Loading...
HomeMy WebLinkAboutMEP2008-00077 - MEP Permit / Conditions - 3/13/2009 PS014-STATFD� MASON COUNTY A o (PDEPARTMENT OF COMMUNITY DEVELOPMENT > OSN = Planning Division o Y Y P O Box 279, Shelton, WA 98584 of �o 1864 (360)427-9670 MASON ENVIRONMENTAL PERMIT March 13, 2009 MASON COUNTY PUBLIC WORKS P O BOX 1850 SHELTON WA 98584 Parcel No.: 123050060010 Issued: 3/13/2009 Case No.: MEP2008-00077 Project Description: Realignment of approximately 2.7 miles of Bear Creek Dewatto Road.Three major culverts will be installed as part of the project. Four Category III wetland areas totaling 9,962 sf will be filled as a result of project. The mitigation will compensate for impacts by connecting a previously intact wetland which was divided by the construction of ", „ the existing road. The project will create and establish 21,631 sf of wetland, 13,677'sf of buffer enhancement and 47,990 sf of buffer preservation. The following critical areas are present on this property: Long-Term Commercial Forest WHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions is ranted pursuant to the Mason P 9 P on County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date Mason Environmental Permit 3/13/2009 Case No.: MEP2008-00077 Conditions: 1.) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). 2.) The applicant acknowledges that the project will be completed as proposed, so that the project will be consistent with all applicable standards of the Mason County Resource Ordinance. 3.) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. 4.) The Mitigation Plan, dated October 2008, proposed by the Mason County Public Works Department, must be implemented throughout project development. The mitigation proposed would compensate for impacts to four wetlands adjacent to the road. 5.) Monitoring shall occur as proposed within the Wetland Mitigation Plan dated October 2008. 3/13/2009 Page 3 of 3 MEP2008-00077 e � I �01- UCH LC I I L) Pagel of 3 n �� I PERMIT NO.: � MASON COUNTY DATE RECEIVED: i --2i —(�� DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE ORDINANCE (Chapter 17.01 MCC) 411 N.5TH Street/P.O.Box 279,Shelton, WA 98584 ENVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMIT CONDITIONAL USE❑ The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1.APPLICANT NAME: SIGNATURE: MAILING ADDRESS � � Q�s�� WORK PHONE q !E-MAIL ADDRESS p HOMEPHONE ! O FAX# If an agent is acting for the applicant during the permit process,complete#2. 2.AUTHORIZED AGENT NAME: �Ae;P7C SIGNATURE: MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# 3.SITE ADDRESS 7 PARCEL NUMBER // LEGAL DESCRIIPTION DIRECTIONS TO SITE: 17C cic�r/ oYry /Y 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 )<Wetlands,Chapter 17.01.070 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Seismic Hazard Areas,Chapter 17.01.102 0 In-Holding Lands,Chapter 17.01.062 0 Fish&Wildlife Habitat Conservation Areas,Chapter 17.01.110 Page 2 of 3 5. Identify current use of the property Ywith existing improvements: 7/re Dr!;-?�e<q4 3. �or•7��r-rc;f/'a� d exiS i c� 6. Identify and describe the proposed project, including the type of materials to be used,construction methods,principle dimensions, and other pertinent information(attach additional sheets,if needed): 7. Describe why the action requiring this p�permit cannot be avoided. 8. Will there be an alteration of a wetland and/or wetland vegetation area? Yes No ❑ 9. Identify any surface water on or adjacent to property: ❑ Saltwater ❑ Lake ,K Stream ❑ Pond Wetland ❑ Drainage Ditch 10. If septic is located on project site,include records. A4 4. ❑ Connect to Septic ❑ Community Septic ❑ Public Water Supply ❑ Well 11. Type of Job: ❑ New Q Add IK Alteration ❑Repair ❑ Demolition ❑ Other: This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $590.00/$355.00(with another permit) MASON CONDITIONAL USE ENVIR.PERMIT: $1,420.00 HABITAT MANAGEMENT PLAN REVIEW: $415.00 SE I:IPLANNING\PAC\FORMS REVISED July 2008 Page 3 of 3 Show the following on the site plan Lot Dimensions Flood Zones Existing Structures Fences Water Lines Driveways Drainage Plans Shorelines Septic System Topography Indicate Directional by (N,S,E,W,etc.) Proposed Improvements Easements In relation to plot plan Name if Flanking Street APPLICANT TO DRAW �� SITE PLAN BELOW: APPLICANT TO DRAW TOPOGRAPHY BELOW: Mason County Public Works Bear Creek Dewatto Road Realignment Proiect Description The project involves the realignment of approximately 2.7 miles of the Bear Creek Dewatto Road in northern Mason County. It is approximately four miles north of Belfair. The initial phase of construction (clearing and grubbing the right of way) is scheduled for 2009. The remainder of the construction will take place in 2010. The existing two-lane road does not meet Mason County design specifications for vertical and horizontal alignment, shoulder width and guardrail placement. The northerly 5,260 feet on the project will primarily involve widening the road on its current alignment. The southerly 6,100 feet of construction will involve significant horizontal realignment. This realignment will be combined with de-commissioning approximately 4,700 feet of the existing road. In addition, a 700-foot connecting road from the current Tiger Mission/Bear Creek Dewatto Road intersection to a new intersection will be constructed. The project location is shown on the enclosed maps. Three major culverts will be installed as part of the road project. All three will re-locate culverts that currently exist on the portion of the road, which will be decommissioned. One, located at sta. 73+10, on Courtney Creek (west fork of the Union River), will be constructed to allow fish passage. It is a ten-foot round pipe. It will replace an upstream culvert, which is a barrier to fish passage due to an outfall drop. This culvert will be located at the lower end of a riverine depressional wetland that drains into Courtney Creek. The other two culverts are each three feet in diameter and will be installed on streams, upstream of any documented fish presence (WDFW Priority Habitats and Species database). WDFW's Salmonscape data base shows summer chum use ending one-half mile downstream of the culvert on Courtney Creek. Coho use extends approximately one mile above the culvert crossing. Fish use in the project vicinity is shown on the enclosed maps. Culvert installation will take place between July 15 and September 30. At that time of year, the two non-fish bearing streams will be dry and Courtney Creek, at most, will be pooled with no surface flow. The fish passable culvert will be constructed to meet the Washington Department of Fish and Wildlife's design standards for a "No Slope" culvert installation. The installation will potentially benefit wintering coho by improving access to the wetland above the stream crossing. Road construction detail and the culvert design for the crossing at Sta. 73+10 are shown on the enclosed drawings. Four wetland areas totaling 9,962 square feet will be filled as a result of the project. All four have been rated as Category III wetlands. Two are depressional wetlands with no connection to a stream and are very small. Another is approximately 18 acres in size and connects to Mission Creek via a 5,100-foot man-made ditch. The fourth is a riverine depressional wetland under 7,000 square feet in size, which drains into Courtney Creek. The fill in all four areas has been minimized to only that amount necessary to meet current safety standards. Mason County will mitigate for the wetland fill by constructing an on-site mitigation project. The project will create approximately 50,740 square feet of new impervious surface. All stormwater drainage from the completed project will be treated by retention in the designed ditches. The ditches will be seeded with grass and will retain run-off for infiltration and sediment removal before it is discharged from the ditch. The road to be de-commissioned will have the asphalt removed initially. Once the existing utilities are re-located, it will be scarified and seeded with grass. Various BMPs, including silt fence, drainage control devices and mulching will be used to minimize stormwater impacts to the surrounding area during construction. SECTION 5, 8 , VVNSHIP 23 NORTH, RANGE 1 WST9 WAb 4 v N, X I y "x ## 4 UM To WFAM scde 1 4w OFZXAH� save N, N T S DAW w REASIOM MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.ZHU WETLAND MMGATION' P.O.BOX 1850 COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD s;7ET SHELTON WASHINGTON 98584 MP 7.30-MP 10.00 P �3 COUNTY ROAD PROJECT#-1$O VICINITY MAPoc 60)427-9670 P-18 SECTION 5, 8 AND 9, TOWNSHIP 23 NORTH, RANGE 1 WEST W.M. _ f , A r 8 / — r C �r DAh �' PtY151ottS DAIS BY MASON COUNTY PUBLIC WORKS COUNTY ROAD N0.79800 WETLAND MITIGATION P.O.BOX 1850 sH�r COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK -DEWAQTTO ROAD MP 7.30-MP 10.00 P_3 SHELTON,WASHINGTON 9SS84 --- COUNTY ROAD PROJECT u 1563 OF (360)427-9670 ROADWAY PLAN P-18 8 SECTION 5, 8 AND 9, TOWNSHIP 23 NORTH, RANGE 1 *EST W M. - ' $ I I - l \ s r _ ` 77 ': DATE BY N MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.79800 WETLAND MITIGATION wen cw P.O.BOX 1850 y f� COUNTY + 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD MP 7.30-MP 10.00 P_2 SHELTON,WASHINGTON 98584 _ COUNTY ROAD PROJECT# aU 07 (360)427-9670 ROADWAY PLAN P-18 \ SECTION 5, 8 AND 9, TOWNSHIP 23 NORTH, RANGE 1 WEST W.M. ,r..... • T r �+` T DATE BY ,\ NEVI ohs DATE BY MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.79 WETLAND MITIGATION P.O.BOX 1850 SHEETCOUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD MP 7.30-MP 30.00 ( P�3 SHELTO WASHWGfON 98584 COUNTY ROAD PROJECT x 1563 oc 360)427H670 ROADWAY PLAN P-18 SECTION 5, 8 AND 9, TOWNSHIP 23 NORTH, RANGE 1 *EST W 44. • i �s unit er -\` onTE a`' MASON COUNTY MAD NO. .� ,V WETLAND MTTlGATION :,eR cooe COUNTY PUBLIC WORKS Z9.949 P.O.BOX 1850 sm COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO MAD MP 7.30-MP 10.00 P. d� SHELTON,WASHINGTON 98584 COUNTY ROAD PROJECT ROADWAY PLAN OF (360)477-9670 P-18 SECTION 5, 8 AND 9, TOWNSHIP 23 NORTH, RANGE 1 WEST W.M. sl,t ' \ ul rp y D.n REnsiONS wic �' MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.79800 WETLAND MITIGATION �*< SHEET. P.O.BOX 1850 BEAR CREEK-DEWATTO ROAD COUNTY ENGINEER 415 N.SIXTH STREET MP 7.30-MP 10.00 P=5 SHELTON,WASHINGTON 98584 COUNTY ROAD PROJECT -LW ROADWAY PLAN °F '"0� (360)427-9670 P-18 O o O 200 '. 1 a 1 o ! 0 ♦oo ,,1 t1 1 M f 1 I 0 Q 320 •�M 7e 1 38a 00 ` o O �60 140 CD d 0O cP CO u' O ' Q0 o "00 26 T23NR1W ' 280 ti o I , -bo 220 260 ~ zoo 200 t ►I ! r z8 320 0 CD v o t M l�0 WO / 0 O M 151 ^ o � ,ICitsall unty Nor asr Fork U I ver lq0 i Z f 1 m I 1p� 1601 o N E ! ^�O �p 200 N 1 inch =417 feet W E 1 inch = 0.08 miles S 0 6, o o 0 • N 00 itsap County o soo o C, S h� o 100 o — __ O -IT I I �O h so I 0 SU f �� soo 1 Tiger Lake o0 �o 0 I � h rj T23NR1 W o r - + LO 0 r� 0 0 0 hoo b h N 1 inch = 394 feet W E 1 inch = 0.07 miles S National Wetlands Inventory Map L10WH ��. , •. ,y � ✓ PSSC PSSC �c PSSC l (PSSC PABH f' PFOC I t� L1 OWH C'PFOA r PFOA PSSC F MF PFOC PSSC j PSSC ifj; PSSC P' P A PSSC I , r� 1 I PSSC PSSC PSSC PSSC PEMA= A PSSC PAY 1 ` " ic 11 F6CP T23NR1W _+ F OV 1}I ' J y/ PSSC rr (r Impacted Wetlands Shown in Green MASON COUNTY PUBLIC WORKS r BEAR CREEK DEWATTO ROAD REALIGNMENT WETLAND A, IMPACTS = 348 FT -WETLAND �•\� -\` \``\ IMPACTED WETLAND WETLAND DAIS w REYLSIDNS DATE W MASON COUNTY PUBLIC WORKS COUNTY ROAD N0.79800 WETLAND MITIGATION cc P.O.BOX 1850 Ts�er COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD MP 7.30-MP 10.00 P�7 N,}o SNELTON,WASNINGiON 98584 COUNTY ROAD PROJECT 7t (360)427-9670 150 IMPACTED WETLAND DF P_. MASON COUNTY PUBLIC WORKS BEAR CREEK DEWATTO ROAD REALIGNMENT WETLAND B, IMPACTS = 8710 FT ZZ ol ol sP • AND CONTINUE I \ ---- s WETLAND CONTIN OPEN WATER IMPACTED WETLAND er WETLAND DATE 6Y RIVISWIBI DATE I6Y MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.79800 WETLAND MITIGATION srKn COUNTY ENGINEER P.O.BOX 1850 snu 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD SHELTON,WAISHINGTON 98584 MP 7.30-MP 10.00 P- (360)427-9670 COUNTY ROAD PROJECT# 150 IMPACTED WETLAND ° P-. r MASON COUNTY PUBLIC WORKS BEAR CREEK DEWATTO ROAD REALIGNMENT WETLAND C, IMPACTS = 512 FT J I ! I I ! i ! �1 I 0 SP 13 ��- w- S 1 ------------ J I I 1 7 / IMPACTED WETLAND jWETLAND DATE HY REVL510l5 DIE B1' MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.79800 WETLAND MITIGATION c P.O.BOX 1850 svEEr w a_N- COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD MP 7.30-MP 10.00 P_9 �,p� SHELTON,WASHINGTON 98584 - COUNTY ROAD PROJECT# 1563 Dr (360)927-9670 IMPACTED WETLAND P-18 r MASON COUNTY PUBLIC WORKS BEAR CREEK DEWATTO ROAD REALIGNMENT WETLAND H2, IMPACTS = 392 FT WETLAND / IMPACTED WETLAND v jO / WETLAND sP • SP 20 - �• � DATE m PkV19Dra DALE m v'1 MASON COUNTY PUBLIC WORKS COUNTY ROAD NO,79800 WETLAND MMGATION Jr- 77 P.O.BOX 1850 COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD MP 7.30-MP 10.00 P=1( SHELTON,WASHINGTON 98584 COUNTY ROAD PROJECT 8 (360)427-9670 1563 IMPACTED WETLAND °F P-lf BEAR CREEK - DEWATTO ROAD IMPROVEMENT PROJE-CT WETLAND MITIGATION PLAN 1 ? Sods 1, 30 l7 t \ 04q \\ _ r \\ 1 \\ L i A .\ LEGEND --- -- - Y&TLAND SITE -- EXISTING MEILAND l ;\ p u: A `A i onTF ueVi9ois DAM N MASON COUNTY PUBLIC WORKS AftL COUNTY ROAD NO.79800 WETLAND MITIGATION sE COUNTY ENGINEER 415 N.SIXTN18r see BEAR CREEK-DEWATTO ROAD p GRADING PLAN SHELTON,WASHINGTON 98584 P_] `��°`• (360)427-9670 COUNTY ROAD PRO)ECi>< 1523 BEFORE a P-] BEAR CREEK - DEWATTO ROAD IMPROVEMENT PROJECT - WETLAND MITIGATION PLAN ------------------ -———— WETLAND SITE ` ------------- EXISTING WETLAND .All rm uewiors Dole WETLAND MITIGATION MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.79800 P.O.BOX 1850 BEAR CREEK-DEWATTO ROAD ve[ COUNTY ENGINEER 415 N.SIXTH STREET GRADING PLAN SHELTON,WASHINGTON 98584 = COUNTY ROAD PROJECT# 1563 AFTER (360)427-9670 P-1 nmem r ��'� BEAR CREEK - DEWATTO ROAD IMPROVEMENT PROJECT WETLAND MITIGATION PLAN TWER �\ 1 r � OMOTOpUC710N s- -I'=rip• \ 8 REGRADED Aj EMSTING i ���',,,i \♦\ WETLAND LEGM ----- 1 \ --------- �EbST1NGo p �\ ; ♦1 f \ \ $ X—'lt--„--N—=,: x rE LINE ♦ ' '� I 1 (i Q '�;. art—m-- UNE - -'u n T LINE ' �rLL•. n`—��t ,r'. �� ti �-. --wry 1 —�,� ,♦ 1, +++...`yam � \� .., � f -P DESI ROAD -'-cur"—:man ar.. _ � `_aT^_'�,ar�.._1 �°rr�"�.an r - \�'�•aa �\ ' �..ru\-'�"_'u-��ru. _._._._.. ---'-�� ftA y DATE B1 NEVLSIOf6 M7E m MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.79800 WETLAND MTfIGATION .E�+�a P.O.BOX 1850 Ss�Er COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD SITE PLAN P-16 (360)427-9670 SHELTON,WASHINGTON 98584 - COUNTY ROAD PROJECT# 1563 _ P•18 i BEAR CREEK - DEWATTO ROAD IMPROVEMENT PROJECT WETLAND MITIGATION PLAN SYMBOLS - ---- --- --— ----+---- ------ _ METLAND sNRue wx _ WETLAND E1IEROE7IT MIX-1 REPRODUCTION v• Yi TIMBER GRADED UPLAND i f \ '�' � I . -71•'r'GYP• CREATED METLAI/0 - EXISTING WETLAND \� i / \\ 40% E)aSTWG *ETLAIO ` 4V q I I i T11Pf�DU(,noN IV f \ t----- i Y 4ff i Y i . lam. W W W RE,ATEDD WETLAN� . isx;}�.y� \W W `v w .0 ,'v .L. �C W �• . i10E y `-, (r i y • REPRODUCTION. EXISTING WETLAND Y v, W W y y • y �, TIMBER \ aY Y y y Y i Y � �•�` LEGEND - —--— WETLAND SITE `� NOTE ---------------- EXISTING WETLAND GRADED UPLAND AND CREATED WILAND TREE LINE TO E PLANftD PER SCWDULE MI TABLE 1. unir er a�s�oru onh er :Mud MASON COUNTY PUBLIC WORKS COUNTY ROAD NO. UW WETLAND MITIGATION cap P.O.BOX 1850 COUNTY ENGINEER 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD srcer PLANTING PLAN P-17 SHELTON,WASHINGiON 98584 _- COUNTY ROAD PRO)ECT# 1 �F (360)427-9670 — P-18 r- BEAR CREEK - DEWATTO ROAD IMPROVEMENT PROJECT WETLAND MITIGATION PLAN CROSS-SECTION B - B 15.63--7 15.21 463.00.00 —30 —20 —10 0 10 20 30 20+40.00 CROSS-SECTION A - A 26.8 34.11 —7.56 32.9 4ss 00 -40 -30 -20 -10 0 10 20 30 40! —_ y0 21+60.00 CONSTRUMON NOTE All ORADO AREAS TO BE OVER-EXCAVATED ONE (1)FOOT TO ALLOW FOR PLACEMENT OF TOPSOIL DATE :Y�S;CIi; �AIE BY MASON COUNTY PUBLIC WORKS COUNTY ROAD NO.798(b WETLAND MITIGATION P.O.BOX 1850Lp::' COUNTY ENGINEEF h 415 N.SIXTH STREET BEAR CREEK-DEWATTO ROAD CROSS-SECTION �.F SHELTO(W)427-670 98584 COUNTY ROAD PROJECT X W (360)427-9670 Pagelof3 PERMIT NO.: LOW 10 MASON COUNTY DATE RECEIVED: 1 -2i -OE5 DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE ORDINANCE (Chapter 17.01 MCC) 411 N.5TH Street/P.O.Box 279,Shelton, WA 98584 ENVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMIT CONDITIONAL USE❑ The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1.APPLICANT NAME: ,vI SIGNATURE: IG3o o✓n � ;c l✓or'�s' MAILING ADDRESS WORK PHONE jam, q d E-MAIL ADDRESS HOME PHONE r6' / G5 FAX# If an agent is acting for the applicant during the permit process,complete#2. 2.AUTHORIZED AGENT NAME: SQ r� SIGNATURE: MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOMEPHONE FAX# 3.SITE ADDRESS e ciff 7 PARCEL NUMBER - LEGAL DESCRIIPTION DIRECTIONS TO SITE: T�'c 7 � 1�rA5 4. State which section requires permit: ❑ Long Tenn Commercial Forest,Chapter 17.10.060 Wetlands,Chapter 17.01.070 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Seismic Hazard Areas,Chapter 17.01.102 0 In-Holding Lands,Chapter 17.01.062 0 Fish&Wildlife Habitat Conservation Areas,Chapter 17.01.110 Page 2 of 3 5. Identify current use of the property with existing improvements: 1 'ZAe 42//f 4 e<:74 .S/ a a //an 6. Identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions, and other pertinent information(attach additional sheets,if needed): 7. Describe why the action requiring this permit cannot be avoided. 1::7e1 -i p�i o�-7 8. Will there be an alteration of a wetland and/or wetland vegetation area? Yes No ❑ 9. Identify any surface water on or adjacent to property: ❑ Saltwater ❑ Lake A Stream ❑ Pond Wetland ❑ Drainage Ditch 10. If septic is located on project site, include records. "V 4. ❑ Connect to Septic ❑ Community Septic ❑ Public Water Supply ❑ Well 11. Type of Job: ❑ New ❑ Add Alteration ❑Repair ❑ Demolition ❑ Other: This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $590.00/$355.00(with another permit) MASON CONDITIONAL USE ENVIR.PERMIT: $1,420.00 HABITAT MANAGEMENT PLAN REVIEW: $415.00 [APLANNINGTACTORMS REVISED July 2008 i Page 3 of 3 Show the following,on the site plan Lot Dimensions Flood Zones Existing Structures Fences Water Lines Driveways Drainage Plans Shorelines Septic System Topography Indicate Directional by(N,S,E,W,etc.) Proposed Improvements Easements In relation to plot plan Name if Flanking Street APPLICANT TO DRAW SITE PLAN BELOW:: APPLICANT TO DRAW TOPOGRAPHY BELOW: III