Loading...
HomeMy WebLinkAboutStormwater Report Review for BLD99-0431 - BLD Engineering / Geo-tech Reports - 8/30/1999 1 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: Aug. 30, 1999 INTER-DEPARTMENTAL COMMUNICATIONS TO: Allan Borden, DCD-Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. DCD WO#9952 SUBJ: Stormwater Report Review NAME: North Mason United Methodist Church BLD99-0431 Allan, A copy of a recorded O&M Covenant for the proposed United Methodist Church in Belfair has been received by Public Works, and Public Works' review and acceptance of the proposal is complete. I haver also had a conversation with Pat McCollough,the project engineer, and informed him that I'd reviewed and accepted the proposal with a condition/recommendation that all of the catch basins be equipted with emergency spill control oil water seperators. Pat indicated that he didn't consider that an unreasonable condition and felt it was acceptable. Please inform me, or have the applicant notify me when the stormwater control features are completed so I can inspect and approve the completed facilities. Please feel free to contact me at County extension 461 if you have any questions pertaining to i these comments,or this department's review. SinfeAely, AVJM rU4 �.�/ _11 an A. Tahja — File: H:\WP\STRMWTR\REVIEWS\NMUM-CHU.RC2 t MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: Aug. 13, 1999 INTER-DEPARTMENTAL COMMUNICATIONS TO: Allan Borden, DCD -Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. ncn WO#9952 SUBJ: Stormwater Report Review NAME: North Mason United Methodist Church BLD99-0431 Allan, The Stormwater Site Plan(SSP)for the proposed United Methodist Church to be located in Belfair, has been received and reviewed by Public Works, and determined acceptable with one exception. The parking and loading area runoff is directed to the proposed infiltration pond without any treatment. I have discussed this with Pat McCullough,the project engineer. He has agreed to incorporate Spill Control (SC)oil/water separators in the proposed catch basins (7 total). Pat and I considered a single SC separator in the last catch basin located ahead of the infiltration pond, but given the area of the parking and loading areas, a single separator might not be able to keep contaminants from reaching the pond, so I am requesting SC separators at all catch basin locations. Approval of the SSP should be conditioned on the installation of SC oil/water separators at each of the catch basin locations. An Operation and Maintenance Covenant accompanied the stormwater plan which I have reviewed and edited. I am returning the O&M Covenant to Mr. Tom Miller,the church's representative along with instructions for recording the document. I will inform you when the O&M Covenant has been recorded and I received a copy of the recorded instrument. Please feel free to contact me at County extension 461 if you have any questions pertaining to these comments, or this department's review. Sincerely, 'Alan A. Tahja -Toy" Mt I Ie r File: H:\WP\STRMWTR\REVIEWS\NMUM-CHURCH vvuKK UKULK - PUBLIC WORKS DEPT. �N) Date: v6M (E) Work Order �M_ rl PERMIT M ' I 6,t)6q _-0 ENumber. Requested by: AUAM O0-"CA) Authorized by: r-r za � Date: el_6—(C�q Type of Work- wF)7w - oi�z� 47 LltoiT 6 66 1//,, 6&6e 9p toa k-- CHARGE TO: L 'I NAME AGENCY/COMPANY 'ki-,0C D BILLING ADDRESS 5 7M PHONE 14- -1-77L) (B) Pub. Works Person In Charge: A 14211 L 77 ...... (C) Project Time Line: (from -to dates) TO Project Start date: Estimated Fk-Jsh Date: Apffo*nate hom: ESTIMATED TOTAL SS: COST ESTIMATE (D) En4oy*e 1891 H22M Subtotal FrInce% TOTAL Stlyll BRIE TOTAL M EQUIPMENT USED: MATERIAL USED: (F) Actual Cost $ BARS: PR0J#- DATE Em*yee PISMO Nine LB&C Hours SUM Frinoe% TOTAL EQUIPMENT USED: I La to Unit Rate TOTAL$'S MATERIAL USED: TOTAL ALL (G) BILLED DATE JNV#_ PAID DATE REC.0 CK#