HomeMy WebLinkAboutSHX2011-00048 - SHX Permit / Conditions - 11/1/2011 oN_sTA MASON COUNTY
C DEPARTMENT OF COMMUNITY DEVELOPMENT
�p '�
o s = Planning Division
r 0 T i P O Box 279, Shelton, WA 98584
N Y Y (360)427-9670
OJ �O
1864
Exemption from Shoreline Management Act
Case No.: SHX2011-00048 Substantial Development Permit Requirement
The Proposal By: KENNY ROGERS
1213 S 308ST STREET UNIT 38
FEDERAL WAY,WA 98003
To undertake the following development:
Install 3 ft. deep cap along 130 ft. length of existing concrete bulkhead; work on upland portion of
bulkhead and not in Tiger Lake.
Within Tiger Lake and/or its associated wetlands is exempt from the requirement of substantial development because
the development is categorized under WAC 173-27-040(2) as being category
A-does not exceed $5.000
Please contact Allan Borden at ext 365 if you have any questions.
Issued: 11/1/2011
Expires: 11/1/2013 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
' 123052300014
N _ Kitsap CountyrrM7hr
--------------- 2
FAR �EK DEWAITO RD f ----,_ _
? �J� Iry
O 123052300015
J
5
LLJ
VF
0�
'r_1M,;123052300011
T23NR2W
T23N 1W=
NE K D
12 05 300012 ^"
1
CO
J o
2 i1� 123052300013
123052300022 is
1 t t Fr.
` 123052222222
'~ r 230.`,230GG32
123057590035 /////i +» ' _� ,� _ •
40 e', 123057590036 ;•• '" r �/
<�i1`3052300040
123053000000
123053100000 123053100020
N VtNnhh, • - a ` 06)
WF,
1 inch = 100 feet (�
1 inch = 0.02 mites
220011fl
2100i05
22 00111
S-R. 131 TIGER LAKE TERRACE TIGER LAKE
VOL . 7 PG . 92- 94
2300014
'�- 2300015
2300000 2 3000 1 O 230oo 1 1 �
GIL, i 01 C
S.R. 29 Pro � S 25/112 110
2300013 Qre/n
2300020 2300022
_ - - -- - -7 230002 I SP 4(Q
SA 25W
7590
7590 7390 7590 Z300032 S 4/23
033 034 035 036
SP 1738 S 2300030 13 90093
2300040
1390080
3100
000
429002t
7-1 G£R LAKE TRACTS
si t 1 e. tia } r
PA
�-Ii♦♦`.
�, ;�ti,� •� t i 9 �1 t.i � �Y
�..�}, �'11�j,car ( `� .F�. .i�-'h�/.• �^+/�r� r �1�1'� `1�, !� r�l.
Al
i tom,K 'l, '
�a. T'ay �.�' a_1 , �'d`�,µ �!r F.; I �,.�,i li.;- ;i''� ��� �i F�• �,�11,' y r�"� "=
\ � 'rt .,q � 14 A-�s r .} ;•. � • a i •i+'• ate' • _ A►.
,. .�"T"!�. 1 .+,�' ,,'fit'II�. •k �` fir!' �',,I �l _
�.,\i r.� .r t i•. ; ` �' fy`;c. trr ,� !1 1�R�+ .I✓ .
r
ATTACHMENT A
This Attachment dated is incorporated into the Agreement
entered into between the parti6s an describes the Contractor's scope of work.
5?11O , 1
tree_
i
r �p
r
k�/A.-
Customer Initials Contractor Ini '
Page 9
-------------------------------------
AGENCY USE ONLY
rM
2010
Date received:
US Army Corps
WASHINGTON STATE of Engineers '
Agency reference#:—<44
Joint Aquatic Resources Permit =—�
Tax Parcel#(s):
Applicaton (JARPA)
i Form')
USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW.
------------------------------------
Part 1-Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) [help,2
Rogers cap
Part 2-Applicant
The person or organization responsible for the project. ei
2a. Name (Last, First, Middle)and Organization (if applicable)
Rogers, Kenny
2b. Mailing Address (Street or PO Box)
1213 s 308`h st unit 38
2c. City, State, Zip
Federal Way WA 98003
2d. Phone(1) 2e. Phone(2) 2f. Fax 2 . E-mail
206-999-2415 ( ) 253-850-5100 kennyrogers@cbbin.com
Part 3-Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this
application.) [hel
3a. Name (Last, First, Middle) and Organization (if applicable)
Lincoln, Earl Earl Lincoln Construction INC.
3b. Mailing Address (Street or PO Box)
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form (SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://www.nws.usace.army.mil/PublicMen u/Menu.cfm?sitename=REG&pagenam e=mainpage_ESA
• If you are applying for an Aquatic Resources Use Authorization you will need to fill out and submit an Application for Authorization to Use State-
Owned Aquatic Lands form to DNR,which can be found at http://www.dnr.wa.gov/Publications/agr_use_auth_app.doc
• Not all cities and counties accept the JARPA for their local Shoreline permits. If you think you will need a Shoreline permit,contact the appropriate
city or county government to make sure they will accept the JARPA.
ZTo access an online JARPA form with [help]screens,go to
http://www.epermitting.wa.gov/site/alias_resourcecenter/jarpa-jarpa_form/9984/jarpa_form.aspx.
For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help@ora.wa.gov.
JARPA 2010 v1 3/30/2010 Page 1 of 14
P.O. Box 368
3c. City, State, Zip
Belfair, Wa 98528
3d. Phone(1) 3e. Phone(2) X Fax 3 . E-mail
360-275-6382 ( ) 360-275-9765
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. hei
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple property owners. Complete the section below and fill out JARPA Attachment A for each
additional property owner.
4a. Name (Last, First, Middle)and Organization (if applicable)
Rogers, Kil Ja
4b. Mailing Address (street or PO Box)
1213 308" st unit 28
4c. City, State, Zip
Federal Way WA 98003
4d. Phone(1) 4e. Phone(2) 4f. Fax 4 . E-mail
206-999-2415 ( ) 253-850-5100
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. [rei
❑ There are multiple project locations (e.g., linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) hel
❑ State Owned Aquatic Land (If yes or maybe,contact the Department of Natural Resources(DNR) at(360)902-1100)
❑ Federal
❑ Other publicly owned (state, county, city, special districts like schools, ports, etc.)
❑ Tribal
❑ Private
5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) h[ elpl
140 NE Daly dr
5c. City, State, Zip(if the project is not in a city or town, provide the name of the nearest city or town.) [tgjPJ
[Belfair, WA 98528
JARPA 2010 v1 3/30/2010 Page 2 of 14
5d. County hf elpl
Mason
5e. Provide the section, township, and range for the project location. [heV
'/4 Section Section Township Range
- -- — ---------------- --
5 23 1 W
5f. Provide the latitude and longitude of the project location, h( pjp
• Example:47.03922 N lat./-122.89142 W long. (NAD 83)
47.51852 N / -122.83796
5g. List the tax parcel number(s) for the project location. h[ elpl
• The local county assessor's office can provide this information.
12305-23-00030
5h. Contact information for all adjoining property owners. (If you need more space, use DARPA Attachment C.) hel
Name Mailing Address Tax Parcel # (if known)
Jurgich, Donald and Joyce 144 NE Daly dr 12305-75-90036
...............--....-.................--......
.._
Belfair, WA 98528
James and Caroline Payton 3008 Crane AVE _ 12305-23-00032
Bremerton, WA 98310
5i. List all wetlands on or adjacent to the project location. hel
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hel
Tiger Lake
5k. Is any part of the project area within a 100-year flood plain? h( eld
❑ Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. Lhel
JARPA 2010 v1 3/30/2010 Page 3 of 14
Cedar; Fir trees, underbrush, moss, grass
5m. Describe how the property is currently used. hei
Seasonal
5n. Describe how the adjacent properties are currently used. r,ei
I
i
i Seasonal
5o. Describe the structures (above and below ground) on the property, including their purpose(s). EtIeV
-Outhouse (toilet)
- House (sleeping and cooking)
a.
5p. Provide driving directions from the closest highway to the project location, and attach a map. nei
JARPA 2010 v1 3/30/2010 Page 4 of 14
Hwy 3 south - Old Clifton — Right on Old Belfair Hwy- Left on Bear Creek rd — Right on Daly Second to last
driveway on left
Part 6—Project Description
6a. Summarize the overall project. You can provide more detail in 6d. [hel
- Repair of Bulkhead non water side pp
- New 3' x 8" cap on top of existing bulkhead �3C le"tA �trzt� ,
6b. Indicate the project category. (Check all that apply) hem
❑ Commercial 5�Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6c. Indicate the major elements of your project. (check all that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Road
❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey ❑ Scientific
❑ Boat House ❑ Dike / Levee /Jetty ❑ Land Clearing Measurement Device
❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs
❑ Boat Lift ❑ Dock / Pier ❑ Mining ❑ Stormwater facility
❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool
E� Bulkhead ❑ Fence ❑ Piling ❑ Utility Line
❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall
❑ Channel Modification ❑ Fishway (upland)
❑ Other:
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. hel
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year flood plain.
JARPA 2010 v1 3/30/2010 Page 5 of 14
Dig behind existing bulkhead and fill with drain gravel 5' deep 2' wide
Tie tipping section to deadmen with stainless steel threaded rod
Form and pour concrete cap on existing wall to tie together with rebar
6e. What are the start and end dates for project construction? (month/year) Lhel
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: Nov 2011 End date: June 2012 ❑ See JARPA Attachment D
6f. Describe the purpose of the project and why you want or need to perform it. [heipi
Existing concrete bulkhead is failing
6g. Fair market value of the project, including materials, labor, machine rentals, etc. heI
$8,596.12
6h. Will any portion of the project receive federal funding? heI
• If yes, list each agency providing funds.
❑ Yes (<No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) net
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. h( eM
Not applicable
JARPA 2010 v1 3/30/2010 Page 6 of 14
7b. Will the project impact wetlands? hel
❑ Yes MNo ❑ Don't know
7c. Will the project impact wetland buffers? h[ elpl
❑ Yes S�No ❑ Don't know
7d. Has a wetland delineation report been prepared? hel
• If yes, submit the report, including data sheets,with the JARPA package.
❑ Yes IS4 No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? h[ elpl
• If yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes N No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hf elpl
• If yes, submit the plan with the JARPA package and answer 7g.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No 1Z Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. hel
i
i
7h. Use the table below to list the type and rating of each wetland impacted; the extent and duration of the
impact; and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. [Lg_!pj
JARPA 2010 v1 3/30/2010 Page 7 of 14
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type' (sq. ft. or
category' Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
"Creation(C), Re-establishment/Rehabilitation(R),Enhancement(E), Preservation(P),Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
71. For all filling activities identified in 7h., describe the source and nature of the fill material, the amount in cubic
ards that will be used, and how and where it will be placed into the wetland. [Leipj
7j. For all excavating activities identified in 7h., describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. hel
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hel
aCheck here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
Not applicable
JARPA 2010 v1 3/30/2010 Page 8 of 14
All work is upland of waterbodies
8b. Will your project impact a waterbody or the area around a waterbody? [held
Yes ❑ No
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? hel
• If yes, submit the plan with the JARPA package and answer 8d.
• If No, or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No ,E� Not applicable
Work is upland of water bodies
i
i
I
i
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g., you do not need to restate your answer here. hel
8e. Summarize impact(s) to each waterbody in the table below. [heV
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name location2 of impact3 to be placed in or linear ft.) of
drive, etc.) removed from waterbody
waterbody directly affected
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3 Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
JARPA 2010 v1 3/30/2010 Page 9 of 14
8f. For all activities identified in 8e., describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. [hel
8g. For all excavating or dredging activities identified in 8e., describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. Lhel
Part 9-Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. h[ eM
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of
Ecology's 303(d) List? hel
• If yes, list the parameter(s) below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
http:i/www.ecy.wa.gov/programs/wq/303d/.
❑ Yes No
JARPA 2010 v1 3/30/2010 Page 10 of 14
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? heI
• Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
Hood Canal Watershed -- 17110018
9d. What Water Resource Inventory Area Number (WRIA #) is the project in? [he�.�]l
• Go to http://www.ecy.wa._qov/services/gis/maps/wria/wria.htm to find the WRIA#.
WRIA 15
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? [Lgjpj
• Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.html for the standards.
❑ Yes ❑ No X Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? hel
• If you don't know, contact the local planning department.
• For more information, go to: http://www.ecy•wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
❑ Rural Urban L:;Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? hel
• Go to http://www.dnr.wa,gov/BusinessPermits[Topics/ForestPracticesApplications/Pagesifp_watertyping.aspx for the Forest
Practices Water Typing System.
❑ Shoreline Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? hf eM
• If no, provide the name of the manual your project is designed to meet.
Yes ❑ No
Name of manual:
9L If you know what the property was used for in the past, describe below. h( elpl
9j. Has a cultural resource (archaeological) survey been performed on the project area? LhLeM
JARPA 2010 0 3/30/2010 Page 11 of 14
• If yes, attach it to your JARPA package.
❑ Yes No
9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. hei
h i r habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
91. Name each species o g p Y
Species List that might be affected by the proposed work. hei
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecV.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help@ora.wa.gov.
• For a list of agency addresses to send your application, click on the "where to send your completed
JARPA" at http://www.epermitting.wa.gov.
1 Oa. Compliance with the State Environmental Policy Act (SEPA). (check an that apply.) h[ elpl
• For more information about SEPA, go to www.ecv.wa.gov/aroq4afns/sea/sepa/e-review.htm1.
A copy of the SEPA determination or letter exemptio is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (check the box below in 10b.) hf eigl
JARPA 2010 v1 3/30/2010 Page 12 of 14
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law.
10b. Indicate the permits you are applying for. (check an that apply.) [LgjPJ
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
,Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
Part 11—Authorizing Signatures
Signatures are requi d before submitting the JARPA age. The JARPA package includes the JARPA form,
project plans, photos, c. hf elpl
11 a. Applicant Signature ( uire hel
I certify that to the best of kno ledge and belief, the information provided in this application is true, complete,
and accurate. I also ce y that I ha the authority to carry out the proposed activities, and I agree to start work
only after I have re ved all necessa ermits.
I hereby aut ize the agent named in Part this application to act on my behalf in matters related to this
applicatio (initial)
JARPA 2010 v1 3/30/2010 Page 13 of 14
Part 11-Authorizing Signatures
Signatures are required before submitting the JARPA package.The JARPA package includes the JARPA form,
project plans, photos, etc. hel
11a. Applicant Signature (required) hf efol
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I herebyauthorize the agent named in Part 3 of this application to act on m behalf in matters related to this
9 PP Y
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. lG it— (initial)
Q-0 na Ilo-
Applicant Printed Name Applicant Tignature J Date
11 b. Authorized Agent Signature het
I certify that to the best of my knowledge and belief,the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agen�f Printed Name Auth ent Sig tune Dat
11c. Property Owner Signature if not applicant). hel
P Y 9 ( f—e1
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
P 9 9 9 P P Y P J P P 1
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
i
t
3^t_ Rols S to
Property Owner Printed Name P perty QoTer Signatuqf Date i
18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format,contact The Governors Office of Regulatory Assistance(ORA).People with hearing loss
can call 711 for Washington Relay Service.People with a speech disability can call(877)833-6341.
ORA publication number: ENV-019-09
JARPA 2010 v1 3/30/2010 Page 13 of 13
i
i