Loading...
HomeMy WebLinkAboutSEP2009-00070 - SEP Determinations - 10/5/2009 G 5= s x STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 October 5,2009 Allan Borden, Planner Your address Mason County is in the Department of Community Development I Kitsap Planning Division watershed PO Box 279 Shelton,WA 98584 Dear Mr. Borden: Thank you for the opportunity to comment on the determination of nonsignificance for the Scott-Dock Replacement project(SEP2009-00070) located at 371 Northeast Tiger Way East in Belfair as proposed by Judy Scott. The Department of Ecology(Ecology) reviewed the environmental checklist and has the following comment(s): WASTE 2 RESOURCES: Anya Caudill(360)407-6084 The applicant proposes to remove a structure(s)that may contain treated wood. Please refer to Ecology's publication "Focus on Treated Wood Exclusion," available at http://www.ecy.wa.gov/pubs/0304038.pdf,for suggested best management practices and disposal requirements for treated wood. For additional information or clarification, please contact Dee Williams with Ecology's Hazardous Waste and Toxics Reduction program,at(360)407-6348. Property owners,developers,and contractors are encouraged to recycle all possible leftover construction, demolition,and land clearing(CDL) materials and reduce waste generated. Recycling construction debris is often less expensive than landfill disposal. Please visit http://1800recycle.wa.gov to find facilities that recycle construction, demolition,and landclearing materials in your area. Please consider incorporating building materials that have been salvaged or are made from recycled materials to the greatest extent possible in the project. WATER QUALITY: Roberta Woods(360)407-6269 Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW,Water Pollution Control,and WAC 173-201A,Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Erosion control measures must be in place prior to any clearing,grading,or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand,silt,clay particles,and soil will damage aquatic habitat and are considered to be pollutants. • October 5,2009 Page 2 Proper disposal of construction debris must be on land in such a manner that debris cannot enter the water of the state;e.g.,Tiger Lake or cause water quality degradation of state waters. During construction,all releases of oils, hydraulic fluids,fuels,other petroleum products,paints, solvents,and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over other work on the site. The applicant should consider alternatives to treated wood or other chemically treated wood for in- water construction of wooden structures. Over time,treated wood may contaminate nearby sediment and cause toxicity for aquatic organisms. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecolog y gy Southwest Regional Office (SM:09-5554) cc: Anya Caudill,W211 Roberta Woods,WQ Judy Scott(Applicant) Tim Zech, Lakeshore Construction (Contact) py�N-STATFO MASON COUNTY Mc DEPARTMENT OF COMMUNITY DEVELOPMENT 0 A° = Planning Division N Y P O Box 279, Shelton, WA 98584 (360)427-9670 1864 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2009-00070 Description of Proposal Remove existing 6 ft. by 64 ft. dock and old piles on Tiger Lake and replace with 6 ft. wide by 50 ft. long dock fixed on 8 new piles. Proponent:P JUDY SCOTT Location of Proposal: 371 NE TIGER WAY EAST BELFAIR Parcel Number: 123055000017 Legal Description: TIGER LAKE TRACTS N 75' TR 17 Directions to Site: Old Belfair Hwy to Bear Creek Dewatto to 371 NE Tiger Way East. Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Allan Borden at ext. 365 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 10/5/2009. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date s t M ii -jv: 14 - - ,: a .•- a Av AI s 5 AP y N 1 inch = 300 feet W E 1 inch = 0.06 miles S t 23055000013 s " 123054290020 123055000014 123055000015 123055000016 123052222222 123055000017 ` 7E TIR1W 123055000904, r 123054200030 123050060010 1230 500001 P 11 Y 123055000019, 123055000020 123055000034 123055000021 123055000022 N 1 inch = 100 feet W E 1 inch = 0.02 miles S or r O 5C4 Y)-1 RECEIVED -Tp I 426 W. CEDAR ST) Pat/5 )SA-5 7- -71 (71 7,k c( — 0 00 70 PLANT-ANG: rQ Hy, KS AF E MEASURED FROM THE FURTHEST PROJECTION OF Ti-j'E BUILDING Tl-- golk4f-rd PLANNING Al PLANNING: a p p� �. . . +h 50 2evq- oao-7 o 5cv-ff- do wk T� � r - i LAKESHORE CONSTRUCTION P.O.Box 1058 Belfair,WA 98528-1058 275-5029 5 J� 10 ��- �1 X S '"5er Coligpo oe v"n /3of P��1 614e 6 - w, t'o G ro u LAKESHORE CONSTRUCTION �flair, 98528 1058 S 6-j j !/v(/ t , 6000 BOX A A �C St doc(<-1)�i La 6ewce� T(f I ----_ pos�+'J0.1 r K S 1"rju, cr 6w d e MIA, pfk 3-EQZ009 - "r10 MASON CO. ENVIROMENTAL CHECKLIST RECEIVED A. BACKGROUND oP 0,1 20W 1. Name of proposed project, if applicable: 426 W; CEDAR ST► ` -O ct u- e---,A S*wvboct 2. Name of applicant: Judi 3. Address and phone number of applicant and ontact person: O goy 2 3 z�s�ass wc� Q 4. Date checklist prepared: � a� G g-1'� -o C1 5. Agency requesting �checkllist: �A Aso� 0-oi � AA 6. Proposed timing or schedule (including phasing, if applicable): Sep- . o` o Zc)a 9 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: If yes, explain. Wo 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Ylb 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. no 10. List any government approvals or permi s that will be needed for your proposal, if known. bc�� wLld� < 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) blmm�Q.. -Do o I 6 � 1c1 GV�5o �-+ � 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 3_ ] I "� _T` UX" E'CLS+ ��k( i B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one): Flat, olling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? % C. What general types of soils are found on the site (for example, clay,0sand, <ra3vtmr muck)? If you know the classification of agricultural soils, specify them and note any primeland. d. Are there surface indications or history of unstable soils in the immediate vicinity: If so, describe. Mason County Environmental Checklist Page 2 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. no f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. h L g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? no y\-L h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: rl v N-C- 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. Y10k-�- b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. Mason County Environmental Checklist Page 3 l C. Proposed measures to reduce or control emissions or other impacts to air, if any: 110�, 3 WATER: a. Surface- 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Y-e s, ­T—k L-Jcc, 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. [)L__� Pk � � n(-,-N a�_Q&(A�_ 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. no Mason County Environmental Checklist Page 4 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Y ES 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. nO b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. Y10 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals..., agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. L m_ C. Water runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and �II his flow disposal, if an include quantities, if known). Where will this water flow. Will t p Y ( q � ) into other waters? If so, describ� ' 2) Could waste materials enter ground or surface waters: If so, generally describe. Mason County Environmental Checklist Page 5 d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: n 6 I,L 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir,(cedar ine, other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? fld�\_Q_ C. List threatened or endangered species known to be on or near the site. R 0)\ �. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Mason County Environmental Checklist Page 6 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site.- Birds- hawk, heron, eagl , songbird ', other Mammals: deer, bear, elk, er Fish: bass, salmon, rout herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. (1 U1\,� C. Is the site part of a migration route? If so, explain. h d. Proposed measures to preserve or enhance wildlife, if any: r_�� 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Mason County Environmental Checklist Page 7 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. p(.) 1) Describe special emergency services that might be required. 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? n b� 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. ),ow `nO\S. 8 .._ q :(XJ P w-,_ 3) Proposed measures to reduce or control noise impacts, if any: nu ►� 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent proZ7? &(--X (4"-0 K_ k U's t&,�4 Mason County Environmental Checklist Page 8 b. Has the site been used for agriculture? If so, describe. no C. Describe any structures go'n'the site. t---�t wc,vQ d. Will any structures be demolished? If so, what? OU bcck e. What is the current zoning classification of the site? no 2onkn f. What is the current comprehensive plan designation of the site? g. If applicable, what is the current Shoreline Master Program designation of the site? U±b��� h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. T) o i. Approximately how many people would reside or work in the completed project? 11 urn j. Approximately how many people would the completed project displace? 1/1 OkL k. Proposed measures to avoid or reduce displacement impacts, if any: 1104& Mason County Environmental Checklist Page 9 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: rn aso f Cou VA 1 - A L(J\�Cu_ 9. HOUSING: a. Approximately how many units would be rovided, if any? Indicate whether high, middle, or low-income housing. V� b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. 1, 1� X C. Proposed measures to reduce or control housing impacts, if any: 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? 'A 0, b. What views in the immediate vicinity would be altered or obstructed? TAO\� C. Proposed measures to reduce or control aesthetic impacts, if any: Mason County Environmental Checklist Page 10 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? nLK-Q�- b. Could light or glare from the finished project be a safety hazard or interfere with views? t0 C. What existing off-site sources of light or glare may affect your proposal: no r\,L d. Proposed measures to reduce or control light and glare impacts, if any: p 9 9 P Y 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? Fl s�A k t2 ) b. Would the proposed project displace any existing recreational uses? If so, describe. n0 C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: ncy)\-� Mason County Environmental Checklist Page 11 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. ncs-IK-L b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. n()Y\-Q. c. Proposed measures to reduce or control impacts, if any: YA 0 Y�Q 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. n yx U`.xuA e - b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. (A 0 C. How many parking spaces would the completed project have? How many would the project eliminate? 1) d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). YA 0 Mason County Environmental Checklist Page 12 e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. ND f. How many vehicular trips per day would be generated by the completed project: If known, indicate when peak volumes would occur. h 14 g. Proposed measures to reduce or control transportation impacts, if any: 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? v If so, generally describe: b. Proposed measures to reduce or control direct impacts on public services, if any: Mason County Environmental Checklist Page 13 16. UTILITIES: a. Circle utilities currently available lectricity, atural gas ater, refuse service, telephone sanitary sewer septic system b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. fv\ , Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date submitte —f, Mason County Environmental Checklist Page 14 ESA LISTED SALMONIDS CHECKLIST Applicant Information Project Information NameA Name l Cl I I C Phone ap S Location Description �- Ce mew ► I I V XLQ S ha.J RU ram,N CA Dr)a Vu ),, 1A r -L-L) A OU This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. 1. Are ESA listed s lm ids currently present in the watershed in which your project will be located? YES NO Please describe. 2. Has there ever bee anOA listed salmonid stock present in this watershed? YES NO Uncertain Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. April 2003 Mason County Environmental Checklist Page 15 T�• • i r i-r, r.4-! ;i i-i--~.-i�.`.•.•+-r}'.-t 7-I•I. Fli j� '.`.r.v r•.--....J...{1.t 1-i i. ,,{,�j� _.- r�jw w ♦.ti�h f .+? ; I ++aN r _,f. '�'i^-} w �- '.- +-.-i-+-�� lv •n :too r-.r-- .+-I+y.j..i— r- {x�.�•J•-.t!•�-�-.-,-+. -.{,. c. �•_1••t..+-l.1..1 3'• 1. +.a.. .w . .•4..+tip.+�.�y-.+-.wi..r.i..L ..�..�.•�.•�.�. e,... Skokomish Indian Tribe Natural Resources Department (360) 877-5213 N.541 Tribal Center Road Fax(360) 877-5148 Skokomish Nation,WA 98584 September 301",2009 Enviromnental Review Application No.: SEP2009-00070 Project Name: Replace existing dock Description of Proposal: Remove existing 6ft by 64ft dock and old piles on Tiger Lake and replace with 6ft wide by 50ft long dock fixed on 8 new piles. Location: 371 NE Tiger way East Belfair WA, 98528 Proponent: Judy Scott Dear Allan, Does all the lumber used meet or exceed the standards established in'Best Management Practices For the Use of Treated Wood in Aquatic and Other Sensitive Environments'developed by the Western Wood Preservers Institute,Wood Preservation Canada, Southern Pressure Treaters'Association,and Timber Piling Council,dated August 1,2006,and any current amendments or addenda to it. Current amendments and addenda include but may not be limited to'Amendment#1: CCA-Chromated Copper Arsenate',dated October 25,2006; and 'Addendum#1: ACC-Acid Chromated Copper', dated February 28,2007? Functional grating is not required for docks and floats on freshwater lakes however this does not mean that it should not be considered on all new docks and floats. Providing at least a 30%-50%grating would greatly mitigate the negative environmental impacts this project may have, or be found to have as better science becomes available. However,the Skokomish Tribes Tribal Historic Preservation Officer will be providing comment as to the potential cultural impacts of this SEPA and you should not move forward with the above project until you receive those comments. Thank you for including the Skokomish Tribe in the planning process,if you have any questions about the comments provided herein please contact Randy N.Lunper (Environmental Planner) at 1-360-877-5213 ext#508 or email them to rluinper@skokomisli.org. Sincerely, Joseph Pavel Director Skokomish Natural Resources Department 1 i ♦tom T: r♦♦; ; � 1•i i.L . ♦`1-I 1 ♦�♦•1����,�J J>y Y ^,T Y•♦y1-1 4J� I.+Iti-���'Y-+'�A-t 1-Y...,;y 1 tY + ♦ 3Y 1 ♦1i . 1.♦ ' ♦ -.�.::.- .1..'►„�.jH- �/1 . . r.t�f -�_.:•: �.; .~. S'-�+"► .-. T:..t.>�+-..ir'i{r�4,�'Y• f.►.I- �,t%.ri�.+��r+-�•!.+ .f-T.►,I. ♦ia-+♦�.1 Skokomish Indian Tribe Tribal Center (360) 426-4232 N. 80 Tribal Center Road FAX (360) 877-5943 Skokomish Nation, WA 98584 September 21,2009 Allan Borden Department of Community Development PO Box 279 Shelton, WA 98584 RE: Judy Scott/Dock removal and replacement SEP2009-00070 Dear Mr. Borden, The Skokomish THPO has received the DNS for the Judy Scott Dock Removal& Replacement Project. We are in concurrence with the determination of non-significance. Should the project plans change in regards to ground disturbing activities,our comments may be revised accordingly. Thank you for the opportunity to comment on this project, if you have any questions regarding these comments please feel free to contact me at shlanayl@skokomish.org.or(360)426-4232 Sincerely, Kris Miller Tribal Historic Preservation Officer