F AA2022-00011 FOREST PRACTICES
PROJECT DESCRIPTION: ISSUED: 11/14/2022
SITE ADDRESS: 721 NE TIGER MISSION RD BELFAIR
EXPIRES: 11/14/2024
PARCEL: 123055100008
APPLICANT: HANNAN PATRICK&MARGENA OWNER: HANNAN PATRICK&MARGENA
1821 WINFIELD AVE 1821 WINFIELD AVE
BREMERTON, WA 98310 BREMERTON,WA98310
360.509.3057
FEES: Paid Due
Forest Practice Review $300.00 $0.00
Totals : $300.00 $0.00
CONDITIONS
* 1. ARCHAEOLOGICAL RESOURCES:
Archaeological or historical resources, such as ruins, sites, buildings, artifacts,fossils, or other objects of antiquity that may
have significance from an historical or scientific standpoint, which may be encountered by the developer/contractor, shall not
be further disturbed. If the developer/contractor encounters any such artifacts, he/she shall immediately stop work and notify
Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result
in civil penalties.
* 2. STORM WATER& EROSION CONTROL:
Escape of silty water or mud from this property shall be considered a violation of County and State storm water management
regulations and could subject the applicant(s)to civil fines or penalties. No more than 32,670 sq. ft of ground disturbance for
development purposes, and no more than 5,000 sq. ft. of new impervious surfaces(not including roofs)is allowed without an
engineered stormwater and erosion control plan.
Applicant shall adhere to requirements of submitted Minimum Requirements 1-5.
The erosion and stormwater facilities shown on this plan (if any)are the minimum requirements for anticipated site
conditions. These facilities shall be upgraded as needed for unexpected storm events and to ensure that sediment and
sediment-laden water do not leave the site.
Printed by:Genie Mcfarland on:11/14/2022 03:54 PM
Page 1 of 2
^1
Mason County
Planning Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
FOREST PRACTICES FPA2022-00011
* 3. HOURS OF OPERATION:
Noise associated with this application shall not exceed what is allowed under Mason County Code 9.36. Harvest operations
shall start no earlier than 7:00 AM and shall end before 8:00 PM on a daily basis.
* 4. SLASH ABATEMENT:
This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an
extreme fire hazard under RCW 76.04.600 and WAC 332-24-650. An extreme fire hazard could be created if one or more of
the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of
an existing structure and/or designated public use area,which is not owned by the owner of the fire hazard area.
The land owner is fully liable in the event of fire, if he or she fails to appropriately abate the hazard. Extreme fire hazards
shall be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural
Resources (DNR).
* 5. STEEP SLOPES:
Consistent with the site plan submitted with this application, the steep slope area west of the home site shall not be stumped
and ground cover shall be as undisturbed as possible.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorize ent: �� Date: 1
Printed by:Genie Mcfarland on:11/14/2022 03:54 PM Page 2 of 2
MASON COUNTY
COMMUNITY SERVICES
Building,Planning,Environmental Health,Community Health
615 W.Alder St.—Bldg.8,Shelton,Wa 98584 Phone:(360)427-9670 ext.352 ♦ Fax:(360)427-7798 F PA a _ O �
FOREST PRACTICES APPLICATION/NOTIFICATION
Type IV General
This application should be accompanied with an Environmental Checklist(SEPA) as well as an activity map/site plan which addresses
items listed below.
TYPE OR PRINT IN INK:
1. Landowner,Timber Owner and Operator information.
Legal Name of LANDOWNER Legal Name of TIMBER OWNER Leizal Name of OPERATOR
e,'- 4,
Mailing Address: Mailing Address: Mailing Address:
W
City, State,Zip City, State,Zip City, State,Zip
Phone:366—5b1--306 7 Phone: Phone:
Email: p Ai L corn Email: Email:
2. Contact person information.
Contact Person
Phone: 3(00- 501 345-f
Email: p p
3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: 60("
For tax reporting information or to receive a tax number,call the Department of Revenue at OWftT 497329- `36D ^1 OS
.- 6t 33
4. Legal description where the forest practices will occur.
Parcel Number Sub Division '/.'/. Section Township Range E/W
00 w
5. Answer each question as it applies to your proposed forest practice.
a. 14 No. ❑ Yes. Is the activity within an urban growth area?
b. No. ❑ Yes. Is the activity within a public park?
C. No. ❑ Yes. Is the activity within 500 feet of a public park? Park name:
d. ®No. ❑ Yes. Is the activity located on lands platted after January 1, 1960?
e. ❑No. Yes. Is the activity within 200 feet of saltwater 0 lake Q river/creek/stream 0 pond Q
wetland=seasonal runoff Osl pes which exceed 15%?
f. What is the expected duration of FPA?
Proposed start date: 12ar22 Proposed end date: O
6. Are you cutting or removing timber?
❑No. IN Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the
activity map.
Rev.August 2017
Acres Volume to be Steepest Slope in
Unit# Harvest Type Yarding Method net Harvested mb Harvest Unit
7. Are you constructing or abandoning roads?
No. ❑ Yes. Complete the table below. Show locations and identify all road activities on the activity map.
Total Length Steepest Side Slope Abandonment Date
Type of Activity feet % Mo/Yr
Road Construction Does Not Apply
Temporary Road Construction
Road Abandonment
Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife
(WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm.
8. Are you installing or replacing water-crossings?
Ig No. ❑ Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map.
Crossing Crossing Dimensions Crossing Crossing Dimensions
Identifier Type width x length) Identifier Type width x length)
9. Mark the following activities that will be done in or over typed water.
Activity in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream
Removing culverts of bridges
Equipment crossing
Ground skidding
Suspending cables
Cable yarding
Falling and bucking
Other
10. Is any activity in a wetland or wetland buffer?
0 No. ❑ Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map.
Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area
Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres)
other
11. Describe how the following are identified on the gro
• Harvest boundaries/unit corners: I
• Right-of-way limits and centerlines for road work,cult' s and brig :
• Critical areas and critical area buffer boundaries: 56
Page 2 of 4
12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American
cultural resources? No. IR Yes.
13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest
Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local
regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance
does not ensure compliance with the Endangered Species Act or other federal state or local laws.
Signature of LANDOWNER Signature of TIMBER OWNER Signature of OPERATOR
(if different than landowner) (If different that landowner)
Print name:��knlA 904AAn Print name: Print name:
Date: Date: Date:
Additional information: (Optional)
Per Mason County Ordinance 11.05, Section 11.05.120, a site map shall accompany this application which includes the
following information.
I Harvest boundaries and tree retention areas.
II The approximate location of any structures.
III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads, and landings
within the proposal.
IV The location of future land development including stormwater management facilities and vegetation to be retained
for site landscaping, open space,wildlife habitat, screening,and/or buffers.
V Site topography at contour intervals of 40 feet.
VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance.
VII Drainage ways and culverts.
VIII Site area targeted for further harvest including proposed timing.
IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet.
Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification.
Page 3 of 4
NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion
control review. Projects which disturb more than one acre(regardless of total lot size)will require an engineered
stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE
Stormwater Manual.Applicants will be charged for Public Works staff time to review these plans and applications.
Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a
NPDES(National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to
Mason County's threshold. WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is
not a perquisite for FPA approval. It is the responsibility of the applicant to obtain this permit when required.
FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730
10 to 20 Acres$880
Over 20 Acres$1,100
EIS(DS)$5,000+90/hr
Departmental Review
(For Office Use Only)
Site visit:
Date approved: J I /1 U / Z z
I
i
I
&son County Community Services
I
I
I
I
I
I
I
Page 4 of 4
FINDINGS OF FACT
FPA Case#2022-00011
APPLICANT: Hannan
APPLICATION DATE: Sept. 12, 2022
Mason County has reviewed the above referenced application for Class IV General Forest
Practices and finds it in conformance with all applicable County land use regulations in
effect at the time of application.
FINDINGS
The proposed FPA is compliant with the following conditions:
The proponent has paid the prescribed fees. X
The proponent has filed a complete, signed application. X
A map has been received that complies with the requirements of 11.05.120: X
(I) Harvest boundaries and tree retention areas.
(II) The approximate location of any structures.
(III) The location of all existing and proposed streets, right-of-ways, easements, skid
roads,haul roads, and landings within the proposal.
(IV) The location of future land development including stormwater management
facilities and vegetation to be retained for site landscaping, open space, wildlife
habitat, screening, and/or buffers.
(V) Site topography at contour intervals of 40 feet.
(VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas
Ordinance.
(VII) Drainage ways and culverts.
(VIII) Site area targeted for further harvest including proposed timing.
(IX) North arrow and scale shall be shown on all site plans. The scale shall be no
smaller than one inch to 200 feet.
That this FPA is in conformance with the following Mason County ordinances:
11.05
That the proposed FPA involves < 1 acres of a 2.11 acre parcel.
That the notifications required by 11.05.060 have been made if applicable.
Note: Harvest unit is greater than 500 ft from State Park.
Mason County Resource Ordinance
1
_X_That at the issuance of this permit will not result in a violation of the Mason
County Resource Lands and Critical Areas Ordinance.The site was inspected by
Michael MacSems of the Mason County Planning Department who determined
that any critical area buffer and/or steep slope issues have been resolved.
Geo-Technical Report/Assessment Review
A Geo-Technical_Report,_X_Assessment(check one) was written by
Envirotech Eng and a submittal checklist was approved by Michael MacSems
of Mason County DCD on_10/11/22_.
Washington State Department of Transportation
_X_A DOT Access Permit is not required for this proposal.
A DOT Access Permit is required for this proposal.
Date Approved by DOT:
N/A
Mason County Road Access Permit
Road Access Permits_X_were issued by Mason County Public Works on
8/29/2019.
RAP 19-60.
Shoreline Master Program
That, if applicable, all activity under this application are in conformance with the
Mason County Shoreline Master Program and has a shore line designation of
N/A.
State Environmental Policy Act
This application for FPA # 2022-00011:
_X_Has been reviewed for SEPA compliance under case#: SEP 2022-00057.
Is SEPA exempt.
X DNS
MDNS
Stormwater Management
Escape of silty water or mud from this property shall be considered a violation of County
and State storm water management regulations and could subject the applicant(s)to civil
fines or penalties.No ground disturbance shall result from this project and no more than
2
2,000 square feet of new impervious surfaces (gravel) is allowed without additional
stormwater and erosion control review.
Applicant shall adhere to requirements of submitted Minimum Requirements Narrative
Permission from Underlying Property Owners:
Yes.
Permit Signed by Operator: Self
DOR Tax ID#604-973-518
CONCLUSION
In conclusion,this application for Class IV General Forest Practices is consistent with the
above criteria and that the public uses and Mason County has fulfilled its statutory
obligations.
RECOMMENDATIONS
I, being the Director of the Mason County Community Services,hereby attest to and
certify that appropriate provisions have been made for this Class IV General Forest
Practices Application and hereby recommend approval. In addition to these facts
evidenced by the contents of the file for this Forest Practice Application.
Signed,
Kell Rowen,Administrator Community Services Dept. Date
i%-Ju- / P�'— —k, -
Michael Mac ems, FPA Reviewer Date
3
p�r S�vw bey/ �rvc vrv�d
FPA Stormwater Submittal
Parcel # 12305-51-00008
Address: 721 NE Tiger Mission Road Belfair, WA 98528
Submitted by: Patrick Hannan, Property Owner
Minimum Requirement #1
Prepare a stormwater site plan: See attached site plan
Project Description: See SWPPP description
Minimum Requirement #2: FPA Construction SWPPP
Project Description
1. Project Location: Address is 721 NE Tiger Mission Road Belfair, WA 98528.
Parcel Number: 12305-51-00008
2. Parcel size is 2.11 acres. Approximately 0.7 acres will be logged.
3. No new road construction.
4. The eastern portion of the site running along Mission Tiger Road is generally flat. The
site is sloped on the western portion with the steepest slope being 38%. Envirotech
Engineering conducted a geological assessment of the site. The geological assessment
is attached for reference. Section 2.3 of the assessment notes stormwater runoff is
minimal. Significant scour, erosion and sediment transport are not apparent near the
site. The site is composed of undisturbed native soils.
5. The project is expected to be completed between September 1 and October 15, 2022.
6. Trees will be harvested using saws. After logging, a manufactured home will be installed
on the property as a primary family residence.
Element 1: Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction, the limits
of construction will be clearly marked before land-disturbing activities begin. Trees that are to be
preserved, as well as all sensitive areas and their buffers, shall be clearly delineated, both in the
field and on the plans. In general, natural vegetation and native topsoil shall be retained in an
undisturbed state to the maximum extent possible.
Construction area boundaries will be marked with stakes and flagging. The sloped critical area
where no stump removal is to occur will also be marked with stakes and flagging.
Element 2: Establish Construction Access
Construction access has been obtained via a road access permit. Access is located on Tiger
Mission Road. Access is stabilized with a culvert. If sediment is tracked off site, public roads
shall be cleaned by shoveling or sweeping at the end of the day to prevent sediment from
entering surface waters.
Element 3: Control Flow Rates
N/A. The increase in runoff and/or erosion due to logging will be negligible. The majority of
construction and logging will be located on the level eastern portion of the property. Vegetation
and topsoil will be preserved on the sloped portion of the property with no stump removal in
critical areas. Natural vegetation buffers at site perimeter will prevent an increase in stormwater
and erosion.
Element 4: Install Sediment Controls
N/A. Natural vegetation boundaries will prevent the discharge of sediment laden water.
Element 5: Stabilize Soils
N/A. Project does not include new road construction.
Element 6: Protect Slopes
No stump removal will be permitted on the sloped western portion of the site to preserve natural
vegetation and topsoil. Envirotech Engineering evaluated the impact of tree removal on the
sloped portion of the site and determined slope stability would not be impacted. See attached
letter from Envirotech Engineering.
Element 7: Protect Drain Inlets
N/A. No storm drain inlets will be impacted by logging at this site.
Element 8: Stabilize Channels and Outlets
N/A. No site runoff is to be conveyed in channels or discharged to a stream or other natural
drainage point.
Element 9: Control Pollutants
All onsite pollutant sources shall be handled and disposed of in a manner that does not cause
contamination of stormwater. Good housekeeping and preventative measures will be taken to
ensure the site will be kept clean, well-organized, and free of debris.
I
Element 10: Control De-Watering
N/A
Element 11: Maintain BMPs
N/A. Elements 3-8 require minimal controls.
Element 12: Manage the Project
Erosion and sediment control BMPs for this project have been designed based on the following
principles:
0 Design the project to fit the existing topography, soils, and drainage patterns.
• Emphasize erosion control rather than sediment control
• Minimize the extent and duration of the area exposed
• Retain sediment on site
• Thoroughly monitor and maintain all ESC measures
In addition, project management will incorporate the key components listed below:
• Seasonal work limitations: From October 1 through April 30, clearing, grading, and other
soil disturbing activities shall only be permitted if shown to the satisfaction of the local
permitting authority that silt-laden runoff will be prevented from leaving the site through a
combination of the following:
o Site conditions including existing vegetative coverage, slope, soil type, and
proximity to receiving waters; and
o Limitations on activities and the extent of disturbed areas; and
o Proposed erosion and sediment control measures.
• Based on the information provided and/or local weather conditions, the local permitting
authority may expand or restrict the seasonal limitation on site disturbance.
Minimum Requirement #3: Pollution Source Control
See Element 9 of SWPPP
Minimum Requirement #4: Preserve Natural Drainage Systems and
Outfalls
Natural drainage features will not be significantly altered by construction on site. Natural
vegetation boundaries will preserve stormwater drainage. See description in SWPPP.
Minimum Requirement #5: Manage Stormwater On-Site
Note description in SWPPP, especially element 12.
t5 1/ 1 13 1 12 1 11 1 10 1 9 1 B 1 7 1 8 1 S 1 / 1 3
I 72.92/6.1/
\ 1 b,k
a
�. 10
,\ PARCEL 1239661-OOWS
/ \- ---------- /51M
x;
PARCEL PLAN
OOyE� 1-v wD
GNp
97 _�
PARCEL 12305-51-00008
} NO BTU #MP }++� # �-
__ + RE A--IN + '* + \
ro
+SLOPED AREA +/+ + ++ ,\
+ + + CRITICAL AREA t# + 54•
} + + + +
TOP SLOPEIN
--
:D'--D-BOA'
REPLACEMENTAREA DRAIN HELD I--� RESIDENCE
L-I GRAVEL DRWE O�WILL II �\
o
PROPOSED TREE "
REMOVALAR EA.
(9ET9ACp
RIGHT OF WAY ` 7-1
CUCONCRETE
CULVERT
Aaron
11E / Russell
_—fL NE TIGER MISSION ROAD —_—_—_—_—_—_—_—_—_—_—_—_—_—_—_—_�_—_—_—_—_—_—_—_—_— De 3 2 g n
LLC
..mng.Nlk.m 206.383.2076
irtte TREE REMOVAL SITE PUN
}^ NORTH o ry A1R s.EEr
3 TREE REMOVAL SITE PLAN 5.IUL-22 A0.1
N 1-.20d- EcuE
AS NOTED
f'
13 1/ 1 13 1 12 1 11 1. 1D 9 B 1 1 8 1 5 1 / 1 3
' 72.92/8.1/
I1 ,
b
0
\•
,\ PARCEL 1230S51-0D008
/ tl1M
\X
\ NORTH
^'e:-\•e�RF \�\ PARCEL PLAN
�HOOy\• P•BD-0"
\
PARCEL 12305-51-00008 \\\
- _ -TOP SLOPE
23>tY 2TRSS D—D-BOX RESIDENCE
REPLACEMENT AREA DRAIN FlELD (13S1 SO Fry 79
SEE 5
__• Iy ORAVE90 Fr)
g1oW''w'ie1RDA__" � (185590 FT1 ��-� `\,\
(SETBACK
INFlLTRATION
RIGHT OF WAY
t NATURAL BUFFER AREA
} t t 4- t t
BB SO Fn } } `}
t t /
Ra+
AarDn
17C CULVERTRT toe' 3o.a Russel l
__ ___—__.__ fL NE TIGER MISSIIXJ ROAD _—_______—.___.________ _______i 7-__________________ Deslgn
LLC
NOTE:NE TIGER MISSION ROAD AND BUILDING SITE G - _ rooQ�.�Nllr.iu 206.]!].2016
SLCPE TO SOUTH AT APPROA.1%GRADE %Su
rv�
RESIDENTIAL SITE PLAN
NORTH AVM ev AIR s�1rr
RESIDENTIAL SITE PLAN AO.O
-- I .1 o \ SJUL-JUL
wE AS NOTED