Loading...
HomeMy WebLinkAboutSEP95-0224 - SEP Determinations - 1/10/1996 STATg o� RECEIVED JA N 1 2 1996 0 y"lase a STATE OF WASHINGTON MASON CO. PLANNING DERL DEPARTMENT OF ECOLOGY P.O.Box 47600 • Olympia, Washington 98504-7600 • (206)407-6000 • TDD Only(Hearing Impaired)(206)407-6006 January 10, 1996 Mr. Gary Yando Mason County PO Box 578 Shelton WA 98584 Dear Mr. Yando: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the relocation of 0.9 miles of the Bear Creek-DeWatto Road between Tiger Lake Road West and the western end of Panther Lake Road, which includes work in Mission Creek and wetlands (95-0224) . We reviewed the environmental checklist and have the following comments. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology pursuant to WAC 173-201A-110. A short-term water quality standards modification may be issued if the proponent agrees to a number of specific construction practices and techniques designed to minimize water quality impacts. The construction schedule will be tied to the schedule on the Hydraulic Project Approval (HPA) . If you have any questions, please call Ms. Jeannette Barreca with our Water Quality Program at (360) 407-6556. Sincerely, Elizabeth J. Phinney Environmental Review EJP: 96-0001 cc: Jeannette Barreca, SWRO Abbe White, SWRO TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY A. BACKGROUND 1. Name of proposed project, if applicable: BEAR CREEK-DEWATTO ROAD - MISSION CREEK CULVERT REPLACEMENT 2. Name of applicant: Mason County Department of Public Works 3. Address and phone number of applicant and contact person: P. 0. Box 1850 Richard J. Geiger Shelton, WA 98584 427-9670 ext.531 4. Date checklist prepared: January 9, 1995 5. Agency requesting checklist: Mason County Department of Community Development 6. Proposed timing or schedule (including phasing, if applicable) : May 1, through October 1, 1995 - Construction is expected to be completed during reconstruction of the Bear Creek-DeWatto Road as part of County Road Project (CRP) 1472. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal? If yes explain. Proposed culvert replacement is expected to be performed as an element of the Bear Creek-DeWatto Road construction project - CRP 1472. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. An Erosion and Sediment Control Plan is to be prepared for the Bear Creek-DeWatto Road Construction Project (CRP 1472) . 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None Known. 1 TO BE COXPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY 10. List any government approvals or permits that will be needed for your proposal, if known. Mason County Environmental Permit Hydraulic Project Approval 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description. ) Relocate and Replace an existing 6' diameter drainage culvert beneath Bear Creek-DeWatto Road with a 14' Super Span Arch. Maintain streambed in new Arch location and restore streambed at old culvert location. Armor roadway fill embankments in areas of potential scour. At another location, fill wet area at new road crossing, while creating a new wet area of the same or larger size immediately to the North. 12. What is the location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s) . Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The project is located at approximate milepost 2 .45 to 2.50 on the Bear Creek-DeWatto Road (County Road No. 28850) in the North Half of Sections 5 and 6, Township 23 North, Range 1 W. , W.M. , in Mason County , Washington. Vicinity map attached. B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one) : Flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 5-12% Road. Embankments stand at approximately 100 % slopes. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification 2 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY of agricultural soils, specify them and note any prime farmland. The USDA Soil Conservation Service Soil Survey of Mason County (Series 1951, No. 9 issued Sept. 1961) lists the soil in the immediate vicinity of the proposed culvert replacement as a Kitsap Silty Clay Loam normally found on 0- 5 percent slopes. Typically underlain with a compacted glacial till (hardpan) . d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. None evident. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. As much as 1500 cubic yards of backfill borrow material may be needed for the wet area crossing. If borrow is available from other areas of the road construction project, the contractor would be expected to utilize those materials if found to be of suitable quality in terms of gradation, stability and other pertinent specifications as required in Washington State DOT 1994 Standard Specifications for Road, Bridge, and Municipal Construction. If not, borrow material would have to be brought in from another location, yet to be determined. This is not a likely occurrence. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. The entrance of the proposed replacement arch may be susceptible to scour. Some minor streambed excavation may occur as a result of the arch installation, but the grade of the existing streambed will be maintained. g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? Approximately 50+% of the fill area and 25+% of the arch area will be covered with pavement when completed. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Replacement will be done during the dry season of the year to alleviate environmental impacts. Denuded soils will be stabilized and hydroseeded as a final element of the 3 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY proposed activities. Inlet and outlet areas around arch ends will be armored with rip-rap rock to protect the fill slope toe areas against scour. 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. Dust from the construction and fumes from the equipment. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None known. c. Proposed measures to reduce or control emissions or other impacts to air, if any: Apply water to roadway for dust control as required during construction. 3. WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Yes, The proposed arch is located on Mission Creek, identified in Volume 1 of Washington Department of Fisheries Catalog of Washington Streams and Salmon Utilization for Puget Sound in the Shelton Basin-WRIA 14 as stream number 0080. Mission Creek is listed as a year round fresh water creek with an approximate average flow of 5 cfs, however during the Summer of 1994, the stream was observed as dry for most or all of the months of July through September. The terminus of Mission Creek is Bear Creek-DeWatto Passage, a salt water extremity of southern Puget Sound. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes , please describe 4 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY and attach available plans. Yes, Mission Creek empties into Bear Creek-DeWatto Passage by way of a long (Unnamed-approx. '-4 mi. ) narrow inlet emanating from Bear Creek-DeWatto Passage. The footings of the new arch are expected to reside permanently below the level of the final streambed bottom. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. Burial of the arch footings is expected to require the removal of approximately 120 cubic yards of streambed or shoreline material. The other wet area crossing will require as much as 1500 cubic yards of fill. Borrow backfill material is expected to be from the same source(s) as is acquired for the Bear Creek-DeWatto Road reconstruction which will be determined by the contractors choice from acceptable sources. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. Site will be de-watered by pumping Mission Creek around the excavation site during the culvert replacement, if necessary. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. No. 5 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example, Domestic sewage: industrial, containing the following chemicals . . . ; agricultural, etc. ) . Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable) , or the number of animals or humans the system(s) are expected to serve. None. c. Water Runoff (including storm water) : 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known) . Where will this water flow? Will this water flow into other waters? If so, describe. Rain/Storm water is only known source of flow. Final recipient of run off is Bear Creek-DeWatto Passage. 2) Could waste materials enter ground or surface waters? If so, generally describe. Possible gas, oil or diesel spillage during equipment maintenance operations. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Construction will be during the summer or dry season. 4. PLANTS: a. Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other X evergreen tree: fir, cedar, pine, other X shrubs X grass X pasture crop or grain X wet soil plants: cattail, buttercup, bulrush, skunk cabbage, others water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? 6 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY Only small areas in the vicinity of the arch footings are expected to be disturbed. All vegetation, including wetland vegetation, will be removed in the area of the wet area crossing. c. List threatened or endangered species known to be on or near the site. None known. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: All exposed soils will be hand broadcast seeded with grass upon completion of associated earthwork or hydroseeded as part of the Bear Creek-DeWatto Road reconstruction. Grass specifications will be according to WSDOT Standard Specifications. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other ALL mammals: deer, bear, elk, beaver, other All except bear & elk fish: bass, salmon, trout, herring, shellfish, other Washington Stream Catalog lists Coho & Chum Salmon. Shellfish and Herring may be present along with fresh water species of fish & mammals. b. List any threatened or endangered species known to be on or near the site. None known. C. Is the site part of a migration route? If so, explain. Unknown. May be in the path of Canadian Geese Migratory Route. d. Proposed measures to preserved or enhance wildlife, if any: The streambed under the arch will be maintained as much as is practicable to facilitate fish passage. The arch is expected to entirely restore itself to a natural streambed condition. 7 TO BE COMPLETED BY APPLICANT: EVALUATION FOR !AGENCY USE ONLY 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. N/A. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None. 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. Only those associated with refueling and servicing the construction equipment. 1) Describe special emergency services that might be required. Emergency medical or traffic control in case of an accident. 2) Proposed measures to reduce or control environmental health hazards, if any: Normal construction safety standards, NUTCD traffic control standards are expected to be enforced. Closure of the road may be required during the actual excavation and replacement of the culvert. b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment operation, other)? None. 8 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site Normal noise form road construction equipment. Construction activity will be restricted to daylight hours. 3) Proposed measures to reduce or control noise impacts, if any: Mufflers on equipment. Restrict work hours to daylight hours. 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Current site is a County road. Adjacent areas include residences, recreational waterfront properties, and timber resource areas . b. Has the site been used for agriculture? If so, describe. No. c. Describe any structures on the site. Bear Creek-DeWatto Road, County Road number 28850. d. Will any structures be demolished? If so, what? Existing road pavement will be removed and recycled as fill/pavement or disposed of off site along with culvert being replaced. e. What is the current zoning classification of the site? N/A f. What is the current comprehensive plan designation of the site? Suburban. g. If applicable, what is the current shoreline master program designation of the site? 9 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY Urban. h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. Unknown. i. Approximately how many people would reside or work in the completed project? None. j . Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Project will not change any of the existing uses of the surrounding properties. 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None. c. Proposed measures to reduce or control housing impacts, if any: None. 10. AESTHETICS: a. What is the tallest height of any proposed structure(s) , not including antennas; what is the principal exterior building material(s) proposed? 10 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY Ground Level or subterranean. b. What views in the immediate vicinity would be altered or obstructed? None. c. Proposed measures to reduce or control aesthetic impacts, if P P any: None. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal: None. d. Proposed measures to reduce or control light and glare impacts, if any: None. a. What designated and informal recreational opportunities are in the immediate vicinity? Hunting, hiking, fishing, boating etc. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None. 11 TO BE COMPLETED BY APPLICANT: EVALUATION POR AGENCY USE ONLY 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. None known. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None known. c. Proposed measures to reduce or control impacts, if any: None. 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. Site is part of County road system. b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system. Show on site plans, if any. Yes. Mason County Transit. c. How many parking spaces would the completed project have? How many would the project eliminate? None. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private) . No. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. Yes. Highway will used for the delivery of equipment and materials to the project site. 12 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. None. g. Proposed measures to reduce or control transportation impacts, if any: Project is expected to require the use of signing and flagging personnel to assist the motoring public to negotiate the construction zones during construction.Project may require closure of the Bear Creek-DeWatto Road for a brief period (less than a week) during the actual culvert replacement. 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No. b. Proposed measures to reduce or control direct impacts on public services, if any: None. 16. UTILITIES: a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: All of the items listed are considered available at or near the site with the exception of a sewer system. Currently all septic systems are on-site systems. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed: None. 17. SIGNATURE: 13 TO BE COMPLETED BY APPLICANT: EVALUATION FOR AGENCY USE ONLY The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Y` Signature: f Date Submitted: January 9, 1995 14 I . `l L': t t♦ t :... r.. • r♦-♦� ♦ ..�, { ►N. 4'. ♦ •-tom ♦-! 1--f � � Y • � f-I .f 1 + rw r � 1 ♦� "Ii �tl . � ., Skokomish Indian Tribe Tribal Center (206) 426-4232 N. 80 Tribal Center Road Shelton, WA 98584 December 7, 1995 Gary Yando Mason County Department of Community Development 426 West Cedar Pu Box 578 Shelton, WA 98584 RE : MDNS, 95-0224 ; Bear Creek-Dewatto Road Project and Mission Creek Culvert Replacement. Mr. Yando, The above referenced mitigated determination of nonsignificance and SEPA checklist were mistakenly not sent to the Skokomish Tribe for environmental review. Consequently the Skokomish Tribe was unable to review and comment on the merits of the proposal . In fact, we only recently became aware of the project because an affected landowner called our office for assistance. I contacted your office recently and was able to get a copy of the MDNS on December 6th, however the comment period has been over for nearly 2 months . The Skokomish Tribe is requesting that Mason County DCD reopen SEPA and afford the Tribe the opportunity to comment on this proposal . We realize that not receiving a copy of this proposal was just an oversight by your staff. However considering a project of this magnitude and importance, it is critical that it receive adequate environmental review by the Tribe. In addition, the Tribe requests that all project planning for this proposal be put on hold until after the new SEPA review period has ended. Please call me at 877-5213 or Jim Park (Skokomish Tribal Natural Resources Director) at 426-4232 at your earliest convenience. Sincerely, %�� Marty Ereth RECEIVED Skokomish Fish Habitat Biologist DEC 0 8 1995 MASON CO. PLANNING DEEL GARY YANDO,DIRECTOR SIN.STA o P A o u DEPARTMENT OF COMMUNITY DEVELOPMENT T o z PLANNING -SOLID WASTE - UTILITIES N Y y BLDG. I • 411 N. 5TH ST. • P.O. BOX 578 1864 SHELTON,WA 98584 • (360) 427-9670 December 27, 1995 Rebecca Inman Department of Ecology Environmental Review Section P.O. Box 47703 Olympia WA 98504-7703 Dear Ms . Inman: Mason County Department of Community Development is sending your office a copy of the enclosed SEPA checklist (Mason Co. SEP95- 0224) for the Bear Creek - Dewatto Road Project, proposed by Mason County Department of Public Works . This checklist was circulated on September 28, 1995 for the 15 day period, with comments due by October 13 , 1995 . Your office should have received a copy, as is the standard public review process done with environmental checklists . For more information, please contact Allan Borden of the Department of Community Development at (360) 427-9670 ext . 365 . Siacerely, Allan Borden Shoreline Planner Recycled