Loading...
HomeMy WebLinkAboutStormwater Plan - GRD Engineering / Geo-Tech Reports - 11/9/1994 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 November 9, 1994 INTER-DEPARTMENTAL COMMUNICATIONS DATE TO: JASON NANASSEE, DCD - Planner FROM: AT-AN A. TARTA, P/W - Hydraulic Engineer SUBJ: CHET'S TRUSSES - Cammercial Stormwater Site Plan Review Jason, I have reviewed the proposed stormwater drainage plan prepared for "Chet's Trusses" by CONSOLIDATED ENGINEERING, and do not feel that the proposal meets minimum County requirements for commercial site developments. Commercial sites are required in Mason County Parking Standards (Ordinance No. 815) to retain surface water runoff on site or dispose of it into an area approved by the Mason County Engineer. Recognizing that many areas of Mason County do not readily lend themselves to infiltrating stormwater runoff, Mason County Public Works has allowed discharges from commercial sites to occur if the rates of discharge from the site conform to Puget Sound Water Quality Authority (PSWQA) downstream erosion control standards. These standards underlie the requirements contained in the Stormwater Management Guidelines distributed by the Mason County Department of Community Development. The PSWQA Technical Manual (III-1.3 Minimum Computational Standards) requires; 1. For all computations, except for basin plans or equivalent, the minimum standard shall be the Soil Conservation Service Unit Hydrograph (SCSUH) method (1) with the level pool routing method, or equivalent hydrograph techniques, subject to approval of the local government. The Santa Barbara Urban Hydrograph (SBUH) method is also an acceptable method. A computer simulation using the information submitted by Consolidated Engineering input into the SBUH method, indicates that the proposed facility exceeds predevelopment discharge rates by appreciable amounts. Other concerns include; 1) In calculating the pre-development runoff, the engineer appears to only address the runoff from the front half of the property, then applies a 5 year event rain intensity to the site. It would be to the proponents advantage to use the full site in determining pre-development discharge rates. The employment of a 5 year storm event has little relevance in this site's analysis. File: H:\WP\LETTERS\C-TRSS.IDC A. 2) Catch Basin #4 discharges stormwater from the site to the north without any control feature. 3) The extent of material to be excavated/graded cannot be determined from the plan sheets submitted. Sheet 2 of the drainage plans shows three elevation contour lines and indicate that a 25 foot cut will be required for the building. Where this borrow material is to be deposited is not indicated on the plans. If all the material is to be removed off site, then the receiving site should be identified and permitted if necessary. There is a remote possibility that the three contour lines fully describe the surface topography, but there is no indication of the frequency of the contours or their relative elevations. The contour lines need labeling. If the entire area contained within the contour line shown in the northeast corner of the property were excavated 25 feet deep, the volume would be approximately (2)x(70x8Ox25)/27=2,590 cubic yards. In stumnary, I feel the stormwater plan needs further designing and information needs to be submitted to facilitate calculation of earthwork quantities. l 47,M � A. TAIi7A File: H:\WP\LETTERS\C-TRSS.IDC