HomeMy WebLinkAboutGEO2024-00083 - BLD Engineering / Geo-tech Reports - 5/16/2024 PLANNING
GEOTECHNICAL REPORT
RESIDENTIAL DEVELOPMENT SITE
00 SEA SPRAY LANE
SHELTON, WASHINGTON
PREPARED FOR
DoNni,n MOON
BY
ALL AMERICAN GEOTECHNICAL
OLYMPIA, WASHINGTON
MAY 1612024
MASON COUNTY
COMMUNITY SERVICES Geotechnical Report
&.riding,Vlennu,g.Envluomm� 1l 1 H-11h.Con—way HeeIC,
Instructions:
This checklist must be submitted with a Geotechnical Report and completed, signed, and stamped by the licensed
professional(s)who prepared the Geotechnical Report for review by Mason County pursuant to the Mason County
Resource Ordinance. If an item is found not applicable, the report should explain the basis for the conclusion.
Note: Unless specifically documented, this report does not provide compliance to the Intemational Residential Code Sections
R403.1.7 for foundations on or adjacent to slopes. Section R403.1.8 for expansive soils or section 1808.7.1 of the International
Building Code Section for Foundations on or adjacent to slopes.
Applicant/Owner Donald Moon Parcel# 22020-23-94004
Site Address 00 Sea Spray Lane Shelton Washington
(1) (a) A discussion of general geologic conditions in the vicinity of the proposed development,
Located on page(s) 6 - 8
(b) A discussion of specific soil types.
Located on page(s) 8 - 10
(c) A discussion of ground water conditions,
Located on page(s) 10
(d) A discussion of the upslope geomorphology,
Located on page(s) 10
(e) A discussion of the location of upland waterbodies and wetlands,
Located on page(s) 10
(f) A discussion of history of landslide activity in the vicinity, as available in the referenced maps and records.
Located on page(s) 10
(2) A site plan which identifies the important development and geologic features.
Located on Map(s) Figure 2 Pages 11 & 28
(3) Locations and logs of exploratory holes or probes.
Located on Map(s) Figure 2 Pages 11 & 28
(4) The area of the proposed development, the boundaries of the hazard, and associated buffers and setbacks shall
be delineated (top, both sides, and toe)on a geologic map of the site.
Located on Map(s) Figure 2 Pages 11 & 28
(5) A minimum of one cross section at a scale which adequately depicts the subsurface profile, and which
incorporates the details of proposed grade changes.
Located on Map(s) Figure 2 Page 2, 25, 26, & 28
(6) A description and results of slope stability analyses performed for both static and seismic loading conditions.
Analysis should examine worst case failures. The analysis should include the Simplified Bishop's Method of
Circles. The minimum static safety factor is 1.5,the minimum seismic safety factor is 1.1, and the quasi-static
analysis coefficients should be a value of 0.15.
Located on page(s) 11 - 13
(7) (a) Appropriate restrictions on placement of drainage features,
Rev. February 2018
Located on page(s 13
(b) Appropriate restrictions on placement of septic drain fields,
Located on page(s) 13
(c) Appropriate restrictions on placement of compacted fills and footings,
Located on page(s) 13 - 14
(d) Recommended buffers from the landslide hazard areas shoreline bluffs and the tops of other slopes.
Located on page(s) 14
(e) Recommended setbacks from the landslide hazard areas shoreline bluffs and the tops of other slopes.
Located on page(s) 14
(8) Recommendations for the preparation of a detailed clearing and grading plan which specifically identifies
vegetation to be removed, a schedule for vegetation removal and replanting, and the method of vegetation
removal.
Located on page(s) 15
(9) Recommendations for the preparation of a detailed temporary erosion control plan which identifies the specific
mitigating measures to be implemented during construction to protect the slope from erosion, landslides and
harmful construction methods.
Located on page(s) 15
(10) An analysis of both on-site and off-site impacts of the proposed development.
Located on page(s) 15
(11) Specifications of final development conditions such as, vegetative management, drainage, erosion control, and
buffer widths.
Located on page(s) 16
(12) Recommendations for the preparation of structural mitigation or details of other proposed mitigation.
Located on page(s) 16
(13) A site map drawn to scale showing the property boundaries, scale, north arrow, and the location and nature of
existing and proposed development on the site.
Located on Map(s) 16
11 Curts D Cushman hereby certify under penalty of perjury that I am a civil engineer licensed in the
State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering
geologist licen estate of Washington with special knowledge of the local conditions. I also certify that the
-ci Wasf� .�
fo Geotechnical Report, dated May 16, 2024 and entitled
Reesidential Development Site 00 Sea Spray Lane Shelton,Wahington
meets all the requirements of the Mason County Resource Ordinance,
Fn �Geolcyist/� ��z y Geologically Hazardous Areas Section, is complete and true, that the
9 assessment demonstrates conclusively that the risks posed by the
landslide hazard can be mitigated through the included geotechnical
[Curtis Dean Cushman design recommendations, and that all hazards are mitigated in such a
(Signature and Stamp) manner as to prevent harm to property and public health and safety.
Page 2 of 2
Disclaimer: Mason County does not certify the quality of the work done in this Geotechnical Report.
ALL AMERICAN GEOTECHNICAL
CONTACT INFORMATION
PREPARER INFORMATION
AAG PROJECT NUMBER: AAG24-054
CONTACT: CURTIS D.CUSHMAN
ADDRESS: 8947 BUTTONWOOD LANE NE
OLYMPIA,WASHINGTON 98516
TELEPHONE: (360)491-5155
CELL/TEST: (360)481-6677
EMAIL ADDRESS: CURTIS.CUSHMAN@COMCAST.NET
CLIENT INFORMATION
CLIENT: DONALD MOON
TELEPHONE: (360)491-8475
BILLING ADDRESS: DONALD MOON
490143RD LANE SE
LACEY,WA
98503
SITE ADDRESS: 00 SEA SPRAY LANE
SHELTON,WASHINGTON
EMAIL DONALDMOON123456(a)GMAIL.COM
PARCEL NUMBER 22020-23-94004
GPS LOCATION: 47.206 -122.971 dd
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 2
Phone#: (360)491-5155 Cell#: (360)481-6677
EI2I( G1.,O,I t'cII\1( I .
SCOPE OF UNDERSTANDING
DONALD MOON
490143RD LANE SE
LACEY,WA 98503
RE: GEOTECHNICAL REPORT
PROPOSED RESIDENCE
00 SEA SPRAY LANE
SHELTON,WASHINGTON
E 1/2 W 1/2 GOVT LOT I EX LOT:D OF SP 42882
47.206 -122.971 (DD)
PARCEL: 22020-23-94004
MAY 16,2024
Dear Mr. Moon:
Mr. Donald Moon (client) hired All American Geotechnical, Inc. (AAG) in April, 2024 to create a
geotechnical report for the above residential property in Mason County,Washington. The following is the
report written to comply with the Mason County Requirements in the Mason County Code -Critical areas
in accordance with the Submittal Checklistfor a Geotechnical Report for the above property southwest of
Shelton in Mason County, Washington.
The site is planned to be developed with a single-family residence. This report will demonstrate the area
planned for the residence is suitably in compliance with Factors of Safety for a Landslide Hazard Area. As
per client contact,we did a relevant site visit and a search of public documents. A copy of this report will
be provided to the client by PDF.
Landslide hazards will be noted and analyzed in text. Other geotechnical information is likewise included.
We appreciate this opportunity to be of service to you and we look forward to working with you in the
future. If you have any questions concerning the above items, the procedures used, or if we can be of any
further assistance please call us at the phone number listed below.
Respectfully Submitted,
o Wa'Sh/ ALL AMERICAN GEOTECHNICAL,INC.
w
�9 eering Geo. ist
2439 V �
Go
Curtis D. Cushman, L.G., L.E.G.
Curtis Dean Cu Senior Engineering Geologist
AAG24-054 8947 Buttonwood Lane NE,Olympia, WA 98516 3
Phone#: (360)491-5155 Cell #: (360)481-6677
ALL AMERICAN GEOTECHNICAL
TABLE OF CONTENTS
SCOPE OF UNDERSTANDING 3
INTRODUCTION 6
1) SITE CONDITIONS 6
SURFACE CONDITIONS 6
A) SITE GEOLOGY 7
B) SOIL 8
C) GROUND WATER CONDITIONS 10
D) UPSLOPE GEOMORPHOLOGY 10
E) UPSLOPE WATERBODIES AND WETLANDS 10
F) LANDSLIDE ACTIVITY 10
2) SITE PLAN 11
3) EXPLORATORY HOLES OR PROBES 11
4) PROPOSED DEVELOPMENT 11
5) CROSS SECTION 11
6) SLOPE STABILTY ANALYSIS 11
SEISMIC LIQUEFACTION HAZARD 12
GEOSEISMIC SETTING 12
LATERAL EARTH PRESSURES 13
7)RESTRICTIONS 13
A)PLACEMENT OF DRAINAGE FEATURES 13
B)PLACEMENT OF SEPTIC DRAIN FIELDS 13
C)PLACEMENT OF COMPACTED FILLS AND FOOTINGS 13
RECOMMENDATIONS FOR SITE PREPARATION 13
RECOMMENDATIONS FOR STRUCTURAL FILL 14
D)BUFFERS 14
E)SETBACKS 14
8)CLEARING AND GRADING PLAN 15
9)EROSION CONTROL PLAN 15
10)ON AND OFFSITE IMPACTS 15
11)FINAL DEVELOPMENT CONDITIONS 16
12)STRUCTURAL MITIGATION 16
13 SITE PLAN 16
CONCLUSIONS AND RECOMMENDATIONS 16
PROVISIONS 16
GENERAL 16
CONTRACTORS ARE RESPONSIBLE FOR SITE SAFETY ON THEIR OWN CONSTRUCTION PROJECTS 17
READ THESE PROVISIONS CLOSELY 17
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 4
Phone#: (360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
REFERENCES 18
MAPS 18
PUBLICATIONS 18
WEBSITES 18
APPENDIX 19
LIDAR IMAGERY 20
NEIGHBORING WELL LOG-- 101 E SEA SPRAY LANE 21
NEIGHBORING WELL LOG-- 115 E SEA SPRAY LANE 22
ASCE7-16 SEISMIC DESIGN SPECIFICATIONS 23
SLOPE MODELS 25
STATIC MODEL A-A' 25
DYNAMIC MODEL A-A' 26
FIGURES 27
FIGURE I VICINITY MAP 27
FIGURE 2. SITE PLAN 28
FIGURE 3. EROSION CONTROL NOTES 29
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 5
Phone#: (360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
INTRODUCTION
This report summarizes the results of our geotechnical study of the parcel herein described. The proposed
building site is on a shotgun parcel of 2.27 acres in area long to the north-south. Development will be
south of Sea Spray Lane and above a steep bluff descending south to Hammersley Inlet. The parcel is
currently undeveloped. Access would be off Sea Spray Lane which is off E Agate Road via E Hammersley
Reach Road. E Agate Road turns from SR-6 northeast of Shelton, Washington.
In general, the parcel is on a slope descending gently to the west. However, at its southern end, the slope
swings to the southwest and then finally descends nearly 100 feet abruptly to the south, terminating at the
water's edge. The slope descending to the water is well over 40%and 10 feet in height.
The elevation of the parcel is highest at over 120 feet north of Sea Spray with the lowest at mean sea level
at the southern end of the parcel. The proposed residence will be around the 100-foot contour.
Our understanding of the project is based on information from the client. This geotechnical report and the
checklist for Mason County involves the following:
1. A review of the available geologic,hydrogeological and geotechnical data for the site area.
2. A detailed geologic reconnaissance of the site area and surrounding vicinity.
3. Investigation and identification of shallow subsurface conditions at the site by
characterizing the exposed soil, sampling, and reviewing published well logs.
4. Comparison of the site to published geologic maps,previous field investigations,and open
file reports. Inspection of aerial photographs to determine the geomorphology of the site.
5. Evaluation of the landslide, erosion, and seismic hazards at the site per the Mason County
Critical Areas Ordinance regulations.
6. Slope modelling.
As the slope south of the parcel exceeds 40%and is greater in height than 10 feet and is within 300 feet of
the proposed building site, this is considered a Landslide Hazard Area (LHA) Therefore, Mason County
requires that a geotechnical report be prepared in accordance with the Mason County Ordinance; 8.52
Resource Ordinance. 8.52.140 Geologically hazardous areas.
1) SITE CONDITIONS
SURFACE CONDITIONS
The proposed location for the residential development is on a relatively flat terrace of glacial till above
Hammersley Inlet. The immediate area is one of typical ridge-and-valley fluted terrain carved by
continental glaciation and, in this area,surfaced by lodgment till.
Curtis D Cushman, L.E.G. of AAG conducted a site visit on April 17, 2024. The client was on site. The
purpose of a site visit is to physically observe the property and adjacent properties in order to identify any
recognized geologic conditions. Visual observations were documented.
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 6
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
The parcel is mostly forested except for the bluff which is mixed with brush. The trees are straight and
vertical showing little evidence of movement. The development area is constrained by the sight-lines
between neighboring residences. It is nearly level and the underlying geology is straightforward (see
below).
A) SITE GEOLOGY
The site is mapped as Qgt— Fashon Stade till
Geologic Unit Symbol: Qgt
Geologic Unit Age: Pleistocene
Geologic Unit Name: Vashon Stade till
Publication Source: WGS
Publication Number: OFR 2003-23
Quadrangle Name: Squaxin Island
Feature Link: WGS I OFR 2003-23 1 Squaxin Island I Qgt
Unit Description: Unsorted and highly compacted mixture of clay, silt, sand, and gravel deposited
directly by glacier ice;gray where fresh and light yellowish brown where oxidized; very low
permeability; ...cobbles and boulders commonly faceted and(or) striated; ranges in thickness from
wispy, discontinuous layers less than I in. thick to more than 30 ft thick; ...typically, weakly developed
modern soil has formed on the cap of loose gravel, but the underlying till is unweathered...
Age: Pleistocene
Lithology: continental glacial till
Age-Lithology: Pleistocene continental glacial till
The above description is taken verbatim from the Geologic Map of the Squaxin Island 7.5-minute
Quadrangle, Mason and Thurston Counties, Washington; 2003;Logan,Robert L. and others;
Washington Division of Geology and Earth Resources Open File Report 2003-23.
The geology at the client parcel has been interpreted as a thicker blanket of Qgt than is usually mapped.
This is because the Squaxin Island Quad does not show any underlying deposits in this area. These are
commonly Qps and Qpf sedimentary materials seen elsewhere which are firm pre-Vashon deposits. In
addition, water wells indicate finer deposits than anticipated, following site observations, which indicate
the area may have a layer of lacustrine deposits nearby, similar to the post-till Qgof deposits seen to the
east. This is not an important consideration for this slope stability modeling, but should be borne in mind
when excavating; finer grained sediments, including possible clays or elastic silts may be encountered.
It is also to be noted that the width and location of the band of Qls—Landslide deposits is incorrect. This
mapping should be restricted to the bluff and not to the terrace above it.
A A G 24-0�4 8947 Buttonwood Lane NE,Olympia,WA 98516 7
Phone#: (360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
What was seen in the field was gravelly sand with some silt. The deposits seen on site are likely SP Poorly
graded gravelly sand. The glacial deposits are firm and suitable for construction. Clay, again, may be
present, but it is unlikely.
There are no nearby folds or faults. The major mountain building is well to the west along the Olympic
Mountains thrust faults and associated structures.
Nearby water wells have columns that are varied in makeup, one in the appendix shows fine-grained
deposits. This indicates the presence of lakes in the area following the end of the latest glacial stade. In
no well was there a definite contact found between the mapped Vashon till and underlying,earlier,deposits.
The closest major fault is the Tacoma fault zone that is near Allyn, Washington over 13 miles to the north-
northeast of the client parcel. Seismic acceleration is important in modelling the slope stability as the Puget
Sound area is in an active tectonic zone and although this fault does not pose an immediate hazard to the
proposed building project, low levels of seismic activity are not uncommon and there is always the
possibility of a major shock. In the case of a Cascadia event,the site is mapped on the Washington Geologic
Information Portal as in a zone with a potential MMI of 7, Very Strong
In the case of a Tacoma event, the site is mapped on the Washington Geologic Information Portal as in a
zone with a potential MMI of 6, Strong.
In the case of a Seattle event, the site is mapped on the Washington Geologic Information Portal as in a
zone with a potential MMI of 7, Very Strong.
The development zone is mapped on the Coastal Zona Atlas as a Stable slope. The bluff is mapped as an
Unstable slope. This is in keeping with it being mapped as a feeder bluff that is allowed to be eroded at its
base by wave and tidal weathering to provide sediments into the marine environment of South Puget Sound.
The land will be eroded back, but this will take many years as the slopes appear resistant and well-
vegetated.
It is mostly within the Shoreline Environmental Designation of"Residential." The DNR 2007 Hazard
Zone is Low at the development site and is High along the bluff. The DNR 2009 Landforms shows a
somewhat larger bluff area as being High. The DNR 2010 Landslides mapping shows failure along the
bluff, but is, again, in error, being too far to the north. This error, by the way, is likely due to scaling up
from the large-scale Quad map to the smaller-scales seen on the Information Portal.
The building area is within a shoreline conservancy area that is not defined any further. This mapping
appears to be incorrect, being too far north.
B) SOIL
The soil in the areas of the proposed development is described by the USDA Web Soil Survey as:
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 8
Phone#:(360)491-5155 Cell#: (360)481-6677
ALL AMERICAN GEOTECHNICAL
So Sinclair shotty loam,5 to 15 percent slopes
Map Unit Setting
• National map unit symbol. 2hn7
• Elevation: 0 to 300 feet
• Mean annual precipitation: 25 to 50 inches
• Mean annual air temperature: 50 degrees F
• Frost free period: 200 days
Description of Sinclair
Setting
• Landform: Till plains
Typical profile
• HI - 0 to 11 inches: gravelly loam
• H2- 11 to 35 inches: very gravelly loam
• H3 -35 to 60 inches: gravelly sandy loam
Properties and qualities
• Slope: 5 to 15 percent
• Depth to restrictive feature: 28 to 42 inches to densic material
• Drainage class: Moderately well drained
• Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately low(0.00 to
0.06 in/hr)
• Depth to water table: About 18 to 30 inches
• Frequency offlooding.None
• Frequency of ponding.None
• Available water supply, 0 to 60 inches: Low(about 3.7 inches)
This soil was what was seen on site. The bluff to the south is likely the following due to being steeper
than 15 percent:
Rl—Rough broken land
Map Unit Setting
• National map unit symbol: 2hmr
• Elevation: 0 to 710 feet
• Mean annual precipitation: 50 inches
• Mean annual air temperature: 50 degrees F
• Frost free period.• 180 days
• Farmland classification:Not prime farmland
AAG24-054 8947 Buttonwood Lane NE,Olympia, WA 98516 9
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
Description of Rough Broken Land
Typical profile
• HI - 0 to 4 inches: gravelly loam
• H2 - 4 to 43 inches: very gravelly loam
• H3 - 43 to 60 inches: very gravelly sandy loam
Properties and qualities
• Slope: 45 to 90 percent
• Depth to restrictive feature: 20 to 72 inches to densic material
• Drainage class: Well drained
• Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high(0.57 to
1.98 in/hr)
• Depth to water table: More than 80 inches
• Frequency offlooding:None
• Frequency of ponding.None
• Available water supply, 0 to 60 inches: Low(about 3.2 inches)
The soil is similar to the Sinclair and implies similar soil formation, but the soil on the bluff is likely
younger.
C) GROUNDWATER CONDITIONS
There is no evidence of flowing water. There was no evidence of active surface erosion. Natural drainage
is toward the inlet.
D) UPSLOPE GEOMORPHOLOGY
The client parcel is on a low ridge that culminates at 215-feet in elevation over 4,600 feet to the north-
northeast of the client development site. The intervening terrain is irregular near the client parcel but is
more regular away from it as the slope rises gently to the north-northeast. This rise poses no hazard to the
client parcel.
E) UPSLOPE WATERBODIES AND WETLANDS
There are no upland water bodies. There are no wetlands on the parcel. There are none mapped along the
shore. There are no stream buffers on the site.
F) LANDSLIDE ACTIVITY
The bluff is mapped (somewhat erratically) as a landslide area. The criterion for this description is not
known. It appears to be an erosional bluff,retreating slowly due to wave and tidal undercutting. The bluff
appears relatively stable and, being well-vegetated and being comprised of an obdurate material, the rate
of retreat is apparently low.
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 10
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
2) SITE PLAN
Please see Figure 2 in the Appendix.
3) EXPLORATORY HOLES OR PROBES
The site was cut into the geologic deposits and the column is exposed alongside the road descending to
the south. Hand samples were examined on-site.
4) PROPOSED DEVELOPMENT
This will be a single-family residence.
5) CROSS SECTION
A cross-section is in the Appendix. It is along line A-A'.
6) SLOPE STABILTY ANALYSIS
The Slope Stability Analysis is as follows following the Mason County Code of Ordinances of 2021:
8.52.140 (E)(5) (d)
A description and results of slope stability analyses performed for both static and seismic loading
conditions. Analysis should examine worst case failures. The analysis should include the Simplified
Bishop's Method of Circles. The minimum static safety factor is 1.5, the minimum seismic safety factor
is 1.1 and the quasi-static analysis coefficients should be a value of 0.15.
Slope stability was modeled using the GALENA 6.1 program in both static and dynamic conditions (ca=
0.15). "Static" condition refers to an"as is" state of a given slope. "Dynamic"puts seismic acceleration
into the model for earthquake conditions. The factor for ground acceleration (ca) is set at 0.15 by Mason
County.
The surface soil was field classified as a SP Poorly graded gravelly sand. These units are consistent with
the description of Qgt deposits. The site was modeled with a single layer. The possible water table was
included in the model. Parameters used for the subsurface material are presented in the following table.
Table 1. Modeling Parameters for Subsurface Material
Geolo c Unit L nit «eight Cohesion Phi Angle
Qgt -Vashon Stade glacial till 113 1100 ;S
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 11
Phone#: (360)491-5155 Cell#: (360)481-6677
ALL AMERICAN GEOTECHNICAL
Factors of safety were determined using the Bishop (semi-circular) method. Under static conditions, the
slopes did not show susceptibility to deep-seated failure that would cause damage to the existing
development. See Appendix for model output and cross-sections. Under dynamic loading(Ca=0.15),the
computations demonstrated that the site has a safe FoS. The following are the Factors of Safety (FoS)
attained for the sections with respect to their current topographical representation.
General information for the slope profiles and the initial positions for analysis is presented in the following
table.
Table 2. Initial Positions,Variance, and Findings
Anah sis Load?cross Analysis Earthquake Slope to I Initial Positions(lnals sis Range) Co❑ficurarions Factor of
Number Building Envelopel Ilpe Force iBuilding. Lo��er L-t er Radius Auahzed Safety
Cross-Section A. _ _
Analysis 1 1500#172-213' IStatic 0.0 Below I 40(30) 192.5(41) 220_(100) 125,001 I1.51____
� ----
Analysis 2 11500#172-2Y 13' !Dyna❑is 0.150 g_ 40(30) 192.5(41) 320(100) 125,001 11.1�---
The values input were selected to be as conservative as possible so the FoS are possibly higher. The graphic
output of these data is presented in the Appendix, pages 25-26.
SEISMIC LIQUEFACTION HAZARD
The Liquefaction Susceptibility Map of Mason County, Washington by Palmer, Magsino, Poelstra,
Bilderback, Folger, and Niggemann (September 2004) maps the site area as having a Very Low
liquefaction potential.
The Site Class Map of Mason County, Washington by Palmer,Magsino, Bilderback, Poelstra,Folger, and
Niggemann(September 2004)maps the area as site Class C. Site class C is a very dense soil and soft rock
(nehrp classification).
GEOSEISMIC SETTING
According to the Seismic Zone Map of the United States (Figure 1613.3.1(1)) contained in the 2018
International Building Code (IBC), the project site is located where the maximum spectral response
acceleration is greater than 65 percent of gravity(g).
We recommend following seismic factors for design purposes.
• Site Class: C (very dense soil/soft rock)
• Spectral response acceleration, short period(Srls): 1.498 g(Fa= 1.2)
• Spectral response acceleration, 1-second period(SMi): 0.551 g(Fv= 1.449)
• Peak Ground Acceleration 0.671 g
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 12
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
LATERAL EARTH PRESSURES
Lateral loads may be resisted by friction on the bases of footings and floor slabs and as passive pressure
on the sides of footings. An allowable coefficient of friction of 0.40 may be used to calculate friction
between the concrete and the underlying native soil. We recommend the following be used to determine
the lateral earth pressures considering the onsite SP:
• � (soil friction angle) 38 degrees
• Ko(at rest earth pressure coefficient) 0.384
• Ka(active earth pressure coefficient) 0.238
• Kp(passive earth pressure coefficient) 4.20
• y(soil unit weight) 113 pcf
7)RESTRICTIONS
A)PLACEMENT OF DRAINAGE FEATURES
The following notes are general and may not be applicable in part to this property. All ground surfaces,
pavements and sidewalks should be sloped away from the proposed residence and any associated
structures. Surface water runoff should be controlled by a system of curbs, berms,drainage swales,and/or
catch basins and directed onto splash blocks at least 5 feet from the footings,then dispersed overland flow
onto lawn or plantings. We recommend that conventional roof drains be installed. Footing drains shall be
installed for the proposed structure. The roof drain should not be connected to the footing drain. For
footing drains,the drain invert should be below the bottom of the footing. Drainage may also be done by
capturing the drain water then directing it by tightline to a dispersion facility at an adequate and approved
location, such as a natural drainage or a beach. This technique is feasible,but the drop to the beach would
cause difficulties in dispersal to avoid extra erosion.
Drainage should be such that there is no flow onto or over the steep slopes to the south.
B)PLACEMENT OF SEPTIC DRAIN FIELDS
The drain field is located as mapped on Figure 2. The drainfields will be outside the LHA. Domestic
water is from an on-site well.
C)PLACEMENT OF COMPACTED FILLS AND FOOTINGS
RECOMMENDATIONS FOR SITE PREPARATION
There is little geotechnical site preparation to be noted. The building footprint for possible construction is
outside the 50-foot vegetation buffer and aligns with the neighbors' eaves. Removal of juvenile and
opportunistic trees will be required for this parcel.
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 13
Phone#: (360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
All deleterious material will then be removed and sub-soils reached for the footings for the construction of
slab and/or footings. Any material that is excavated may be stockpiled and later used for erosion control
and/or landscaping. Surficial material unsuitable for these tasks should be removed from the project site.
No foundation elements shall be constructed on"untested"fill material.
If demonstrated to be acceptable, the sand/gravel sedimentary material on site may be suitable for re-use
as structural fill.
Where placement of fill material is required, the exposed subgrade areas should be compacted to a firm
and unyielding surface prior to placement of any fill. Over-excavation in any building area should be
backfilled with structural fill, compacted to the density requirements described in the "Structural Fill"
section of this report.
RECOMMENDATIONS FOR STRUCTURAL FILL
All fill material should be placed as structural fill. In general, the structural fill should be placed in
horizontal lifts of 8 inches to allow adequate and uniform compaction of each lift. Fill should be compacted
to at least 95 percent of MDD (maximum dry density as determined in accordance with ASTM D-1557)to
grade.
The final appropriate lift thickness will depend on the fill characteristics and compaction equipment used.
Material placed for structural fill should be free of debris, organic matter,trash,and cobbles greater than 6
inches in diameter. The moisture content of the fill material should be adjusted as necessary for proper
compaction.
Onsite soils may be considered for use as structural fill only if industry standards are satisfied. Fill material
requirements are found on page 9-26 to 9-30 of the WSDOT Standard Specifications 2010. In general, a
native soil (sand, silt, and gravel) encountered on a site must have less than 10 percent fines (material
passing the US No. 200 sieve)to be suitable for use as structural fill.
Footing design for this material will be by the Engineer of Record.
D)BUFFERS
The construction area is outside the 50-foot vegetation buffer. It will be located along the neighbor eave
lines.
The slopes are such that erosion should be considered as a factor but, with proper control, not a limiting
factor. The LHA shall not be disturbed.
E)SETBACKS
The geotechnical setback is seen on Figure 2, page 28.
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 14
Phone#: (360)491-5155 Cell#: (360)481-6677
ALL AwRICAN GEOTECHNICAL
8)CLEARING AND GRADING PLAN
The site is undeveloped outside of an access road that will be upgraded. Clearing will be for some trees
and lower-story vegetation. Clearing may be done by commonly approved standards. Grading will be
limited.
All job site safety issues and precautions are the responsibility of the contractor providing services and/or
work.
9) EROSION CONTROL PLAN
It is our opinion that the potential erosion hazard of the site is not a limiting factor for the proposed
developments. The slope at the site is shallow and will be kept that way. A dangerous discharge of water
is unlikely. Simple erosion control methods will reduce or eliminate any potential erosion risk. Trees and
understory growth on the steep slopes will not be disturbed. Revegetation as needed should occur
immediately following construction. With adequate vegetation, the erosion risk is lessened. No hazard
trees appear to be present but may be removed,if identified,anywhere outside the 50-foot vegetation buffer.
The possibility of down-slope contamination is unlikely if proper control methods are employed. A silt
fence shall be installed as shown on Figures 2 and 3 and other control methods, such as swales and baled
straw are practical. No re-contouring of the site will occur.
Surface drainage should be directed away from all slope faces. Straw,hay, or jute matting shall be used to
cover the exposed soils until permanent vegetation is established. All slopes should be seeded as soon as
practical to facilitate the development of a vegetative cover, or otherwise protected. Surface water should
be captured and directed off-parcel.
A revegetation plan should not be required. When residential plantings or any plantings on the periphery
of the residential area and the slopes are planned, native species should be considered as the primary
vegetation in areas away from lawn and ornamental plantings. Shallow rooted species, such as grass,
should be planted closer than 10 feet from underground drainages.
Densely rooted evergreen shrubs are preferable than tree species on slopes greater than 15%gradient. Tall
trees may become unstable in wet soils under high wind conditions. In general,the steep sides of the bluff
should be left in a natural condition unless erosion or sloughing eventually pose a hazard to the residence.
10) ON AND OFFSITE IMPACTS
There should be no notable on- or offsite impacts if the project is completed according to the
recommendations of this report and in accordance with all regulations and to the high standards and
practices of the building contractor.
AAG24-054 8947 Buttonwood Lane NE,Olympia, WA 98516 15
Phone#: (360)491-5155 Cell#:(360)481-6677
ALL AMEwAN GEOTECHNICAL
11)FINAL DEVELOPMENT CONDITIONS
Final development will rely on the location of the residence needing to be properly footed on competent
geologic deposits with adequate setback from the LHA. All final conditions will follow the design by the
Engineer of Record and compliance with all regulatory agencies. If this and the above recommendations
are followed, final development conditions may be achieved.
12) STRUCTURAL MITIGATION
There is no structural remediation to be done.
13 SITE PLAN
Please see Figure 2.
CONCLUSIONS AND RECOMMENDATIONS
Based on the results of the site reconnaissance, subsurface observations, and our experience in the area, it
is our opinion that the proposed development site on the client property is suitable for a residential
development. The location of the residence as proposed complies with the Factors of Safety for the county
code. The erosion hazard is manageable, and drainage should not pose a great problem. For erosion
control,we recommend a silt fence or other erosion control measures noted above followed by revegetation.
The retreat of the bluff from its current place is inevitable. This is likely not going to affect the residence
location for the foreseeable future.
PROVISIONS
GENERAL
We have prepared this report for the exclusive use of Don Moon and his authorized agents for development
of this property in Mason County, Washington. Site inspections, research, and mapping have culminated
in this report. This report is intended to meet the requirements of the Mason County Code. This report
does not specify setbacks for: line-of-sight setbacks, FWHCA setbacks, eagle tree setbacks, wetland
setbacks,or property line setbacks. Within the limitations of scope,schedule and budget,our services have
been executed in accordance with generally accepted practices in the field of geotechnical engineering in
this area at the time this report was prepared. No warranty or other conditions,expressed or implied,should
be understood.
Clients and property owners must understand that,while a slope may be found to have an acceptable Factor
of Safety related to deep-seated mass wasting, surficial failure and landslides can and do occur on steep
slopes. The property owners should monitor the stability of their property following construction.
Moreover, acceptable Factors of Safety do not guarantee there cannot be failures. It is the responsibility
of the property owners to understand that there are always risks in building on or near steeply sloped areas.
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 16
Phone#: (360)491-5155 Cell#: (360)481-6677
ALL AMERICAN GEOTECHNICAL
CONTRACTORS ARE RESPONSIBLE FOR SITE SAFETY ON THEIR OWN CONSTRUCTION PROJECTS
Our geotechnical recommendations are not intended to direct the contractor's procedures, methods,
schedule or management of the work site. The contractor is solely responsible for job site safety and for
managing construction operations to minimize risks to onsite personnel and to adjacent properties.
READ THESE PROVISIONS CLOSELY
Some clients, design professionals, and contractors may not recognize that the geoscience practices
(geotechnical engineering or geology) are far less exact than other engineering and natural science
disciplines. This lack of understanding can create unrealistic expectations that could lead to
disappointments,claims and disputes.All American Geotechnical includes these explanatory"limitations"
provisions in our reports to help reduce such risks.
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 17
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
REFERENCES
MAPS
DeLorme 3-D TopoQuads(2002),Source Data USGS,Yarmouth,Maine.
Palmer, Magsino, Poelstra, Bilderback, Folger, and Niggemann (September 2004), The Liquefaction Susceptibility Map of
Mason County, Washington, published by Washington State Department of Natural Resources.
Palmer, Magsino, Bilderback, Poelstra, Folger, and Niggemann (September 2004), The Site Class Map of Mason County,
Washington,published by Washington State Department of Natural Resources.
Rogers,A.M.,Walsh,T.J.,Kockelman,W.J.,and Priest,G.R.(1996),Map showing known or suspectedfaults with quaternary
displacement in the Pacific Northwest,published by U.S.Geological Survey OFR 91-441-0,Plate 1,scale 1:2,000,000.
PUBLICATIONS
ASTM International(2005),Annual Book of Standards 2015, Section 4, Volume 4.08,published by ASTM International,West
Conshohocken,Pennsylvania.
Kollmorgen Instruments Corporation(1994),Munsell Soil Color Charts(1994 Revised Edition),published by Macbeth Division
of Kollmorgen Instruments Corporation,New Windsor,New York.
Ness,Fowler,Parvin(1960),The Soil Survey of Mason County, Washington, USDA Soil Conservation Service,in cooperation
with the United States Department of Agriculture, and Washington Agricultural Experimental Station, and the Soils
Conservation Service.
Parks, Neal, Koloski, Laprade, Molinari, Butler, and Lorentson (November 2006), Guidelines for Preparing Engineering
Geology Reports in Washington, published by Washington State Geologist Licensing Board,Olympia,Washington.
WEBSITES
(as online USDA WSS, WA State Geologic Information Portal,Mason County GIS,Dept of Ecology,etc.)
Mason County Government Information Services
(http://www.co.mason.wa.us)
Mason County Codes,Ordinances,and Regulations
(http://www.co.mason.wa.us/code)
Puget Sound Lidar Consortium
(http://pugetsoundlidar.ess.washington.edu/lidardata/index.httnl)
United States Department of Agriculture Natural Resource Conservation Service
(http://soildatamart.nres.usda.gov)
Washington Administrative Code
(http://apps.leg.wa.gov/waco
Washington Department of Ecology
(http://apps.ecy.wa.gov/welllog)
(https://fortress.wa.gov/ecy/coastalatlas/viewer.htm)
AAG24-054 8947 Buttonwood Lane NE,Olympia, WA 98516 18
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
APPENDIX
LiDAR Imagery
Neighboring Well Logs
ASCE7-16 Seismic Design Specifications
Slope Models
Figure 1. Vicinity Map
Figure 2. Site Plan
Figure 3.Erosion Control Notes.
AAG24-054 8947 Buttonwood Lane NE, Olympia, WA 98516 19
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
LiDAR IMAGERY
A. W
"T•_ �. 1 D
0
1, c
a
F
c
W �
10
G
7 �
7
Q �
N FF
b
E
m � c
w
c
0
f
m
d
d
O
y
Oy
t
a
3
0
5
`o
V
m
E
E
0
� w
w
C9
- - O
000.0000 _ • ss Z
AAG24-054 8947 Buttonwood Lane NE, Olympia, WA 98516 20
Phone#: (360)491-5155 Cell #: (360)481-6677
ALL AMERICAN GEOTECHNICAL
NEIGHBORING WELL LOG--101 E SEA SPRAY LANE
Fit F ORIG a FIRST COPY-DEPT OF ECOLOGY WATER WELL REPORT START CARD NO W1,21144
SECOND COPY-OWNER THIRD COPY-DRILLER STATE OF WASHNGTON UNrOUE WEIL ID SKS-220
WATER RIGHT PERMIT NO N!A
(1)OWNER NAME DAN TURNER ADDRESS P.O.BOX 2227 SHELTON WA 93594
a LOCATION OF WELL County MASON NW 1t4 SW 114 SEC 20 TWp 20N R 2W
128)STREET ADDRESS OF WELL(orneamst address) 101 E.SEASPRAY LANE. PARCEL 220202194003
1
(3)PROPOSED USE DOMESTIO I (10)WELL LOG OR DECOMMISSIONING PROCEDURE DESCRIPTION
(4)TYPE OF WORK NEW WELL I
METHOD. ROTARY 1
1 MATERIAL
BROWN SILTY FINE TO MED SAND 0 44
(S)DIMENSIONS Domater d leeli { rUiel GREY SILT,SOME FINE TO MED SAND,GRAVEL,Ct AY � 44 � 56
Drilled 76 liver Depth of co� cleted we: 72 n I GREY SILT.SOME GRAVEL,FINE TO MED SAND.yV e. I 59 1 0
1 GREY SILTY FINE TO COARSE SAND,GRAVEL.W.B I 61 I 72
I GREY SILTY CLAY 1 72 1 76
I I
;6)CONSTRUCTION DETAILS I I 1
Cose10 maid. 6" Dom From .i R to 67 ft
Welded Dam From n to If 1 I I
I I
Liew Dam From C to n l I 1
Threaded 1 I I
I 1 I
1 1
PorloraWns Yes ❑ No r I I 1
aY Type of perforalor used I 1 I
Size of perforabons in by in I j
perforasons dote ft to in.I I
I perlcratons t(om I-. to „I R E C E V E D ,
perforaeons from h W et.i I 1
CCi L N18
I I
Screens Yes 0 No ❑ 1
I 1
Maredaceuds Name. JOHNSON ; WA State Dapartment
'w Tvpe STAINLESS Model No I 1 I
�yf Dom 6'TEtSiot sure 20from 670It b 720 E I Of ECOIUyyI(SWRO�
Iz� Doin Slot sae from ft to f I 1 1 I 1 I
I I
F r
I I I
u Grli'm packed Yes ❑ No .7 See of 0re.++s I I I
i By Gravel packed from n to 1 1 I I
1 I I
Surface seal Yes 'i— No To Vnat depU17 1{ rt I 1
Matenal used n seal BENTONTTE CHIPS 1 I 1
Did any stray contain unusable wales Yes_ No
o I I
3 Type of water? Depth of Strata n l I 1
Mathod of soa mg strata off I I 1
O 1 I I
Z I I
(7)PUMP ki—ewtivKi ham. I I
Type H P 1 1 I
i I 1
v I I I
W
,S (6)WATER LEVELS Sunau eler above mean sin NvW C I I
Stave lava) 64 below,top of wall Date 061,21:1 a I 1 I
Artesian presswe Ibs Per sq n Date 1 I I
i A1te►ton pressure is controlled by I I
1 I 1
8 t
I
� (D)WELL TESTS PUMP test ms0l? Byritwm I Wed Started 0.5722/ta Completed. 0S43riB
h. Yi.q Mi. wro, a M..e..n.�.. •1
r.q Pit—•.0 It 4..rtori.n.. •is WELL CONSTRUCTOR CERTIFICATION!
Y.q a.D.ie will a imnv..i.1i, n,. 1 Constructed arid/of accept responsibility for Construction of
Recovery day 1 this well.and rts compliance with all Washington wet construction
Tvrie Alt LO Time Wtr Lvl Time 'Mr LN i standards. Materials used and the information raported
above are true to my best knovdedge and belief
I
IName RICHARDSON WELL DRILLING COMPANY INC.
Day of lest (Address P.O.BOX 44427 TACOMA•WA SS444
Bailer test qv—win s a...d— A. his i ✓
Arlest a 0avmm stem set at 72 I1 for / M I(Sipn _ Lt No 24!?
Arteuon Lbw OaUmm Date I
Temperature of water Was chemical analysis made? No IContrwWs Rogistration No RICHAMP22100 DATE {r4rt{
AAG24-054 8947 Buttonwood Lane NE,Olympia, WA 98516 21
Phone#: (360)491-5155 Cell#: (360)481-6677
ALL AMERICAN GEOTECHNICAL
NEIGHBORING WELL LOG--115 E SEA SPRAY LANE
0
CL
WATER WELL REPORT
Or/giasl L 1'eapy-Eeatep.I"copy-orate,.rr tap,-dAlkr CURRENT
iri'�i o c ri Notice of l■tent No.
Construction/Decommission/"z"in circle)
® Construction Unique Eco!ngy Well ID Tag No.APKW
w Decommission ORIGINAL INSTALLI TION
Wtutt Right Permit No.
O Notice o Intent Number YaQJW
C PROPOSEO USE: 0 Domestic p Intdsatra! ❑ Memicrpsl Property Owner Nature CAMP13EL.TOM G SANDRA
0 ❑ MsA."r ❑ I.r ton 0 Teu Well ❑Otler Well Street Address SEA SPRAY LN
C TYPE OF W ORK: Owmr's number of well(if nrm thaw Carl
0 ®New+ell p p U ❑R«.drttoad Afe" yt Bored ❑ M,vr. Cit}' LIQZ{ County�-4�
p tkepered ❑t�bk ® Rotary ❑ Jetted Location 2&1;4.1!4 ,m(I:4 Six iss Twn 2Q R 2
E DIMENSIONS: Daarcrtaf rtR�in:hrs,dnikd] Qn «\
>_ D thofc :reed-eH 8.
0 CONSTRUCTION DETAILS Lat/Loog ww-t r
C Cuteg 0 Welded §" Uam aura 4 d to�n (a,t,r Still Lat Deg _ Min_Sec
1MaJkd: 0 L.uer mstaltcd= Ihtn rrom—r.to _n REQUIRED) Long Deg_ Min Sec _
❑Threaded Uam 1 ro.�_R m _R CONSTRUCTION OR DECOMMLSSION PROCEDCRE
A., Perforanoaa: 0 Yes 0 No Faruma Describe by cukr.chuxter.um of aukrui and structure,said tte lend and
s- Type of perforator toed_ matve of the"n"liat�ea;h strums Peter. ed..it atus lust Cee envy fix x ewh change
0 ofmfor"aon (USE ADDtn0NAL SHEETS IF NECESSARY.)
SIZE of pelts—+by—in and eo of reefs_from_P.re_ MATERIAL FROM TO
C _ Scram: co Yes ❑ No ® K-ia t .rii,_' - PIPE STICK UP 0 1
r3 Miusita we*'a Nacre "NSON BROWN SAND.GRAVEL,CLAY 1 35
T)ve SSW Model Yo TELES GRAY SAND,CLAY GRAVEL WET 35 53
f f Duo,¢Stot sue gg Iram In It to In n. GRAY SILT 53 57
Dmm Sla sea from M1 o rt DARK GRAY FINE SAND 57 62
GravetTlrer parted 0 Yes 0 do Sue of gn.rtesaed_ DARK GRAY SAND.GRAVEL,SOME 62 78
+�,a Materuh placed tn;rn n to It CLAY.SEAMS OF WATER 62 78
_>% Sarfare seal: ®Yes ❑No To hv'"p O jLn GRAY CLAY,SILT 78 97
C maic+w w;ed costar SENTONITE GRAY BROWN SAND,SILT,CLAY, 97 102
Dd any sw a cattalo amrsabk ❑ Nei ® No WATER 97 102
1)re el.are^_ Depth of neon__
GRAY SAND,SOME GRAVEL. SEAM 102 131
OF WATER 1 131
Medod of scaling straw Or_
GRAY SAND.GRAVEL.WATER 13131 139
�— PUMP:Atawfxturer'a Nacre_
O r HP._
z WATERLEVELS: lrtbsmfwx ekwtwn abo.r ttttum sea ksel�l
y Sulk keel'fq R Delve.sop of well Datt J0AUfr(,4.. -_--
0 Arttsun prtssv _lbs per sduare—h Dar
Anesun.metucoatorkdby. cap.ealmetc) --
C" N'[LI.TFSTS:Dnwdowa is arnoum+atn Inel K bweRd below smile kssl
0 was a ps-rp test rw.hs❑ Yes ❑No If yes.Dy wltor' P.P
0 Yield._bat'mia-itl_n dra+do.a alt"_hn
LL Yieldeel/aria s.it%—n drawdorRanee hn
w Yess, nl.'men.,th—n.d.a.de+n aft, hot -.-
0 R-~,y dam firer eaLeu m coo rAtw p+mp nu-ed^i—tc•fr,,J rarer—d f a wtfl
eop IC,wtrrlew) I-Y.7)IIIL•9"ton
C Ttme Water Iswl Toe Wale*Ie•et Ir water Intl
E — — — — —
R Doe of�artiaikr kst2QPt;men.rsh aQfl draw dawn afkrlM -"�-__
CL
t7J Airua pt;min raD urns scrar,_M1for_Ms
Anrao-now t P m Dar_ Start Date 2LAVQZ Completed Date
Trmperatsne of+ater_Was a c",csil a-Nys"—del ❑Yes ❑No Tax Parcel`slo.
I-
WELL CONSTRUCTION CERTIFICATION: I eonstrwe d anilor accept responsibility for consuWton of tlus well,and to compliance with all Washmg:cm well
cons ruction suridatds. Materials used and the information reported above are true to my best knowledge and belief.
®Driller❑Engtstoet❑Trainee Driller os uaince Li rise No 2219 Drilling Company'NICHOLSON DRILLING INC
\arse its.t,b.f..rl SI;LLIVA\,JO y Address PO BOX 123
Dnikr'I:n irrcr/Tmtnee Stigriature City,State•Zip PORT ORCHARD•WA, 9b166
IF TRAINEE Dtilla's Lrceme No
Contractor's
Drilkr's Si turf: Registration No NICHODI1371k.1 Date t IA
ECY OJO�1.20(Rev)OS) Ecobo its as Eywl Orpsetssney Enplo)w
AAG24-054 8947 Buttonwood Lane NE,Olympia, WA 98516 22
Phone#: (360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
ASCE7-16 SEISMIC DESIGN SPECIFICATIONS
411 C Hazards by Location
Search Information :an
Coordinates: 47.206,-122.57'
EI•vattort: t�3 n ,r
tar Sl►
Timsafamp: 2024-05-16T20 Gr 28.rO 7
.n
ttemrd Type: Seism c
Re hence Document:ASCE7-16 �t wrrinp
Risk c III I�
�' {. Klap dot X.::5 ar ylo Pe7crt a reap errer
sit class: c
MCBR Horizontal Response Spectrum Design Horizontal Response Spectrum
sa(9) sa(8)
1.50 ',QO
t,OD
0.60
C SQ 0,<n
0,20
C.00 0.00
0 5 'C 15 porter!is) 0 5 .0 15 Period(s)
Basic Parameters
Name Valus Description
SS 1.496 MCER ground moben fpenad=0.2sj
S. C,551 EdCLR ground motion(penod-t,Os)
sm, 1.797 Sno-tnoddied spectral screlerator,vak:o
SW 0.799 Site-modified spectral accelerstar raLe
Styr 1.198 Numeric seismic design value a:0,2s SA
SDI 0a32 Numenc seismic design value a.1,0s SA
-Additional Information
Name Value Description
SDC D Se sn-c dealyn catngary
F, 1.2 S.e amplitcaco-Paaor at 0.25
F. 1,.49 S-e amplifcator Paccar at I.:)s
C R5 V.UC4 Coeflic*w.o'-sk(0,2e)
CR• 0.8P2 :oeftiew oF,*k(1.0s1
AAG24-054 8947 Buttonwood Lane NE, Olympia, WA 98516 23
Phone#: (360)491-5155 Cell #: (360)481-6677
ALL AMERICAN GEOTECHNICAL
ASCE7-16 Seismic Design Specifications continued
PGA 0.641 DACE;peak ground acceleration
FPGA 1.2 Ste ampldcato^-fa:tor at PGA
PGA#J 0.769 S:e modifec peak ground acceleratcn
T, 16 Long-penod transit on pencd(s;
SsRT 1.498 Probab4stc risk-targeted ground motion(0.2s)
SsUH 1.657 Factored u�fottn ward spectral accolorabo-(2%vovab lty of
exceedance in 50 years)
SsD 1,5 FacCored determ nisb:accelerator value(0.2s)
S I RT 0.551 Prooab I st c nsk.:argeted ground mo5on(1.0s)
S1UH 0.625 Fac-orod urrfortrntrazaro spectral acceletabo-(2`d o obab Ily of
exco¢Canco in 50 years)
SID 0.787 Fay..aeddeletmrxstr.accelerator value(1.0s)
F'GAd 0.616 Fncrored cetermnistr.accelerator value(PGA)
Tho rosutfa kxAcatod horn 00 NOT rolloct any sfato or focal amor dirronts to fho valims or any dohnooWn Tinos mado during fho bWd)ng codo adopt,on
process.Users should cnn/irm any oufpuf obla.'red from this fool with the lxa.'Authon/y Having g Junsd,ction before proceeding w.dh design
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 24
Phone#: (360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
SLOPE MODELS
STATIC MODFI.A-A'
c
>yQ y I
O'ic�i dr � � y
E
g
o
t
I C �
Lu
Q �
4�
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 25
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
DYNAMIC MODEL A-A'
3Ny_�
1 G V =
cc /T
� fY
N � V
h
y E
y 0Q
i
i
I
}
} M
}
I
}
}
}
}
a
} S
} N
}
} Q
}
}
p
O
w )O J V
�_._. Q S E
a� u
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 26
Phone#:(360)491-5155 Cell#:(360)481-6677
ALL AMERICAN GEOTECHNICAL
FIGURES
FIGURE 1 VICINITY MAP
123'W".0,kN O.-MV51,Vv i22157,601 W
L
V
X,
'q
0 J
C&MA
r 14
INLET
10— V94
J,
jj
M
N
7-
2
i'l:•
r
CII&I ac,w
vw
AAG24-054 8947 Buttonwood Lane NE,Olympia,WA 98516 27
Phone#:(360)491-5155 Cell#:(360)481-6677
D
g "a
� m a
.c �
E n
p C)
O m
Notes: o
T' This is not a survey. This �'rf
map is a presentation of I
a z: information from county,
a= o.
N 3 state,and/or federal
T agencies,client provided
information,and onsite �C
observations.7.
C�7
N
r
=
r9 O r,
ti
� O
S�
Site Soil C:
7
So--Sinclair Shotty loam,
5 to 15 percent slope. l„='
1 �
1 ,
>
R
Site Geology
, 1
3 �
Qgt--Vashon glacial till
i
Qls--Quaternary landsli s
CO
i
i I i
i
1 �
i 1
I _ i
i
1 ,
1 �
1
1 =\
' 1
m i `
0. Z
c Pn+paud
N �' lct'
w /
y _
A L--— LIM
Qls
10
}nl�t
00 N
FILTER FABRIC MATERIAL 80•WIDE ROLLS
USE STAPLES OR WIRE RING TO ATTACH
FABRIC TO WIRE
27X27X14 GAUGE WIRE
FABRIC OR EQUIVALENT
GENERAL EROSION CONTROL NOTES:
r4r 1. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE
BEGINNING OF CONSTRUCTION.THE PROJECT ENGINEER AND THE COUNTY
5'ff \ SURFACE ,a\\ SHALL INSPECT AND APPROVE THE INSTALLATION OF 1/2 INCH MINIMUM DIAMETER STEEL ROD
EROSION CONTROL MEASURES PRIOR TO BEGINNING CONSTRUCTION. (STRAP)CLAMPED SECURELY TO PIPE
2' •, -,---- 2.EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS
6•MAx ON THIS PLAN.THE CONTRACTOR IS RESPONSIBLE FOR THE CORRUGATED TIGHTLINE 4 INCH
/! INSTALLATION AND MAINTAI NANCE OF ALL EROSION CONTROL MEASURES. MINIMUM,6 INCH SUGGESTED
NO SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES
SHALL BE ALLOWED.CARE SHALL BE TAKEN TO PREVENT MIGRATION ^' M/N/illL
2x4•w000 POSTS,STANDARD OR BURY BOTTOM OF FILTER OF SILTS TO OFF SITE PROPERTIES. Ic+;-�: ".-, Sp4f70
BETTER OR EQUALALTERNATE: MATERIAL IN 8-2-TRENCH ';; i ^? '�.r' .:. AQ/ F-.
STEEL FENCE POSTS 3.THE CONTRACTOR SHALL MAKE DAILY SURVEILLANCE OF ALL EROSION
CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS OR ADDITIONS 111 ^'"TL:A}ti%_,•'.
':.:.:V'e'�:Y'.ra,....
TO THE EROSION CONTROL MEASURES.THE CONTRACTOR SHALL PROVIDE y� '
ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED NECESSARY *`:' b •ri; °L w'+'F',a.,
By
THE COUNTY INSPECTOR AND/OR THE PROJECT ENGINEER.FAILURE
?zr•p JY r4*1 �4ti r'Z tea`.{.•:�._
FILTER FABRIC 8• TO COMPLY WITH ALL LOCAL AND STATE EROSION CONTROL '•: 'Pti.'. tA/:'.?"
REQUIREMENTS THE C MAY RESULT IN AND/OR
PENALTIES BEING LEVIED 'r' YY r-�r''.,s •i.`•'' .':'i•>5�;, ,
FABRIC
GAUGE WIRE k' '4h• -
AGAINSTTHECONTRACTORAND/OR PROJECT OWNER. '�. c�.���p-.aA'yv:+�.;".••-w,x.��'.1 ar4.:;ji�5ipb-
FABRIC OR EQUIVALENT
4.DURING THE WET SEASON NOVEMBER TO MARCH ALL DISTURBED SOILS ^.•�.-4+' ?�-''s`�;`?�"yS�aaC�:"
GROUND SURFACE 5 ( ) " ""•A•. j��"'H`'�" -l+F:�
SHALL BE STABILIZED WITHIN 48 HOURS AFTER STOP OF WORK.EROSION
CONTROL MEASURES SHALL INCLUDE,BUr NOT BE LIMITED TO, �?'('�`��±n�!•rt"�=rr.,"„A-";u 5�•f '++�.`y,/.•
PROVIDE 314•-112•WASHED COVERING
GRAVEL BACKFlLL IN TRENCH THE EFFECTED AREA INCLUDING SPOIL PILES WITH 'v�'1.-' .Srti.'.4"'�•`�' v''ti w!?- '++'"�"
1Y
AND ON BOTH SIDES OF FILTER PLASTIC SHEETING,STRAW MATTING.JUTE MATTING,STRAW MULCH, •`'•'E>r .*tiJ '
FENCE FABRIC ON THE SURFACE 6'MIN ORWOOSWHEAT.SEEDI GO THE DISTURBED AREAS SHALL TAKEPLACE `
TIGHTLINE ANCHORED WITH TWO,
MC WCOD POSTS 5.ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY 3 FOOT REBAR LENGTHS OR BOLTS.
ALT.STEEL FENCE POSTS TO MAKE SURE VEGETATIVE COVERAGE IS COMLETE.AREAS SHALL BE
REPAIRED,RESEEDED,AND FERTILIZED AS REQUIRED.
FILTER FABRIC FENCE NOTES:
1.FIE ER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO 6.TRACKING OF SOIL OFFSITE WILL NOT BE ALLOWED.IF ANY SOIL IS
THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS.WHEN JOINTS TRACKED ONTO A COUNTY STREET,IT SHALL BE REMOVED BY THE END
ARE NECESSARY,FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT OF THAT WORKING DAY.ANY FURTHER TRACKING OF MUD WILL THEN
A SUPPORT POST WITH A MINIMUM 64NCH OVERLAP AND SECURELY BE PREVENTED BY SWEEPING OR WASHING OF THE VEHICLES TIRES
FASTENED AT BOTH ENDS TO THE POST. BEFORE DRIVING ON A COUNTY STREET.
2.POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN 7.NO MORE THAN 500 LF OF TRENCH ON A DOWNSLOPE OF MORE THAN 5
SECURELY INTO THE GROUND(MINIMUM OF 30INCHES). PERCENT SHALL BE OPENED AT ONE TIME.
3.A TRENCH SHALL BE EXCAVATED APPROXIMATELY 81NCHES WIDE AND 12 JJFL-AREINCHES DEEP ALONG THE UNE OF POSTS AND UPSLOPE FROM THE BARRIER. B.E%CAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. END SECTION
9.TRENCH DE WATERING DEVICES SHALL BE DISCHARGED IN A MANNER THAT WILL QUARRY SPALLSLI4.WHEN BT FENCENDARD S ALL BE FASTS ED SECURELYBRIC IS TO,A WIRE MESH OR ENERGYOF THE OSTSUINGH BEFASTENEDSESTAPLV TOT EAST IIOPESIDE NOTADVERSELV AFFECT FLOWING STREAMS.DRAINAGE SYSTEMS OR ..,;�.t�" +fi+_, •-,:r�T`_�n;;a^e.Ah
ED THE POSTS USING HOG
VY-DUTY THE ERE SHALL
AT X END INTO
OFFSITE PROPERTIES. DISPERSION DEVICE .r;C:, �Saria 4W ti.Sy.J,�v;l :•:ti�T�,)'t'•-v.:j�•t•L•'+
LONG,TIE WIRER OR HOG RINGS.THE WIRE SHALL EXTEND INTO THE
TRENCH A MINIMUM OF OINCHES AND SHALL NOT EXTEND MORE THAN 36 10.ALL STORM SEWER INLETS RECEIVING RUNOFF FROM THE PROJECT DURING
INCHES ABOVE THE ORIGINAL GROUND SURFACE. CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER GRASS-LINED$WALE SHOULD BE A
s.THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED WILL BE FILTERED BEFORE ENTERING THE CONVEYANCE SYSTEM. MINIMUM ONE FOOT WIDE AT THE
TO THE FENCE AND 20INCHES OF FABRIC SHALL BE EXTENDED 11.ALL OFFSITE CATCH BASINS IMMEDIATELY ADJACENT TO THE SITE BOTTOM AND ONE FOOT DEEP WITH
INTO THE TRENCH.THE FABRIC SHALL NOT EXTEND MORE THAN 36 SHALL BE PROTECTED FROM SILTATION. A MAXIMUM SLOPE OF 5 PERCENT.
INCHES ABOVE THE ORIGINAL GROUND SURFACE.FILTER FABRIC SHALL
NOT BE STAPLED TO THE EXISTING TREES. MINIMUM 4 FEET
12.ALL DISTURBED AREAS SHALL BE SEEDED OR SODDED UPON COMPLETION LEVEL SECTION
6.WHEN EXTRASTRENGTH FILTER FABRIC AND CLOSER POST SPACING IS OF WORK.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT
USED,THE WIRE MESH SUPPORT FENCE MAP BE ELIMINATED,IN SUCH COMPLETE COVERAGE OF THE DISTURBED AREAS IS PROVIDED S THAT
A CASE,THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE GROWTH OF THE VEGETATION IS ESTABLISHED. GEOTEXTILE FABRIC
POSTS WITH ALL OTHER PROVISIONS OR ABOVE NOTES APPLYING.
7.FRTER FABRIC FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE 13.CATCH BASINS SHALL TRAP SEDIMENT OR FILTER FABRIC MUST BE
AREA HAS BEEN PERMANENTLY STABILIZED. PLACED UNDER GRATE UNTIL VEGETATION IS ESTABUSHED.
8.FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH
RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL ANY
REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
All American Geotechnical,Inc. Drawn g 22020-23-94004 Figure
Y� Erosion Control Notes Permit Number: Parcel Number: 3
8947 Buttonwood Lane NE BWJ 5/16/24 Proposed Home
Olympia,Washington 98516 Revisions: Applicant Name: Donald Moon 111 E Sea Spray Lane Page
Shelton,Washington PP Site Address: 29