Loading...
HomeMy WebLinkAboutBLD94-1574 Storage, Manufacturing - BLD Application - 10/13/1994 Permit No. MASON COUNTY oc= to BUILDING PERMIT APPLICATION �/��] 426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628 PCE�V6E PRINT 9 rn x g$ ` eV A) LoQJ ,,u Phone# 0D� - 2�� ��fs Add n o 09r✓ Fire District# it v UJ St u-)/d- Zip gfr-bctionO Job Site 11e J C�-a 12 r(' f 4)r 0-2 019 R c I k v Owner Mailing Address PC) 6 O X ( R U City f v St W4 Zip S Lien/Title Holder CAV Address U-r-r 21 14 F City �c�st✓ St CO, Zip #2 Contractor Name /UO r4 k w ej� Q t c.o t+v t Contractor Reg#/UD R T%SD ?S D-Z Address C) 60k 30')q Expiration Date_01 /_r_/q_ City a Y Y M rO kA) St LAJ� Zip 9 831 o Phone# 2 3 _y 3 Z3 #3 If septic is located on project site, include records. Connect to Septic? Public Water Supply Well Connect to Sewer System? Name of System (If residential, proof of potable water is required) A p 02 eEtl � #4 cel No.1)311 -�_- 00 D Legal Description 70- t5 n )E �E #5 Building Square Foo� eoxiissting/proposed) 1st FI 36 y / 0� 2nd FI / 3rd FI / Loft / Basement / Deck / #bedrooms / #bathrooms / Garage / Carport 1 (Circle:Attached or Detached?) Other sq. ft. / /n1 #6 Use of building Uoi-4 e Z rn4ALA CACt o" " Describe work /t✓t,c 4"i4G�Wc�f 94-c'!� I Tf�SSrS #7 Type of Job: New X Add Alt Repair Other #8 MOBILE/MANUFA TUBED HOM RMATION Model Year Mak Model Length Wid Serial No. #Bedrooms Bathrooms Type of Heat Purchase Price $ #9 Indicate by circling the applicable source if any water is on or adjacent to subject property: A' River Pond Creek Stream Wetland Lake Marsh Saltwater Seasonal Runoff Other /`� Show following on the site plan Lot Dimensions Flood Zones Existing Structures Fences Structure Setbacks Driveways Water Lines Shorelines Drainage Plan Topography Septic Systems Wells Proposed Improvements Easements Indicate Directional by (N, S, E, W) Name of Flanking Street Name of Fronting Street in relation to plot plan APPLICANT TO DRAW SITE PLAN BELOW �Ap d5 ���r� APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW Plumbing Fixtures ($3 each) Fee Mechanical Fixtures($6 each) No. Toilets CIRCLE FUEL TYPE: Gas, Electric, Bath Basins Heatpump, Other Bath Tubs No. UaL Fees Showers _ Furn BTU Hot Water Htr _ Heatpumps _Laundry Washer _ Vent Systems Sinks Spot Vent Fans Floor Drains No. Boilers/Compressors _Laundry Basins HP Dishwasher No. Air Handling Units _Disposal _ cfm# Urinals No. Fire Protection Systems Other _ Auto. Fire Alarm Sys 50�00 Fixed Fire Supp. Sys 50.00 Permit Basic Fee 15.00 Auto Fire Sprink Sys 25.00 TOTAL PLUMBING $ No. Other Gas Outlets Wood, Gas, Pellet Stove NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COM- MENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR Permit Basic Fee 15.00 WORK IS SUSPENDED OR ABANDONED FOR A PERIOD TOTAL MECHANICAL $ OF 180 DAYS AT ANY TIME AFTER WORK IS COM- MENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU- ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE CONFORMANCE THEREWITH. NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING THE BUILDING DEPARTMENT. DEPARTMENT. X OWNER X BY DATE DATE / Iq A y FOR OFFICIAL USE ONLY:Accepted by: '` ` ` Date: � DEPARTMENTAL REVIEW FOR OFFICE USE ONLY Approved Cond. Hold Approval Planning: Environmental Health: Building Plan Review (� c( Occupancy Group: 8—,Z Type of Const: Fire Marshal: Other: Special Conditions:- -s Oe p-m rr FEES Building Permit / Z yK C, 02 ecii rJ 1 C6 Plan Check -�- -i-If r S Z cam-,-L r 2 G7G3 7o SC O nJ 17— Plumbing Fee Mechanical Fee Wood/Gas/Pellet Stove Radon Monitor Violation Fee Site Inspection Building State Fee 1/l Other Other Building Valuation: � �7 c TOTAL FEE a * ' GARY YANDO,DIRECTOR P�cN.sT,arFo o A U N u DEPARTMENT OF COMMUNITY DEVELOPMENT o T i PLANNING -SOLID WASTE-UTILITIES 2� N Y BLDG. III • 426 W. CEDAR • P.O. BOX 578 1864 SHELTON,WA 98584 • (206)427-9670 November 10, 1994 Mr. Rolla Boughan Consolidated Engineering P.O. Box 2321 Bremerton, WA 98310 RE: BLD 94-1574. "Chet's Trusses" Minimum guidelines for stormwater management. Inadequate permanent stormwater management plan. Mason County has reviewed the proposed stormwater drainage plan prepared for "Chet's .Trusses." The proposal does not meet minimum County requirements for commercial site developments. Commercial sites are required in the Mason County Parking Standards (Ordinance No. 815) to retain surface water runoff on site or dispose of it into an area approved by the Mason County Engineer. Recognizing that many areas of Mason County do not readily lend themselves to infiltrating stormwater runoff, Mason County Public Works has allowed discharges from commercial sites to occur if the rates of discharge from the site conform to Puget Sound Water Quality Authority (PSWQA)downstream erosion control standards. These standards underlie the requirements contained in the Stormwater Management Guidelines distributed by the Mason County Department of Community Development. The PSWQA Technical Manual (III-1.3 Minimum Computational Standards) requires; 1. For all computations, except for basin plans or equivalent, the minimum standard shall be the Soil Conservation Service Unit Hydrograph (SCSUH) method (1) with the level pool routing method, or equivalent hydrograph techniques, subject to approval of the local government. The Santa Barbara Urban Hydrograph (SBUH) method is also an acceptable method. A computer simulation using the information submitted by Consolidated Engineering input into the SBUH method, indicates that the proposed facility exceeds predevelopment discharge rates by appreciable amounts. Other concerns include; 1) In calculating the pre-development runoff, it appears to only address the runoff from the front half of the property, then applies a 5 year event rain intensity to the site. It would be to the proponents advantage to use the full site in determining pre-development discharge rates. The employment of a 5 year storm event has little relevance in this site's analysis. 2) Catch Basin #4 discharges stormwater from the site to the north without any control feature. page2 RB 3) The extent of material to be excavated/graded cannot be determined from the plan sheets submitted. Sheet 2 of the drainage plans shows three elevation contour lines and indicate that a 25 foot cut will be required for the building. Where this borrow material is to be deposited is not indicated on the plans. If all the material is to be removed off site, then the receiving site should be identified and permitted if necessary. There is a remote possibility that the three contour lines fully describe the surface topography, but there is no indication of the frequency of the contours or their relative elevations. The contour lines need labeling. If the entire area contained within the contour line shown in the northeast corner of the property were excavated 25 feet deep, the volume would be approximately (1/2)x(70x8Ox25)/27=2,590 cubic yards. In addition, there is no evidence for provision for temporary erosion and sediment control. At a minimum: An P,SC plan should show limited construction access to the site, provide for the covering of soils if they are to be exposed for more than 2 days, retention of sediment on-site through the use of structural and source control BMPs, maintenance of erosion and sediment control BMPs through regular inspection. In summary, the stormwater plan needs further designing and information needs to be submitted to facilitate calculation of earthwork quantities. ZRestfull. ssee, Planner ment of Community Development c: _ Alan Tahja Chester Loudin E ✓ MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 January 4, 1995 INTER-DEPARTMENTAL COMMUNICATIONS DATE TO: RANDY NEFF, DCD - Planner ALAN A. TAI-LTA, P/W - Hydraulic Engineer FROM: -- ------ S U B J: Revised Stormwater Plan for Chet's Trusses . -- submitted a revised permanent stormwater plan for the proposed expansion of Chet's Trusses manufacturing facilities near Belfair, Washington. The revised plans prompted a site visit by myself to verify consistency between the submitted plans and the actual site. A site inspection was conducted on December 13, 1994, with myself representing Public Works and yourself representing DCD. The site inspection revealed a number of concerns not addressed in Mr. Ban's site plan, in particular; (1) The berm and paved road paralleling the south boundary of the site are not evident on the site and should be identified on the site plan as proposed. (2) A residential structure appears to be sited in the location of the "new" truss factory. This and any other structures to be removed during development should be identified on the plan sheet. (3) The property immediately south of the proposed improvements appears to be a wetland area. The water table appears to be very near the surface of the existing site(s) . Depth to water table for the site should be determined. Storage proposed below the water table elevation will be viewed as dead (permanent) storage. (4) The "existing" 30 foot diameter pond Mr. Boughan proposes to use for retention/detention appears to be an element of the stormwater plan implemented for the existing improvements. This pond was observed to be full of water on December 13, 1994. The storage Mr. Bohan has proposed appears to be permanently filled, with no reserve capacity for detention available. In addition to concerns with the physical site, Mr. Boughan has again employed static analytic methods based on improper storm runoff curves. A computer simulation based on the Santa Barbara Urban Runoff methodology indicates that the storage capacities proposed by Mr. Boughan are not adequate and provide little benefit or mitigation from increased runoff. I feel environmental concern are not being adequately addressed in this latest stormwater plan and that a SEPA checklist should be required of the applicant. As a manufacturing activity, this proposal should be reviewed to d �w�he�_thaNPDES permit needs to be procured for this site. 447 A Ahd A. TAHJA File: H:WP\LETTERS\CHETS.TRS a X� t` t �'.�' +}_ ;•1�, a � 7,1r, ra.�rlil 'I�i�;. �tOADCO�ISTRUCTION 14�G EEMENT it ;(r BE '•.,,.�},I {# r SJ i .r.ffi"y" 1"Y 1 '{h 'r' Iy) DEPARTMENT OF HIG14WAYS, MASON COON ; WASHINGTC ; ` !} AND Iit r U i i I 'I I+�a�. I i k r> I �. ,•�� i ty.E{ ; r PI 1> jc 1. r ( + I. _ .i rl, i P� a $ Allan J r:," I1 072 r' Ei""I�,r; PROPERTY OWNER I i , y �+ !' i (��` li �, ;iI � ,_ 9825 r do ' h ti I h 1. t .,I � � .�°�i{ �'{�(��. rl' 1 f i'�� f t•�F-_'•f�{'7� �II. i Iy y �r '1 I N'.�111 f�'��'� �, ' { I I• I , '1N it 9greelnbtit ti 7 be supplemental;to the tvritteti i, nil6i any right of wa deed but shall not be In conflict therewith.It shall also serve to protect b interests o!thb'count and the property owners where'no right of way eed is necessary.it it intended to cover details of construction in matters to-do 1>e be silpcept to mieunderetandittg Undo liability nor obligation shall exist except as stated herein or In the right of way deed.) I 1� 1; V th Z'Gr 'I hi I ,. I ..I. { �j %�4r , H+``. +� ts # t tf If Is:- rail J]�'E( ��jl�' y �' � r. 1' { unit tsighed hereby, agree tth 1; dll�wing conditions for the°�o struction of the project .named and I I �1 I I �rC ; ,.. i7� '-� 4' ,I•� I !�, r i trVe. etsi'VA diet_ilnd erld i from ditcb off-ovuet-a-Pltoger� - • t—._ --- �'!�' 1 a� b `owner at ,time of ,project, anydirt ,ilia b d o feasible locations dit .i• r � 1 I. t 6 r I it �'t'�.i ii •oa.0 ty,hold espil si �. 'for an ro art a that may open �e�igging �(�I I ... a• ;I i I ;.,;.y tl� { II. 1 '' j�a'I r�•;,�l��l�r, ,;�p.�Mh`�sdnlYli>fh:i'a.rrru:. sod: in this consttpe on Will bi left in idµ. or better ma s- J i.♦• i :. F { I' r,... - 11..•.. 3{�'�I ' r t .tt5 `"f �` !� ''tfi,1l��1 i I 1 �.. k.•J a iW �.ti� k act urrins �V ��./► :,y F .r.;.oM1 3 (1� I .[Y 'r' 1 is 'y, , I� .:,I �,. ...:j. r : qq ---. •II� 1�15�'1 5 �,il �I,'{,=I'�.. L� ICI..1 � h(��'��fTT'j f.., t �}, i.' j..'.1 ir, I ' a for. pie ,rate`t0a a 11TvYQmm_�t�lio�tda_�� i. Y grYeLLn bf ---- �ir'uSr �,• � �' �� t I , a j yi c IT w ,3{`"r, I •y � 3 1• {/ v ..� r�i i"'��r�� 9 I�S(.�'�'�� �`�' ��11.+ I I �I _.�- ' I ! ;j __ — --,--I — —.. — C I� 1 ;� { . ' DO WIler it (Signed is { Y , �.`y�( I•Ft f � t� ,��** �r f 7 ;{• � L�'' ( .+E1 /y�r Il 1 j�'�f 1�, 3 y�'��� �id�1..��Y j:� a3,.:��'r�• �� I�1�11��.� r� � . �,;��•; ���1}'��H �I�.�'•� r J 17. 41 _ash+ �r � - .7�t} }r�a�F.!�!i,•, Ey";�'.l}r 1 _ 1. ✓.. f r^�W� - - '+:•- +''� `$Z- T �1- �_.i �_r 'uTi-` �i�61Y ii fir'-..4. -" •S> t �_ +F-h+�,3 .. '- �:_}- ^Fa'.a-i7�..*1e. •Y!: r,.p.rlpl',+C. n.. •...4-' �?.` ..: .: ._°'.-c,,_•YQBT!`�FTS "a-.r,'G"S/� ..": 'f:• k�,,}'.z .x7".�M�2P'a�,ar sc „W' - +wR _NA "y s y 3+. '',7¢;;`.}(.Axg��.+t"A•! - c ``'C- ; •�finr+�tY�rsi--••t.,r:.w+c. pq'.-•� "�w.�rtc . arr++^ 3 >- �,..'�a2-rie-^a �-•�r.�;-= -. - w.•x,sx � �x• .g .e _ �' - -�'--•T"-„--- fir.'---'>'*--... •._ -�-_. ..��..�.._.: _��•�r -. `-- ._ -.� r .f�' �a'� w L_.._. A.�—(fig - �, •iaOM ar. !" 1�.�' � '- '. .�J�,.i7i. 1 Jy? .(�'." 'i J�l:'R^�'q Ir!-. �-Y.••l'!,_�4 '-f".-�y.� „'Y T.'�•�^�+'wT•F f(Y' Y�.6•+ R"i�. •zt -r' :LyT.!�5Xa.n� .r .3cC!-•a+:i_ y�'!i 3a-_`;i',P!3�'9Jr __ 18 r :r -..,3:4.=_.>te.•'. OF _+r•w.��•.•• +'k!�!C �, r' sw m--.�.•�,: �i - aver #r r;-.A�pc••• -sue �s.�.nensS.a•r �•.��s -c �`• "�}-•-- ,...«.:_,, t' _ .,,-..., .,,.. — .. ?'i:�-x.�ic., ...:..... . s :�s _rl- .,- .rya-�.r.su�:m,ku-.. .. '�` -�':^..,:,e'.�'-�•4,�, ��ri.>.a+��aari'�a� - - �M�.: x _ - � �'►:.�u sue. � z: �.�:s:�.c. J`7�". a+.;�--.. :..m.� .Q:f� •�c._J..,,...� rn��. v:� �.#�::is '� _.' �r .J�..=,�'��� ��d'-�°�-.�<y,1�--+c�c4.er�i�r. �`� aa-zRe �'�`�e 'Sa-+s�- -^e-,s�es' '�€'�^ . - � - r-*cam.• - _ . T___. .. ,.t=r . ["C z>k z'a. t•'"' .i` i.,�.-' , . x7 rx i - 'r"- - - .,_ s.,aa ..mr•.3.vw- ..macs - .k - �.YRRs'..' --�- iY• ...�c^� �,"s w �a:waa�nw•ewpr w -.:�`�ne'x,.. _� �T+ --- - - _�__ - !"�."� �g� '�._..__����•r�s-.-3a--���-�T '�4-�.� - _ g -c _ �_��-saw-'�Fes- __ g "7,&' - ?4!s r -'- 'X+ sr'<e. _•,.'€�-r, F'.... �.� j- ��! -_ r art" .f a. ..� s s_' '2 iR:3„ - --- E T� �1 NJ+:`�rl �T'i.y_ - i�3z.1�1r _r. Ii..•t?":�,Yr+i��[Tt�- -a1TJu. F t i i � _ _ +,-n- 1��1 !'_':''" •t� s ' - .RV 9-�ri�l+R .,ram .�1.,, h _ .,r.6 f-. •'b€. 3 w. Ic i. s. :c-:' _.a.` a �9k_�_2�.�'} ' �" �.t .' ys• .•:-.��r� =,` _ ::' ,+• :'. '„'ao•'• ! &yam.' S ;:. :J �� 7�aiaa _3 " Nrch + -._�I�'�'5..3.�-t' , 1 �Yp_ Y�pl sc,?"� T=?•^:- �. �-+'Y1'w �d�:. .',y'••"''' .'7�'�. .t.�"�-��•,',�'Y#+,�.,s'a' •.� _ ✓r ' �I •Fr;yc� _ .,rxa. �.-•s.«r.•*�.r ..ar �.rti.JNr+w. .. ,� .:-3�,,,-•c,...:.�w -LW WAR r - .....,..� ,,y� .:t'E�.•� .s._ •"S _ '�,.�; .rc.:�.;�t,X�4t'...>3t eex �t--.�..�.. a'-k`'�/�••��� '�`T ',� �"•r�+ ;<... �" �s�'". -. ..K. 1 _,� w.x '•CLa�-a fib ".•.=v',.,.'Z.M Ir•-' !-••-ny �- )i':.ic�.;,rJ '.as_ - :1 �i-.iY•1c��~- `.a-1 ) � -' •F�.>� ai.Tr:s- Fes'"`�^' _ _ ..•S4- ,th � iF _:.vrM1: �.-"�����.�- • .}� "' _ l`ttW+e'�P Ja'yuf4rT/'r'...� W. }' a(p�+e�+'o�1L.�w•.t.+yve�g2�_ �'r''�"i'n,�"�'.u.• � ..-. _rr�j• �J _..c. t z'• .:-rF,"f'w '�J;..,�s'�g 7 -u �` � '�`y�� .� _ 4a v .e .. y ,•vJ"! -ra..i i+.v.,r`�Vm - �� 'T �'.�:: .. .. ., �- }�•`�'�`i 1.��•:�i.�y!�2<4 tR+:_�w•-�y+��,'� � �7 -� 'R Yi. 7�~. r:+T3'nY. - _ - > t + �7'''-' '. :TY Z. 1.,.._..m� _ ipxvaS 1I5d i..�A��.rr3''• !' .es -•u5 •s�` '`3t'_ '.,;;•- r„a-�a � �� a�.ticJ. f�;s.� •�� �4-�..� � •Y'' � aatt��j.� •w�.•� i��.�a,.;F.�,:'£;' "'t-•: 3_�a -.�. �o'`s� �.� ;ti +'z�`y.•+S�°a"s�. :� x,r,�s1a•... = +�-,s»: .�'�'���__:�r�r� :t�sx r�-.•'�,rs� ��s td>r�a,�g.,::n'crr=�s�r•�s.sei �a,;, ...as�*r-'�r w�-�-+)r�---f-�-��.,—•rs�c•._�..-'�^-^�:^'z.^.�.s-�i_:.�_, �v�"��s-- ^^.�.c�� ��--�� --�=.��-a;_ ^-�� ,.WlwQvrxi + YY'i'-p LM.. s�'Y..w .•r�•iN --:.yn•I .} r ir'-i.. x }4 ''=•A%: _ ��.9�'�'k�:t'�`-:l.;q s_4s{� .�'L`s t �._ .�;`3 ''e a '� `a�m`'tH.u_.�' 3er� �-s.-° +a .�c :.a'� `-�. 'c. r �'+z<.. ty'"� '.'L�ss7`_y.:.,�..`; -+�. _ `a��''L'^'- .�^--- t';4 ;:��: `�Z"_..'.=r__.'._:aar >'uc.�{.«.�::-n► ;.a �.:ii�.c.. ;iwr"'��a�i +n�._ - i n •'�a:.,,.:� 3i�-.� J.-�' -f- __ -�=' •-����L` �d ? .:L-'�-'T"^- 'z_ � ""}"`t� '"^��`�S`e"'ae�`y._w�,si�Dp� '�. r "`` - �;*.-.1.-1c .w�,,,�„�".•`�"'� - - r'.'r_. '=�I�`. S - "rw-_: � i°4?S'__ _.,'�..r[��,,;T��.}r.._ �•.,,qr,✓r: - •-� _ � a•.4�'+2'',+. .r�S�'�., itr^"- � ;s�� ..sr';' �' - lj. y.�. _$'.a:S'�i'a«. 7 rt��;.�.,�.::y r--• q3P - °`!3^' ,,y_ Y M-S�'�i�` '��+ -_.-��z.:_.{N .Y.a Y,t�4�'.. ::...�'. �... .yae. _?i,. >`Y�,.. �. ,w':�.�v .rc,gh3. iha '._ '.:alL►'�t �._ "' �y'..s�^sx. '' '.ai.' .i4c:•• s - ��-^� :..+'_�� ' :.�.�_.�a' ' ice t• _-A. - -:c.�..�..+.:,�;... 1,s .�s-._ 7":-,q�_:'`� `,f `-M s - �- ---c.--"'Ftc^" �'e"'r'-,'�_�._'^''�*'� _' '" 'n'�v,•ro•-*�'�mrro,.' _ ��*.-_:���r�-:,,- - o--�-, a'7• - - s ::dTFSf. 9C.St3 - - _ t..-.•-�• - ::., `'met' _ •� _� ws GARY YANDO,DIRECTOR N.STA �0. O o n O Vol DEPARTMENTOF COMMUNITY DEVELOPMENT U z N T PLANNING -SOLID WASTE-UTILITIES X y BLDG. III • 426 W. CEDAR • P.O. BOX 578 Mesa SHELTON, WA 98584 (206) 427-9670 , December 12 , 1994 Chester Loudin P.O. Box 1980 Belfair, Wa. 98528 Re: Building permit BLD94-1574; Storage/Manufacturing buildings; two currently proposed buildings each 5000 square feet and one future .building 7200 square feet. Mr. Loudin: Pursuant to the Mason County Environmental Policy Ordinance and State Environmental Policy Act (SEPA) , environmental review is required for this development . I have enclosed an environmental checklist which should be filled out and returned to the county at your convenience. Please answer all questions as completely as possible in order to eliminate potential delays in processing. Upon receipt of the checklist and evaluation, a threshold determination will be issued. Processing time is dependent on the determination but will include posting of .the site and acceptance of public comments . If you have any questions feel free to give me a call . Thank you. Respectfully, Don Brush, Planner Department of Community Development CC: Mike Byrne, Building Department INVESTIGATION REPORT FORM Revised 12/03/92 ..................................I....... Statement of Policy ...............................................I.......................................................................................................... "It is the policy of Mason County to provide the highest level of service to our community. This means that we will investigate and resolve concerns expressed by the public. We will accomplish this in a timely man- ner and with courtesy, objectivity, and equity." Mason County Board of Commissioners ........................................................... Part A: Nature of Complaint .......................................................................................................................................................... • Initiator's Name: • Address: • Telephone: • Department of Concern: F1Clerical ❑ Building F1 Health 11 Comm Development Fire • Area of Concern: F' Process Delay Personnel Policy/Fee Code Violation ❑ Other • Location of Concern: • Nature of Concern: .......................................................................... Part B: Concern Intake and Referral .......................................................................................................................................................... Received By: Referred To: Response Date: ........................... Part • C: Findings ......................................... ................................................................................................................ Referral Forwarded to: ❑ N/A Findings: ....................I................... Part D: Resolution N'fma Fw ' Intake/File Gonv-White Referral Copy-Yellow Referral Copy-Pink Tracking Copy-Gold