HomeMy WebLinkAboutCOM2010-00108 Cancelled Signs - COM Permit / Conditions - 12/16/2010 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)127-7262 `
Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton,WA 98584
too
COMMERCIAL BUILDING PERMIT COM2010-00108
OWNER: OLYMPIA FEDERAL SAVINGS RECEIVED: 11/10/201C
CONTRACTOR: LICENSE: EXP: ISSUED: 12/16/201C
SITE ADDRESS: 24081 NE STATE ROUTE 3 BELFAIR EXPIRES: 6/16/2011
PARCEL NUMBER: 123283290000
LEGAL DESCRIPTION: LOT: A OF SP#152 PTN NW SW W OF SR 3 SURVEY 13/130
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
PERMIT FOR 2 NEW SIGNS FOR THE NEW OLYMPIA ST RT 3 TO SITE ADDRESS H�FT
FEDERAL SAVINGS, including projecting wall and monument �—
sign
General Information Co tr tion&Occupancy Information
Type of Use: BANK Insp.Area: OB
Unit Type of Constr.:
Type of Work: SGN Fire Dist.: 2 s: Occ. Group:
Lole
Stories: Exit Design. Load:
Valuation: $ 25,700.0 Height:
Pre-Manufa ured Uni Informati Square Footage Information
Make: Length: Lv v Lot Size:
Model: Width: Building:
Year: Serial Basement: Parking Spaces:
Setbac mation
Shoreline&Planning Information
Front: E 42.00 Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp.Plan Desig.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2010-00108 Please refer to the following pages for conditions of this permit. 1 of 4
FEES
Plumbing Fixtures Mechanical Fixtures Date Amount Receipt
Type By
Type Qty. (:MM 1/1nonl a�RnRR �n1nnn
Type Qty. Plan Check Fee
C.MM 11/1n/,)n1 Vn nn S19nlnnn
` Planning Review Fee �e�n S1�nlnnn
Building State Fee
nl r 19/MOn1n
Building Permit Fee nl n 19/gnnln Tdn1 �� q19nlnnn
Total $736.73
CASE NOTES FOR
COM2010-00108
CONDITIONS FOR
COM2010-00108
1 Approved per dimensions, locations, and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
Dimension of signs meets standards.
X ,,?9IC/
2) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or properties. Silt fencing must
be installed and maintained until upland vegetation has become established. X
3) Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is Belfair UGA
General Commercial (GC)zone.
X &�__
4) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
5) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be
granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour wAl be charged and collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X ((
6) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
14.28.
7) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND
OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD
RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x (i J
8) Changes to approved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilationrequirements),
Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
X e iy_i
COM2010-00108 2 of 4
9) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections,by the Mason County Building Department. All construction must be in
conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Mason County Building Inspector shall be made prior to requesting additional inspections.
X fz/2( �
10) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
non-compliant with Mason County ordinances and building regulations.
X C iL.2
11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the
time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control
of the pelmi holder have prevented action from being taken. No more than one extension may be granted.
X ((��
12) The channel letter sign located at the entrance to the building, attached to the sun shade/canopy, shall require an engineered design, prepared and
stamped by a Washington State licensed design professional. the design shall be prepared in accordance to the 2009 International Building Code,
Section H105 and verify that the sun shade/canopy and sign will withstand wind pressure and earthquake loads as provided for in Chapter 16.
A copy of the design and stamped plans shall be delivered to the Mason County Building Department prior to the final inspection and available for
the Mason County Building Inspector during inspection. An OSHA approved access shall be avaialable for the inspector during the inspection.
X
This permit becomes null and void if work orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection. / /
OWN ER OR AGENT: DATE: h l� /<�
COM2010-00108 3 of 4
I
o O
N CONCRETE MECHANICAL MANUFACTURED HOME
C) Date By
o Footings !Setbacks Gas Piping Ribbons ic
o Interior Date By Interior-Date By Date By
o Exter" Date By Exterior-Date B
TI
Point Load I Isolated Footings INSULATION Date By 0
Date By Date
I SLAB INSULATION By FIRE DEPARTMENT �# m
Foundation Wails Floors Date By r
pfltP. By r�ata By DECKS D
FRAMING walls Date By <
z
Date By Date By PROPANE TANKS O
PLUMBING Vault Date By to
Date By OTHER
Groundwork Attic
Date By Type-
Date By Date By
D.W.v DRYWALL Type- O
int Brace Wall Date By
Date By 3
Date By FINAL INSPECTION p
Water Line Firs Seperation L
Date By Date By Date By Q
O
Pass or Request Inspect.
Type of Insp. Fail Date Date Done By Comments 000
IJ
}
A
O
h
A
A2.10 NEW FLOOR FLAN
A2.11 DEMOLITION & NEW REFLECTE'
A4.01 INTERIOR ELEVATIONS &SECTI(
uj °.� A5.10 DOOR, DOOR FRAME,WINDC
N
N
M0.01 GENERAL NOTES, LEGEND AN
U M0.02 SCHEDULES AND DETAILS
W 3: M3.10 PLUMBING FLOOR PLAN
M4.10 HVAC FLOOR PLANS
r
E0.10 LEGEND, NOTES
E 0.11 ELECTRICAL SPECIFICATIONS
E2.10 ELECTRICAL PLANS
E3. PANEL SCHEDULES
10
V
PPROVE
ENVIRONMENTAL JUL 11 2018
HEALTH
MASON COUNTY ENVIRONMENTAL HEALTH
WLJ
{1
16
A o,
o � 15
o yo, � 'l�LU�rtt
LA,NbSCAPI
•DQ6 5 '�'�Fx _ I
11 PA1JO ! , 1 G L�� L6�.� Y v 1��15 +jl
co
z , L)h i YK ue, K}-c,
2
cl
F.
F.F.100.50
IN
i 2
27'li7` 37 1Q S5 hQ� r
��•• � rah (c.
{.
3 1 t o pS AP sq 4
1 i0 ry 1,N
. Rh
LANDSCAP
R=2'
13
is
joo
o- LANCI AP r
7 15 �/
' 16
rb
101 : � SITE
1" 14 ,\��`
u
4 co
�A1aDSCAPE
PLAN r1 .
' - �`�..ram . ,�,•