HomeMy WebLinkAboutSHX2013-00051 JARPA - SHX Permit / Conditions - 8/23/2013 �oN_srgTFo MASON COUNTY
�P DEPARTMENT OF COMMUNITY DEVELOPMENT
o s = Planning Division
o T z P O Box 279, Shelton, WA 98584
7 N Y y (360)427-9670
OJ �O
1864
Exemption from Shoreline Management Act
Case No.: SHX2013-00051 Substantial Development Permit Requirement
The Proposal By: CATHY GATTO
50 NE BELLA VISTA DR
BELFAIR, WA 98528
To undertake the following development:
Replace existing smaller rock bulkhead with 2-ft. diameter rock at base and mid-sized rock along
4- to 5-ft. height and 60 ft. length on west side of Tiger Lake.
Within TIGER LAKE and/or its associated wetlands is exempt from the requirement of substantial development
because the development is categorized under WAC 173-27-040(2) as being category
B-normal maintenance
Please contact Allan Borden at ext 365 if you have any question
Issued: 8/23/2013 ¢� /'
Expires: 8/23/2015 Authorized Local Government Official �/�Z3 L
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
' 123052100050
123052100130
a
123052100000 123052100060
123052290002
123052200010 123052100070
K
0 123052100071
3 /123050060010 _
123052100080
IL
123052100090
W 123052290001 123052100102
2
123052100100 123052100104 123052222222
1230521001 1010
123052200110 123050060010
i 123055200037 i 1 123052100105
123055200036 123055200038 123055200039
I 123055200035 NE DOGWOOD RD
p i 123055200003
T2 N 1 i 123052200111 ! / 123055200032 cj
123055200034 123055200033 123055200030 Q 123055200028 123055200004
�
� 123055200005
123055200023 m
123055200019 123055200020 1 W
I f123055200024 123055200025 Z 123055200006
I 123055200021 123055200027
RD
NE LAUREL" 123055200022 �— j
123050060010
I 123055200007
123052300000 123055200008
123055200015
' 123055200018 123055200017 1
II 1230! 55200013 123055200011
I 123055200016 123055200009
123055200014 123055200012
1 NE DALY DR 123052300014
123052222222
123052300015
123052300010
123052300011
123052300012
123052300013
123052300020
123052300022
N voL-2 0�06� SUYeU13 . 606S�
1 inch = 200 feet 1 inch = 0 miles ry&;�
W E
"
S
123050060010 a `�'• . 123052100090w •• -�` ' /„"
w
+�T � .ti �,•� 123052100102 •7/ _.-•
�• ' . �'•,a-'!�' " •�' ���'�. �. �"- 123052100104 i
r •, 123052100100 t• � s., � 123052222212
'123052100101
a
123052100105 �,•-�_ -
,10,.;) " 123055200039
kNE DOGWOOD RDw! . '+ .• .._ I
+• 123055200003
, .� 123050060010
( �� ` '�>, � � { •'" „ram'
•
o
23055200030
ti a . • e •
A
:.+123055200004
T r (12.,3055200028
T ^ ' Co
+
LIA, V%123055200005'
f7
*5200027
1230`520DS)065�
M -
a
:
123052222222
NE LAUREL ,A. k.
�`� w • t 1 .rr-`•
Y
` 123055200011 '.+ y
f.�r •1� 123055200009
' w
+1
123052300014 .,
�/•'NE D_ALY DF �
123052300010-•�.
" �c• `
•� ._ �.. - '• ..,,.' 123052300015'
L•-
1 inch = 100 feet
W EP/✓
1 inch = 0 miles
S
--------�DIOCEVED.........
AGENCY USE ONLY
Date received.
)UL 3 1 2013
of Engineers k '
rps 1
WASHINGTON STATE s�o�;� 426 W. CMAR i ^S /���
Joint Aquatic Resources Permit : Agency reference#:`J1�2013-Vu� I
Application (DARPA) Form'°2 Tax Parcel#(s):
1 a 3o5 -5a• 6wo
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW.
i
L--------------------------------------I
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) h( elpl
a#-0 Q i r�
Part 2—Applicant
The person and/or organization responsible for the project. hel
2a. Name (Last, First, Middle) - Q f
2b. Organization (if applicable)
2c. Mailing Address (Street or PO Box)
2d. City, State, Zip ! }
2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail
1
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://www nws usace army mil/PublicMenu/Menu cfm?sitename=REG&Pagename=mainpage ESA
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
http://www.epermitting.wa.gov/site/alias resourcecenter/iarpa iarpa form/9984/iarpa form.aspx.
For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help(cb-ora.wa.gov.
JARPA Revision 2012.1 Page 1 of 14
Part 3-Authorized Agent r Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this,
application.) nem
3a. Name (Last, First, Middle)
3b. Organization (mfapplicable)
fh4h*W-1X
3c. Mailing Address (street or Po sox)
3d. City, State, Zip l� q
1✓ !�/�l
3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail
Part 4-Property Owner(s)
Contact information for people or organizations owning the property(ies)where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. hem
N� Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,
contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E
to apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
41b. Organization (if applicable)
4c. Mailing Address (street or Po Box)
4d. City, State, Zip
4e. Phone(1) 4f. Phone(2) 4 . Fax 4h. E-mail
JARPA Revision 2012.1 Page 2 of 14
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. h( elpl
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) hel
9 rivate
Federal
❑ Publicly owned (state,county, city,special districts like schools, ports, etc.)
❑Tribal
❑ Department of Natural Resources (DNR) — managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box If there is no address, provide other location information in 5p.) hf elpl
----A &) e., 6-.e&14 0/ ,s A- Or,
�) U
5C. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) h� elpl
5d. County hel a
5e. Provide the section, township, and range for the project location. hel
1/4 Section Section Township Range
5f. Provide the latitude and longitude of the project location. h� eM
• Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83)
5g. List the tax parcel number(s) for the project location. LbLel
• The local county assessor's office can provide this information.
a 3 Ss-a o Ono
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) help]
Name Mailing Address Tax Parcel # (if known)
C (
WW a ,r— Lc1 6
JARPA Revision 2012.1 Page 3 of 14
5i. List all wetlands on or adjacent to the project location. nei
T b C-9- LAJc C
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. [hem
TIVC�c C,AIKC
5k. Is any part of the project area within a 100-year floodplain? hei
® Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. hey
�x { ►'`f) � k�.�u� V�t��' �wI IGy ew��jti W 4 ,r`S i I�wS
i'—
5m. Describe how the property is currently used. h(�
ftg1AlvKQ
I
5n. Describe how the adjacent properties are currently used. hf eM
5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition. h( elpl
Y I� Si it d� rack L4W. ►� I��ripvs owns /� a now.
�•v� SF 7 I`�L frZr1[�-•J
5p. Provide driving directions from the closest highway to the project location, and attach a map. h( em
JARPA Revision 2012.1 Page 4 of 14
I
Part*6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. [help]
I AS jivl I a l•tw a /-9-L-) y ro4k la - [ e^ouo 4 - eW
c� re u,kt a 6I Lv o,ck a s f i 11 /zeG�-,r%,1 W-"n�
6b. Describe the purpose of the project and why you want or need to perform it. hel
�' O S . t,J2 to rr\� S
6C. Indicate the project category. (Check all that apply) hf eld
❑ Commercial Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (Check all that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home
(upland)
❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift ❑ Dock/ Pier ❑ Marina / Moorage
❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility
Bulkhead ❑ Fence ❑ Outfall Structure
❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin
❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
JARPA Revision 2012.1 Page 5 of 14
6e. Describe how you plan to construct each projectlelement checked in 6d. Include specific construction
methods and equipment to be used. h(_elp_]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-"year"floodplain.
tu.D 'kmf"
Z- S--1+ Uwivol s V
3- rtriv+Mc e)Q"W�* ' wW(1
y- SF4a raw Got r&ej +b CK.rnO-J Blau-e lg e to-AlkkO4
l�2wsti a S vru�t c�. M.rf-h?� 411 �Oo b 164 .
S- I A,d m vv Vt y C(wq-&^
(, a HAgl ✓u f er pw►yvc f4rVW arc t"l s 4%-eJ b&,orY,.
1' Si 4o lt" VVs
6f. What are the anticipated start and end dates for project construction? (Month/Year) [help]
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage. ?
Start date: l• J End date: I ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hf eM
f -5- -
6h. Will any portion of the project receive federal funding? h[�el ]
• If yes, list each agency providing funds.
❑ Yes No ❑ Don't know
Part 7—Wetiands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) [tpjpJ
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hel
❑ Not applicable
7b. Will the project impact wetlands? h� elpl
❑ Yes ❑ No [Don't know
JARPA Revision 2012.1 Page 6 of 14
7c. Will the project impact etland buffers? he]
❑ Yes ❑ No Don't know
7d. Has a wetland delineation report been prepared? hel
• If Yes,sub the report, including data sheets,with the JARPA package.
❑ Yes No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? hel
• If Yes,submit the wetlan,0 rating forms and figures with the JARPA package.
❑ Yes ❑ No Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hf eM
• If Yes,submit the plan with the JARPA package and answer 7g.
• If No,or No pplicabie,explain below why a mitigation plan should not be required.
❑ Yes XNo ❑ Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. nel
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below)where we can find this information in the plan. hf eM .
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type (sq. ft. or
categoryZ Acres) acres)
`CCU r
If no official name for the wetland exists,create a unique name(such as'Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
`Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P),Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
JARPA Revision 2012.1 Page 7 of 14
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. of elpl
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. net
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In P rt 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) h� eM
Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
❑ Not applicable
81b. Will your project impact a waterbody or the area around a waterbody? eip]
❑ Yes No `J 'S a hQ a r✓ 0 U C-�- l S a ( we
JARPA Revision 2012.1 Page 8 of 14
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? h[ e�i
• If Yes, submit the plan with the JARPA package and answer 8d.
• If No, or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No ❑ Not applicable
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your answer here. hel
Be. Summarize impact(s) to each waterbody in the table below. [tgjPJ
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of
drive, etc.) placed in or waterbody
removed from, directly affected
waterbody
a
If no official name for the waterbody exists,create a unique name(such as"Stream 1�The name should be consistent with other documents provided.
Z Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3 Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter'permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. heI
a l( MG`�r�—+t i5 Cv c ( ( �cz S G�e �+ - s - a-)
JARPA Revision 2012.1 Page 9 of 14
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed_ hgl
eVy"O-L�c C4 � c � s
0nd c� ��c,E�'cd c�,f n-- c �c < l
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. h( elpl
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? hf eM
• If Yes,list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at
http://www.ecV.wa.gov/programs/wq/303d/`
❑ Yes ❑ No
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [help]
• Go to http://cfpub.epa.gov/surf/locatelindexcfmto help identify the HUC.
9d. What Water Resource Inventory Area Number(WRIA#) is the project in? hf eM
• Go to http://www.ecy.wa.gov/services/qis/maps/wria/wria.htm to find the WRIA#.
JARPA Revision 2012.1 Page 10 of 14
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? h( eM
• Go to htti)://www.ecV-wa.gov/programs/wq/swqs%criteria.html for the standards.
Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? heI
• If you don't know, contact the local planning department.
• For more information, go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 design ations.htm1.
Rural Urban ❑ Natural ❑ Aquatic ❑ Conservancy ElOther
9g. What is the Washington Department of Natural Resources Water Type? LtLeM
• Go to http://www dnr wa qov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest
Practices Water Typing System.
Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? h[ elpl
• If No, provide the name of the manual your project is designed to meet.
❑ Yes ❑ No n
Name of manual:
9i. Does the project site have known contaminated sediment? LheM
• If Yes, pleas describe below.
❑ Yes No
9j. If you know what the property was used for in the past, describe.below. nel
L�,n � -
9k. Has a cultural resource (archaeological) survey been performed on the project area? heI
• If Yes, attach it to your JARPA package.
❑ Yes ❑ No
JARPA Revision 2012.1 Page 11 of 14
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. rhelp]
fit, n
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. hel
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or help(aD-ora.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) hr ell
• For more information about SEPA,go to www.ecy.wa.gov/programs/sea/sepa/e-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
A SEPA determination is pending withn C60qi:Z4 (lead agency). The expected decision date is
W14lnin 11.4 Woerinc A&,�S .
❑ 1 am applying for a Fish Habitat Enhancement Exemption. (check the box below in 10b.) LheM
❑ This project is exempt(choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law.
JARPA Revision 2012.1 Page 12 of 14
1 Ob. Indicate the permits you are applying for. (Check all that apply.) hf elM
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development Conditional Use ❑ Variance
❑ Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemption Form
Effective July 10, 2012, you must submit a check for$150 to Washington Department of Fish and Wildlife,
unless your project qualifies for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
❑$150 check enclosed. (Check#
Attach check made payable to Washington Department of Fish and Wildlife.
❑Charge to billing account under agreement with WDFW. (Agreement# )
❑ My project is exempt from the application fee. (Check appropriate exemption)
❑ HPA processing is conducted by applicant-funded WDFW staff.
(Agreement # )
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use.)
❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012.
(HPA# )
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA Revision 2012.1 Page 13 of 14
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. he]
11a. Applicant Signature (required) h[ eM
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. �— (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. C ,� -(initial)
Applicant Printed Name Applican ignature Date
11 b. Authorized Agent Signature hi elpj
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Printed Name Authorized Agent Signature Date
11c. Property Owner Signature (if not applicant). hel
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner. _
CZ
Property Owner Printed Nam Property wner Signatur Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043.
People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341.
ORA publication number: ENV-019-09 rev. 06-12
JARPA Revision 2012.1 Page 14 of 14