Loading...
HomeMy WebLinkAboutSEP2018-00097 - SEP Determinations - 4/26/2019 sTare i- — Y� ttit9� STATE OF WASH INGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service -Persons with a speech disability can call 877-833-6341 April 26,2019 Michael MacSems, SEPA Responsible Official Mason County Department of Community Services Planning Division PO Box 279 Shelton, WA 98584 Dear Michael MacSems: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Mason Transit Authority(MTA)Park and Ride Project(SEP2018-00097)proposed by Mason Transit Authority. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): SOLID WASTE MANAGEMENT: Derek Rockett(360)407-6287 All grading and filling of land must utilize only clean fill. All other materials may be considered solid waste and permit approval may be required from your local jurisdictional health department prior to filling. All removed debris resulting from this project must be disposed of at an approved site. Contact the local jurisdictional health department for proper management of these materials. WATER QUALITY/WATERSHED RESOURCES UNIT: Chris Montague-Breakwell(360)407-6364 Erosion control measures must be in place prior to any clearing, grading,or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control,and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Michael MacSems, SEPA Responsible Official April 26, 2019 Page 2 Construction Stormwater General Permit: The following construction activities require coverage under the Construction Stormwater General Permit: 1. Clearing, grading and/or excavation that results in the disturbance of one or more acres and discharges stormwater to surface waters of the State; and 2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or sale will ultimately disturb one acre or more and discharge stormwater to surface waters of the State. a) This includes forest practices(including, but not limited to, class IV conversions) that are part of a construction activity that will result in the disturbance of one or more acres,and discharge to surface waters of the State; and 3. Any size construction activity discharging stormwater to waters of the State that Ecology: a) Determines to be a significant contributor of pollutants to waters of the State of Washington. b) Reasonably expects to cause a violation of any water quality standard. If there are known soil/ground water contaminants present on-site, additional information (including, but not limited to:temporary erosion and sediment control plans; stormwater pollution prevention plan; list of known contaminants with concentrations and depths found; a site map depicting the sample location(s);and additional studies/reports regarding contaminant(s))will be required to be submitted. You may apply online or obtain an application from Ecology's website at: http://www.egy.wa.gov/prowms/wg/stonnwater/construction/-Application. Construction site operators must apply for a permit at least 60 days prior to discharging stormwater from construction activities and must submit it on or before the date of the first public notice. Ecology's comments are based upon information provided b the lead agency. As such the gY P p Y � Y may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (MLD:201901983) cc: Derek Rockett, SWM Chris Montague-Breakwell,WQ Danette Brannin,Mason Transit Authority(Proponent) MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES DETERMINATION OF MITIGATED NONSIGNIFICANCE (WAC 197-11-340) SEP2018-00097 Description of This SEPA is associated with a Class IV General FPA Proposal: and a Land Modification Permit(3,860 cu yd) for 7 acres site owned and/or controlled by the Mason Transit Authority for the eventual construction of a park and ride facility.This SEPA determination ONLY applies to the logging and grading phase of this project.There are no critical area issues with this site. Proponent: Mason Transit Authority Location of Proposal: 25200-25650 SR 3, Belfair, WA. Parcel Number: 12321-41-60000 & 12321-41-00000 Legal Description: Portion of E %2, SE 1/4, Sec 21, Twp. 23N., Rng 1W., W.M. Directions to Site: From SR 3, leave highway across from Log Yard Road. The Lead Agency for this proposal has determined that it does not have a probably significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c).This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency.This information is available to the public upon request. Please contact Michael MacSems at ext. 571, or mms@co.mason.wa.us with any questions. This DNS is issued under WAC 197-11-340(2).The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by 4/26/2019. Appeal of this determination must be filed within a 14-day period following this final determination date,per Mason County Code Chapter 15.11 Appeals. Date:4/12/2019 1&ttPa"A Kell Rowen,Planning Manager,Mason County Dept of Community Services SEPA Environmental Checklist Mason County Permit Center Use: SEP L01k - 000517 ❑ Single Family DNS: $385 ❑ Other DNS: 0 to 9.99 acres: $630 Parcel#: 1 Z-A Z J -44-I -y®ouo 10 to 20 acres: $755 Date Rcvd: i 6a00 0 Over 20 acres: $945 ❑ DS/EIS: $2,525+70 Per hr 7-evo�1 3/l ci m Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: hel This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use"not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. A. BACKGROUND hem 1. Name of proposed project, if applicable: Lhem Mason Transit Authority Park and Ride - Belfair 2. Name of applicant: tLeM Mason Transit Authority 3. Address and phone number of applicant and contact person: hem Mason Transit Authority 601 West Franklin St. Shelton, WA 98584 (360) 432-5710 SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11 4. Date checklist prepared: LLeM September 13th, 2018, Revised March 19, 2019 5. Agency requesting checklist: n[ el Mason County 6. Proposed timing or schedule (including phasing, if applicable): nei 2019 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. LLei Mason Transit Authority intends to develop the site into a park and ride site. The future park and ride will have a building on site for MTA business. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. hem SCJ Alliance performed a stream evaluation based on recommendation from Mason County in the pre-submission conference. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. hL gm No 10. List any government approvals or permits that will be needed for your proposal, if known. Jtg!PJ Land Modification Permit, Forest Practices Permit, Septic Permit, and National Pollutant Discharge Elimination System permit. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.)lkipj Planned improvements include a clearing and grading the MTA site to prepare for the park and ride, frontage road improvements, and stormwater facilities, Future facilities will include illumination, video surveillance, signing and striping, bus pads and shelters, 4,500 square foot transit building and electric car charging stations. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. n!i Parcel#(s): Parcel #: 12321-41-00000 A 12 32 1- 4 t- 6 Ooo O Address: Address: 25650 WA-3, Belfair WA 98528 (approx.) Legal Description: N/A Twp/Range/Section and/or GPS location: N/A SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 2 of 11 B. ENVIRONMENTAL ELEMENTS hf el 1. Earth a. General description of the site hel (circle one): Flat, rolling, hilly, steep slopes, mountainous, other: b. What is the steepest slope on the site (approximate percent slope)? h[ g�i 10% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. h� elp] Alderwood gravelly sandy loam (group B) d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. hf elpl There is no history of unstable soils e. Describe the purpose, type,total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. h[_elp] Frontage road (0.52 acres) and future asphalt parking lot (2.66 acres) It is anticipated there will be a net cut of 3860 cu. yds. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hI el� Best Management Practices (BMPs) will be used to prevent erosion. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? h[ elpl 6.5% _ (proposed impervious surface area / project site area) h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: h[ eM A temporary erosion and sediment control (TESC) plan will be in place along with following appropriate best management practices (BMP's) to prevent 2. Air erosion. a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. hf M Dust may occur during construction. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. hel None 4 c. Proposed measures to reduce or control emissions or other impacts to air, if any: LLelpl BMPs will be used to minimize dust. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11 3. Water a. Surface Water: Lqgjpj 1) Is there any surface water body on or in the immediate vicinity of the site(including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. nC eip] No 2) Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. t,ei No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. n[ eM None 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. Lnei None 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. nei FEMA map indicates that the project site does not lie within the 100-year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. nei None b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. LtleM A septic permit is being applied for. Effluent from the future building sewer system will be pumped into County approved septic system. The system will be forward compatible to hook up to municipal sewer when available. Stormwater will also be infiltrated, see the Drainage Report. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any(for example: Domestic sewage; industrial, containing the following system,chemicals. . . ; agricultural; etc.). Describe the general size of the the number of such systems, the number of houses to be served (if applicable), or th e number of animals or humans the system(s) are expected to serve. k[ A septic permit is being applied for. Effluent from the future building sewer system will be pumped into County approved septic system. The system will be forward compatible to hook up to municipal sewer when available. c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any(include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. nei Stormwater runoff to be collected by catch basins then conveyed to on-site stormwater pond. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 4 of 11 2) Could waste materials enter ground or surface waters? If so, generally describe. k No 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: Appropriate BMP's will be used to prevent adverse impacts to ground and surface waters. 4. Plants nei a. Check the types of vegetation found on the site: Lkpl deciduous tree: alder, maple, aspen, other X evergreen tree: fir, cedar, pine, other X shrubs X grass pasture crop or grain orchards, vineyards or other permanent crops wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered?LkM Vegetation will be removed where conflicting with proposed improvements. c. List threatened and endangered species known to be on or near the site. LLelp None d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: lbgM A landscape plan will be provided as part of the construction plans. e. List all noxious weeds and invasive species known to be on or near the site. None 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: Lnem birds: hawk, heron, eagle, songbirds other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 11 b. List any threatened and endangered species known to be on or near the site. rf elpl Washington State Department of Fish & Wildlife mapping shows no endangered species in the immediate project area. c. Is the site part of a migration route? If so, explain. nei No d. Proposed measures to preserve or enhance wildlife, if any: of elp] None e. List any invasive animal species known to be on or near the site. None 6. Energy and natural resources a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. k At this time all energy improvements will occur on future phases, which will include electric power for parking lot lighting and electric car charging stations b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. n[ elpl No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: nei The future phases will include car charging stations and LED lighting. 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. of M 1) Describe any known or possible contamination at the site from present or past uses. No past or present contaminations are known. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. No hazardous chemicals are anticipated. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. All vehicles used for construction will be fueled off site and spill control measures will be in place during construction. 4) Describe special emergency services that might be required. None are anticipated. 5) Proposed measures to reduce or control environmental health hazards, if any: Applicable BMP's will be in place during construction activities including spill control measures and a TESC plan SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11 b. Noise 1) What types of noise exist in the area which may affect your project(for example: traffic, equipment, operation, other)? h[ elpl Noise in the project area will not affect the project. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. k Short term noise impacts include noise from construction work. No additional long term noise impacts are anticipated. 3) Proposed measures to reduce or control noise impacts, if any: hI elpl Construction will be limited to daytime hours. 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. h[ elpl The current and adjacent uses are forest lands. b. Has the project site been used as working farmlands or working forest lands? If so, describe. Yes, it is currently forest land. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? The entire site will be converted to other uses. If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use?LLeM Approximately 7.9 acres. 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No c. Describe any structures on the site. hf m None d. Will any structures be demolished? If so, what? hel No e. What is the current zoning classification of the site?LLel General Commercial f. What is the current comprehensive plan designation of the site? h[ em Belfair Urban Growth Area - General Commercial g. If applicable, what is the current shoreline master program designation of the site? LkM N/A h. Has any part of the site been classified as a critical area by the city or county? If so, specify. LkM No SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 7 of 11 i. Approximately how many people would reside or work in the completed project?Jkm This project does not create or eliminate any existing jobs. j. Approximately how many people would the completed project displace? hf elpl This project does not displace any residents. k. Proposed measures to avoid or reduce displacement impacts, if any: hI elpl None L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: hf empl The project is in compliance and is compatible with the current zoning and comprehensive plan designations. m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: The project is in compliance and is compatible with the current zoning and comprehensive plan designations. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. hem No housing units will be provided. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. 1Lpjpj No housing units will be eliminated. c. Proposed measures to reduce or control housing impacts, if any: hf empl None are proposed since no housing impacts occur as part of this project. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed?IkM There will not be any proposed structures on site. b. What views in the immediate vicinity would be altered or obstructed? hem No views will be altered or obstructed by the parking are aproject. c. Proposed measures to reduce or control aesthetic impacts, if any: Lhem Future phases will include landscaping in compliance with Mason County municipal code. 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? hel No existing off site sources will affect the proposal. b. Could light or glare from the finished project be a safety hazard or interfere with views? Lkm No c. What existing off-site sources of light or glare may affect your proposal?lbem None d. Proposed measures to reduce or control light and glare impacts, if any: [hemp] Shields will be used to prevent glare. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? n[ elp] None b. Would the proposed project displace any existing recreational uses? If so, describe. of elpl None c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: 1bgjpj None 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. n[ m No b. Are there any landmarks,features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. tgi The Department of Historic Preservation issued a no impact letter for the site. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. lLei Consultation with the DAHP as well as historic maps were used to assess potential impacts. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. WSDOT Standard Specifications will be followed to avoid and minimize disturbances to resources. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. hf em Highway 3 and Log Yard Rd. New road will access project site from intersection. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? hf ?l The future park and ride will have a public transit bus stop located on project site. c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? hel Future phases will include 100 carpool parking and 8 bus parking spots. SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 9 of 11 d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe(indicate whether public or private). of el Yes, an Intersection Control Analysis (ICA) was approved by WSDOT in July 2018. e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. of elpj No f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates?lLeipj This phase generates no vehicular trips.The future phase will have peak hours between 4pm and 6 pm. The percentage of trucks will be negligible. Comprehensive traffic numbers are in the WSDOT approved ICA. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: hem A roundabout intersection is recommended in the ICA. The future park and ride is designed such that traffic congestion is mitigated. 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. hf el Yes, police and fire service. b. Proposed measures to reduce or control direct impacts on public services, if any. Lkm Security cameras will be installed on-site and landscaping will be designed to enhance safety in the parking area. 16. Utilities a. Circle utilities currently available at the site: h[ e electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. hem Underground power and fiber supplied by Mason County PUD #3. Water supplied by Belfair Water District. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11 1 NATURE k C. SIG [ pl The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relyin"gon-them- make .ts decision. Signature: Date Signed: 3-19-2018 Print Name of Signee: Patrick Holm If applicable, Position and Agency/Organization: Project Manager at SCJ Alliance for Mason Transit Authority Date Submitted: 10-18-2018 SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 11 of 11 Dc SEPA Environmental Checklist Mason County Permit Center Use: ❑ SEP Single Family DNS: $385 u ❑ Other DNS: 0 to 9.99 acres: $630 Parcel #: < 10 to 20 acres: $755 Over 20 acres: $945 Date Rcvd:RECEIVED ❑ DS/EIS: $2,525+70 Per hr R v OCT 18 2018 615 W. Alder Street Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: hf elpl This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. A. BACKGROUND n� ejpl 1. Name of proposed project, if applicable: of eM Mason Transit Authority Park and Ride - Belfair 2. Name of applicant: n� 2io Mason Transit Authority 3. Address and phone number of applicant and contact person: JbLgLm Mason Transit Authority 601 West Franklin St. Shelton, WA 98584 (360) 432-5710 SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11 4. Date checklist prepared: of elpl September 13th, 2018 5. Agency requesting checklist: of eM Mason County 6. Proposed timing or schedule (including phasing, if applicable): nj tl 2019 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. n( elpl There are no future additions planned 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. n[ elpl None 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. of el No 10. List any government approvals or permits that will be needed for your proposal, if known. n( PjPJ Land Modification Permit, Forest Practices Permit, Septic Permit, and National Pollutant Discharge Elimination System permit. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) Lneiol Planned improvements include new pavement, stormwater facilities, illumination, video surveillance, signing and striping, bus pads and shelters, and electric car charging stations. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. fheM Parcel #(s): Parcel #: 1 2321-41-00000 Address: Address: 25650 WA-3, Belfair WA 98528 (approx.) Legal Description: N/A Twp/Range/Section and/or GPS location: N/A SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 2 of 11 B. ENVIRONMENTAL ELEMENTS Lp1pj 1. Earth a. General description of the site 1tgjpj (circle one): Flat, rolling, hilly, steep slopes, mountainous, other: b. What is the steepest slope on the site (approximate percent slope)? JheM 10% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these Soils. h[ eini Alderwood gravelly sandy loam (group B) d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. hf elpl There is no history of unstable soils e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. hf !!o Asphalt parking lot approximately 85,000 sq. ft. Net cut/fill quantities to match. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. itg!pi ; Best Management Practices (BMPs) will be used to prevent erosion. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? hei 50% _ (proposed impervious surface area / project site area) h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: h[ elpl A temporary erosion and sediment control (TESC) plan will be in place along with following appropriate best management practices (BMP's) to prevent 2. Air erosion. a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. hei Dust may occur during construction. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. h� ejm None c. Proposed measures to reduce or control emissions or other impacts to air, if any: h� e!o BMPs will be used to minimize dust. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11 3. Water a. Surface Water:1nei 1) Is there any surface water body on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. nI�1 No 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 1neM No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. hf eM None 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. of elpl None 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. neio FEMA map indicates that the project site does not lie within the 100-year floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. of elpl None b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. JneM No 2) Describe waste material that will be discharged into the ground from septic tanks or other ? sources, if any(for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. of eip] None c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. ILeM Stormwater runoff to be collected by catch basins then conveyed to on-site stormwater pond. SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 4 of 11 2 Could waste materials enter round or surface waters. If so generally describe. nei 9 � 9 Y L�l No 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: Appropriate BMP's will be used to prevent adverse impacts to ground and surface waters. 4. Plants nI elpl a. Check the types of vegetation found on the site: tf Dial deciduous tree: alder, maple, aspen, other X evergreen tree: fir, cedar, pine, other X shrubs X grass pasture crop or grain orchards, vineyards or other permanent crops wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? lbeM Vegetation will be removed where conflicting with proposed improvements. c. List threatened and endangered species known to be on or near the site. hf Dial None d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: nj Dial A landscape plan will be provided as part of the construction plans. e. List all noxious weeds and invasive species known to be on or near the site. None 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: n birds: hawk, heron, eagle, songbirds other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 Of 11 b. List any threatened and endangered species known to be on or near the site. JtgjPJ Washington State Department of Fish & Wildlife mapping shows no endangered species in the immediate project area. c. Is the site part of a migration route? If so, explain. lbeIW No d. Proposed measures to preserve or enhance wildlife, if any: n( gtp] None e. List any invasive animal species known to be on or near the site. None 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. n�elpl Electric power for parking lot lighting and electric car charging stations b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. n� el No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: of Lid LED lighting 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. nei 1) Describe any known or possible contamination at the site from present or past uses. No past or present contaminations are known. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. No hazardous chemicals are anticipated. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. All vehicles used for construction will be fueled off site and spill control measures will be in place during construction. 4) Describe special emergency services that might be required. None are anticipated. 5) Proposed measures to reduce or control environmental health hazards, if any: Applicable BMP's will be in place during construction activities including spjll control measures and a TESL plan SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11 b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? n� el Noise in the project area will not affect the project. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate cate what hours noise would come from the site. of elpl Short term noise impacts include noise from construction work. No additional Ion term noise impacts are anticipated. 9 P p 3) Proposed measures to reduce or control noise impacts, if any: nI eM Construction will be limited to daytime hours. 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. of elpl The current and adjacent uses are forest lands. b. Has the project site been farmlands e s used as working a lands or working forest lands? If so describe. Yes, it is currently forest land. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? C The entire site will be converted to other uses. If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? of e!W Approximately 7 acres. 1 Will the proposal ffect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: IVo c. Describe any structures on the site. JLel None d. Will any structures be demolished? If so, what? of g!o No e. What is the current zoning classification of the site? n[ e General Commercial — 13-C1 fs1, 0U ,A f. What is the current comprehensive plan designation of the site? of eM Belfair Urban Growth Area - General Commercial g. If applicable, what is the current shoreline master program designation of the site? of e N/A h. Has any part of the site been classified as a critical area by the city or county? If so, specify. h[ e No SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 7 of 11 i. Approximately how many people would reside or work in the completed project? of el This project does not create or eliminate any existing jobs. j. Approximately how many people would the completed project displace?JLDjPJ This project does not displace any residents. k. Proposed measures to avoid or reduce displacement impacts, if any: n[ el None L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 1tg1pj The project is in compliance and is compatible with the current zoning and comprehensive plan designations. m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: The project is in compliance and is compatible with the current zoning and comprehensive plan designations. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. nLeM No housing units will be provided. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. n( elpl No housing units will be eliminated. c. Proposed measures to reduce or control housing impacts, if any: of el None are proposed since no housing impacts occur as part of this project. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? nj eto The tallest structure will be the parking lot lights (less than 40 feet in height) b. What views in the immediate vicinity would be altered or obstructed? hf elpl No views will be altered or obstructed by the parking are aproject. c. Proposed measures to reduce or control aesthetic impacts, if any: n( p-tJ The parking area will provide landscaping in compliance with Mason County municipal code. 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? h( eM No existing off site sources will affect the proposal. b. Could light or glare from the finished project be a safety hazard or interfere with views? hei No c. What existing off-site sources of light or glare may affect your proposal? nC ei None d. Proposed measures to reduce or control light and glare impacts, if any: (help) Shields will be used to prevent glare. SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 8 Of 11 I� 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? of el None b. Would the proposed project displace any existing recreational uses? If so, describe. of el None c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: of el None 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. of elpl No b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. nI eIp] The Department of Historic Preservation issued a no impact letter for the site. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of -4- archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. n[ eIp] Consultation with the DAHP as well as historic maps were used to assess potential impacts. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to '4- resources. Please include plans for the above and any permits that may be required. An inadvertent discovery plan will be included with the project specifications. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. JneM Highway 3 and Log Yard Rd. New road will access project site from intersection. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? n� eM Public transit bus stop located on project site. c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? JLpjpj 100 carpool parking and 8 bus parking spots SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 9 of 11 d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). tLpe� Yes, an Intersection Control Analysis (ICA) was approved by WSDOT in July e. Will The project or proposal use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. hI gi No f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? hf el These numbers are included in the approved ICA. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: JLeM A roundabout intersection is recommended in the ICA. A park and ride is designed such that traffic congestion is mitigated. 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. Itpipi Yes, police and fire service. b. Proposed measures to reduce or control direct impacts on public services, if any. hf elpl Security cameras will be installed on-site and landscaping will be designed to enhance safety in the parking area. 16. Utilities a. Circle utilities currently available at the site: [helpi electricit natural gas, water, refuse service, telephone, sanitary sewer, septic system, other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. ILeM Underground power and fiber supplied by Mason County PUD #3. Water supplied by Belfair Water District. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11 C. SIGNATURE ±Pjpl The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relyin�-them t make its decision. Signature: Date Signed: 10-18-2018 Print Name of Signee: Patrick Holm If applicable, Position and Agency/Organization: Project Manager at SCJ Alliance for Date Submitted: 10-18-2018 Mason Transit Authority SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11 dah me h,hn Allyson Brooks Ph.D..Director State Historic Preservation Officer December 19, 2017 Mr. Patrick Holm SCJ Alliance 8730 Tallon Lane, Suite 200 Lacey, WA 98516 In future correspondence please refer to: Project Tracking Code: 2017-04-02668 Property: Mason Transit Authority, Upgrades to Five Park and Ride Locations Re: Executive Order 05-05 Review, No Effect Dear Mr. Holm: Thank you for contacting the Department of Archaeology and Historic Preservation (DAHP) and providing a copy of the cultural resources survey report prepared by HRA for the Mason Transit Authority project. I have reviewed the report and agree with findings made in the report that the project will have no effect on cultural resources. As a result of this review, further contact with DAHP on this matter is not necessary. However, if information become available and/or the scope of work changes, and/or the Shelton Matlock Park and Ride property is funded for construction, please resume consultation by DAHP and all consulting parties. In the event that archaeological or historic materials are discovered during project activities, work in the immediate vicinity must stop, the area secured, and contact made with concerned tribes and DAHP for further consultation. We appreciate receiving any correspondence or comments from concerned tribes or other parties that you receive as you consult under the requirements of Executive Order 05-05. These comments are based on the information available at the time of this review and on behalf of the State Historic Preservation Officer(SHPO) in conformance with Executive Order 05-05. Thank you for the opportunity to review and comment. If you have any questions, please don't hesitate to contact me. Sincerely, Matthew Sterner, M.A. Transportation Archaeologist (360) 586-3082 matthew.sterner@dahp.wa.gov STATF,'0 State of Washington • Department of Archaeology&Historic Preservation 04 P.O. Box 48343 • Olympia,Washington 98504-8343 • (360) 586-3065 a www.dahp.wa.gov d, 0 by 1889 a % � p 3 r V) o { o YiL . s R Q t4 Ali- N 1 1 7 Al 514 Aix S i.t/. to y� n � ZF IL WK 40. �y f I 3 't.• 4 C T s"Y ',� '• w NAY `,{. ..1'�'' �4` �'4'.�'� A a ham' ; * ;� ! 'Y'�y-1'i• `h' _ �r`�� �T.s �`A�" ` r �. `A• �� ��rY ���*FAT' '�:� . ,:., Lf b k _.rig a � A " r Legend / TP-1 & Approximate Test Pit Location and Designation LOT 20 N / 101' / /�/ Project Limits / A 100.0 \ \ \fir 4 LOT 1 \ , / LOT 16 1.0 inches/hour assumed /TP-1N for bioretention facility. No / \ /data from TP 8 provided, \ so averaged rates from �i \ TP-6 and TP 9 100.0 (.4+1.8)/2 = 1.1 , 1.0 used. DTP-8 \ \ i 0.4 inches/hour used for infiltration pond. TP-7 TP-9 20.0 `\ � 1.8 \ TP 3 / TP-6 / 0.4 T 1P 0 / > 0.3 .9 m LOT 13 TP-2� N TP-5 % 0.3 )0.0 m TP-4 20.0 % 0.3 inches/hour used ` 0.3 for biofiltration swale. •� ;-� .I DRAF LOT 12 .Q 0 150 300 a Scale in Feet a Source:SG Alliance,2017 .19 Mason Transit Authority Figure Park and Ride Improvements Site and Exploration Location Plan 2 LANDAU Belfair Site ASSOCIATES Belfair,Washington 123212490080 123217500 123211300060 123217500020 123217500030 i 123211400040 123219999999 ` � .`• � � ,/�yv Rf` � 123211390051 123211390052 ► 123211400030 r 123211400041 j t„ 123211390011 �. • 123211400001 123211390012 I # ; :n i•��., ", I 12321420007n NO r: 123214290082 123214200060 C� 9.Q I 1232131 P ., 123214290083 12321319004' i DO T23 N R l W 123214290081 23214290084 s., }'� ' � 123214100000 12 ,N.�.� � 3219999999 k. `� "' 123213102000 � � r� t r . ✓1 123214200090 ° .�"`��• +► � ram, �€�� .�>, � • A. 2 123213400010 nm 123214300130 123214300000 123214300010 j �� ' '� 123214400000 r 123213400030 123214360100 r ri, i- •- �� E� a• •in ro•ri•, INN, I� ' 123214300110 s.wi topo and<,th r: SCJ ALLIANCE CONSULTING SERVICES TECHNICAL MEMORANDUM (Update) TO: Danette Brannin Mason Transit Authority 790 E.Johns Prairie Road Shelton,WA 98584 FROM: Lisa Palazzi,CPSS, PWS SCJ Alliance DATE: January 23,2019 PROJECT#: 738.05 SUBJECT: Results of onsite assessment of potential stream conditions 1. PROJECT DESCRIPTION SCJ Alliance was asked to assess potential stream conditions on the future Mason Transit Authority Park and Ride site, located inside of Tax Parcel number 12321-41-00000 near the intersection of Highway 3 and Log Yard Road, about a mile northeast of Belfair,WA(Figure 1). Mason County GIS maps indicate a potential stream crossing through the MTA development site, however, no streams were clearly documented in the past. To answer the question,SCJ Alliance staff—Patrick Holm, P.E. and Lisa Palazzi, CPSS, PWS—visited the site on January 16, 2019 to evaluate culvert crossings and look for evidence of continuous surface flow pathways. No regulated streams were found on the Project Site. t;y t V 1♦� e t Figure 1. Mason Transit Park and Ride Project Site Area. 8730 Tallon Lane NE, Suite 200 • Lacey,WA 98516 • Office 360.352.1465 • Fax 360.352.1509 • www.scialliance.com MTA Park&Ride Site Stream Assessment January 23,2019 Page 2 of 4 2. RESULTS AND DISCUSSION SCJ Staff visited the site on January 16th, 2019 to assess potential stream conditions. The weather was 45 degrees and clear, but antecedent rainfall conditions were within normal range. the range of normal. The definition of a regulated stream per Mason County Code is the same as the state definition—WAC 222-16-030: "Streams: Those areas where surface waters flow sufficiently to produce a defined channel or bed. A defined channel or bed is an area which demonstrates clear evidence of the passage of water and includes, but is not limited to,bedrock channels, gravel beds,sand and silt beds and defined channel swales. The channel or bed need not contain water year round. This definition is not meant to include irrigation ditches, canals,storm or surface water runoff devices or other entirely artificial watercourses, unless they are used by salmon or used to convey streams naturally occurring prior to construction. " For purposes of this project, we focus on the definition of a Type Ns Stream (non-fish,seasonal): "Type Ns Streams"are all segments of natural waters within the bankfull width of the defined channels that are not Type S, F,or Np Waters. These are seasonal, nonfish habitat streams in which surface flow is not present for at least some portion of a year of normal rainfall and are not located downstream from any stream reach that is a Type Np Water. Ns Waters must be physically connected by an above-ground channel system to Type S, F, or Np Waters." Therefore,for a seasonal flow channel to be regulated as a stream,the surface flow pathway must surface flow into other streams or wetland systems. �r To make this determination,we walked the 1� existing logging road that crosses through the • project site and marked (with handheld GPS waypoints) locations of two culverts and + ` associated flow pathways in the road in the vicinity of the mapped stream channel (Figure 2). f L The presence of culverts suggests that there was ••4 some surface flow in the past. We assessed surface flow pathways upstream and downstream at each culvert crossing. There was • f no flow or even evidence of past flow through the • culverts on the day of the field visit. The areas upstream and downstream at each culvert • crossing were dry with no scour marks or evidence of ponded water. Upstream from each culvert,there was no visible Figure 2.Showing locations of culvert crossing and handheld flow channel within 15 feet of the road. GPS Waypoints. Downstream of both culverts,there was what appeared to be an old excavated channel for about 20-30feet, but neither channel showed evidence of flow or ponding,and both were vegetated with mostly upland plants—including Scotch broom,salal, sword fern, bracken fern and Oregon grape. Photos in tables below provide visual evidence of lack of regulated stream conditions-- no continuous surface drainage course downstream. MTA Park&Ride Site Stream Assessment January 23, 2019 Page 3 of 4 Table 1. Northern Culvert Waypoint Description 063 At northern culvert crossing. Photo looking at upstream inflow(culvert inlet is buried with gravel; no flow or evidence of flow). Second photo looking across the road at downstream outflow(culvert outlet open, no flow) 064 Downstream of northern culvert crossing, no flow; minimal evidence of water 065 Farther downstream of northern culvert crossing, no flow; minimal evidence of water �. p y, i"�`P�u lub t3 Fit ♦ x , y Myj T y ! Figure 3.Top left:Northern Culvert(#I)inflow is blocked, but no evidence that water ponds for long periods of time. r w1 r aa¢ -'� +�!►, Top right:Outflow not blocked,still no evidence of flow yqr� -�4 (,� ..1:.,-, t • fi ;:_•* or ponding. Bottom left,farther downstream in cleared channel,but no flow or evidence of flow. Not a regulated stream MTA Park&Ride Site Stream Assessment January 23, 2019 Page 4 of 4 Table 2. Southern Culvert Waypoint Description 066 Southern culvert crossing, upstream end 067 Downstream from Southern culvert crossing,stops at wall of Scotch broom in old road and no channel n 0 . Sx. ' •� �..;;r t .y� •1 3r 1 ,S riffs�+7�Z di �T �' _ -r? _ " _., * Figure 4.Top left:Southern culvert(#2)inflow is blocked, but no evidence that water ponds for long periods of time. �� rJ f: � Top right:Looking farther upstream—no evidence of scour channel or surface flow channel. Left,downstream end of culvert open,but no evidence of jx� I w or ondin . Not a regulated streams stem. &,.,: i x '`: f �'� '; Bottom left and bottom right looking farther downstream from southern culvert. No evidence of surface flow,and < topography does not allow for a continuous surface flow tit iz.` a 4 ✓�i i.=.J� :; i ,q pathway. +rg o �rr� ff }Y (1 Y '} a "_`' Not a regulated streams stem. R 3L 01 t�+«z .: icy s4 -�lrt,•. �.:�4, " r MASON COUNTY DCD SEPA Contact List Sen SEPA 2u 16 - 1� 1 to(check all that apply) on L4 Z) Z /IZ Skokomish Tribal Nation,Nat. Res. Dept. WA Department of Commerce ATTN: Julian Sammons reviewteam@commerce.wa.gov N 541 Tribal Center Rd., Skokomish Nation,98584 jsammons@skokomish.org U.S.Army Corps of Engineers Efdsarff@skokomiosh.org SEPA Reviewer-Jason Sweeney Skokomish Tribal Historic Preservation Officer PO Box C-3755,Seattle,98124 ATTN: Kris Miller Jason.t.sweeney@usace.army.mil 80 N Tribal Center Rd,Skokomish Nation,98584 shlanay1@skokomish.org WA Dept.of Fish and Wildlife Quinault Indian Nation SEPAdesk@dfw.wa.gov ATTN: Mark Mobbs PO Box 189, Tahola, 98587 a WA Dept.of Fish and Wildlife mmobbs@quinault.org ATTN: Chris Waldbillig D Squaxin Tribal Nation,Natural Res.Dept. 450 Port Orchard Blvd,Suite 290 2952 SE Old Olympic HWY,Shelton 98584 Port Orchard,WA 98366 jdickison@squaxin.us Chris.waldbillig@dfw.wa.gov emarbet@squaxin.us szaniewski@squaxin.us WA Dept.of Fish and Wildlife rfoster@squaxin.us ATTN: Darrin Masters M The Confederated Tribe of the Chehalis 450 Port Orchard Blvd, Suite 290 ATTN: SEPA Reviewer-Glen Connelly Port Orchard,WA 98366 420 Howanut Rd.,Oakville,98568 Darrin.Masters@dfw.wa.gov gconnelly@chehalistribe.org WA DNR,South Puget Sound Region WA Dept.of Fish and Wildlife 950 Farman Avenue N,Enumclaw,98022-9282 ATTN: Allison Cook southpuget.region@dnr.wa.gov (Habitat Biologist-S Puget Sound Watershed) WA DNR,Aquatic Resources 1111 Washington St SE,Olympia WA,98501 PO BOX 47027, Olympia, 98504-7027 allison.cook@dfw.wa.gov 11 WA D r nr.wa.gov WA DNR,SEPA Center WA Dept.of Transportation ATTN: External Coordinator ATTN: Dale Severson PO BOX 47015,Olympia,98504-7015 P.O. Box 47440, Olympia 98504-7440 sepacenter@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov Olympic Region Clean Air Agency ATTN: Lauren Whybrew City of Shelton 2940-B Limited Ln. NW, Olympia 98502 ATTN:Jason Dose 1Alauren.whybrew@orcaa.org 525 West Cota St.,Shelton 98584 Mason County Transit jasond@ci.shelton.wa.us ATTN: Danette Brannin 790 E Johns Prairie Rd,Shelton,98584 Port of Shelton Efdbrannin@masontransit.org ATTN: Brandon Palmer Mason County PUD#1 21 West Sanderson Way,Shelton 98584 ATTN: Darrin Hall BrandonP@portofshelton.com N 21971 Hwy 101, Shelton,98584 darrinh@mason-pud1.org Dep't of Archaeology&Historic Preservation 0 Mason County PUD#3 P.O.Box 48343,Olympia,98504-8343 ATTN: Kristin French SEPA@dahp.wa.gov �-�j kristin.french@masonpud3.org cWA Department of Ecology Tacoma Public Utilities-Real Property Services Environmental Review Section ATTN: Dave Letterman PO BOX 47703,Olympia,98504-7703 3628 S 35th St,Tacoma, 98409-3192 separegister@ecy.wa.gov letterm@cityoftacoma.org A Department of Health zWV h 1-6 Mason Cty P.W.ATTN: ATTN:Joe Laxson joe.laxson@doh.wa.gov Mason Cty E.H.ATTN: . Other: Q Mason Cty Bldg ATTN: Agent: Applicant: Q School District: MC DCD last updated on 2/28/19 Notes SEP2018-00097 SEPTIC- Belfair/Allyn UGA: NO INDIVIDUAL OR COMMUNITY ON-SITE SEPTIC SYSTEM 001/28/202 achase ALLOWED for new development or redevelopment on existing lots, except as noted in MCC 17.03.030(2)(a)(ii). Sewer Connection may be available and required. SEPTIC - Belfair/Allyn UGA: NO INDIVIDUAL OR COMMUNITY ON-SITE SEPTIC SYSTEM 0v2s/2o2 o achase ALLOWED for new development or redevelopment on existing lots, except as noted in MCC 17.03.030(2)(a)(ii). Sewer Connection may be available and required. 05/02/201 mms@co.maso SEPA comment period closed on 4/26/19. One comment letter was received from WSDOE. No 9 nma.us changes required. A six-year prohibition on development, consistent with RCW 76.09.470 and/or 76.09.460, has been placed on this tract, due to a Class Il, III, or IVS FPA(or no permit when one was required) 04/10/201 mms@co.maso having been issued for this parcel. FPA#2417997. Effective on the date of issuance, renewal or 9 nma.us on the date of discovery. Date: 10/16/2018. The County shall not issue any permits for development for a period of six-years, unless a finding is made that such logging is in compliance with Mason County codes and regulations. 03/28/201 mms@co.maso Documents Received on 3/19/2019: Revised SEPA checklist, letter from Lisa Palazzi (SCJ 9 nma.us Alliance) about two culverts, and letter from DAHP. 01/31/201 sboldman Link to Laserfiche Folder 9 01/31/201 sboldman Link to Laserfiche Folder 9 Patrick, I received your phone message asking for a call, and I'll call you shortly, but first I wanted to send you in writing the comments that Trish Woolett and I came up with when we meet last month regarding the SEPA checklist. Trish will be the person reviewing the Land Modification (aka grading) permit. Page 2, Q 7: We think that this question should address future activities including road building and construction activities. 01/04/201 mms co.maso Page 2, Q 10: Your answer includes a septic system. Is this accurate? 9 nma.us Page 3, Q 1.e: We want to know the volume of earth that will me pushed or pulled as expressed in cubic yards. Page 3, Q b.1: Just noting that the answer to this question indicates that you are not planning to install a septic system. Page 9, Q 13.b: Can I have a copy of the DAHP letter? Thanks, Michael Case Activity Listing 2/4/2020 11:40:01 AM Case#: SEP2018-00097 Parcel#: 123214100000 Description: CHECKLIST FOR FPAAND GRADING PERMIT MASON TRANSIT AUTHORITY PARKAND RIDE Assigned Done Mal Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By SEPA930 Letter attached.See documents 11/14/2018 None DONE MMS 11/14/2018 MMS Patrick, I have a couple more SEPA related questions for you.I see that on the SEPA checklist that there will be no ground water withdrawal or any discharge from septic tanks,yet elsewhere(page 2)there is a reference to needing a septic permit.While not mentioned in the SEPA,I see in the pre-application meeting notes and on some of the site plans that a 2,310 SF multi-purpose building is part of his proposal.I think the SEPA checklist needs to be revised to mention the building and clarify if the building will be served by municipal sewer and water or not. Also,before a SEPA determination can be issued,we need a better idea of the volume of material involved in the Grading Permit(which hasn't been turned in yet).Please let me know what that number is once it has been determined. Thanks, Michael SEPA930 Letter attached. See documents 12/10/2018 None DONE MMS 12/10/2018 MMS Ron and Trish, I would like to set up a meeting between the three of us to look at the SEPA for the MTA park and ride facility.I'm wondering how many SEPA triggers this project pulls.SCJ Alliance is only expecting to do one SEPA for the entire projects,so we need to make sure that the SEPA document that I have addresses everybody's needs. I'll drop a hard copy of the current draft SEPA off at your desk. Thanks, Michael Pagel of 3 CaseActivity..rpt Case Activity Listing 2/11:40:01 01AM AM Case#: SEP2018-00097 Parcel#: 123214100000 IF, Description: CHECKLIST FOR FPAAND GRADING PERMIT MASON TRANSIT AUTHORITY PARKAND RIDE Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By SEPA010 Application Received 10/18/2018 None HOLD 12/19/2018 REB Dear Applicant, I am Ron Buckholt,planner with Mason County,reviewing permit GRD2018-00015 for the Belfair Mason Transit project. Unfortunately,the subject building permit is being placed on HOLD,due to the following reason(s): 1. Note: It appears that a draft SEPA checklist was provided in conjunction with a previously submitted forest practice permit application and that the proponent is attempting to update the SEPA checklist to address all aspects of the development. In order for the subject grading permit application to be reviewed,the quantity of the cut and fill needs to be identified in terms of cubic yards within the SEPA checklist. Please address. 2. The square footage of all proposed individual structures need to be identified within the SEPA checklist and corresponding site plans,i.e.including bus shelters,etc. 3. As discussed in the pre-application notes,there are wetlands and streams within proximity of the project site,therefore,the SEPA checklist and accompanying site plan shall quantify the distances from all aspects of the proposed development,e.g.including clearing/grading boundaries from the subject wetlands and streams. These distances are needed in order to confirm that the development does not encroach into any regulated streams or wetlands nor any associated buffers and setbacks related to the aforementioned wetlands and streams. Please address with a report or narrative from a certified wetlands biologist on the classification or regulatory status of the wetlands and streams,and delineation,if warranted,in order to demonstrate that the proposed development does not infringe upon the Mason County's adopted codes for prescribed buffers and setbacks from regulated wetlands and streams. 4. Commercial site plan application is required,in order to verify zoning,landscaping,parking standards are being satisfied. Please provide clarification,if the proponent is wishing to incorporate a commercial site plan review concurrent with the SEPA review process. Please note,that if the full scope of work is not disclosed within the SEPA checklist to address the size and quantity of all building elements,the SEPA may have to be re-addressed at the time of commercial site plan and building permit application review(which may cause delay). Please advise on how the proponent would like to proceed in terms of building permit,commercial site plan and zoning review. 5. A geo-technical report was provided(dated December 12,2018). What was the intent of the geo-report? Was it required as part of Michael MacSems review for the forest practice permit?or intended to coincide with a future building permit or stormwater plan submittal? Please provide clarification. Please address these issues in order for the review process to proceed.Thank you in advance. NOTE: Site drainage and erosion control plan sets were forwarded to PW Loretta Swanson on 12/14/18. Page 2 of 3 CaseActivity..rpt Case Activity Listing 2/4/2020 11:40:01AM Case #: SEP2018-00097 Parcel#: 123214100000 1p, Description: CHECKLIST FOR FPAAND GRADING PERMIT MASON TRANSIT AUTHORITY PARKAND RIDE Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To 13y Updated Updated By SEPA930 Letter attached. See documents 12/24/2018 None DONE M M S 12/24/2018 MMS Patrick, I just talked with our manager Kell Rowen about the situation.The site is greater than the maximum required setback of 225'from the wetland that sits on the County line.The NHD overlay does show a non-fish stream within proximity of the MTA site,but based on my field inspection(see photo below),we do not believe that this feature rises to the level of a regulated stream in our Critical Area Ordinance. On that basis,we are comfortable not requiring a study or letter such as what Ron has requested.However,if this project were challenged,having a letter from a biologist confirming what appears to be obvious could come in handy.Your choice. Michael >>>Patrick Holm<>12/21/2018 1:44 PM>>> Thanks for the response Ron.I had originally included an attachment to the Forest Practices Application that addressed the proximity of the wetland and streams.Michael had told me he visited the site and saw no stream/wetland issues over the phone. MTA has a limited grant funding so I wanted to make sure we weren't having them do something that didn't need to be done if it was resolved as part of the FPA. Based on your correspondence,I want to confirm that Michael's site visit assessment is not official and we need to have a wetland biologist prepare the written confirmation mentioned above. Thanks! Page 3 of 3 CaseActivity-rpt