HomeMy WebLinkAboutFPA2022-00011 - FPA Permit / Conditions - 11/14/2022 -s Mason County I ' Planning Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us F AA2022-00011 FOREST PRACTICES PROJECT DESCRIPTION: ISSUED: 11/14/2022 SITE ADDRESS: 721 NE TIGER MISSION RD BELFAIR EXPIRES: 11/14/2024 PARCEL: 123055100008 APPLICANT: HANNAN PATRICK&MARGENA OWNER: HANNAN PATRICK&MARGENA 1821 WINFIELD AVE 1821 WINFIELD AVE BREMERTON, WA 98310 BREMERTON,WA98310 360.509.3057 FEES: Paid Due Forest Practice Review $300.00 $0.00 Totals : $300.00 $0.00 CONDITIONS * 1. ARCHAEOLOGICAL RESOURCES: Archaeological or historical resources, such as ruins, sites, buildings, artifacts,fossils, or other objects of antiquity that may have significance from an historical or scientific standpoint, which may be encountered by the developer/contractor, shall not be further disturbed. If the developer/contractor encounters any such artifacts, he/she shall immediately stop work and notify Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result in civil penalties. * 2. STORM WATER& EROSION CONTROL: Escape of silty water or mud from this property shall be considered a violation of County and State storm water management regulations and could subject the applicant(s)to civil fines or penalties. No more than 32,670 sq. ft of ground disturbance for development purposes, and no more than 5,000 sq. ft. of new impervious surfaces(not including roofs)is allowed without an engineered stormwater and erosion control plan. Applicant shall adhere to requirements of submitted Minimum Requirements 1-5. The erosion and stormwater facilities shown on this plan (if any)are the minimum requirements for anticipated site conditions. These facilities shall be upgraded as needed for unexpected storm events and to ensure that sediment and sediment-laden water do not leave the site. Printed by:Genie Mcfarland on:11/14/2022 03:54 PM Page 1 of 2 ^1 Mason County Planning Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us FOREST PRACTICES FPA2022-00011 * 3. HOURS OF OPERATION: Noise associated with this application shall not exceed what is allowed under Mason County Code 9.36. Harvest operations shall start no earlier than 7:00 AM and shall end before 8:00 PM on a daily basis. * 4. SLASH ABATEMENT: This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW 76.04.600 and WAC 332-24-650. An extreme fire hazard could be created if one or more of the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of an existing structure and/or designated public use area,which is not owned by the owner of the fire hazard area. The land owner is fully liable in the event of fire, if he or she fails to appropriately abate the hazard. Extreme fire hazards shall be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural Resources (DNR). * 5. STEEP SLOPES: Consistent with the site plan submitted with this application, the steep slope area west of the home site shall not be stumped and ground cover shall be as undisturbed as possible. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorize ent: �� Date: 1 Printed by:Genie Mcfarland on:11/14/2022 03:54 PM Page 2 of 2 MASON COUNTY COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health 615 W.Alder St.—Bldg.8,Shelton,Wa 98584 Phone:(360)427-9670 ext.352 ♦ Fax:(360)427-7798 F PA a _ O � FOREST PRACTICES APPLICATION/NOTIFICATION Type IV General This application should be accompanied with an Environmental Checklist(SEPA) as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner,Timber Owner and Operator information. Legal Name of LANDOWNER Legal Name of TIMBER OWNER Leizal Name of OPERATOR e,'- 4, Mailing Address: Mailing Address: Mailing Address: W City, State,Zip City, State,Zip City, State,Zip Phone:366—5b1--306 7 Phone: Phone: Email: p Ai L corn Email: Email: 2. Contact person information. Contact Person Phone: 3(00- 501 345-f Email: p p 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: 60(" For tax reporting information or to receive a tax number,call the Department of Revenue at OWftT 497329- `36D ^1 OS .- 6t 33 4. Legal description where the forest practices will occur. Parcel Number Sub Division '/.'/. Section Township Range E/W 00 w 5. Answer each question as it applies to your proposed forest practice. a. 14 No. ❑ Yes. Is the activity within an urban growth area? b. No. ❑ Yes. Is the activity within a public park? C. No. ❑ Yes. Is the activity within 500 feet of a public park? Park name: d. ®No. ❑ Yes. Is the activity located on lands platted after January 1, 1960? e. ❑No. Yes. Is the activity within 200 feet of saltwater 0 lake Q river/creek/stream 0 pond Q wetland=seasonal runoff Osl pes which exceed 15%? f. What is the expected duration of FPA? Proposed start date: 12ar22 Proposed end date: O 6. Are you cutting or removing timber? ❑No. IN Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Rev.August 2017 Acres Volume to be Steepest Slope in Unit# Harvest Type Yarding Method net Harvested mb Harvest Unit 7. Are you constructing or abandoning roads? No. ❑ Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activity feet % Mo/Yr Road Construction Does Not Apply Temporary Road Construction Road Abandonment Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm. 8. Are you installing or replacing water-crossings? Ig No. ❑ Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier Type width x length) Identifier Type width x length) 9. Mark the following activities that will be done in or over typed water. Activity in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream Removing culverts of bridges Equipment crossing Ground skidding Suspending cables Cable yarding Falling and bucking Other 10. Is any activity in a wetland or wetland buffer? 0 No. ❑ Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) other 11. Describe how the following are identified on the gro • Harvest boundaries/unit corners: I • Right-of-way limits and centerlines for road work,cult' s and brig : • Critical areas and critical area buffer boundaries: 56 Page 2 of 4 12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? No. IR Yes. 13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. Signature of LANDOWNER Signature of TIMBER OWNER Signature of OPERATOR (if different than landowner) (If different that landowner) Print name:��knlA 904AAn Print name: Print name: Date: Date: Date: Additional information: (Optional) Per Mason County Ordinance 11.05, Section 11.05.120, a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. II The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads, and landings within the proposal. IV The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space,wildlife habitat, screening,and/or buffers. V Site topography at contour intervals of 40 feet. VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. VII Drainage ways and culverts. VIII Site area targeted for further harvest including proposed timing. IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet. Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification. Page 3 of 4 NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion control review. Projects which disturb more than one acre(regardless of total lot size)will require an engineered stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE Stormwater Manual.Applicants will be charged for Public Works staff time to review these plans and applications. Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a NPDES(National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to Mason County's threshold. WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is not a perquisite for FPA approval. It is the responsibility of the applicant to obtain this permit when required. FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730 10 to 20 Acres$880 Over 20 Acres$1,100 EIS(DS)$5,000+90/hr Departmental Review (For Office Use Only) Site visit: Date approved: J I /1 U / Z z I i I &son County Community Services I I I I I I I Page 4 of 4 FINDINGS OF FACT FPA Case#2022-00011 APPLICANT: Hannan APPLICATION DATE: Sept. 12, 2022 Mason County has reviewed the above referenced application for Class IV General Forest Practices and finds it in conformance with all applicable County land use regulations in effect at the time of application. FINDINGS The proposed FPA is compliant with the following conditions: The proponent has paid the prescribed fees. X The proponent has filed a complete, signed application. X A map has been received that complies with the requirements of 11.05.120: X (I) Harvest boundaries and tree retention areas. (II) The approximate location of any structures. (III) The location of all existing and proposed streets, right-of-ways, easements, skid roads,haul roads, and landings within the proposal. (IV) The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space, wildlife habitat, screening, and/or buffers. (V) Site topography at contour intervals of 40 feet. (VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. (VII) Drainage ways and culverts. (VIII) Site area targeted for further harvest including proposed timing. (IX) North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. That this FPA is in conformance with the following Mason County ordinances: 11.05 That the proposed FPA involves < 1 acres of a 2.11 acre parcel. That the notifications required by 11.05.060 have been made if applicable. Note: Harvest unit is greater than 500 ft from State Park. Mason County Resource Ordinance 1 _X_That at the issuance of this permit will not result in a violation of the Mason County Resource Lands and Critical Areas Ordinance.The site was inspected by Michael MacSems of the Mason County Planning Department who determined that any critical area buffer and/or steep slope issues have been resolved. Geo-Technical Report/Assessment Review A Geo-Technical_Report,_X_Assessment(check one) was written by Envirotech Eng and a submittal checklist was approved by Michael MacSems of Mason County DCD on_10/11/22_. Washington State Department of Transportation _X_A DOT Access Permit is not required for this proposal. A DOT Access Permit is required for this proposal. Date Approved by DOT: N/A Mason County Road Access Permit Road Access Permits_X_were issued by Mason County Public Works on 8/29/2019. RAP 19-60. Shoreline Master Program That, if applicable, all activity under this application are in conformance with the Mason County Shoreline Master Program and has a shore line designation of N/A. State Environmental Policy Act This application for FPA # 2022-00011: _X_Has been reviewed for SEPA compliance under case#: SEP 2022-00057. Is SEPA exempt. X DNS MDNS Stormwater Management Escape of silty water or mud from this property shall be considered a violation of County and State storm water management regulations and could subject the applicant(s)to civil fines or penalties.No ground disturbance shall result from this project and no more than 2 2,000 square feet of new impervious surfaces (gravel) is allowed without additional stormwater and erosion control review. Applicant shall adhere to requirements of submitted Minimum Requirements Narrative Permission from Underlying Property Owners: Yes. Permit Signed by Operator: Self DOR Tax ID#604-973-518 CONCLUSION In conclusion,this application for Class IV General Forest Practices is consistent with the above criteria and that the public uses and Mason County has fulfilled its statutory obligations. RECOMMENDATIONS I, being the Director of the Mason County Community Services,hereby attest to and certify that appropriate provisions have been made for this Class IV General Forest Practices Application and hereby recommend approval. In addition to these facts evidenced by the contents of the file for this Forest Practice Application. Signed, Kell Rowen,Administrator Community Services Dept. Date i%-Ju- / P�'— —k, - Michael Mac ems, FPA Reviewer Date 3 p�r S�vw bey/ �rvc vrv�d FPA Stormwater Submittal Parcel # 12305-51-00008 Address: 721 NE Tiger Mission Road Belfair, WA 98528 Submitted by: Patrick Hannan, Property Owner Minimum Requirement #1 Prepare a stormwater site plan: See attached site plan Project Description: See SWPPP description Minimum Requirement #2: FPA Construction SWPPP Project Description 1. Project Location: Address is 721 NE Tiger Mission Road Belfair, WA 98528. Parcel Number: 12305-51-00008 2. Parcel size is 2.11 acres. Approximately 0.7 acres will be logged. 3. No new road construction. 4. The eastern portion of the site running along Mission Tiger Road is generally flat. The site is sloped on the western portion with the steepest slope being 38%. Envirotech Engineering conducted a geological assessment of the site. The geological assessment is attached for reference. Section 2.3 of the assessment notes stormwater runoff is minimal. Significant scour, erosion and sediment transport are not apparent near the site. The site is composed of undisturbed native soils. 5. The project is expected to be completed between September 1 and October 15, 2022. 6. Trees will be harvested using saws. After logging, a manufactured home will be installed on the property as a primary family residence. Element 1: Mark Clearing Limits To protect adjacent properties and to reduce the area of soil exposed to construction, the limits of construction will be clearly marked before land-disturbing activities begin. Trees that are to be preserved, as well as all sensitive areas and their buffers, shall be clearly delineated, both in the field and on the plans. In general, natural vegetation and native topsoil shall be retained in an undisturbed state to the maximum extent possible. Construction area boundaries will be marked with stakes and flagging. The sloped critical area where no stump removal is to occur will also be marked with stakes and flagging. Element 2: Establish Construction Access Construction access has been obtained via a road access permit. Access is located on Tiger Mission Road. Access is stabilized with a culvert. If sediment is tracked off site, public roads shall be cleaned by shoveling or sweeping at the end of the day to prevent sediment from entering surface waters. Element 3: Control Flow Rates N/A. The increase in runoff and/or erosion due to logging will be negligible. The majority of construction and logging will be located on the level eastern portion of the property. Vegetation and topsoil will be preserved on the sloped portion of the property with no stump removal in critical areas. Natural vegetation buffers at site perimeter will prevent an increase in stormwater and erosion. Element 4: Install Sediment Controls N/A. Natural vegetation boundaries will prevent the discharge of sediment laden water. Element 5: Stabilize Soils N/A. Project does not include new road construction. Element 6: Protect Slopes No stump removal will be permitted on the sloped western portion of the site to preserve natural vegetation and topsoil. Envirotech Engineering evaluated the impact of tree removal on the sloped portion of the site and determined slope stability would not be impacted. See attached letter from Envirotech Engineering. Element 7: Protect Drain Inlets N/A. No storm drain inlets will be impacted by logging at this site. Element 8: Stabilize Channels and Outlets N/A. No site runoff is to be conveyed in channels or discharged to a stream or other natural drainage point. Element 9: Control Pollutants All onsite pollutant sources shall be handled and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping and preventative measures will be taken to ensure the site will be kept clean, well-organized, and free of debris. I Element 10: Control De-Watering N/A Element 11: Maintain BMPs N/A. Elements 3-8 require minimal controls. Element 12: Manage the Project Erosion and sediment control BMPs for this project have been designed based on the following principles: 0 Design the project to fit the existing topography, soils, and drainage patterns. • Emphasize erosion control rather than sediment control • Minimize the extent and duration of the area exposed • Retain sediment on site • Thoroughly monitor and maintain all ESC measures In addition, project management will incorporate the key components listed below: • Seasonal work limitations: From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only be permitted if shown to the satisfaction of the local permitting authority that silt-laden runoff will be prevented from leaving the site through a combination of the following: o Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and o Limitations on activities and the extent of disturbed areas; and o Proposed erosion and sediment control measures. • Based on the information provided and/or local weather conditions, the local permitting authority may expand or restrict the seasonal limitation on site disturbance. Minimum Requirement #3: Pollution Source Control See Element 9 of SWPPP Minimum Requirement #4: Preserve Natural Drainage Systems and Outfalls Natural drainage features will not be significantly altered by construction on site. Natural vegetation boundaries will preserve stormwater drainage. See description in SWPPP. Minimum Requirement #5: Manage Stormwater On-Site Note description in SWPPP, especially element 12. t5 1/ 1 13 1 12 1 11 1 10 1 9 1 B 1 7 1 8 1 S 1 / 1 3 I 72.92/6.1/ \ 1 b,k a �. 10 ,\ PARCEL 1239661-OOWS / \- ---------- /51M x; PARCEL PLAN OOyE� 1-v wD GNp 97 _� PARCEL 12305-51-00008 } NO BTU #MP }++� # �- __ + RE A--IN + '* + \ ro +SLOPED AREA +/+ + ++ ,\ + + + CRITICAL AREA t# + 54• } + + + + TOP SLOPEIN -- :D'--D-BOA' REPLACEMENTAREA DRAIN HELD I--� RESIDENCE L-I GRAVEL DRWE O�WILL II �\ o PROPOSED TREE " REMOVALAR EA. (9ET9ACp RIGHT OF WAY ` 7-1 CUCONCRETE CULVERT Aaron 11E / Russell _—fL NE TIGER MISSION ROAD —_—_—_—_—_—_—_—_—_—_—_—_—_—_—_—_�_—_—_—_—_—_—_—_—_— De 3 2 g n LLC ..mng.Nlk.m 206.383.2076 irtte TREE REMOVAL SITE PUN }^ NORTH o ry A1R s.EEr 3 TREE REMOVAL SITE PLAN 5.IUL-22 A0.1 N 1-.20d- EcuE AS NOTED f' 13 1/ 1 13 1 12 1 11 1. 1D 9 B 1 1 8 1 5 1 / 1 3 ' 72.92/8.1/ I1 , b 0 \• ,\ PARCEL 1230S51-0D008 / tl1M \X \ NORTH ^'e:-\•e�RF \�\ PARCEL PLAN �HOOy\• P•BD-0" \ PARCEL 12305-51-00008 \\\ - _ -TOP SLOPE 23>tY 2TRSS D—D-BOX RESIDENCE REPLACEMENT AREA DRAIN FlELD (13S1 SO Fry 79 SEE 5 __• Iy ORAVE90 Fr) g1oW''w'ie1RDA__" � (185590 FT1 ��-� `\,\ (SETBACK INFlLTRATION RIGHT OF WAY t NATURAL BUFFER AREA } t t 4- t t BB SO Fn } } `} t t / Ra+ AarDn 17C CULVERTRT toe' 3o.a Russel l __ ___—__.__ fL NE TIGER MISSIIXJ ROAD _—_______—.___.________ _______i 7-__________________ Deslgn LLC NOTE:NE TIGER MISSION ROAD AND BUILDING SITE G - _ rooQ�.�Nllr.iu 206.]!].2016 SLCPE TO SOUTH AT APPROA.1%GRADE %Su rv� RESIDENTIAL SITE PLAN NORTH AVM ev AIR s�1rr RESIDENTIAL SITE PLAN AO.O -- I .1 o \ SJUL-JUL wE AS NOTED