Loading...
HomeMy WebLinkAboutRLC99-0074 - RLC Permit / Conditions - 5/28/1999 1 Z�� -7 Z'/ - coo 0 0 GARY YANDO,DIRECTOR ypN.STgTFO o A N DEPARTMENT OF COMMUNITY DEVELOPMENT U o T z PLANNING -SOLID WASTE - UTILITIES z� N Y y BLDG. I • 411 N. 5TH ST. • P.O. BOX 578 Mesa SHELTON, WA 98584 • (360) 427-9670 FINDINGS FOR MASON ENVIRONMENTAL PERMM DATE: May 28, 1999 PERMIT NO.: RLC99-0074 PROPOSED ACTION: Washington Department of Transportation. (Portion of NWl/4 of Section 17 in R1W, 123N) Repair of existing road alignment of State Route 3 Milepost 22.48 to 22.76 with soldier pile walls and improved surface and subsurface drainage systems; work to occur in buffer of category wetland vegetation and in potential landslide hazard area. Proposed project: Construct 800 foot long soldier pile wall on downhill side of existing road alignment; wall height varies from 3 feet to 20 feet but piles will be driven as deep as 70 feet into the soil; surface and subsurface drainage piping will be drilled into adjacent uphill slopes and ditches installed to capture drainage and direct to culverts placed beneath and across the highway alignment; road shoulders will be graded to final contours; replanting of wetland vegetation in buffers will reduce potential impacts of this proposal. DEPARTMENT OF COMMUNITY DEVELOPMENT: The proposal is located within the known landslide area north of the Town of Allyn. State Transportation geotechnical engineers have analyzed the area and have worked closely in the design of this project; their report of information and findings is included with their application. Public Works has reviewed the information and finds the report satisfactory. The project is also next to a category 3 wetland that extends 100 feet wide within the ravine adjacent to the road alignment. The soils are saturated for much of the year and support plant cover of willows, alders, and sedges. The road alignment constructed in 1994 has already crossed the associated wetland buffer, and the proposed drainage facilities will be placed where an existing ditch is located. Very little additional area is needed to install the new ditch and culverts along the west side of the project area. Two sections of the Mason County Resource Ordinance apply to this proposal: Landslide Hazard Areas (Sec. 17.01.100) and Wetlands (Sec. 17.01.070). This permit will allow the placement of the engineered soldier pile retaining wall on the downhill side of the road and the current alignment to be used for the proposed repair of roadbed and drainage facilities adjacent to the wetland. The retaining wall plans were accompanied by engineering calculations and narrative that assures that the structure meets safety factors for construction and stability of the project site. The use of erosion control revegetation measures and the replanting of wetland vegetation along the west side of the project area will allow the project to address the temporary impacts of road and drainage construction. Recycled DEPARTMENT OF PUBLIC WORKS: Public Works has reviewed the plans, calculations, and narrative from Department of Transportation engineers and finds the data and report satisfactory to the Resource Ordinance standards. DEPARTMENT OF HEALTH (ENVIRONMENTAL HEALTH): No review by Department of Health was needed for this proposal. FIRE MARSHAL: No review by the Fire Marshal was needed for this proposal. COUNTY BUILDING OFFICIAL: As the proposal is exempt from county building codes, no building permit was required for this proposal. OTHER COMMENTS: In addition to the SEPA environmental review being carried out by the Washington Department of Transportation, the Washington Department of Fish and Wildlife provided input that erosion and sedimentation was minimized by controlling the runoff into the proposed drainage facilities and by re-establishing wetland vegetation along the edge of the wetland situated along the west side of the road alignment. CONCLUSIONS: Based upon the above review, this Department finds that the applicant (Washington Department of Transportation) has presented a proposal to repair the existing road alignment and improve area surface and subsurface drainage. In order to lessen potential impacts to the wetland vegetation adjacent to the State Highway, implementation of erosion control measures and temporary vegetation cover and replanting of wetland vegetation along the west side of the project area will allow the project to address the temporary impacts of road and drainage construction. On this date Mason Environmental Permit RLC99-0074 is approved with the attached conditions. Gary Yando, Director (date) Department of Community Development Allan Borden, Shoreline Planner (date) MASON ENVIRONMENTAL PERMIT RLC99-0074 WASHINGTON DEPARTMENT OF TRANSPORTATION STATE ROUTE 3 ALIGNMENT REPAIRS NE 1/4 OF NW 1/4 OF SEC. 17, RAW., T.23N. CONDITIONS OF APPROVAL 1) The applicant shall follow the specifications and construction standards of the geotechnical report and construction drawings submitted with the project application, including the surface and subsurface drainage system and erosion control measures during construction and following project completion. 2) The applicant shall implement temporary revegetation measures (reseeding and matting) following the preparation of final grades, and shall replant wetland plant species along the west 50 feet adjacent to the drainage system at Milepost 22.59. • r ' I OLSfHpIC < REGION M ... W - - - - - - - - - - - - $EG I N- CON-STRUC-TJ ON - - - - - - - - - - - R, - - - - - - ' SR 302 MP 0 . 00 - - _ _ _ - - - E - - - - - - _ _ - . �' ' .a. SR 302 STA . 0+000:000 a R 3 MP 3. 6 c I o - --------------� W a rl ; - Z ' JEFFERSON --_ Q, E CONSTRUCTION � rN— _ v SR 302 R 302 MP 1 . 26 T GRAYS RI _ W 7 (VICTOR SR 302 STA. 2+0-13 . 000 � ® ! CUTOFF ROAD) 8 I 1 END PROJECT LAKE ► 9 END CONSTRU T I I �"""° m I . ,� ._ SR 3 MP 2 2 . 3 s,P I ® ® PIERCE I •�• THURSTON i o. SR 3 STA . 2+320. 00 - - - - - - o�� - ; - - - - - - - - - - - - - - - - - - - - - - - - - 0-------------- r 'PIERCE C0 I I o o I Q� SR 3 WETLAND MP 22.5e sip ty o Q a. BEGIN CONSTRUCTION QD NB LINE STAN, 0+000. 000 18 17 D 0 16 15 BEGIN PROJECT n m BEGIN CONSTRUCTION SR 3 MP 22 . 48 f� SR 3 STA. 21 +915 . 000 � O END CONSTRUCTION - - - - - - - - � NB t� NE STA : 3#O68-, OOQ - 302 ALLTH 19 2� 0 200 460 660 800 1000 ��.� - TNJ , C'-._-IC ff I RE"Olf"ISTAT FED.AID PROJ.NO. PROJECT DEVELOPMENT DESIGNED BY R.AMES 10 wasH OFF I CE �� SR 3 vl ENTERED BY R.D00D Washington State ALLYN VICINITY SLIDE REPAIR CHECKED BY M.CRICWARE J08'"ieL* Department of Transportation s" ' PROJ. ENCR. N.CAMPBELL 99C518 REGIONAL AOM. C.OEMICH CONTRACT NO. VICINITY MAP 3. DATE DATE REVISION Br N LEGEND • T.22N. R.1W. W.M. Z EXISTING CATCH BASIN Ir w EXISTING GRATE INLET N N w - SEEDING, FERTILIZING, AND MULCHING N ®® STRAW BALE w - M —FILL FILL LINE a p �► —CUT CUT LINE LU Z T- BEGIN PROJECT EXISTING DITCH BEGIN CONSTRUCTION � .--�----- EXISTING DRAINAGE PIPE SR 3 MP 22.48 Z a& U& Wu. EXISTING WETLAND STA. 21+915.000 —►—�--►— EXISTING STREAM Ln W TEMPORARY SILT FENCE EOUATIONs 0 1* ............. WETLAND SITE BUFFER ZONE SR 3 21+897.409 P.T. BK.= SR 3 21+899.177 P.T. AHD. JP WORK ZONE SITE PRESERVATION LINE (CONSTRUCTION FENCE) C�Q PRESERVATION LINE SR 3 21+695.183 P.C. ri H _ - - a __ -� cl o p0,2_ _ _ 63• 5 f a ``�� +800 c*, on 4 I--- ---�— SR 3 21+798.843 P.I.= _ R/W SR3 21+798.843 P.I. — —'------------------------ --"— FORMER 5 " AFTER CLEARING AND GRUBBING OPERATIONS ARE COMPLETED THE TEMPORARY SILT FENCE AND STRAW BALE BARRIERS SHALL BE INSTALLED AS SHOWN ON THESE TEMPORARY EROSION SEDIMENT 0 l0 20 30 a0 50 SCALE IN METERS ALL DIMENSIONS SHOWN ARE IN METERS UNLESS NOTED OTHERWISE CONTROL PLANS. xccla ' STAT FED.AID PROJ.NO. PROJECT DEVELOPMENT DESIGNED BY R. AMES 10 WASH OFFICEAMkk SR 3 TE 1 ENTERED BY R. DODD Washington State ALLYN VICINITY SLIDE REPAIR S.E _ CHECKED BY M GR I GWARE J0e Mumma Department of Transportation I z:` PROJ. ENGR. N. CAMPBELL 99C518 TEMPORARY EROSION AND REGIONAL ADM. G. DEMICH C0'TWT MO. s�c s SEDIMENT CONTROL DATE DATE REVISION BY T.22N. R.M. W.M. z _ _ -. __________ .. .. Ld ........ LA - - - - - , N WIRE-BOUND OR T+► STRING-TIED STARE OR REBAR STRAY BALE TO BE DRIVEN IN s FLUSH WITH TOP • OF BALE EXCAVATED SOILA BACRFILLED AND COMPACTED TO y► YIRE OR STRING I I 11 I THE SATIiFACTION ' . a ORIENTED Ow S[OE 1 OF THE EH41MEER 1* AMD END OF BALE _ 00 �I I DIRECTION-OF FLOW Do w. u,, Z EXISTING EXISTING- - ,�, w GROUNDT I T I cRouwo .)u. ,,�, w. ++�• �'• /�!C +oo .. w. � ALL. la. MINIMUM •�• .W. �) END PROJECT STRAW BALE BARRIER '')`' au. '"`` "'` s: uJ / SR 3 22«162.60 P.T. Lu TYPICAL INSTALLATION AIL. All. : Z� 6► (SEE SPECIAL PROVISION SR ••22+077.46 P.I. ,W. All. AIL END CONSTRUCTION N STRAW BALE) , W SR 3 MP 22.T3 a 3 d o \� SEA. 22+320.000 y 1�1 + —— _ +3 00 _ _ SR 3 i a -- —�— — N 2140� '00"25" W La RM S,qo- ' f R040 o° LEGEND 819 0 i' �' EXISTING CATCH BASIN EXISTING GRATE INLET SEEDING. FERTILIZING. AND MULCHING STRAW BALE \` ` —FILL— FILL LINE \\`. —CUT CUT LINE i' > EXISTING DITCH •------- EXISTING DRAINAGE PIPE --__ '� `� �• EXISTING WETLAND �--+ ► EXISTING STREAM • TEMPORARY SILT FENCE WETLAND SITE BUFFER ZONE AFTER CLEARING AND GRUBBING OPERATIONS ARE COMPLETED WORK ZONE THE TEMPORARY SILT FENCE AND STRAW BALE BARRIERS SHALL -- SITE PRESERVATION LINE (CONSTRUCTION FENCE) BE INSTALLED AS SHOWN ON THESE TEMPORARY EROSION SEDIMENT 0 10 20 30 40 50 PRESERVATION LINE CONTROL PLANS. SCALE IN METERS ALL DIMENSIONS SHOWN ARE IN METERS UNLESS NOTED OTHERWISE "R o. STATE FED.A I D PROJ.NO. PROJECT DEVELOPMENT AMESIO WASH OFFICE SR 3 TE2 DESIGNED BY R. DODD Washington State ALLYN VICINITY SLIDE REPAIR CHEERED BY R. DODD A Department of Transportation ' j�T CHECKED BY M GR 1 GWARE J0w"�" OFPROJ. ENGR. N. CAMPBELL 99C518 TEMPORARY EROSION ANO REGIONAL ADM. G. DEMICH C-TRACT No. g DATE DATE REVISION BY SEDIMENT CONTROLS 5 W Qoti o,� itr 9Z 90 N W 1/4 N W '14 CURVE DATA SEC. 17 N T.22N. R.1W. W.M. to P.I. STATION i DELTA RADIUS TANGENT LENGTH S + - 18 22*077.46 42'00.00'• 243.84 93.60 17 8.74 • N I 86 W N 8 lb SO Ja ;� S W ��4 S W 1/4 n e4 a8 Ln SEC. 8 «� 9 SR 3422+162. .T. ? w w u4 ALL (� \ Q ,ill. ALL .Llt. Da /09 ,ill. Go0..il[. i I [\ ` 9 ^ - 1 \ Z All. N illl al ll� a14 O I 1 \0 66Ln le , \ 96�0 9 10 �� 6 N, 0 w 0 O V) WETLAND SITE 2192.984m2 ALL � 9g 90_' 0.54 ACRE SR 3 +077.4�6 P.I. _ i g 94 2 ti END PROJECT N 90 92/ o SR 3 MP 22.73 �, ` 88' � '� STA. 22+320.000 3 es —°T— —°P T— —OP — —OP— —OT— — —OT— —0 — —0TaA _" — 86 \� + + nn rn 16 Ge 11 80 SR 3 ------- 'A °tom O� N 21'00"2 W TO GORST o +1 _ ___ _ LILT °' �Ge 82 " 12;aS M I L E 5 78 � JF cox ape m 11 76 w 190 / IV 9 m 00 �pt� �/ 1` CDi m 6- eA $2 pew 1, Tq END WAIL 6.5 t. SR 3 21+983.86 P.C: EDqF, OF f_A� 3 22+240.000 OU E � Ln o a 16 f 2 •� 3 �9 ` 78 N o GO CD c v�m3 a �0 N RiM 1g 65 N LD a � / GO V GOr� W %D � 3 Coro .. + o ro 3 ,6 CP NE 114 NW 1/4 o 68 �6A �62/ w u' w SEC. 1 7 -� LP a �0� BEGIN WALL 6.5m t LEGEND 33 i SR 3 22+000.00 / A �� ssv�s i9 EXISTING CATCH BASIN / +ro 1 EXISTING DRAINAGE PIPE LnN —R/W— RIGHT OF WAY BOUNDARY i 10 EXISTING POWER POLE -4 -OP— —OP— —OP. EXISTING OVERHEAD POWER T ro n Imo + BEGIN PROJECT /�0 -OT——OT— —07 EXISTING OVERHEAD TELEPHONE o�: ^' LID 3 MP ti� STA. 21+970.000 OP--OT--OP— EXISTING OVERHEAD POWER AND TELEPHONE v' Iv Ln �v w w -4 ?� SOLDIER PILE WALL x'9�c� AU. ill/. EXISTING WETLAND SE 1/4 SW I/4 696 0 10 20 30 40 50 —10--10--10— EXISTING STREAM SEC. SCALE IN METERS TRENCH DRAIN REGION STATE FED.AID PROJ.NO. PROJECT DEVELOPMENT DESIGNED BY R. AMES 10 WASH OFFICE SR 3 ENTERED BY R. DODD Adw Washington State ALLYN VICINITY SLIDE REPAIR MAP DepartmentCHECKED BY M GRIGwARE JOB NUMBER . Department of Transportation ' PROJ. ENGR. N. CAMPBELL Or REGIONAL ADM. G. DEMICH CONTRACT G. WETLAND SITE PLAN SHEETS DATE DATE REVISION BY h f - - - - - - -- - - - -- - - - - T.22N. R.1W. W.M. _ _ _ _ _ - Z �1 �. _ _ :.. - - - - - - - - - - - - - - Lu . ENO PAVING a OWE 1*170.000 N 111. 41► • M M '� ,1w 'w' all. .`i'' •� � ..�. OWE 1+000= wu/. �lr. SR 3 22+153.000 g AIL (4.88 Lt.) a �lr. emu. Lu w4 ul. all. J Ali. WA Z ALL UU 114 �1/ au. a4 11r. : uJ SR 3 22.162.60 P.T. 1n All. END PROJECT LLJo SR 22+077.46 P.I. -"'- U& Alta to END CONSTRUCTION ; t2 13 END PAVING : w /SR 3 STA. 22+248.000 SR 3 MP 22.73 6 3 SEE SHEET PI STA. 22+320.000 y �lr. 5 t` tt o �� is 17 1s JOINT DETAIL T �� + +300 _ =____ SR 3 —�—__ v► t - - j4 N 21'00'25" W 16) — M ,. LJ 1:14 TAPER TYP. BOTH ENDS l 0 r + OF BARRIER � END WALL 6.5m Rt. SR 3 22+240.000 PDT / 9 o - R SR_ / p s s o a A / �9/X BEGIN WALL 6.5m Rt. �y SR 3 22+000.000 i ,' DL1 STA. 1+030.607 `�\ BEGIN PAVING SR 3 STA. 22+000.000 2C� 1 i xN ` f NEW HORIZONTAL DRAINS SEE SHEET P1 JOINT DETAIL F NEW DITCH ` - LEGEND O , NEW DRAINAGE PIPE EXISTING CATCH BASIN I — EXISTING DITCH EXISTING GRATE INLET --_—__ , •------= EXISTING DRAINAGE PIPE ___• DL1 STA. 1+000.000= Cl NEW GRATE INLET SOLDIER PILE WALL SR 3 22+000.971 (38.231 RT.) ❑ NEW CATCH BASIN EXISTING WETLAND CURVE DATA 0 NEW MANHOLE P.I. STATION DELTA RADIUS TANGENT LENGTH S — --►--H-- EXISTING STREAM 1.004.000 72.06'25.1.. i 2.184 1.7T6 1+02e.437 90•40'S1.7" 1 3 1 3.036 1 4.749 1 HAND PLACED RIPRAP ® TRENCH DRAIN 0 10 20 30 40 50 SCALE IN METERS SINGLE SLOPE CONCRETE BARRIER ALL DIMENSIONS SHOWN ARE IN METERS UNLESS NOT=D OTHER,;:-_ I Acc„'°' STAT FED.A I D PROJ.NO. PROJECT DEVELOPMENT PD2 j DESIGNED BY R. AMES IO WASH ' SR 3 ENTERED BY R. DODO Washington State ALLYN VICINITY SLIDE REPAIR CHECKED BY M GR f GWARE '0°wAmug Department of Transportation I PROD. ENGR. N. CAMPBELL car4.cT w. PAVING AND DRAINAGE PLAN REGIONAL ADM. G. DEMICH �s • I DATE DATE REvISION BY SEC. 17, T.22N., P.M., W.M. MASON COUNTY 00 \ O+ 9 � 78 r0 i i :H-1-98 � n 0 76 7g CO "� H-2-98 8 \ 88 • e9 I 190 a 64 82 +100 H-3-99 80 \ 80 3 N� j8 0 76 �6 H-6-99 1 4 7 —� /16 22!11'000 72 74 H-5-99 3 14 H-2-96 H-4-98 80 r 72 e2 10 70 > WALL SP3 S TA. BEGIN WALL SR3 STA. 68 v 22+D240.000 (6.500 PT-) 22+000.000 16.500 RTJ = W STA. 0+235.670 = W STA. 0+000.000 �e 68 PLAN W STA. 0+235.670 TOP OF WALL AND FINAL GROUND EXIST. GROUND W STA. 0+139.795 EL 61.790 LINE AT BACK OF WALL LINE 6.500 PT. EL 78.905 - -.-s _- W STA. 0+000.000 ------------------------ ------------ - N i R W STA. 0+2231.350 EL 75.420 FINAL GROUND LINE < .; t nj W STA. 0+011.775 ,i :; R AT FRONT OF WALL i i :t n :I a s EL 69.055 „ ,, IT j EL sac ! � EL 65.000 ? 2 545 y j .j SHAFT SPACING 126 SPA a 1830 = 230.580 I I _� 2.545 I 3 t 08L W 360 x 64 �W 360x216 ti W 360 x 216 w SEE SHEET W4 - FRONT OF WALL GRADING W NOTE: �I 1. LINEARLY INTERPOLATE BOTTOM OF SHAFT ELEVATIONS TO ELEVATION o OBTAIN THE ELEVATIONS OF INTERMEDIATE SHAFTS. 2. CONTOUTR LINES ARE EXISTING GROUND. 2 norocE Br.dge oes.gn Engr a G RUTH STATE FE.D AID NO. �• K�pBRICGE AND STRUCTURES OFFICE ti C. s"0 �o 8 Supervisor K.K KLWER �d rW1- ' Imo'-'per. SR 3 - W 1 Des.gned By M. T&UKDM 4/99 10 WASH. y 4� �� �j �► Washington State �I Checked By K.N.KIWER 4/� Department of ALLYN VICINITY SLICE REPAIR ( Derd.led By LL HOUSE 4/99 JOB NUMBER 9'b �s '-�j �t�� E • 9ridge �rp;e�t, Engr � .> AL�,�E Transportation 01 irehm. Plon By ALA' WALL SITE PLAN AND ELEVATION 3� ArGhi}eCt/Speaafizt DATE REVISICN 3v7'P.0 [v'zz n� [x.•'[s s.vm s.Ee*s