Loading...
HomeMy WebLinkAboutSHX2012-00018 In Channel Dock, Landscape Walls - SHX Permit / Conditions - 5/23/2012 STgT�O MASON COUNTY �P C DEPARTMENT OF COMMUNITY DEVELOPMENT • o s� = Planning Division N o i P O Box 279, Shelton, WA 98584 j N Y (360)427-9670 1864 Exemption from Shoreline Management Act Case No.: SHX2012-00018 Substantial Development Permit Requirement The Proposal By: SARAH GIST 650 E LAKESHORE DR ALLYN,WA 98524 To undertake the following development: Construct 8 ft. deep by 12 ft. wide fixed dock along the lake channel supported by small galvanized piling in water and by a concrete sill on shore; and two landscape walls (proposed as 2 to 4 ft. tall, 40 to 50 ft. long) at 8 to 20 ft. from lake channel; regrade to lower level to match landward side of proposed dock. Within ANDERSON LAKE and/or its associated wetlands is exempt from the requirement of substantial development because the development is categorized under WAC 173-27-040(2) as being category A-does not exceed $5,000 Please contact Allan Borden at ext 365 if you have any qu tions. Issued: 5/23/2012 Expires: 5/23/2014 Authorized Local Government Official cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL 201 0 M ' � Date received: US Army Corps , WASHINGTON STATE of Engineers• , se•tne oisrid Joint Aquatic Resources Permit Agency referee Oro a Application (JARPA) Form Tax Parcel#(s): IA 0 -- USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW. i i i i --------------------- -------------- Part 1—Project Identification 1. Project Name (A name for your project that you create. Examples:Smith's Dock or Seabrook Lane Development) h[ elA2 Part 2—Applicant The person or organization responsible for the project. nel 2a. Name (Last, First,Middle)and Organization(if applicable) 21b. Mailing Address (Street or PO Box) 2c. City, State, Zip r 2d. Phone(i) 2e. Phone(2) 2f. Fax 2 . E-mail (31*c ) 1-,-1\-"37 (3 b 0 ) 'R3o-9,\-7 o (gbo ) Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this application.) h( gid 3a. Name (Last, First,Middle)and Organization (if applicable) 3b. Mailing Address(Street or PO Box) Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at http://www.nws.usace.army.mil/PublicMenu/Menu.cfm?sitename=REG&pagename=mainpage_ESA • If you are applying for an Aquatic Resources Use Authorization you will need to fill out and submit an Application for Authorization to Use State- Owned Aquatic Lands form to DNR,which can be found at http://www.dnr.wa.gov/Publications/agr_use_auth_app.doc • Not all cities and counties accept the JARPA for their local Shoreline permits.If you think you will need a Shoreline permit,contact the appropriate City or county government to make sure they will accept the JARPA. ZTo access an online JARPA form with[help]screens,go to http://www.epermitting.wa.gov/site/alias_resourcecenter/jarpaJarpa_form/9984/jarpa_form.aspx. For other help,contact the Govemor's Office of Regulatory Assistance at 1-800-917-0643 or help@ora.wa.gov. JARPA 2010 v1 3/30/2010 Page 1 of 13 3c. City, State, Zip C �f' no -4s\ D 3d. Phone 1) 3e. Phone(2) X Fax 3 . E-mail (&b )430-VL-,'l0 (%0 )45D• 02.2s br Part 4-Property Owner(s) Contact information for people or organizations owning the property(ies)where the project will occur. h[ e�]I ❑ Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. 4a. Name (Last, First, Middle)and Organization (if applicable) 4b. Mailing Address (stree or PO Box) 4c. City, State, Zip 4d. Phone(1) 4e. Phone(2) 4f. Fax 4 . E-mail Part 5-Project Location(s) Identifying information about the property or properties where the project will occur. hei ❑ There are multiple project locations (e.g., linear projects). Complete the section below and use JARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (check all that apply.) h[ ell ❑ State Owned Aquatic Land (if yes or maybe,contact the Department of Natural Resources(DNR)at(360)902-1100) ❑ Federal ❑ Other publicly owned (state,county,city,special districts like schools, ports,etc.) ❑ Tribal Q"'Private 5b. Street Address (Cannot be a PO Box.If there is no address,provide other location information in 5p.) hel L 70 L l- Shacz &< 5c. City, State, Zip(If the project is not in a city or town,provide the name of the nearest city or town.) hel 5d. County nel JARPA 2010 v1 3/30/2010 Page 2 of 13 5e. Provide the section, township, and range for the project location. hel '/4 Section Section Township Range PIA} 5f. Provide the latitude and longitude of the project location. hf eM • Example:47.03922 N lat./-122.89142 W long.(NAD 83) L/7, 3� yS�/ ;t- ./ — / -?3-? I 5g. List the tax parcel number(s)for the project location. Ihelpl • The local county assessor's office can provide this information. /�2o2D- S�- c�ovSS 5h. Contact information for all adjoining property owners. (If you need more space,use JARPA Attachment C.) hL ell ] Name Mailing Address Tax Parcel#(if known) (9too (i l.akt�ll or-t, t�r- 1�r2�D - SDI- OvoSlo k+r� ba�v� ►�11 n ,,Jr� �$��ti C c,�n�c 4, Ps.. �.:•.- 30 la.•� k a r r ► o - 5�I - o ors s'l 5i. List all wetlands on or adjacent to the project location. hel 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hel 5k. Is any part of the project area within a 100-year flood plain? hf eM ❑ Yes ❑ No [won't know 51. Briefly describe the vegetation and habitat conditions on the property. h� eU +�. '�gyp`�-� �3 v� �. s�c.�c� .✓��-� '�aL�G - V C ��r�o�- �5 U,r `IVVC, JARPA 2010 v1 3/30/2010 Page 3 of 13 5m. Describe how the property is currently used. of eiD\l,l J J\ 5n. Describe how the adjacent properties are currently used. of Ai 5o. Describe the structures (above and below ground)on the property, including their purpose(s). of eid h oW\>✓ q� 1� C� �'� V'�- 5p. Provide driving directions from the closest highway to the project location, and attach a map. of elal G� JARPA 2010 v1 3/30/2010 Page 4 of 13 Part 6—Project Description 6a. Summarize the overall project. You can provide more detail in 6d. h[ eM VJ� ��c� �� `CJJ�1i opt\ `� 7� \"L' �►:0�.�-- �v� �5.V`r� \� c.: l.\ C.-�c,-.� .�`�-E n� �� �c�-L �fJo'�'�p+•ti,li.L��� Leo I�t�c�r `�� �D �— \--a �� bt, t��.a.ti ovr � �r✓� �v--''` a..r�-� 1-rr�-�� t��.a9cc,��, 6b. Indicate the project category. (check all that apply) nel ❑ Commercial ❑'Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6c. Indicate the major elements of your project. (Check all that apply) [help] ❑ Aquaculture ❑ Culvert ❑ Float ❑ Road ❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey ❑ Scientific ❑ Boat House ❑ Dike/ Levee /Jetty ❑ Land Clearing Measurement Device ❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs ❑ Boat Lift [Dock/Pier ❑ Mining ❑ Stormwater facility ❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool ❑ Bulkhead ❑ Fence [Piling ❑ Utility Line ❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall ❑ Channel Modification (upland) ❑ Fishway ❑ Other: 6d. Describe how you plan to construct each project element checked in 6c. Include specific construction methods and equipment to be used. hf M • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year flood plain. V31\ bt o-��e�e� �t,U[h L��`�� '�`\ (�J�g �n� � lUpt�,� �e��.pt�.�\�,� O.f►t� 6e. What are the start and end dates for project construction? (month/year) [nP�] • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Start date: R\ End date: �' ❑ See JARPA Attachment D JARPA 2010 v1 3/30/2010 Page 5 of 13 6f. Describe the purpose of the project and why you want or need to perform it. 6g. Fair market value of the project, including materials, labor, machine rentals, etc. h( eU 6h. Will any portion of the project receive federal funding? hf elw • If yes, list each agency providing funds. ❑ Yes ❑ No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) he 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. i ei [DIN'ot applicable 7b. Will the project impact wetlands? h[ eM ❑ Yes ❑ No []Don't know 7c. Will the project impact wetland buffers? hei ❑ Yes ❑ No [Don't know 7d. Has a wetland delineation report been prepared? h[_elM • If yes,submit the report, including data sheets,with the JARPA package. ❑ Yes ❑ No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? hel • If yes,submit the wetland rating forms and figures with the JARPA package. ❑Yes ❑ No Dbon't know JARPA 2010 v1 3/30/2010 Page 6 of 13 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? Lam] • If yes, submit the plan with the JARPA package and answer 7g. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No ❑'Not applicable 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. f eil]] 7h. Use the table below to list the type and rating of each wetland impacted; the extent and duration of the impact; and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below)where we can find this information in the plan. [i,eij� Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category2 Acres) acres) If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. 3Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent'if applicable. Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P),Mitigation Bank/In-lieu fee(B) Page number(s)for similar information in the mitigation plan, if available: 7i. For all filling activities identified in 7h., describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. hf elpl JARPA 2010 v1 3/30/2010 Page 7 of 13 7j. For all excavating activities identified in 7h., describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. p_ ] Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 81 "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) h[ elp] heck here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hel ❑\Not applicable 8b. Will your project impact a waterbody or the area around a waterbody? hei ❑Yes ❑ No 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? If,eip] • If yes, submit the plan with the JARPA package and answer 8d. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ❑ No [ Not applicable JARPA 2010 v1 3/30/2010 Page 8 of 13 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g.,you do not need to restate your answer here. [help] 8e. Summarize impact(s)to each waterbody in the table below. hel Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact3 to be placed in or linear ft.) of drive, etc.) removed from waterbody waterbody directly affected If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. z Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e., describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. helms] '0 �A\ . 8g. For all excavating or dredging activities identified in 8e., describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. het] JARPA 2010 v1 3/30/2010 Page 9 of 13 Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this'section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. h[ eM Agency Name Contact Name Phone Most Recent Date of Contact 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of Ecology's 303(d) List? neio • If yes,list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: httr)://www.ecy.wa.gov/programs/wq/303d/. ❑ Yes D No _ 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [,eir> • Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC. 9d. What Water Resource Inventory Area Number (WRIA#) is the project in? LLeL] • Go to http://www.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#. 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? h[ eM • Go to htti)://www.ecy.wa.gov/programs/wq/swgs/criteria.htmi for the standards. ❑ Yes ❑ No ❑ Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? hf elpl • If you don't know, contact the local planning department. • For more information,go to:htti)://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.htm1. ❑ Rural AUrban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? hel • Go to http://www.dnr.wa.gov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest Practices Water Typing System. ❑ Shoreline Af ish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal JARPA 2010 v1 3/30/2010 Page 10 of 13 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? hl elp] • If no,provide the name of the manual your project is designed to meet. [T�es ❑ N o Name of manual: 9i. If you know what the property was used for in the past, describe below. [help] 9j. Has a cultural resource (archaeological)survey been performed on the project area? hel • If yes,attach it to your JARPA package. ❑Yes Blo 9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. hf eio 91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. hf eld JARPA 2010 v1 3/30/2010 Page 11 of 13 Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/oi)as/. • Governor's Office of Regulatory Assistance at (800)917-0043 or help .ora.wa.gov. • For a list of agency addresses to send your application, click on the "where to send your completed JARPA" at http://www.epermitting.wa.gov. 10a. Compliance with the State Environmental Policy Act(SEPA). (Check all that apply.) nel • For more information about SEPA,gotowww.ecy.wa.gov/programs/sea/sepa/e-review.html. ❑ A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with YY1W5afl (lead agency). The expected decision date is f c`60(" ' ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1 ob.) of elpl ❑ This project is exempt(choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. 10b. Indicate the permits you are applying for. (Check all that apply.) [Lelpj LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance Shoreline Exemption Type (explain): ZTA y t::. Other city/county permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: ❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption Washington Department of Ecology: ❑ Section 401 Water Quality'Certification Washington Department of Natural Resources: Aquatic Resources Use Authorization FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) JARPA 2010 v1 3/30/2010 Page 12 of 13 Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. hf eipl 11a. Applicant Signature (required) hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies enter the property where the project is located to inspect the project site or any work related to the project. (initial) Applicant Printed Name Applicant Signature Date 11 b. Authorized Agent Signature hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. C Authorized Agent Printed Name Authorized Agent Signature Date 11 C. Property Owner Signature (if not applicant). hf elpl Not required if project is on existing rights-of-way or easements. consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact The Governors Office of Regulatory Assistance(ORA).People with hearing loss can call 711 for Washington Relay Service.People with a speech disability can call(877)833-6341. ORA publication number: ENV-019-09 JARPA 2010 v1 3/30/2010 Page 13 of 13