Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GRD2010-00003 - GRD Permit / Conditions - 4/23/2009
Inspection Line(360)427-7262 04MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 i� LAND MODIFICATION BUILDING PERMIT GRD2010-00003 OWNER: BLUE STAR PROPERTIES L.L.0 RECEIVED: 1/19/2010 CONTRACTOR: LICENSE: EXP: ISSUED: 3/19/2010 ENGINEER: APPEX ENGINEERING PLLC 1.253.473.4494 LICENSE: EXP: EXPIRES: SITE ADDRESS: NE LOG YARD RD BELFAIR PARCEL NUMBER: 123211300010 LEGAL DESCRIPTION: SW NE WLY OF R.R. R/W EX PROJECT DESCRIPTION: DIRECTIONS TO SITE: Clearing and Grading 874714 cy for the installation of a regional storm ST RT 3 TO BELFAIR GO PAST THE OVERHEAD RR TRACTS,L ON drainage facility. LOG YARD RD TO SITE THAT IS ADJACENT TO 431 NE LOG YARD RD Inspection Area: Fill?: Yes Comp. Plan Desig.: Urban Growth Grading?: Yes IRO Desig.: Cutting?: Yes Shoreline Desig.: Not Applicable Area Graded: 20.00 Acres SEPA?: Yes Cubic Yards: 874,714.00 FEES Type By Date Amount Receipt Grading Plan Check Fee GMM 1/19/2010 $1,383.14 S12010000 Planning Stormwater GMM 1/19/2010 $255.00 S12010000 Grading Permit Fee DLC 2/24/2010 $5,842.97 912010000 Building State Fee DLC 2/24/2010 $4.50 S12010000 ADJUST--Grading Plan DLC 2/24/2010 $5.95 S12010000 Total $7,491.56 GRD2010-00003 Please refer to the following page(s)for conditions of this permit. 1 of 4 CONDITIONS FOR GRD2010-00003 1) ALL CLEARING,CUTTING, GRADING, EXCAVATING, TERRACING, FILLING AND SIMILIAR WORK WILL BE REGULATED BY THE REQUIR MENTS PURSUANT TO THE MASON COUNTY GRADING PERMIT STANDARDS ADOPTED BY RESOLUTION 141-96 and MASON COON ODE, TITLE 14, CHAPTER 14.44. X 2) All fills shall be compacted to a minimum of 90 percent of maximum density.X � 3) A 20 foot wide fire apparatus access road is required to extend within 150 feet of any portion of the exterior walls of the building. An unobstructed vertical clearance of 13 feet, 6 inches is required. Dead-end fire appar ccess roads longer than 150 feet are required to have an approved turnaround. The maximum grade of a fire apparatus access road is 14%. X 4) The owner/applicant shall provide to Mason County inspection reports prepared by the engineer record, complying with the requirements as noted in Chapter 14.44, section 14.44.220 through 14.44.230. Inspection reports shall be submitted to the Mason County Building Dept., PO Box 186, Shelton, WA 98584. Final approval of the project is dependent upon receipt of all inspection reports. X 4 5) Cut and,fill slopes shall be setback from site boundaries in accordance with Section 14.44.190. X 6) Approved per site plan and topographic cross-section. X Ti 7) It is unlawful to dispose of or to bury any type of solid waste. This includes but is not limited to scrap metal, wood pieces or particles generated as a by-product or waste from the manufacturing of wood products, construction, storm or demolition debris, or other raw materials such as trees and stump�,/� X 8) Compliance with an approved Storm Water Plan shall be subject to an on site inspection, or inspections, by the engineer of record or an authorized representative. Said inspection(s)shall be performed in accordance with the approved plan, and prior to any modification that would make a determination of compliance impossible. Inspection reports shall be submitted to verify all engineering requirements have been completed in accordance with the approved storm water plan. Reports 5hall be submitted to the Mason County Department of Community Development prior to each corresponding inspection and final permit appr opies of all special inspection reports shall be made available at time of inspection. X 9) ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE AND SHALL NOT ADVERSLY AFFECT ANY ADJACENT PROPERTIES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYSTEM OR ROAD WAYx GRD2010-00003 Please refer to the following page(s)for conditions of this permit. 2 of 4 10) Temp Erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. X 1'1) An inspection performed by a representative of the geologist or their authorized representative shall be completed on-site prior to the footing pour to observe excavation of the infiltration system to verify that suitable soils have been exposed as specified in the soils report prepared by GeoResources, LLC dated April 23, 2009. Reports shall be submitted to the Mason County Building Dept., PO Box 186, Shelton, WA 98584 prior to the request for final inspection. X 4 12) Access Roads to the site must not be degraded as a result of work. X fj 13) Owner t is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 14) The applicant shall place fill on the subject parcel and company-owned parcels in a safe manner and in accordance with the submitted Jan. 2010 storm w a plan. X The applicant shall secure the proper grading or land modification permits prior to placing excess or cut materials on properties other than the subject parc!tl mpany-owned parcels. X This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of Conti ation of work is a prog;jags inspection within the 180 day period. Final inspection mustbe approved before building can be occupied. OWNER OR AGENT: DATE: GRD2010-00003 Please referto the following page(s)for conditions of this permit. 3 Of 4 FORM MUST BE COMPLETED IN INK PERMIT NO.: GRDaOIO PLEASE PRESS HARD MASON COUNTY 6 AlAn LAND MODIFICATION PERMIT APPLICATION G 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 e � Shelton 360 427-9670 Belfair 360 279.4467 Elma 360 4825269 Seattle 206 464-6968 APPLICANT INFORMATION CONTRACTOR INFORMATION OWner Blue Star Properties L.L.C. Atin:Bob Dressel Contractor Name Mailing Address PO Box 27s Mailing Address City Belfair State WA Zip Code 98528 City State Zip Code Phone 310 275-0228 Other Ph.( I Ph.(� ) Other Ph.c Lien/Title Holder Blue Star Properties L.L.C. Contractor Reg. # Address PO Box 275 Belfair WA 98528 Expiration ENGINEER INFORMATION Name APEX Engineering PLLC Attn:Dennis Hanberg Phone ( 253 473-4494 Address 2601 South 35th Street Suite 200 State WA Zip Code 98409 PARCEL INFORMATION-12 digit Tax Parcel No..123211001000;123211300010 Fire District #2 Legal Description SW NE,EX PTN ELY OF R.R.R/W PCL A OF BLA#01-19 together with,SE NE'PCL 8 OF BLA#1211-19 Site Address(include street name and city Adjacent parcel to the East is addressed 431 NE Logyard Road Belfair WA Directions to site: From HWY WA 3 turn west on to NE loovard road when road T's turn right to stay on NE loovard road_property is on the left immertiataiy watt of the radr—i Will timber be cut and sold in parcel preparation? (Yes/No) Timber which is cut is not marketable Is your property within 200' of the following: Body of Water(Name) N/A Saltwater Lake River/Creek Pond Wetland _Seasonal Runoff Stream Slopes or Bluffs Soft compressible soils Jor)E' on TYPE OF JOB - Excavation ✓�FillingF__7__1 Grading F7-1 Total size of area 2oacres g Size of area to be cleared on slopes over 10% All areas of the site will be cleared. Estimated amount of cubic yards Boo,000-9oo,Doo cY Describe Work_To clear and grade approximately 20 acres.Allowing for a regional storm pond on portions of the site with remaining portions of the site landscaped for passive recreation if possible. LAND MODIFICATION INFORMATION YES NO Will fill be brought on site? If yes, source Undetermined at this time © ❑ Will excavated materials be taken off site? If yes, destination_Adjacent parcels under the same ❑ Does fill contain potential hazardous materials? ownership will supplement North ❑ p Has a soils report been completed on site? If yes, include copy Mason Fiber operation. 0 ❑ Will proposal result in redirection of any surface water runoff onto adjacent properties? ❑ El Will proposed work alter where storm water or ground water enters or exits the site? © ❑ Will quality, quantity or velocity of storm/ground water be altered? ❑ Will runoff be collected/controlled by interceptors, curtain drains or other collection devices? a ❑ Will the land be replanted upon completion? ❑ EI Will the proposal result in slopes steeper than those currently on site? 0 ❑ Is the site within 200' of a designated shoreline? ❑ M NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the Information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a the Contractor Registration Law RCW 18.27 and am aware of the contractor in the State of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work ordinance requirements regulating the work for which this permit is issued will be done in conformance therewith. No changes shall be made without and all work shall be done in conformance therewith. No changes shall first obtaining approval. / be made without first obtaining approval.- X 7 `!6 Date /r� /�' X Date FOR OFFICIAL USE BEYOND THIS POINT Accepted b Date �Cl ubmittal Amount Due I` Receipt No. D AR MENTAL REVIEW APPROVED DENIED CONDITION CODES Building ment I c3 _ A ,l Planning Department S E iPi 2 0� Public Works Department Fire Marshal FEES Grading Permit Fee 5���,97 Site Inspection Plan Review Fee t>r�' ���q. Other Public Works Fee Pre-Paid at Submittal Violation Fee TOTAL FEES E N G I N E E R S P L A N N E R S S C IBNT I ST S RH2 ENGINEERING,INC. November 14,2008 H1tp:/Nnww.rh2.com Ms.Kell McAboy,County Planner mailbox@rh2.com Mason County Department of Community Development Mason County Building 1 1.800.720.8052. 411 N 5th Street PO Box 279 Shelton,WA 98584 Sent Via• Email WESTERN WASHINGTON Subject: North Mason Fiber Company Stormwater Management Review No.2 12100 NE 19P St,Ste 100 Permit No: GRD2008-00013 Bothell,WA 98011 Dear Ms.McAboy: (tel)425.951.5M RH2 Engineering (RH2) has reviewed the following documents under our existing contract to provide Mason County(County)with General Engineering services. (tax)425,398.2774 • Response Comment Letter prepared by Apex Engineering,PLLC,dated October 29,2008. • Storm Drainage and Erosion Control Report for North Mason Fiber Company by Apex Engineering,PLLC,stamp dated October 28,2008. • North Mason Fiber Company Plans (Sheets 1 through 3) prepared by Apex Engineering, EASTERN WASHINGTON PLLC and professional stamp dated October 29,2008. The review was performed to ensure that the documents and proposed improvements are in 300 Simon Street SE,Suite 5 concurrence with Section 14.48—Stormwater Management of the Mason County Code(MCC). MCC Section 14.48.100 adopts the latest edition of the Department of Ecology's Stormwater East Wenatchee,WA 98802 Management Manual(Manual) with the exception of the Minimum Requirements,Volume I, Chapter 2. The proposed project is a new,non-residential development that includes the creation or addition (tel)509.886.2900 of 5,000 square feet or greater of new impervious surface area and/or land disturbing activity of 1 acre or greater;therefore,the project shall comply with Minimum Requirement Nos. 1 through 11 in (tax)509.886.2313 subsections 3 through 13 of MCC 14.48.140. It should be noted that the proposed project lies within the Belfair Urban Growth Area;therefore,it is subject to the requirements of the County's Belfir Urban Growth Area Stormwater Management Plan. The following comments should be addressed prior to approval of the grading permit. KITSAP PENINSULA 1. The design infiltration rate was developed using the Environmental Protection Agency's (EPA) Falling Head Test Method. The Manual does not recommend this method because it 600 Kitsap Street Suite 101 is small-scale, tends to overestimate infiltration rates and is not considered reliable. The Manual recommends using a Pilot Infiltration Test (PIT) over the Falling Head Method, as Port Orchard,WA 98366 it is a larger scale test with a longer duration. We note that the actual design infiltration rate uses a conservative factor of safety of 9 to the 90 inches per hour identified by (tel)360.876.7960 GeoResources, resulting in a final infiltration rate of 10 inches per hour. (Note: GeoResourses identified a factor of safety of 5.5,although Apex used a factor of safety of 9 (fax)360.876.7988 in the modeling.) After discussion with County staff, the design infiltration rate will be accepted after: 1)the rationale for using the EPA Falling Head Test Method is provided;and (tell 360.876.7960 It/14/08 I0:42 ANI J:\Data\MC\307-073\Storm\4701 North Mason Fiber Company 9�2-08\Ltr to McAboy re North Mason Fiber Stormwatei�_; Ms.Kell McAboy November 14,2008 Page 2 2) the actual data from the test is supplied to validate the test. The EPA Falling Head Test Method is not recommended based on strict conformance with the Manual. Any risks associated with a failure of the infiltration facility are the responsibility of the property owner and/or design engineer. 2. The Storm Drainage and Erosion Control Report for North Mason Fiber Company does not appear to address criteria listed in Volume III,Section 3.3.7 of the Manual, Site Suitability Criteria 1, 2, 5 and 7. It is the duty of the design engineer to confirm that the specific setbacks have been met and state so in the drainage report. 3. The design engineer has not performed a downstream analysis using the premise that the proposed stormwater facilities will infiltrate 100 percent of the developed runoff. MCC Section 14.48.140(10) requires a qualitative downstream analysis to be prepared for projects,including those that propose retention facilities. Please provide the qualitative downstream analysis for compliance with MCC. GeoResources Reports 4. The October 17, 2008 memorandum provided by GeoResources and included as an appendix within Apex's Storm Drainage and Erosion Control Report shall contain a stamp of a licensed professional to make the recommendations supplied in the memorandum. This is generally the case any time that calculations or professional opinions are supplied. Desigg Plans 5. Sheet 1 of 3: The legend identifies a temporary sediment pond, although RH2 was unable to locate on the plan where the temporary sediment pond is proposed to be installed. A temporary sediment pond seems warranted for this project site, so please clarify the installation location. Also, please provide the design dimensions for the proposed sediment pond. 6. Sheet 1 of 3: Identify the proposed outfall location for the temporary sediment pond. (Me detail on Sheet 2 of 3 indicates that the temporary sediment pond will have a piped outfall,but does not indicate where or how that outfall will be placed.) 7. Sheet 1 of 3: General Notes on the plans indicate that, during construction and until the site is completely stabilized, no runoff shall discharge directly into the infiltration pond. It seems that this would require that runoff from the temporary sediment pond would need to discharge off the project site; therefore, a downstream analysis would be warranted. 8. Sheet 1 of 3: The project construction is shown with four phases;please identify how these phases will be implemented. For example,will all the grading be completed as a continuous construction process,with each subsequent phase immediately following the previous? Or will Phase 1 be completed and construction operations ceased for an indefinite period of time before Phase 2 is commenced, and so on? If the latter, please identify how the proposed infiltration pond will be brought online since runoff is not allowed to discharge to it during any construction processes. Also,describe how the temporary sediment pond will be located and/or relocated for each phase. 9. Sheet 1 of 3: Erosion Control Note No. 3 should be revised to indicate the 10-year peak flow due to the project size and construction duration. Also,identify what the peak flow is from the drainage report. 10. Sheet 1 of 3: Add a general note to remove Temporary Erosion and Sedimentation Control (TESC) measures once construction is complete and the site is stabilized. 11. Sheet 2 of 3, Sediment Pond Detail: The bottom of the sediment pond should be 18 inches below the dewatering orifice. The pond shall have a minimum of 3.5 feet of live storage between the dewatering orifice and the riser overflow. Provide sizing of the dewatering orifice. Please refer to Best Management Practice (BMP) C241,Temporary Sediment Pond in the Manual. 11/14/08 10.42 AM JADan\MiC\307.073\Storm\4701 North Mason Fiber Company 9-2-08\Ltr to'%kAboy re North Mason Fiber Stocmw ter. Ms. Kell McAboy November 14,2008 Page 3 12. Sheet 3 of 3:Side slopes steeper than 3 to 1 require fencing for safety. 13. Sheet 3 of 3: The design engineer shall confirm that concerns regarding seepage and embankment failure between the infiltration pond and the wetpond have been reviewed and eliminated. This is in large part because the wetpond will continually have water in it whereas the infiltration pond will not, and the insitu material is indicated to have a substantially high degree of permeability. A qualitative response in the report indicating this has been reviewed by the engineer and the pond will perform adequately will suffice. 14. Sheet 3 of 3: The first cell of the wetpond should have 25-to-35 percent of the total pond volume per Volume V,page 10-6 of the Manual. 15. Sheet 3 of 3:The first cell of the pond should have a sediment depth monitoring device per Volume V,page 10-6 of the Manual. 16. Sheet 3 of 3: Maximize the flow path through the wetpond facility per Volume V,page 10-6 of the Manual. This may necessitate locating the wetpond inlet at the Phase 1-2 boundary line further south on the wetpond. 17. Sheet 3 of 3: The berm dividing the wetpond cells shall be keyed into the soil or the applicant shall provide a geotechnical recommendation that includes consideration that one of the two cells may be empty while the other remains full of water. 18. Sheet 3 of 3: Consideration might be given to a gravity drain for the wetpond facility per Volume V,Section 10.3,pages 10-8 to 10-9. This is not a requirement for permit approval, only a suggestion for maintenance considerations. Items as Conditions of Approval We recommend that the following items be listed as conditions of the permit approval. • The EPA Falling Head Test Method is not recommended for determining the design infiltration rate based on strict conformance with the Manual,and any risks associated with a failure of the infiltration facility is the sole responsibility of the property owner and/or design engineer. • Provide performance bonding or other appropriate instrument for the proposed project in accordance with MCC 14.48.140(13). • A copy of the erosion and sedimentation control plan provided in the Storm Drainage and Erosion Control Report for North Mason Fiber Company prepared by Apex Engineering,PLLC and dated October 28,2008 (or later date) shall remain on-site at all times during construction. • The applicant shall obtain compliance with the Department of Ecology's General Stormwater Permit prior to commencing construction. • If the proposed construction will impact the existing 12-inch diameter ductile iron water main located in the existing 60-foot access and utility easement,the applicant shall inform the owner of that utility immediately. • If the site is converted in the future to a high-use site as defined by the Manual, a facility liner for the wetpond will be required per Volume V,Section 4.4 of the 2005 Manual. 11/14/08 10:42 AM J:\Data\X1C\307-073\Storm\4701 North Mason Fiber Company 9-2208\Ltr to McAboy re North Mason Fiber Stormwater.� Ms. Kell McAboy November 14,2008 Page 4 If you have any questions regarding the information within, please contact me at (360) 698-6528 ext. 5382 or bbeaupain@rh2.com. Sincerely, RH2 ENGINEERING,INC. 13E o %VAsy, Bret Beaupain,P.E. Project Engineer 38752 �S71e BB/sp/jw S;S1ON 1. 11/14/08 ONAL ,\ 11/14/08 cc: Mr.Dennis Hanberg,Project Manager,Apex Engineering(Email) Mr.Gabe Jellison,P.E.,Project Engineer,Apex Engineering(Email) 11/14/08 10:42 AM J:\Data\N1C\307.073\Storm\4701 North Ntason Fiber Company 9_22-08\Ltr to N1cAboy re North XWon Fiber Storrnmter; W RH2 ENGINEERING,INC. http://www.rh2.com malbox@rh2.corn 1.800.720.8052. December 3,2008 Ms.Kell McAboy,County Planner Mason County Department of Community Development WESTERN WASHINGTON Mason County Building 1 12100 NE 195th Street,Suite 411 N 5d,Street 100 PO Box 279 Bothell,WA98011 Shelton,WA 98584 (tel)425.951.5400 (fax)425.398.2774 Sent Via. Email Subject: North Mason Fiber Company Stormwater Management Review No.3 454 West Horton Road Permit No: GRD2008-00013 Bellingham,WA 98226 (tell 360.676.0836 Dear Ms.McAboy: (fax)360.676.0837 RH2 Engineering (RH2) has reviewed the following documents under our existing contract to provide Mason County(County)with General Engineering services. One Pacific Building • Response Comment Letter prepared by Apex Engineering, PLLC, dated November 26, 621 Pacific Avenue,Suite 104 2008. Tacoma,WA 98402 • Storm Drainage and Erosion Control Report for North Mason Fiber Company by Apex (tell 253.272.3059 Engineering,PLLC,stamp dated November 26,2008. • North Mason Fiber Company Plans (Sheets 1 through 3) prepared by Apex Engineering, PLLC and professional stamp dated November 26,2008. The review was performed to ensure that the documents and proposed improvements are in concurrence with Section 14.48—Stormwater Management of the Mason County Code (MCC).The EASTERN WASHINGTON applicant has responded to all previous review comments and the design appears to comply with the requirements of Mason County Code. We recommend approval of the Grading Permit with the 300 Simon Street SE,Suite 5 following conditions applied to the permit. East Wenatchee,WA 98802 (tel)509.886.2900 • The Environmental Protection Agency (EPA) Falling Head Test Method is not (fax)509.886.2313 recommended for determining the design infiltration rate based on strict conformance with the Department of Ecology's Stormwater Management Manual (Manual), and any risks associated with a failure of the infiltration facility is the sole responsibility of the property owner and/or design engineer. • The applicant shall provide performance bonding or other appropriate instrument for the IarSAP PENINSULA proposed project in accordance with MCC 14.48.140(13). 600 Kdsap Street • A copy of the erosion and sedimentation control plan provided in the Storm Drainage and Suite 101 Erosion Control Report for North Mason Fiber Company prepared by Apex Engineering, Port Orchard,WA98366 PLLC and dated November 26, 2008 (or later date) shall remain on-site at all times during (tel)360.876.7960 construction. (fax)360.876.7988 • The applicant shall obtain compliance with the Department of Ecology's General Stormwater Permit prior to commencing construction. (tel)360.876.7960 12/03/08 1:15 PM ]:\Dam\MC\307-073\Storm\470I North Moon Fiber Company 9_22-08\Ltr to McAboy re North Mason Fiber Stormwater] o 01 1 wig Ms.Kell McAboy December 3,2008 Page 2 • If the proposed construction will impact the existing 12-inch diameter ductile iron water main located in the existing 60-foot access and utility easement,the applicant shall inform the owner of that utility immediately. • If the site is converted in the future to a "high-use site" as defined by the Manual for Western Washington, an oil control facility may be required. If you have any questions regarding the information within, please contact me at (360) 698-6528 ext. 5382 or bbeaupain@rh2.com. Sincerely, RH2 ENGINEERING,INC. �,. B �N D. ;r WAS/fir 1� �(i of *A. �� }G Bret Beaupain,P.E. Project Engineer 38752 .;:��'', BB/sp/jw $ r S1gN l.�*:� 12/3/08 ��,5.:57t AL ,`� 12/3/08 12/03/08 1:15 Phl J:\Data\'%1C\307-073\Storm\4701 North Mason Fiber Company 9_22-08\Ltr to M Aboy re North Alison Fiber Stormmaterj