FOUNOA I ION 041 Y
il'itU.If r i I tit ill I
NOf2 fH ON MY i f o NOR 114 MA`;ON F I fit I2 J1JRN I F f I tlF f HWY 3 F:01 1 OW R0A1) 1 f I' f f 0 1 0P 011 HILI
k
t
NE'i_vM. tqv. 04?0'10 COMill IANCV 14) ATIACt1EI► COND] I PIN`: 1 -
Rf Q11>'tit 1�
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date by
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
I
Page No. 1 CASE HISTORY FOR CASE NO.: MIS94-0419
TOM M SHEARER
NE70 KATCHEMAV-m�,N BELFAIR
07/19/94
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
------- ------------------------------ -------- -------- -------- --------------------------------------- ---- --- -------- ---
MISA010 Application received / / / / 06/22/94 06/22/94 CPH
MISA050 Approved For Issuance / / / / 06/22/94 DONE CPH 06/22/94 CPH
MISA500 (F) Issue permit / / / / 06/22/94 DONE CPH 06/22/94 CPH
MISB110 Structural Plan Review 06/22/94 / / 06/22/94 DONE WLC 06/22/94 CPH
MISC155 Final inspection 07/13/94 07/14/94 07/14/94 CONDITIONAL APPROVAL: OK TO POUR AFTER COND LW 07/19/94 LAW
THESE CONDITIONS ARE MET. 1. MAINTAIN A
MINIMUM CLEARANCE TO THE SIDE OF THE
FORM BOARDS OF 3 INCHES. 2. THE MINIMUM
WING WALL IS 18 INCHES, SEE AT GARAGE
DOOR OPENING WITH 2 HOLD DOWNS (RIGHT
CORNER). 3. WHERE VERT. BAR IS WITHIN
THE 3 INCH CLEARANCE REQUIREMENT TO THE
SIDE OF THE FORM, DRILL AND RESET NEW
BAR IN THE CENTER OF THE WALL.
MISC155 Final inspection 07/15/94 07/18/94 07/18/94 CONDITIONAL APPROVAL: 1. NOT ALL OF THE COND LW 07/19/94 LAW
CORRECTIONS WERE MADE ON THE WALL FROM
THE LAST LIST, OK FOR THE CONTRACTOR TO
FINISH CORRECTIONS AND POUR THE WALL. 2.
THE FOOTING WAS POURED WITH OUT An
INSPECTION, A MISTAKE WAS MADE BY THIS
OFFICE, THE WRONG CARD WAS PULLED FOR
THE INSPECTION, THERE IS 2 PERMITS FOR
PEOPLE NAMED SHEARER ON HWY 3 OUT OF
BELFAIR, AND I WAS SENT TO THE WRONG
SITE, THE CONTRACTOR TOOK PHOTO'S OF THE
FOOTING, BASED ON THE PHOTO'S THE
FOOTING APPEAR'S TO MEET M.C.R.
MASON COUNTY
BUILDING III 426 W. CEDAR r
SHELTON, WASHINGTON 98584
(206) 427-9670
CORRECTION NOTICE
II
Job Location ()E X) 945ct t�l,��,�,� t,-- , ,
This structure has been inspected by Mason County Building Department
and the following VIOLATION of County Laws and Ordinances has been
found:
Items listed below must be corrected to gain code compliance
MC.' �II i .� '>'1 . ;r La n� L I G'G l-
/ II � r 41 e—
n i � h � �' G, -f C-�r n cr
l)K U- � + Imo, e j e-r +C_� /r �.J i +� ,n + k 3 to, -I 4 G
r e- - c -, e,,,4 1 o I ti e- j C 01 -)I'L e- Zs'� e, 'n J 4-
Ile. ) L"r , n 4 L G.� tJ D 41n e cJ4 /!
_�I E'er[�e U ✓1�U G r -�d�✓\r� [77/1 d lt./ 4 2rM 1+- G
aa, 4-4, e- 1,-o-n b o2-for c e-
/
r
C J. od j r e_,
You are hereby notified that the above corrections shall be made BEFORE
PROCEEDING WITH ANY FURTHER WORK a4-
❑ Call for re-inspection when corrections are made before continuing
❑ Make corrections, items will be checked on next inspection
❑ OK to
Department
Date Inspector
■ oo s F:k *T MOOV THIV---
i
MASON COUNTY
I '
Mason County Bldg. III 426 W. Cedar
j F.O. Box 186 Shelton, Washington 98584
I I
j
I
I
I II
i
I
I
! I
I
I
I
I
I
I
I
I
I
f I
I
I I
J
- --- -. - - - - - --
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping idate, b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date date by
PLUMBING Attic by OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
I IM! 11, 1 1 111,' !,! .ii ! it Ili 1-t; I I t!'[ j)j 1 '!Ilfl I i it! -M e% I 11"I
fit 1'1S I 1 !' ; jli. i,( 1 1 , 1 i("I
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback _ date by Ribbons
date by Gas Piping date by
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by
PLUMBING date by
Attic OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
I,
I
�I
i
;: _ . .
.ice� � � .,�'ii ,_. -• � \ v_��.�_'. '.Y
�':.- - _
��
r- _i- � -.: _ -- --
• � �� .�.
_ .� .
�`�• `_ a
�? r)�
I 1t ,Ak '�
fZZ
n
IT
i
1iL