FINDINGS FOR
MASON ENVIRONMENTAL PERMM
DATE: May 28, 1999
PERMIT NO.: RLC99-0074
PROPOSED ACTION: Washington Department of Transportation.
(Portion of NWl/4 of Section 17 in R1W, 123N)
Repair of existing road alignment of State Route 3 Milepost 22.48 to 22.76
with soldier pile walls and improved surface and subsurface drainage systems;
work to occur in buffer of category wetland vegetation and in potential
landslide hazard area.
Proposed project: Construct 800 foot long soldier pile wall on downhill side of existing road
alignment; wall height varies from 3 feet to 20 feet but piles will be driven as deep as 70 feet
into the soil; surface and subsurface drainage piping will be drilled into adjacent uphill slopes
and ditches installed to capture drainage and direct to culverts placed beneath and across the
highway alignment; road shoulders will be graded to final contours; replanting of wetland
vegetation in buffers will reduce potential impacts of this proposal.
DEPARTMENT OF COMMUNITY DEVELOPMENT:
The proposal is located within the known landslide area north of the Town of Allyn. State
Transportation geotechnical engineers have analyzed the area and have worked closely in the
design of this project; their report of information and findings is included with their
application. Public Works has reviewed the information and finds the report satisfactory.
The project is also next to a category 3 wetland that extends 100 feet wide within the ravine
adjacent to the road alignment. The soils are saturated for much of the year and support
plant cover of willows, alders, and sedges. The road alignment constructed in 1994 has
already crossed the associated wetland buffer, and the proposed drainage facilities will be
placed where an existing ditch is located. Very little additional area is needed to install the
new ditch and culverts along the west side of the project area.
Two sections of the Mason County Resource Ordinance apply to this proposal: Landslide
Hazard Areas (Sec. 17.01.100) and Wetlands (Sec. 17.01.070). This permit will allow the
placement of the engineered soldier pile retaining wall on the downhill side of the road and
the current alignment to be used for the proposed repair of roadbed and drainage facilities
adjacent to the wetland. The retaining wall plans were accompanied by engineering
calculations and narrative that assures that the structure meets safety factors for construction
and stability of the project site. The use of erosion control revegetation measures and the
replanting of wetland vegetation along the west side of the project area will allow the project
to address the temporary impacts of road and drainage construction.
Recycled
DEPARTMENT OF PUBLIC WORKS:
Public Works has reviewed the plans, calculations, and narrative from Department of
Transportation engineers and finds the data and report satisfactory to the Resource Ordinance
standards.
DEPARTMENT OF HEALTH (ENVIRONMENTAL HEALTH):
No review by Department of Health was needed for this proposal.
FIRE MARSHAL:
No review by the Fire Marshal was needed for this proposal.
COUNTY BUILDING OFFICIAL:
As the proposal is exempt from county building codes, no building permit was required for
this proposal.
OTHER COMMENTS:
In addition to the SEPA environmental review being carried out by the Washington
Department of Transportation, the Washington Department of Fish and Wildlife provided
input that erosion and sedimentation was minimized by controlling the runoff into the
proposed drainage facilities and by re-establishing wetland vegetation along the edge of the
wetland situated along the west side of the road alignment.
CONCLUSIONS:
Based upon the above review, this Department finds that the applicant (Washington
Department of Transportation) has presented a proposal to repair the existing road alignment
and improve area surface and subsurface drainage. In order to lessen potential impacts to the
wetland vegetation adjacent to the State Highway, implementation of erosion control
measures and temporary vegetation cover and replanting of wetland vegetation along the west
side of the project area will allow the project to address the temporary impacts of road and
drainage construction.
On this date Mason Environmental Permit RLC99-0074 is approved with the attached
conditions.
Gary Yando, Director (date)
Department of Community Development
Allan Borden, Shoreline Planner (date)
MASON ENVIRONMENTAL PERMIT RLC99-0074
WASHINGTON DEPARTMENT OF TRANSPORTATION
STATE ROUTE 3 ALIGNMENT REPAIRS
NE 1/4 OF NW 1/4 OF SEC. 17, RAW., T.23N.
CONDITIONS OF APPROVAL
1) The applicant shall follow the specifications and construction standards of the
geotechnical report and construction drawings submitted with the project application,
including the surface and subsurface drainage system and erosion control measures during
construction and following project completion.
2) The applicant shall implement temporary revegetation measures (reseeding and matting)
following the preparation of final grades, and shall replant wetland plant species along the
west 50 feet adjacent to the drainage system at Milepost 22.59.
• r ' I OLSfHpIC
< REGION
M ...
W
- - - - - - - - - - - - $EG I N- CON-STRUC-TJ ON - - - - - - - - - - - R,
- - - - - -
' SR 302 MP 0 . 00 - - _ _ _ - - - E - - - - - - _ _ - . �'
' .a.
SR 302 STA . 0+000:000
a R 3 MP 3. 6 c I
o - --------------�
W a rl
; -
Z ' JEFFERSON --_
Q, E CONSTRUCTION � rN— _
v SR 302 R 302 MP 1 . 26 T GRAYS RI _
W 7 (VICTOR SR 302 STA. 2+0-13 . 000 � ® !
CUTOFF ROAD) 8 I
1
END PROJECT LAKE
► 9
END CONSTRU T I I �"""°
m I . ,� ._
SR 3 MP 2 2 . 3 s,P I ® ® PIERCE
I •�• THURSTON i o.
SR 3 STA . 2+320. 00
- - - - - - o�� -
; - - - - - - - - - - - - - - - - - - - - - - - - - 0--------------
r
'PIERCE C0
I I o o I
Q� SR 3 WETLAND
MP 22.5e sip ty
o Q
a. BEGIN CONSTRUCTION
QD NB LINE STAN, 0+000. 000
18 17 D 0 16 15
BEGIN PROJECT n m
BEGIN CONSTRUCTION
SR 3 MP 22 . 48 f�
SR 3 STA. 21 +915 . 000 �
O END CONSTRUCTION
- - - - - - -
- � NB t� NE STA : 3#O68-, OOQ -
302
ALLTH
19 2� 0 200 460 660 800 1000
��.� - TNJ , C'-._-IC ff
I
RE"Olf"ISTAT FED.AID PROJ.NO. PROJECT DEVELOPMENT
DESIGNED BY R.AMES 10 wasH OFF I CE �� SR 3 vl
ENTERED BY R.D00D Washington State ALLYN VICINITY SLIDE REPAIR
CHECKED BY M.CRICWARE J08'"ieL* Department of Transportation s" '
PROJ. ENCR. N.CAMPBELL 99C518
REGIONAL AOM. C.OEMICH CONTRACT NO. VICINITY MAP 3.
DATE DATE REVISION Br
N
LEGEND
• T.22N. R.1W. W.M.
Z EXISTING CATCH BASIN
Ir
w EXISTING GRATE INLET
N
N
w - SEEDING, FERTILIZING, AND
MULCHING
N ®® STRAW BALE
w -
M —FILL FILL LINE
a
p
�► —CUT CUT LINE
LU
Z T- BEGIN PROJECT
EXISTING DITCH
BEGIN CONSTRUCTION
�
.--�----- EXISTING DRAINAGE PIPE
SR 3 MP 22.48
Z a& U& Wu. EXISTING WETLAND STA. 21+915.000
—►—�--►— EXISTING STREAM
Ln
W TEMPORARY SILT FENCE EOUATIONs
0
1* ............. WETLAND SITE BUFFER ZONE SR 3 21+897.409 P.T. BK.=
SR 3 21+899.177 P.T. AHD. JP
WORK ZONE SITE PRESERVATION LINE (CONSTRUCTION FENCE) C�Q
PRESERVATION LINE
SR 3 21+695.183 P.C. ri
H
_ - -
a
__ -�
cl
o p0,2_ _ _ 63• 5 f
a ``��
+800 c*,
on 4
I--- ---�—
SR 3 21+798.843 P.I.= _
R/W SR3 21+798.843 P.I.
— —'------------------------ --"— FORMER 5 "
AFTER CLEARING AND GRUBBING OPERATIONS ARE COMPLETED
THE TEMPORARY SILT FENCE AND STRAW BALE BARRIERS SHALL
BE INSTALLED AS SHOWN ON THESE TEMPORARY EROSION SEDIMENT 0 l0 20 30 a0 50
SCALE IN METERS ALL DIMENSIONS SHOWN ARE IN METERS UNLESS NOTED OTHERWISE
CONTROL PLANS.
xccla '
STAT FED.AID PROJ.NO. PROJECT DEVELOPMENT
DESIGNED BY R. AMES 10 WASH OFFICEAMkk SR 3 TE 1
ENTERED BY R. DODD Washington State ALLYN VICINITY SLIDE REPAIR S.E _
CHECKED BY M GR I GWARE J0e Mumma Department of Transportation I z:`
PROJ. ENGR. N. CAMPBELL 99C518 TEMPORARY EROSION AND
REGIONAL ADM. G. DEMICH C0'TWT MO. s�c s
SEDIMENT CONTROL
DATE DATE REVISION BY
T.22N. R.M. W.M.
z _ _ -. __________
.. ..
Ld ........
LA - - - - - ,
N WIRE-BOUND OR
T+► STRING-TIED STARE OR REBAR
STRAY BALE TO BE DRIVEN IN s
FLUSH WITH TOP •
OF BALE EXCAVATED SOILA
BACRFILLED AND
COMPACTED TO
y► YIRE OR STRING I I 11 I THE SATIiFACTION '
. a ORIENTED Ow S[OE 1 OF THE EH41MEER
1* AMD END OF BALE _
00
�I I DIRECTION-OF FLOW
Do w. u,,
Z EXISTING EXISTING- - ,�,
w GROUNDT I T I cRouwo .)u. ,,�, w. ++�• �'• /�!C
+oo .. w. � ALL.
la. MINIMUM
•�• .W.
�) END PROJECT
STRAW BALE BARRIER '')`' au. '"`` "'` s: uJ /
SR 3 22«162.60 P.T.
Lu TYPICAL INSTALLATION AIL. All. : Z�
6► (SEE SPECIAL PROVISION SR ••22+077.46 P.I. ,W. All. AIL END CONSTRUCTION
N STRAW BALE) ,
W SR 3 MP 22.T3
a 3
d o \� SEA. 22+320.000
y 1�1 + —— _ +3 00 _ _
SR 3 i a -- —�— —
N 2140� '00"25" W
La
RM
S,qo- '
f R040
o° LEGEND
819 0 i' �' EXISTING CATCH BASIN
EXISTING GRATE INLET
SEEDING. FERTILIZING. AND
MULCHING
STRAW BALE \` `
—FILL— FILL LINE \\`.
—CUT CUT LINE
i' > EXISTING DITCH
•------- EXISTING DRAINAGE PIPE --__
'� `� �• EXISTING WETLAND
�--+ ► EXISTING STREAM
• TEMPORARY SILT FENCE
WETLAND SITE BUFFER ZONE
AFTER CLEARING AND GRUBBING OPERATIONS ARE COMPLETED WORK ZONE
THE TEMPORARY SILT FENCE AND STRAW BALE BARRIERS SHALL -- SITE PRESERVATION LINE (CONSTRUCTION FENCE)
BE INSTALLED AS SHOWN ON THESE TEMPORARY EROSION SEDIMENT 0 10 20 30 40 50 PRESERVATION LINE
CONTROL PLANS. SCALE IN METERS ALL DIMENSIONS SHOWN ARE IN METERS UNLESS NOTED OTHERWISE
"R o. STATE FED.A I D PROJ.NO. PROJECT DEVELOPMENT
AMESIO WASH OFFICE SR 3 TE2
DESIGNED BY R. DODD Washington State ALLYN VICINITY SLIDE REPAIR
CHEERED BY R. DODD A Department of Transportation ' j�T
CHECKED BY M GR 1 GWARE J0w"�" OFPROJ. ENGR. N. CAMPBELL 99C518 TEMPORARY EROSION ANO
REGIONAL ADM. G. DEMICH C-TRACT No. g
DATE DATE REVISION BY SEDIMENT CONTROLS 5
W
Qoti o,� itr 9Z
90 N W 1/4 N W '14
CURVE DATA SEC. 17 N T.22N. R.1W. W.M.
to P.I. STATION i DELTA RADIUS TANGENT LENGTH S + - 18
22*077.46 42'00.00'• 243.84 93.60 17
8.74
• N I
86 W N 8
lb SO Ja ;� S W ��4 S W 1/4
n e4 a8 Ln
SEC. 8
«�
9
SR 3422+162. .T. ?
w w u4 ALL (� \
Q ,ill. ALL .Llt. Da /09
,ill. Go0..il[. i I [\ ` 9 ^ -
1 \
Z All. N illl al ll� a14 O I 1 \0 66Ln le ,
\ 96�0 9 10 ��
6 N, 0
w 0 O
V) WETLAND SITE
2192.984m2 ALL � 9g 90_'
0.54 ACRE SR 3 +077.4�6 P.I. _ i g 94 2 ti
END PROJECT
N 90 92/ o SR 3 MP 22.73
�, ` 88' � '� STA. 22+320.000
3 es
—°T— —°P T— —OP — —OP— —OT— — —OT— —0 — —0TaA _" — 86
\� + + nn
rn 16 Ge 11 80 SR 3 -------
'A °tom O� N 21'00"2 W TO GORST
o +1 _ ___ _
LILT °' �Ge 82 " 12;aS M I L E 5
78 � JF
cox ape m 11 76 w 190 / IV 9 m
00 �pt� �/ 1` CDi m
6- eA $2 pew 1, Tq END WAIL 6.5 t.
SR 3 21+983.86 P.C: EDqF, OF f_A� 3 22+240.000
OU E � Ln
o a
16 f 2 •� 3 �9 ` 78 N o
GO
CD
c
v�m3 a �0 N RiM
1g 65 N LD a
� / GO
V GOr�
W %D
� 3
Coro .. + o ro 3
,6 CP NE 114 NW 1/4
o
68 �6A �62/ w u' w SEC. 1 7 -�
LP a
�0� BEGIN WALL 6.5m t LEGEND 33
i SR 3 22+000.00
/ A �� ssv�s i9 EXISTING CATCH BASIN / +ro
1
EXISTING DRAINAGE PIPE LnN
—R/W— RIGHT OF WAY BOUNDARY
i 10 EXISTING POWER POLE -4
-OP— —OP— —OP. EXISTING OVERHEAD POWER T ro n
Imo +
BEGIN PROJECT /�0 -OT——OT— —07 EXISTING OVERHEAD TELEPHONE o�: ^' LID
3 MP
ti�
STA. 21+970.000 OP--OT--OP— EXISTING OVERHEAD POWER AND TELEPHONE v' Iv Ln
�v w w -4
?� SOLDIER PILE WALL
x'9�c� AU. ill/. EXISTING WETLAND SE 1/4 SW I/4
696 0 10 20 30 40 50 —10--10--10— EXISTING STREAM SEC.
SCALE IN METERS
TRENCH DRAIN
REGION STATE FED.AID PROJ.NO.
PROJECT DEVELOPMENT
DESIGNED BY R. AMES 10 WASH OFFICE SR 3
ENTERED BY R. DODD Adw Washington State ALLYN VICINITY SLIDE REPAIR
MAP DepartmentCHECKED BY M GRIGwARE JOB NUMBER . Department of Transportation '
PROJ. ENGR. N. CAMPBELL Or
REGIONAL ADM. G. DEMICH CONTRACT G. WETLAND SITE PLAN SHEETS
DATE DATE REVISION BY
h
f - - - - - - -- - - - -- - - - - T.22N. R.1W. W.M.
_ _ _ _ _ -
Z �1 �. _ _ :.. - - - - - - - - - - - - - -
Lu .
ENO PAVING
a
OWE 1*170.000
N 111.
41►
• M
M '� ,1w 'w' all. .`i'' •�
� ..�. OWE 1+000=
wu/. �lr. SR 3 22+153.000
g AIL (4.88 Lt.)
a �lr. emu.
Lu w4 ul. all.
J Ali. WA
Z ALL UU 114
�1/ au. a4 11r. : uJ SR 3 22.162.60 P.T.
1n All. END PROJECT
LLJo SR 22+077.46 P.I. -"'- U& Alta to END CONSTRUCTION
;
t2 13 END PAVING
: w /SR 3 STA. 22+248.000 SR 3 MP 22.73
6 3 SEE SHEET PI STA. 22+320.000
y �lr. 5 t` tt o �� is 17 1s JOINT DETAIL
T �� + +300 _
=____
SR 3 —�—__
v► t - - j4 N 21'00'25" W 16) —
M ,.
LJ
1:14 TAPER TYP. BOTH ENDS
l 0 r + OF BARRIER
� END WALL 6.5m Rt.
SR 3 22+240.000
PDT / 9
o - R SR_
/
p
s s o a
A /
�9/X BEGIN WALL 6.5m Rt.
�y SR 3 22+000.000 i ,'
DL1 STA. 1+030.607 `�\
BEGIN PAVING
SR 3 STA. 22+000.000 2C� 1 i xN `
f NEW HORIZONTAL DRAINS
SEE SHEET P1
JOINT DETAIL F NEW DITCH `
- LEGEND
O , NEW DRAINAGE PIPE EXISTING CATCH BASIN I
— EXISTING DITCH
EXISTING GRATE INLET --_—__
, •------= EXISTING DRAINAGE PIPE ___•
DL1 STA. 1+000.000= Cl NEW GRATE INLET
SOLDIER PILE WALL
SR 3 22+000.971 (38.231 RT.)
❑ NEW CATCH BASIN
EXISTING WETLAND
CURVE DATA 0 NEW MANHOLE
P.I. STATION DELTA RADIUS TANGENT LENGTH S — --►--H-- EXISTING STREAM
1.004.000 72.06'25.1.. i 2.184 1.7T6
1+02e.437 90•40'S1.7" 1 3 1 3.036 1 4.749 1 HAND PLACED RIPRAP ® TRENCH DRAIN
0 10 20 30 40 50
SCALE IN METERS SINGLE SLOPE CONCRETE BARRIER
ALL DIMENSIONS SHOWN ARE IN METERS UNLESS NOT=D OTHER,;:-_
I Acc„'°' STAT FED.A I D PROJ.NO. PROJECT DEVELOPMENT PD2
j
DESIGNED BY R. AMES IO WASH ' SR 3
ENTERED BY R. DODO Washington State ALLYN VICINITY SLIDE REPAIR
CHECKED BY M GR f GWARE '0°wAmug Department of Transportation I
PROD. ENGR. N. CAMPBELL car4.cT w. PAVING AND DRAINAGE PLAN
REGIONAL ADM. G. DEMICH �s
• I DATE DATE REvISION BY
SEC. 17, T.22N., P.M., W.M.
MASON COUNTY
00
\ O+ 9
� 78 r0 i
i :H-1-98 � n
0 76 7g CO "�
H-2-98 8 \ 88
• e9 I
190 a
64
82 +100
H-3-99 80 \
80
3
N� j8 0 76 �6 H-6-99 1 4
7 —�
/16 22!11'000 72 74 H-5-99
3 14 H-2-96 H-4-98 80 r
72 e2
10 70 >
WALL SP3 S TA.
BEGIN WALL SR3 STA. 68 v 22+D240.000 (6.500 PT-)
22+000.000 16.500 RTJ = W STA. 0+235.670
= W STA. 0+000.000 �e
68 PLAN
W STA. 0+235.670
TOP OF WALL AND FINAL GROUND EXIST. GROUND W STA. 0+139.795 EL 61.790
LINE AT BACK OF WALL LINE 6.500 PT. EL 78.905 - -.-s _-
W STA. 0+000.000 ------------------------ ------------ - N
i
R W STA. 0+2231.350
EL 75.420
FINAL GROUND LINE < .; t nj
W STA. 0+011.775 ,i :; R AT FRONT OF WALL i i :t n :I a s
EL 69.055 „ ,, IT j
EL
sac ! �
EL 65.000 ?
2 545 y j .j SHAFT SPACING 126 SPA a 1830 = 230.580 I I _� 2.545
I
3 t
08L W 360 x 64
�W 360x216
ti W 360 x 216
w SEE SHEET W4 - FRONT OF WALL GRADING
W
NOTE:
�I 1. LINEARLY INTERPOLATE BOTTOM OF SHAFT ELEVATIONS TO
ELEVATION
o OBTAIN THE ELEVATIONS OF INTERMEDIATE SHAFTS.
2. CONTOUTR LINES ARE EXISTING GROUND.
2 norocE
Br.dge oes.gn Engr a G RUTH STATE FE.D AID NO. �• K�pBRICGE AND STRUCTURES OFFICE ti C. s"0
�o
8 Supervisor K.K KLWER �d rW1- ' Imo'-'per. SR 3 - W 1
Des.gned By M. T&UKDM 4/99 10 WASH. y 4� �� �j �► Washington State
�I Checked By K.N.KIWER 4/� Department of ALLYN VICINITY SLICE REPAIR
(
Derd.led By LL HOUSE 4/99 JOB NUMBER 9'b �s '-�j �t�� E •
9ridge �rp;e�t, Engr � .> AL�,�E Transportation
01
irehm. Plon By ALA' WALL SITE PLAN AND ELEVATION 3�
ArGhi}eCt/Speaafizt DATE REVISICN 3v7'P.0 [v'zz n� [x.•'[s s.vm s.Ee*s