Loading...
HomeMy WebLinkAboutBLD2007-00617 Cancelled Dock - BLD Permit / Conditions - 9/19/2007 f Inspection Line(360)127-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O,Box 186 Shelton, WA 98584 i� RESIDENTIAL BUILDING PERMIT BLD2007-00617 OWNER: MIKE DAVIS RECEIVED: 4/12/2007 CONTRACTOR: LAKESHORE CONSTRUCTION LICENSE: LAKESC"155JA EXP: 4/4/2009 ISSUED: 6/21/2007 SITE ADDRESS: 130 NE TIGER COVE LN BELFAIR EXPIRES: 12/21/2007 PARCEL NUMBER: 123055100005 LEGAL DESCRIPTION: TIGER LAKE TRACTS#2 TR 5 PROJECT DESCRIPTION: DIRECTIONS TO SITE: New dock to be constructed on Tiger Lake. Tigar Lake General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Co tr.: Type of Use: SF Insp. Area: No. of Bathrooms: Occ. r Lot Size: Deck: Type of Work: ACC Fire Dist.: 2 No. of Stories: �d: Building: Valuation: Building Height: tus: Basement: dock 384 Manufactured Home Information Setback IgKrrqbfion Shoreline& Planning Information Make: Length: Ft. Front: Shoreline: Ft. Water Body: Tiger lake g Rear: Slope: Ft. SEPA?: Yes Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee KKK 4/24/2007 $90.51 S22007000 Planning Review Fee KKK 4/24/2007 $170.00 S22007000 Building State Fee RTB 4/27/2007 $4.50 B12007000 Building Permit Fee RTB 4/27/2007 $111.25 612007000 ADJUST--Plan Check Fee RTB 4/27/2007 -$18.20 612007000 Address Fee BLF 6/20/2007 $154.00 B12007000 Total $512.06 BLD2007-00617 Please referto the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR 43LD2007-00617 CONDITIONS FOR BLD2007-00617 1) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required.for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X 2) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X 3) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X 4) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use permit shall be applied for, reviewed and approved prior to the change. X 5) The "approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 6) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). X 7) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the international codes and Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved. X III BLD2007-00617 Please referto the following pages for conditions of this permit. 2 of 5 8) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X 9) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 10) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X 11) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X 12 All property lines shall be clear) identified at the time of foundation inspection. X P P Y Y li 13) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X i 14) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X 15) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X BLD2007-00617 Please referto the following pages for conditions of this permit. 3 of 5 16) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 17) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 18) The surface of floating structures shall be a minimum of eight inches above the surface of the water. X 19) Recreational piers shall be no higher than 11 feet above mean higher high water. Piers and docks shall have at least an eight foot span between pilings. X 20) A Hydraulic Project Approval from the Washington State Department of Fish + Wildlife must be granted prior to construction. X 21) A water quality standards modification will be required from the Department of Ecology for this project (WAC 173-201-035(8)(e)). X 22) The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program.X 23) All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degredation of State waters. X 24) All new treated piling to be used for this project shall recieve a post treatment vacuum of two hours at not less than 22 inches of mercury. Subsequent to release of the vacuum, the piling shall be steamed for a two hour period, followed by a second vacuum of four hours at 22 inches of mercury. X 25) Pressure treated wood must be completely dry prior to placement in water. Use of creosote or pentachlorophenol is prohibited. X 26) Excavated materials cannot be used as landfill within 200 feet of the shoreline without prior approval from the shoreline division of the Mason County Planning Department. X 27) Dock facilities must be maintained in a safe and sound condition. X BLD2007-00617 Please referto the following pages for conditions of this permit. 4 of 5 This permit becomes null and void if work or construction authorized is not commenoed within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and.structure for review and inspection. OWNER OR AGENT: DATE: BLD2007-00617 Please refer to the following pages for conditions of this permit. 5 of 5 o CONCRETE MECHANICAL MANUFACTURED HOME D o o Footings r Setbacks GnsePiping By Ribbons o Interior Date By Interior-Date By Date By rn -- 0) Exterior Date By Exterior-Date BS*ty Point Load/Isolated Footings INSULATION Date By rn BG/SLAB INSULATION ----------------- Date By Data By FIRE DEPARTMENT Foundation Wails Floors Date By Date By Data By DECKS FRAMING walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Date By Type:Date By D.W.v DRYWALL Type: Int.Brace Wall Date By Date By Date By r -0FINAL INSPECTION Water Line Fin SeperatlonCD lV Date By Dale By Date ByCD O m � Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments m V o 0 d m m 0 8 a 0 0 c� 0 Mason County Dept. of Community Development Mason County Bldg. 3 426 W. Cedar P.O. Box 186 (360) 427-9670 Local (360) 482-5269 Elma rioShelton, WA 98584 (360) 275-4467 Belfair Notice to Obtain Final Inspection October 24, 2008 MIKE DAVIS 340 NE DAVIS FARM RD BELFAIR WA 98528 Case No.: BLD2007-00617 Parcel No.: 123055100005 Proiect Description: New dock to be constructed on Tiger Lake. The Mason County Department of Community Development is currently reviewing all permits that are expired and have not been approved for occupancy and use. Pursuant to Mason County Code, Title 14 Building and Construction, a permit and final inspection for this type of activity is required under the 2006 International Building Code or the code your permit was issued and your property is currently in violation status of occupancy and use. Please contact our office to make the necessary arrangements 21 days from the date of this letter. Failure to contact our office to make the necessary scheduled inspections will result in enforcement actions. To bring your site into compliance, you must schedule an inspection. One (1) $68.00 site investigation fee will need to be paid prior to inspection along with any outstanding fees currently due on your building permit. For every inspection required after that, you will be charged $68.00 again, per inspection until final inspection and conditions are met. To schedule an inspection, please call (360) 427-9670 ext. 262. If you should have any questions regarding this notification, please contact me at (360) 427-9670 ext 595. Sincerely, Rich Todd Balderston Mason County Department of Community Development Cc: Property File October 24, 2008 BLD2007-00617 360-427-9670 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING DIVISION P.O. Box 279, Shelton, WA 98584 ALL PERSONS ARE HEREBY ORDERED TO AT ONCE TOP WORK On These Premises at _.7SO 5;j 1 Q O 00 S This order is issued because 61Q(,t/i h Gfr4'0 4 ti 114 (Aj'�Jh Mf A &6?b 1201 , 110 A. Posted ZO 0 P. ' By �� kl- The failure to stop work, the resuming of work without permission from the WARNING Departmentof Community Development,ortheremoval,mutilation,destruc- tion or concealment of this Notice is punishable by fine and imprisonment.