Loading...
HomeMy WebLinkAboutBLD2008-00319 Final Replace Foundation - BLD Permit / Conditions - 12/9/2008 Inspection Line(360}427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 ' Shelton, WA 98584 - RESIDENTIAL BUILDING PERMIT BLD2008-00319 OWNER: WILLIAM STANTION RECEIVED: 3/21/2008 CONTRACTOR: BEAR CREEK III CORP 360-275-3944 271-3472 LICENSE: BEARCC1953M7 EXP: 7/27/200 ISSUED: 5/2/2008 SITE ADDRESS: 861 NE OLD BELFAIR HWY BELFAIR EXPIRES: 11/2/2008 PARCEL NUMBER: 123204290050 LEGAL DESCRIPTION: TR 5 OF NW SE TR A OF SP#153 AF#303682 PROJECT DESCRIPTION: DIRECTIONS TO SITE: Replace exsisting foundation. NE Old Belfair Hwy to address. General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R3 Lot Size: Deck: Type of Work: FOU Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building:1,300 Valuation: Building Height: Occ. Status: Primary Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: Union River SEPA?: No Model: Width: Ft. Rear: Ft. Slope: Ft. Shoreline Desi Side 1: Ft. 9.: Rural Year: Serial No.: Side 2. Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee KKK 3/21/2008 $141.50 S22008000 Planning Review Fee KKK 3/21/2008 $190.00 S22008000 BLD Vio. Investigation Fee MB 3/24/2008 $68.00 S22008000 EH Plan Review TW 4/3/2008 $40.00 S22008000 Building State Fee MAL 5/2/2008 $4.50 S22008000 Plumbing Base Fee MAL 5/2/2008 $23.10 522008000 Building Violation Fee MAL 5/2/2008 $141.50 S22008000 Total $608.60 BLD2008-00319 Please referto the following pages for conditions of this permit. 1 of 4 CASE NOTES FOR BLD2008-00319 CONDITIONS FOR BLD2008-00319 1) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X 2) All construction and demolition debris must be removed from the beach after project completion. Pro er disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degredation of State waters. X-7 3) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X `DSO 4) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 4 5) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 6) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 7) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X-A/ 8) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at X 800- 47-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. 9) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X j2� BLD2008-00319 Please referto the following pages for oonditions of this permit. 2 of 4 10) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X V 11) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building - Department prior to any further inspections being performed or approvals granted. X qg 12) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 41y 13) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X�_w 14 THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 15) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X --ff 16) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be X charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. 17) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X --W/ 18) All construction must meet or exceed all local codes and the international codes. All contruction must meet the required setbacks as established per Mason County Ordinance 45-99 and the Mason County Shoreline Master Program, if applicable. If the foundation is placed in violation of any Mason County Regulation, it will be the owners liability to removed said construction at the owners expense and to do so within the time specified by the building official. x 19) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X • ,4" BLD2008-00319 Please referto the following pages for conditions of this permit. 3 of 4 20) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X _W 21) All property lines shall be clearly identified at the time of foundation inspection. X-4w, 22) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X_W 23) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X ` 24) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 25) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. X:z 26) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. X _�V This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property structure for review inspection. OWN ER OR AGENT: DATE: 2 BLD2008-00319 Please referto the following pages for conditions of this permit. 4 of 4 f 1 o Cn CONCRETE MECHANICAL MANUFACTURED HOME O Footings I Setbacks Date By Ribbons Z ao Gas Piping o Intenor Date By Interior-Date By Date By 0 w Exterior Date By Exterior-Date By S*t-up INSULATION Z `D Point Load!isolated Footings Date By BG I SLAB INSULATION ----- --- Date By Data By FIRE DEPARTMENT Foundation Wails Floors Date By Date By Data By DECKS FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Date By Type- Date By D.W.V DRYWALL Type- Date Brace Wall Date By 100 Date By Date By FINAL INSPECTION 0 v Water Line Fire Seperation NC Date By Date By Dale By p m 00 Pass or Request Inspect. c sType of Insp. Fail Date Date Done By Comments o �7--7e,-09 c,--CD v f/f M O 8 a 0 Uf O S (D .Z' 0 1 F— Z Q I- --� ? 4 NEW 2xG RIM J015T w/51MP50N LPT5 NEW 2xG P.T. BOT PLATE w/ Z 4-DW OLAM OP"a� _ @ 24'O.C. TO WALL PLATE, (2)-I Od L— — — THRU RIM TO 2xG J015T SIMPSON 5D525300 SCREW @ I G' O " D O.C. (BOT UP)TO RIM BD J015f U b - z n ° ° ° ° L— in REF.TOP OF FLOOR SIMPSON LTP5 @ 24'O.C. o — 3N O"L. T NEW PLATE TO SILL 24.5Q'"ITG y, N -,U f2? WAY m N W sg TYPICAL X W NEW I G"x&SCREENED ` n — ° ° ° ° ° Ig FDN VENTS, PER CODE OR JOIST PARALLEL TO WALL ADD 2x6 s �rD&��WM I— BL.KG @ 3' O.C. BTWN FIRST(2)JOIST NEW 4xG P.T. BOT PLATE COUNTERSINK ° ° ° ° ° ° ° ° 1" FOR A.B. PLATE WASHER 4 NUT _ VERT. #4@ 15'O.C. CTR WALL HOOK — _ ,•DQ CKM W#a IN" .�x9 DN w/44x past e 0 ALT. WAY HORJZ. #4 @ 24"O.C. 8"A.B. @ 36"O.C. NUT/WASHER,/NUT OR HEX-HEAD BOLT G"EMBEDMENT NOTE:VMrr THAT MC15T. Z �µ®; °,a 1015TAJ1 & — (3) LINES 4'DIA. RIGID PERF. PIPE • D65T.2LJ°15�.2,a.0 s CRAWL SPACE DRAIN, v NORTH-SOUTH,THRU SOUTH 5TEMWALL, SLOPE TO DAYLIGHT gu (2)44 CONTIN. o 4'DIA. RIGID PERF. PIPE, 7p /—/ Fri 41 FOUNDATION PLAN SLOPE TO DAYLIGHT 1'-4' SCALE: 1/4"=1'-0•• L, I L_ = a ry SECTION rA IV u ` NEW P.T. 4x8 BM 4 BLKG BTWN JOIST ;n - r EXIST. 2xG J015T @ i G"4 24" O.C. GENERAL NOTES r; : 5IMP50N H-4 CLIP JOIST TO 4x8 BM �S`�`'� � a CODE lO�VAL ` to Q SIMPSON AC4 � H NEW P.T. 4x4 20OG INTERNATIONAL BUILDING CODE W POST CAP P05T @ G'O.C. DE51GN LOADS FRAMING LUMBER 51MP50N A13A44 1.5NOW=25 P5F 1.ALL FRAMING LUMBER SHALL BE KIW DRIED,GRADES AS p oWo Z P05T BASE 2. FLOOR LIVE LOAD= 40 P5F. FOLLOWS: 3. LATERAL LOAD: Z a 2x STUDS-STUD GRADE HEM-FIR 2 = Z WIND=55 MPH, DW"B" 4xG 4 GxG COLUMNS-No. I DOUGLA5 FIR SEISMIC:55=1.34g,51=0.49g Q c to LL: SITE CLASS'D" Gx HEADERS-NO. I DOUGLA5 FIR ►� Q E- 4x HEADERS-No. 2 DOUGLA5-FIR w/ q SEISMIC OCCUPANCY CATEGORY II 2. ALL EXPOSED MATERAL5 OR MATERIALS IN CONTACT °p 24'WIDE x 8"D FTG 4. FLOOD LOAD PER CHAPTER 5,ASCE 7-05 4 FEMA ELEV.CERTIFICATE 3 O `� w/(2)-#4 EA WAY CONCRETE SHALL BE PRESSURE TREATED. O 3. MINIMUM NAILING PER 20OG IBC TABLE 2304.9.1 CONCRETE FASTENING SCHEDULE OR A5 NOTED ON THE STRUCTURAL °p DETAIL g 1. CONCRETE IN ACCORDANCE WITH A5TM 150, fe=3000 P51 AT 28 DAY5. DRAWINGS. 00 2. REINFORCING STEEL PER A5TM AG 15,GRADE GO(fy=G0,000 P51) PERMIT SET: 4-22-2008 :Ell JOINS PANEL 0070 - l z •R.,°« �. -b, is �'.�, kn ,� 4� z� Y t a �, ��,•; n t:3�� y,/� �� n� F a;�'�'�als x", r � _ � r f 91 3# . , R ' J CMG D �$ & ♦ .kS y / fi 2 'f, `-S% '6 304'J�1 ;s _t .,RM 91 # a Cf�%ham/ �- /��"� MASON COUNTY No R(?d -oo 427-9670 y ExT. BUILDING DEPARTMENT Z�Z� ._ HZ- q005/(� ALL PERSONS ARE HEREBY ORDERED TO AT ONCE TOP WORK On these Premises at �J/35—,-r a This order is issued because iS'9�CS/�✓� � � /�Si1�LC� "-�-i ���✓� To,Gryy `�`� � �iiT f��Tyo �G �vj /� A.M. Z _� x-''� Poew Z P.M. 20 r By 77? WARNING he failure to stop work, the resuming of work without permission from the Building Official, or the removal, mutilation,destruction or concealment of this N otice is punishable by fine and imprisonment. Stop work notice posted 3/20/2008 at 2:15 pm -TFR BCC2008-00134 12320-42-90050 _ ��w ' MASON COVNTY M- -- ~e'„n�° BUILDIND DEVARTMENT �__ _ 861 NE Old Belfair Hwy., Belfairf"e '.`ice STOP WORK Raised house and installing new footing and stem wall without county permits or approval. Told owner OK to finish footing ' 'F today(3/21/2008) at own risk without permit, but not to continue with any other WARNING work until permits issued. Permit or remove within 21 days. Y- Vw- nil 3 Saw' 0 .s ;w Mo M k� r "our. !tit. 411 �yo r ,i. 1010 Mason County Dept. of Community Development Mason County Bldg. III, 426 W. Cedar, P.O. Box 186, Shelton, WA 98584 Shelton: (360) 427-9670 Belfair: (360) 275-4467 Elma: (360) 482-5269 Web: http://www.co.mason.wa.us Notification of Mason County Code Violation March 27, 2008 Mason County Department of Community Development Shelton WA 98584 Claimant Vs. WILLIAM A STANTION PO BOX 987 BELFAIR WA 98528 Notice The receipt of this notice shall constitute service regarding notification of violations of the Mason County Code, and shall also serve as Warning Notice pursuant to Mason County Code, Title 15, Section 15.13.035. The violation(s) are occurring at the following property: Enforcement Case No.: BCC2008-00134 Parcel No.: 123204290050 Site Address: 861 NE OLD BELFAIR HWY BELFAIR During a routine site inspection, staff from this office noted new construction being conducted without the required development permits. Upon further review, it was determined that the new foundation and elevation to existing structure was completed in the absence of permits or county approval. As a result of these findings, a Stop Work Order was posted on March 20, 2008. According to the Mason County Assessor records, parties named above hold legal interest in the parcel and are therefore subject to enforcement action for failure to comply. The parties shall respond to the county within twenty days of the postmark, posting on site, or delivery of the notice. Records indicate that this enforcement issue has not been resolved and is outstanding at this time. Order YOU ARE HEREBY ORDERED to abate violations in the following manner: 1) Contact Mindi Brock at (360) 427-9670 ext. 356 to discuss compliance actions and details. 2) Immediately cease and stop all construction until Mason County approval and permits issued. 3) Apply for the required After-the-Fact Building Permits for foundation. Engineered plans will be required. Plans must meet the requirements per Mason County Flood Damage Prevention Ordinance #81-07, Section 5. An after-the-fact permit has been submitted and Mike Dully, engineer, contacted our office regarding the floodway requirements on March 24, 2008. 1 appreciate your prompt actions in resolving this case. Penalties This notice is to inform you that in the event that you fail to comply, we will pursue additional enforcement action against you, including but not limited to recording against the parcel, civil infractions, liens against the property through the Mason County Hearings Examiner process and/or criminal prosecution as allowed under Title 15.13 of the Mason County Code. Note that the removal, mutilation, destruction or concealment of any Notice posted on 3/20/2008 would be deemed a separate violation of Title 14. In the event that you feel you have received this notice in error or that the facts are inaccurate, I strongly encourage you to contact me at (360)427-9670 ext 356 to discuss your concerns immediately. BCC2008-00134 2 of 3 ICI Sincerely, Mindi Brock Building Inspector / Code Enforcement Mason County Dept. of Comm. Development Cc: Property File BCC2008-00134 3 of 3 ■ Complete items 1,2, item 4 if Restricted Delivery is ldesird.complete A. Signature ■ Print your name and address on the reverse X J so that we can return the card to you. Y , _�Agent ■ Attach this card to the back of the mailpiece B. Received b uti�e �� . Addressee or on the front if space permits. y(Punted Name ,TJ O i/�> Cam, to of Delivery t• Article Addressed to: D. Is delivery addWs different from item t? ❑Yes If YES,enter delivery addr''ess below: O No WILLIAM A STANTION PO BOX 987 BELFAIR WA 98528 3• S rvice Type rtified Mail Cl Express Mail ❑Registered ❑Return Receipt for Merchandise EJ Insured Mail ❑C.O.D. 2. Article Number 4. Restricted Delivery?(Extra Fee) (Transfer from service label) 7007 1490 0004 Yes PS Form 3811, February 2004 esti_ et _ 6 4 4 2 9 216 Domc Return Receipt 102595-02-M-1540 MASO Ty PERMIT NO 6 BUILDING PER I tAPPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 • Belfair (360) 275-4467 - Elma (360) 482-5269 1 I YY>Y On the web www.co.mason.wa.us _ APPLICANT INFORMATION CONTRACTOR IN Owner Company Name ( +.' " -t-L�- MailinQ Address 14 Mailing,Address�U1 a City sac kk"l�:,.__State W i Zip Code City d��{Xdlf, , State w Zip Code ADZ. Phone Q'74 .391v4f Other Ph. a)7/3Y72,� Phone Q75'.41M- Other Ph. �? Lien/Title Holder Contractor Reg. # Exp. E mail'address E Mail Address Drivers Lic. # DOB Drivers Lic. # DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well--.,- Sewer System s-- Name of Sewer System PARCEL INFORMATION - 12 Digit Parcel No. Fire District Legal Description , +4 f`d�T AkfS Z U3G 2- Site Address (Please include street name, street number and city) Directions to site 0 10 I9c �I i rz - R%W�I ► +. 1C.--- lonwv-, kjerne �- Will timber be cut and sold in parcel preparation?Yes 4NQ Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New_>L_Add Alt Repair Other PfiZIMARY RESIDENCE ❑ SEASONAL ❑ Use of Building Describe Work No. of Bedrooms- No. of Bathrooms_:Square ootage- 1st Floor :3CAi Bnd Floor 3rd Floor Basement Deck_ Covered Deck Other Sq. ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or the contractor. I further declare that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf, represents that the informaticn provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 da s or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS APROGRESSINS CTION.INACTIVI OF THIS PERMIT APPLICATION O,F1180 DAYS WILL INVALIDATE THE APPLICATION. 00, Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by' Date DEPARTMENTAL REVIEW APPROMILP DENIED NOTES Building Department I Planning Department Environmental Health Department Fire Marshal FEES Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing & Base Fee Planning Review Fee Mechanical & Base fee Other Wood /Gas/ Pellet Stove Fee State Fee t on Fee r Pre-Paid at Submittalion $ TOTAL FEES c ow, G 5 t� 1 d � i104 0 on �+- s o G 9ya' )os / ° p APPROVED MASON OUNT DCD F LA NINC E USIT REQV ►���3-z�a-�y 2q doso EC TO BE ON SITE g* GF U c3.1 ;1' TO APPR L� �^ Cat- - --- •� � ,yh �rya 5' '" •, Sc ►1ok Seru��' uesday, July 22, 2008 10, AM N r July 22, 20, 8 To: 13ob& f ricia Percival.Bear Creek III Homes&Designs, by Fax: (360)275-3.,22 From: Mik, Dully Subject: W,a Stanlion Foundation kcpairs, 861 Old Belfair HWY,Belfair, WA 99 '28 Reference: tvlWl)Consultants Drawing S-1 dated 4-22-2008 with revised Sectio. •A" dated 4-30-2008 On July 7, 2008 1 visited the subject site with Bob Percival, The impro%ements described in the reference drawings appear to have been install as directed in ;hose drawings. z., Michael W Dully M WD Cori:ultams 221 NE La, don Road Relfair,Wr:98528 Phone: (361)275-5906 E-Mail: mi cedully(djwavccable.comt_= — �:RF'S: t fi Q