Loading...
HomeMy WebLinkAboutBLD99-0431 Final Church - BLD Permit / Conditions - 3/1/2001 r MASON COUNTY =%��=.o • - Mason County Bldg. III 426 W. Cedar 7 . t P.O. Box 186 Shelton, Washington 98584 E3 l.J 1 L_ D I N C�i P !`z R M I -T FOR INSPECTIONS CALL 427-9670 BETWEEN 5pm AND Sam 427-7262 BLD99--0431 PARCEL : 1 232 1 4 300000 PLAT : D I V : BLK : L0"1' . JOB ADDRESS : 25140 NE STATE ROUTE. 3 RELFAIR OWNER : NORTH MASON UNITED METHODIST CONTRACTOR : T .N. MILLER REMODELING 275 -5702 LEGAL . SO SE El SEE BLA 193-22 AF #5611121 NE 25141 STATE ROUTE 3 CLASS OF WORK . tNEW BEDR : 0 BATH -. 5 TYPE AMOUNT BY DATE RECEIPT TYPE AMOUNT BY DATE RECEIPT TYPE OF USE . . . . :COM STORIES . . . . . . . :2 s -- � OCCUP . GROUP . . . :A2 . 1 BLDG . HEIGHT . . : 0 .Bf t PICK 1 2021.85 KN /5124199 50336 IPLI S 264.511 KS 11129159 1723 TYPE OF CONST . . :5-1 HP FIREPLACES . . . . : 0 PROT 1 3111,55 KS 11129199 1723 PIN1 S 21.11 KS 11/29199 1723 OCCUP . LOAD . . . . : 0 WOOD`3TOVES . . . . : 0 FIR S 1010.93 KS 11129199 1723 NCR S 63.25 KS 11129199 1723 DWELL .UNITS . . . . :527 PARKING SPACES : 0 NNE $ 4?.Of KS 11129199 1723 jAdditiosal fees Aet store 1ere...... INSPECTION AREA s 2 SHORELINE? . . . . :N PLCN $ 65.1/ KS 11129199 1723 TOTAL: 6114.11 VALILATION: 477461 SE:TBACKS------•- --- ----- TOILETS . . . . . . . , . . : 8 FUEL TYPES---------- BOILERS/COMP---- MOBILE HOME-- FRONT . . .W 85 .Bf t BATH BASINS . . . . . . : .6 : /LPG/EL.E/ / : 0- 3 HP . ; 0 REAR . . . .E 80 .Oft BATH TUBS . . . . . . . . : 0 3-15 HP . : 0 MODEL : SIDE ( 1 ) .N 85 .Oft SHOWERS . . . . . . . . . . . 0 FURN < 100K BTU : 1 15-30 HP . : 0 SiDE (2. ) .S 150 .0ft WATER HEATERS . . . . : 1 FURN >-100K BTU : 0 30-50 HP . : 0 SHRL I NE .N 0 .Bft CLOTHES WASHERS . , : 0 FURN •- FLOOR . . . ; 0 50+ HP . 1 0 -YEAR--------- AREA ----------------- KITCHEN SINKS . . . . : 3 HEAT PUMP . . . . . . : 0 LOT SIZE . . : FLOOR DRAINS . . . . . : 6 VENT SYSTEMS . . . : 0 EVAP COOLERS : 0 LENGTH : 0 BUILDING . . . , 5577sf DRINKING FOUNT . . . : 2 VENT FANS . . . . . . : 8 HOODS . . . . . . . : 0 WIDTH . : 0 BASEMENT . . . : 21749f LAUNDRY TRAYS . . . . : 0 DOMES . 1NCIN :O --SERIAL#------ DECKS . . . . . . : Bsf DISHWASHERS . . . . . . : 1 AIR HANDLING UNITS--- COMML . INCIN :O GAR/CARP :? Osf GARB DISPOSALS . . . : 0 <— 10000 cfm . : 0 RELOC/REPAIR : 0 ATIDT . :7 URINALS . . . . . . . . . . : 2 > 10000 cfm . : 0 OTHER UNITS . : 0 MISC PLM FIXTURES : 5 GAS OUTLE:TS . # 4 PROJECT DESCRI►T104:CRURCN PROJECT LOCATION:SIGN UP ON PROPERTIED SIAKE ON PROPERTY SIGN UP ON PROPERTY GOING OUT OF BELFAIR TO GOIST TOP Of Will PAST TRAIP TIESTLE IRIS ?[Roll BECOMES NULL AND VOID if WORK OR CBNSTRUCTIO AUTHORIZED IS 101 CONNENCED NITNIN 161 OAYS OR It CONSTRUCTION OR WORK IS SUSPENDED FOR A PERIOD OF 1i1 DAYS AT ANY TIME AFTER WORK iS CONNENCEO. EVIDE' OF CONTINUATI00 'OF 1011 IS A PROGRESS INSPE4�TION 111010 THE ISO DAY PERIOD. FINAL INSPECTION HOST OF APPROD BEFORE BUILDING CAN BE OCCUPIED. 01 P.4 OR AGENT, DATE, - -- BLO-PRMT, rev; 13131191 COMPLIANCE TO ATTACHED CONDITIONS IS REQUIRED ^,ONCRETE MECHANICAL MOBILE HOME Fdotings-Setback date by Ribbons date ZG-C><> by 7`�? Gas Piping date b Foundation Walls date by Set Up `date •- Z _oo by / INSULATION date by ,BG/SLAB Insulation Floors !`� Final date -ZG'c� by T date 2 7-e C' by date by FRAMIN Walls FIRE DEPT. date 1 - w by 7 /` date by date by PLUMBING Attic OTHER Groundwork date by date ?- v by D.W.V. WALLRD NAILING _ date X!--Z -cam by j/� date - Sc z by / /7 Water Line FINAL INSPECTION date by date by date by 0,00 ��},�i��C�}�i� o� ,Oc�rT c/���.oc cs d� ��-� o T�•� hicc.oir✓G I c`,e:2 C--L�,� ,��i` �S1T�ir/.�Rr i� C c�.✓'7�i9C�— tv�J7WL/ � h�/lo'-� I /=/C C Qi7 /-•� D��T cf/Si�.aT11 Z �Oy �%/�/%� Gt/i=C C Gv�L L D•'Rr..r /Lp O/l��G-�'C/f/JG� �,y SiT f T/? UWV do*' G • -+%Si f`/ C C ,&nt2 U--'d �T /� ... 7-coo ��� /Ssci,� ak S",�•C C fEi S`% c�.,��>- /G� /����7 f�Z 7- Z- y-od 1 c�/9.�. w,� 9ri7 c d� c��•� �i�s D6z� T� . MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 PERM i Z"- (a (DO N0 1 -r 1 C:) NiS f ase No . : SL099--•0431 For : NORTH MASON UNITED METHODIST . Page : 1 1 ) Approved per dimensions and setbacke-';,6 oubmitted site plan and represented on the approved stormwater site plan . X �___w__W_, 2) Parking shall be sufficient for 61 normal parking stalls (9 feet by 20 feet ) and 3 handicap parking stalls ( 12 .5 feet by 20 feet ) with sufficient maneuvering aisles . Handicap stalls shall be of a smooth surface at level or ramped to entry, located closest to the building entry, and shall be signed with the International Symbol of Access .. ?Screening by vegetation and/or fencing from adjacent residential properties is req X- "V l 3 )• All upland areas disturbed or newly created by construction activities; shall be seeded, vegetated or given an equivalent type of erosion protection ( sift fencing or straw m a_� X 4 ) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum of 5 ' setback from all property lines , easements and 10 ' from 'Ail..,puNty and State Road right of ways . f'� ' 5 ) -' (!his application Is subject to Buffer and Landscaping requirements as established under K4as�frpnty Ordinance 1 .03 .036 . B) . The use, handling and stora a of hazardous materials or flammable and combustible ,liquids in excess of 10 gallons Is not allowed without the approval of the Mason County Fir t+� shal� V- X a .0 7) Approved plan provisions for surface/ subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely Impact adjacent parcels , as required under the requirement; of Mason County Stormwater Ordinance . For CONCRETE MECHANICAL MOBILE HOME ootings-Setb?ck date by Ribbons date by Gas Piping date by Feundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 further Information regardingg try i s w (i i Trance, uorntact t 6e ma Cori County Public ork 6 De ment prior to construction at Ext 450. X �'� 8 ) ,NOTEe THE CALCULATED FIRE FLOW DEMAND FOR A 7751 SO FOOT TYPE V--N BUILDING IS 2250 GPM . CREDIT FOR AN AUTOMATIC FIRE SPRINKLER SYSTEM AND AN AUTOMATIC FIRE ALARM SYSTEM WILL REDUCE THE FIRE FLOW DEMAND TO 1350 GPM . IT IS ACKNOWLEDGED THAT FIRE FLOW IS NOT CURRENTLY AVAILABLE FROM THE BELFAIR WATER DISTRICT . HOWEVER , THE COMPREHENSIVE PLAN FOR THE BELFAIR WATER DISTRICT INCLUDES INFRASTRUCTURE IMPROVEMENTS THAT WILL PROVIDE FIRE FLOW FOR THIS SITE . BASED ON THE PLANNED BUILD OUT OF THE BELFAIR WATER DISTRICT SYSTEM. THE FOLLOWING CONDITIONS ARE BEING PLACED ON THIS BUILDING PERMITI i . INSTALL A LIMITED SUPPLY SPRINKLER SYSTEM THROUGHOUT THE BUILDING . SEPARATE PLANS AND XERIy4 - RE REQUIRED . 2-. INSTALL A MONIT13RED FIRE ALTRIA SYSTEM T UGHOUT THE BUILDING . SEPARATE PLANS AND PER ARE REQUIRED . RED . i] V-11 — NOTE : THE APPLICANT AGREES TO THE FOLLOWING CONDITION REGARDING CONNECTION TO THE BELFAIR WATER SYSTEM: { AT SUCH TIME THAT THE BELFAIR WATER SYSTEM PROVIDES FIRE MAIN SERVICE TO THE SUBJECT PROPERTY THE NORTH MASON METHODIST CHURCH AGREES TO EXTEND A FIRE MAIN OF APPROPRIATE SIZE ONT6 THE SUBJECT PROPERTY AND TO INSTALL A FIRE HYDRANT AT THE LOCATION NOTED ON XHEE,, Al OF THE PLANS . F 3 . -F��OCATION OF PORTABLE FIRE EXTINGUISHERS ARE NOTED ON SHEET A2 AND A3 . x r JiL 4 . RGENCY LIGHTS ARE NOTED ON SHEET A2 & A3 . x X . ON SHEET Al . 5 . A KNOX BOX EMERGENCY KEY BOX IS REQUIRED . CONTACT MASON COUNTY FD 2 AT 275- 6711 TO ' ORDU?T E KNOX BOX . X �l . 6 Q=UPART"LOAD�SI� A'u�` ARE REGU(RED TUBE POSTED IN THE FOLLOWING ROOMS % x 9) NON RESIDENTIAL ENERGY COMPLIANCE FORMS ARE ATTACHED TO PLANS . REVIEW CHANGES INCLUDING SLAB INSULATION, OUTSIDE AIR REQUIREMENTS (6180 CFM) , AND DAYLIGHT SWITCHING NOTES . ;ONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Wall p g s date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. i date by date b date by PLUMBING y Attic OTHER Groundwork date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date b date by I Y date by � I Ii II j I I I MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 10) All approved plans are requ i r eu to be on-site for i nspec : ion purpose,,,, f inspection is called for and plans are not on site Approval WILL NOT be granted . In addition, a Re.- Inspection fee in the amount of $42 .06 per hour (minimum 1 Dour ) will be charged and must be collected by this department prior to any further inspections being performed or approval granted . X f 1/0 11 ) PURSUANT TO 1997 UNIFORM BUILDING CODE , ALL. SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING, FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED ON RATES AS ADOPTED BY THEJURISDICTION AND 'THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNERICONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS . -I' 12 ) The approved plot plan is required to be on--site for inspection purposes . if Inspection is called for and plot plan is not on site, Approval WILL NOT be granted . In addition , a Re-- inspection fee In the amount of $42 .00 per hour (minimum 1 hour ) will be charged and must be collected by this department prior, to any further inspections being performed or approval granted . X -/j 13 ) UMC Chapter 7 . In buildints of unusually tight construction , fuel burning appliances shall obtain combustion air from outside (excluding cooking appliances and clothes dryers ) . X �fS1.1t'M, 14 ) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction . X 15 ) ALL. CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE: PERMITTED AND APPROVED CLASSIFICATION . ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION . CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE . :— —— CONCRETE MECHANICAL MOBILE HOME ' Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date FRAMING by date by date by Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by �I I I 1 MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 16) Proposed structure or ortions thereof with an projection over 30" in height from grade line, must maintain a aration distance between adjacent structures and that furthest projection . X ;Illy ems. 17) Changes to approved building plans that effect compliance to the 1991 Washington State Energy Code, 1991 Ventilation and Indoor Air Qualit Code, the Uniform Buiidin Code andfor Mason County .., -"Y-Rations must be approved by Mason Couny prior to constructionX 18 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED--KS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE . x rl1 ✓�- _ 19) If the tank size is between 125 and 500 gallons you must 'follow these guidelines : 1 . Tank is to be 10 feet from any buidlin?, public way or property lire . 2 . If the tank is exposed to probable vehicular damage , provide protective bollards . 3 . All weeds , grass , brush, trash and other combustible material shall be kept a minimum of 10 feet away from LP containers . X 20) Owner/builder, assumes all responsibility if dralnfield/reserve area is encumbered . X_ �`l _ . Case No . : BLD99-04:31 _ONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Rihbons date by Gas Piping date b Fdundation Walls date by Set Up date by INSULATION date by IBG/SLAB Insulation Floors Final ,d6te by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date r _G/ by ��j date by / —43 c j'�?y