Loading...
HomeMy WebLinkAboutMEP2012-00009 Dock in Channel, Landscape Walls - MEP Permit / Conditions - 6/6/2012 �oN-STgT�o MASON COUNTY A o N DEPARTMENT OF COMMUNITY DEVELOPMENT " Planning Division > SN ~ � Z 7 N IT ti P O Box 279, Shelton, WA 98584 7864 �0 (360)427-9670 MASON ENVIRONMENTAL PERMIT June 06, 2012 TO BE KEPT IN THE GIST 650 E PARCEL FILE 650 LAKESHORE DR ALLYN WA 98524 Parcel No.' Issued. /6/ Case No.: MEP2012-00009 Project Description.- Construct 8 ft. wide by 12 ft. deep fixed dock along the lake channel supported by small galvanized piling in water and by a concrete sill on shore; and two landscape walls (proposed as 2 to 4 ft. tall, 40 to 50 ft. long) at 8 to 20 ft. from lake channel, regrade to lower level to match landward side of proposed dock. The following critical areas are present on this property: Long-Term Commercial Forest XXX FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date t Mason Environmental Permit 6/6/2012 Case No.: MEP2012-00009 Conditions: 1.) Approved per dimensions of structures and setbacks on submitted site plan; the June 2012 version had a 8 ft. wide by 12 ft. deep dock located at the shoreline. X 2.) The applicant acknowledges that the project will be completed as proposed, so that the project will be consistent with all applicable standards of the Mason County Resource Ordinance. 3.) A Hydraulic Project Approval from the Washington State Department of Fish Wildlife must be granted prior to construction. For more information contact Habitat Biologists Gloria Rogers(Freshwater) at 360-249-1293 ext 249 or Margie Schirato (Saltwater) at 427-2179. X 4.) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 5.) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X 6.) All construction and demolition debris must be removed from the shore area after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X 6/6/2012 MEP2012-00009 MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP A -COW ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd 4 '�- �I -L UEWED MASON COUNTY -�R 1 0 2012 DEPARTMENT OF COMMUNITY DEVELOPMEN'�IASON COI.;N.i"�G Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A,39.34,58.17,76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: Mailing Address: �O AhA Work Phone: , .� o cJ Email Address: S S� ';Jr • e-0--,` Home/Cell Phone: Fax#: If an agent is acting for the property owner during the permit process,complete#2. 2.AUTHORIZED AGENT _ Name: Mailing Address: Q Work Phone: ��b- ��1 . ,$ ��� Email Address: Home/Cell Phone: Fax# $110) 0 - L Qb 3.PROJECT SITE �C Site Address: (, S o .5�M Parcel#: _ Legal Description: e Directions to Site: Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. T ' 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 Fish 8t Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements: �A�C\ rs�p—� 6. Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets,if needed): 7. Describe why the action requiring this permit cannot be avoided. 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes 9. Identify any surface water on or adjacent to property (circle one): Saltwater Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records. Connected to Septic Connected to Community Septic � «} ��/`j,Q{atjiL� 11. Identify existing water supply(circle one): is Water Su Well 11. Type of Job(circle one): ew Add Alteration Repair Demolition Other: Print Name Signature Date C Community Dccclopnicnt I'M MI P P¢ee 2 of 2 Re\ised June_'UIU f � f =bigA r t � � S CA-) \'Kt: h