Loading...
HomeMy WebLinkAboutBLD94-1574 Manufacture Bldg 5,000 sq ft see also 12317-41-00050 - BLD Letters / Memos - 12/12/1994 GARY YANDO,DIRECTOR �oN.STA o A u o DEPARTMENT OF COMMUNITY DEVELOPMENT i o T z PLANNING-SOLID WASTE-UTILITIES N Y y BLDG. III • 426 W. CEDAR • P.O. BOX 578 1864 SHELTON, WA 98584 • (206)427-9670 December 12 , 1994 Chester Loudin P.O. Box 1980 Belfair, Wa. 98528 Re: Building permit BLD94-1574; Storage/Manufacturing buildings; two currently proposed buildings each 5000 square feet and one future building 7200 square feet . Mr. Loudin: Pursuant to the Mason County Environmental Policy Ordinance and State Environmental Policy Act (SEPA) , environmental review is required for this development. I have enclosed an environmental checklist which should be filled out and returned to the county at your convenience. Please answer all questions as completely as possible in order to eliminate potential delays in processing. Upon receipt of the checklist and evaluation, a threshold determination will be issued. Processing time is dependent on the determination but will include posting of the site and acceptance of public comments. If you have any questions feel free to give me a call . Thank you. Respectfully, Don Brush, Planner Department of Community Development CC: Mike Byrne, Building Department Recycled I i GARY YANDO,DIRECTOR SON.STgTFO A DEPARTMENT OF COMMUNITY DEVELOPMENT u i o T i PLANNING -SOLID WASTE-UTILITIES N Y 4 BLDG. III • 426 W. CEDAR • P.O. BOX 578 1864 SHELTON, WA 98584 • (206)427-9670 November 10, 1994 Mr. Rolla Boughan Consolidated Engineering P.O. Box 2321 Bremerton, WA 98310 RE: BLD 94-1574. "Chet's Trusses" Minimum guidelines for stormwater management. Inadequate permanent stormwater management plan. Mason County has reviewed the proposed stormwater drainage plan prepared for "Chet's Trusses." The proposal does not meet minimum County requirements for commercial site developments. Commercial sites are required in the Mason County Parking Standards (Ordinance No. 815) to retain surface water runoff on site or dispose of it into an area approved by the Mason County Engineer. Recognizing that many areas of Mason County do not readily lend themselves to infiltrating stormwater runoff, Mason County Public Works has allowed discharges from commercial sites to occur if the rates of discharge from the site conform to Puget Sound Water Quality Authority (PSWQA)downstream erosion control standards. These standards underlie the requirements contained in the Stormwater Management Guidelines distributed by the Mason County Department of Community Development. The PSWQA Technical Manual (III-1.3 Minimum Computational Standards) requires; 1. For all computations, except for basin plans or equivalent, the minimum standard shall be the Soil Conservation Service Unit Hydrograph (SCSUH) method (1) with the level pool routing method, or equivalent hydrograph techniques, subject to approval of the local government. The Santa Barbara Urban Hydrograph (SBUH) method is also an acceptable method. A computer simulation using the information submitted by Consolidated Engineering input into the SBUH method, indicates that the proposed facility exceeds predevelopment discharge rates by appreciable amounts. Other concerns include; 1) In calculating the pre-development runoff, it appears to only address the runoff from the front half of the property, then applies a 5 year event rain intensity to the site. It would be to the proponents advantage to use the full site in determining pre-development discharge rates. The employment of a 5 year storm event has little relevance in this site's analysis. 2) Catch Basin #4 discharges stormwater from the site to the north without any control feature. Recycled page2 RB 3) The extent of material to be excavated/graded cannot be determined from the plan sheets submitted. Sheet 2 of the drainage plans shows three elevation contour lines and indicate that a 25 foot cut will be required for the building. Where this borrow material is to be deposited is not indicated on the plans. If all the material is to be removed off site, then the receiving site should be identified and permitted if necessary. There is a remote possibility that the three contour lines fully describe the surface topography, but there is no indication of the frequency of the contours or their relative elevations. The contour lines need labeling. If the entire area contained within the contour line shown in the northeast corner of the property were excavated 25 feet deep, the volume would be approximately (1/2)x(70x8Ox25)/27=2,590 cubic yards. In addition, there is no evidence for provision for temporary erosion and sediment control. At a minimum: An ESC plan should show limited construction access to the site, provide for the covering of soils if they are to be exposed for more than 2 days, retention of sediment on-site through the use of structural and source control BMPs, maintenance of erosion and sediment control BMPs through regular inspection. In summary, the stormwater plan needs further designing and information needs to be submitted to facilitate calculation of earthwork quantities. ZRestfull,ssee, Planner ment of Community Development f c: Alan Tahja Chester Loudin MASON COUNTY DEPARTMENT of GENERAL SERVICES Mason County Bldg. III 426 W. Cedor P.O. Box 186 Shelton,Washington 98584 -(206)427-9670 BUILDING PARKS& RECREATION FAIR/CONVENTION CENTER ADMINISTRATION /Li 3 /.may RE: Permit Number /S774, During a recent plan review for your proposed project, it was determined that the following information needs to be submitted prior to the building permit being processed for approval: I c�e- /� �cc� car �/ivt� 'S o ✓ ��oor' 5`1vt,J /o ' 7L �i /vA D Al C_ gS 4') oo�Lj 'SD�? Lt ft l o K ,c r GL✓I'� o��,. n�u�h�h 4 7'�'�CT'G�yc�'�, Once the information has been received by our department, the project will continue to be processed. If you should have any questions, please contact me between the hours of 8:OOam-9:OOam, Monday-Friday at (206) 427-9670 ext . If you can not make contact between those hours, please call and leave a message and I will return your call as soon as possible. Thank You, Building Inspector cc: Property File LOU Y_Ial n I CAUS_� 94 -- MASON COUNTY BUILDING DEPARTMENT PLAN REVIEWER AND INSPECTOR CHECKLIST 1994 NON-RESIDENTIAL ENERGY CODE SLAB INSPECTION ( ) Slab insulation R-10 recommended only FRAMING INSPECTION ( ) Attic ventilation (1/150) 5000 / 150 = 33 sq. ft. total venting INSULATION INSPECTION ( ) Attic insulation R-19 minimum ( ) Service water heater placed on R-10 pad ( ) Service water pipe insulation R-3 .3 minimum FINAL INSPECTION/LIGHTING INSPECTION Interior lighting allowance (per building) ( ) 5000 sq. ft. X 1. 5 watt allowance = 7500 total watt allowance ( ) Single switch not to exceed 800 of 20 ampere circuit (16 amps) Exterior lighting allowance (per building) ( ) 300 lineal feet X 7.5 watt allowance = 2250 total watt allow. ( ) 24 hour lighting on timed', switched, photocell or combination. i i JOHNS PANEL-UUM �P JJ �� ZONE B Cc DPP �� 1611 17 CP � 0 �6• f� � pT l-1 � �� •� rZ . Wes VF 2�0 '� VGS� T '�Pli• ZONE \ A2 68 ZONE 64 ZONE C B RM99 ZONE B A 54 SO 20// 45 11 z _ X � f7 2 RM95 ZONE I B J� I 3] ZONE B / Uninra / River RM93 l !p 3 / 4 1 ZONE B r 11 �24 1 IU.ZONE A2 11 n rl i( /� 4.� 1 Lou in Cjuste ,� MASON COUNTY BUILDING DEPARTMENT PLAN REVIEWER AND INSPECTOR CHECKLIST 1994 NON-RESIDENTIAL ENERGY CODE SLAB INSPECTION ( ) Slab insulation R-10 recommended only FRAMING INSPECTION ( ) Attic ventilation (1/150) 5000 / 150 = 33 sq. ft. total venting INSULATION INSPECTION ( ) Attic insulation R-19 minimum ( ) Service water heater placed on R-10 pad ( ) Service water pipe insulation R-3 .3 minimum FINAL INSPECTION/LIGHTING INSPECTION Interior lighting allowance (per building) ( ) 5000 sq. ft . X 1'. 5 watt allowance = 7500 total watt allowance ( ) Single switch not to exceed 800 of 20 ampere circuit (16 amps) Exterior lighting allowance (per building) ( ) 300 lineal feet X 7. 5 watt allowance = 2250 total watt allow. ( ) 24 hour lighting on timed switched, photocell or combination. jjj,,,� ........ n.....................