The plan review check list and corrections, along with the Energy Compliance Worksheet (when applicable) are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X 11) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 12) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels Compliance Method: IV Window (Max U-Factor):0.40 Skylight (Max U-Factor):0.58 Doors (Type/Max U-Factgf):0.40 or less, Wall insulation R-21 , Floor insulation R-30 , Ceiling Insulation R-38, Vault Insulation R-30, Slab Insulation R-10X 13) This structure is limited to U-1 use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the Uniform Building Code and Maso County Regulations unless a "Change of Use" permit is applied for, reviewed and approved. X 14) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 15) All changes to "approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X 16) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made r r to requesting additional inspections. X 17) THE DEMOLITIO ND DISPOSAL OF DEMOLITION DEBRIS MUST MEET REQUIREMENTS AS PER MASON COUNTY REGULATIONS. X 18) All property lines shall be clearly identified at the time of foundation inspection. X BLD2003-00532 Please refer to the following pages for conditions of this permit. 3 of 4 19)' All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being • , non-compliant with Mason County ordinances and building regulations. X 20) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have preve ted action from being taken. No more than one extension may be granted. X This permit becomes null and void if work or construction a orized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence continuation of work is ss' spe ion within the 180 day period. Final inspection must be approved before building can be occupied. n OWNER OR AG _ _ _ DATE, _ O� BLD2003-00532 Please refer to the following pages for conditions of this permit. 4 of 4 W , r v a CONCRETE MECHANICAL MANUFACTURED HOME 0 �a Footings /Setbacks Date By Ribbons 0 L„ Date /�'0`5 By Gas Piping Date B y N Foundation Walls Date B y Set-up Date By INSULATION Date B y B G / Slab Insulation Floors Final Date By Date By Date By FRAMING Walls FIRE DEPT Date By 4 Date By Date By PLUMBING Attic OTHER Groundwork Date By Date By WALLBOARD NAILING D.W.V. Date By Date By FINAL INSPECTION Water Line Date By Date By Date By CD ...CD ID 4 peas Co► ,- See <-,� P f,� red o O-Y\. `� I I-1�- '� �' .�� �� /yrr�.,f�ts �vvr•-, �i--i�1-� to 5-i y- 0 o r � eel A,%CD 0 Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360)427-9670 Local (360)482-5269 Elma Shelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection November 07, 2007 STANLY BISHOP NE 792 OLD BELFAIR HWY BELFAIR WA 98528 Case No.: BLD2003-00532 Parcel No.: 123204400030 Proiect Description: Garage The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $64.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $64.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 359. Sincerely, Terry Ryan Mason County Department of Community Development Cc: Property File November 07, 2007 BLD2003-00532 PERMIT NO.: BLD MASON COUNTY ,1� y BUILDING PERMIT APPLICATION 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968 APPLICANT INFORMATION CONTRACTOR INFORMATION Owner Contractor Name Mailing Address Mailing Address �~ city �o�-F ,g State14!t Zip Code =JA City "fit Zip Code Phone( - �oo0ther Ph.(��a 2Z4'" G.,q.S;c' Ph.� Other Ph.( Lien/Title Holder Contractor Reg. # Address Expiration SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System �Na of Sewer System Well Water System Name of Water System *"* PARCEL INFORMATION-12 digit Tax Parcel No. 12.? 1• / / ODn— k30 Fire District Legal Description z— PA e Site Address(Please include street name, street number and city) Directions to site Will timber be cut and Sold in parcel pr paration? (Yes/No) Is your property within 200' of the following: Body of Water (Name) Alo Saltwater Lake ;Vo River/Creek #o Pond 4/o Wetland A110 Seasonal Runoff'[e Stream_ Slopes or Bluffs PERMANENT RESIDENCE❑ SEASONAL RESIDENCE❑ TYPE OF JOB New Add _Alt Repair Other Use of Building •'�R Describe Work Al r ' No. of Bedrooms­4 No. of Bathrooms Ale.) SQUARE FOOTAGE- st Floor 2nd Floor AloN 3rd Floor Loft Basements Deck rzi Other sq. ft. Garage 7 c1 Attached Detached ;Carport ,; , Attached&,n Detached MOBILE 4QME INFORMATION-Make Model Model Year Len h Width Serial No. No. of Bedrooms No. of Bathrooms Type He Purchase Price $ Replacement Unit ?(Yes/No) Installer ame Certification No. NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-1 certify that I am currently registered as a Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without approval. first obtaining approval. X Date X Date VOR OFFICIAL USE BEYOND THIS POINT Accepted by Date J Y'(; Submittal Amount Due Receipt No. DEPARTMENTAL REVIEW: APPROVED DENIED Cf3NDITlfJN CODES Building Depart ent / p, ` Occ GroupT e Constr. V` �✓ illy y Planning Department Environmental Health Department RECEIVE Public Works Department � HAY U 12003 Fire Marshal BELFAIR OFFI I Valuation $ FEES Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing& Base Fee Planning Review Fee Mechanical&Base Fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal ( ) TOTAL FEES y _ , i i • 1 r�