HomeMy WebLinkAboutSPI2006-00313 - SPI Inspections - 3/21/2007 y N� .STA MASON COUNTY
o P A o li_N DEPARTMENT OF COMMUNITY DEVELOPMENT
>. S Ni Planning Division
z� o Y ti P O Box 279, Shelton,WA 98584
00 o (360)427-9670
1864
Site Inspection
March 21, 2007
SCOTT RICH
3705 NE 119TH ST
VANCOUVER WA 98686
Case No.: SP12006-00313
Parcel No.: 122205017003
Project Description: Feasibility to develop lots in Allyn UGA.
Dear Applicant:
Pursuant to your application,a site pre-inspection (SPI)was performed on your property. Below you
will find comments made regarding the proposed development and its critical values.
In some cases, setbacks for development from shorelines, steep slopes, streams, and wetlands must
be included in your specific proposal; these setbacks are included as part of the comments listed
below.
This information is based on County and State regulations as they exist to date. These regulations
may change and may affect the requirements for development of the subject property.
Please contact me at(360) 427-9670,ext 365 if you have questions.
Sincerely,
�b
Allan Borden
Land Use Planner
Mason County Planning Department
3/21/1007 1 of 3 SP12006-00313
r `
Site Inspection
3/21/2007 Case No.: SP12006-00313
Comments:
Pre-inspection for Scott Rich on Dec. 14, 2006:
The purpose of the pre-inspection was to evaluate issues related
to this portion of two blocks in the Town of Allyn to provide area
for future development or construction of a single family
residences adjacent to Case Inlet and North Bay Rd. The
property has a general slope of 5 to 10 percent to the North Bay
Case Inlet shoreline. There is a small area in the northern most
area that would be considered upland with evergreen and
deciduous trees; the site was subject to fill and clearing in the
past. The remainder of property is extensive wetlands and
occupies the southern 80 percent of the property and many areas
of estuarine vegetation at lower elevation in the tidelands of the
bay.
The zone designation for the site is Allyn Urban Growth Area R-1
zone. Standard building setbacks for this zone are a 20 foot front
yard and rear yard setbacks, and 5 foot side yard setback (lot line
setbacks). These setbacks are measured from portions of
structures over 30 inches above grade such as roof overhangs,
stairs, decks, fuel tanks, heat pumps etc.
Landslide hazards: Generally, there are no steep slopes that
exceed 15 percent associated with the low bank adjacent to the
shoreline. The applicant does not need a geologic study as part
of future development review.
Wetland critical area: Planning staff confirmed the parcel and
vicinity contain certain wetlands, which are regulated under
Mason County's Wetlands chapter 17.01.070 of the Mason
County Resource Ordinance (enclosed with this letter). The
wetlands are likely Category I estuarine wetlands to the east and
Category III wetlands to the north (off the property) and to the
south (on the property). As part of the proposal review, you
should have a qualified biologist delineate the wetland edge,
characterize the wetland category, and determine the proper
vegetation buffer using the information from this Wetlands
chapter. The wetlands shall have the determined vegetative
buffer, and any possible building must be setback an additional 15
feet from the outer edge of vegetative buffer. The buffer is
currently intact with some trails existing through it; some tree
limbs may be trimmed on a limited basis in accordance with the
Wetland chapter standards.
Shoreline development is guided by the Mason County Shoreline
Master Program and Resource Ordinance Fish and Wildlife
3/21/2007 2 of 3 SP12006-00313
Site Inspection
3/21/2007 Case No.: SP12006-00313
Habitat Conservation Areas standards. Any possible building
would need to meet setbacks from the ordinary high water mark of
the inlet, likly to be between 60 and 100 feet distance. Depending
what development is proposed, additional public review permits
set forth in these programs may need to be applied for and
approval granted by the County Hearing Examiner.
County review early in the process is very important in proposing
development on these lands. The biologist evaluation is the
important first step in planning any development on the property,
especially for the determined vegetation buffer and setbacks.
Due to the extent of wetlands present, it is likely that nearly all of
the property will be affected by development standards stated
above. Land uses without buildings or structures would still need
to provide proper water supply and septage disposal and be
located adequate distances from property lines and from shore or
wetland critical areas.
You would need to confirm with the Health Department about the
adequacy of supplying water and connecting with the sewer
system in the vicinity.
General process: Future site development must include a site
plan, showing all setbacks from property lines, wetland edge and
proper buffers, and existing and proposed improvements; this site
plan will be needed for building permit application submittal, as
well as the environmental permit review.
Specific standards for future development contained in County
Codes may be found at the County website address
http://www.co.mason.wa.us. If you have any questions please
feel free to call. Thank you.
3/21/2007 3 of 3 SP12006-00313
MASON COUNTY
PLANNING DEPT. PRE-INSPECTION APPLICATION r
PLEASE PRINT $205.00 Fee Required I l
1. Owner: VA.L)- ' qi-04 Applicant: gznq
Site Address: tyl+ %A l 4A• Applicant Address: S:W5-- NL I I cr!!�
Owner Address: 2 1,1 5,7- City:V V_0A"k V,t1�V ,. St
Ci �,.. � � ��ZiP�'1�6"��'f.�'
ty: V I P r/r :r�. St Zip Phone: _ 2L' % f 1172 day
Phone:(3 ) W6, R Wf 4"e day �� M
Phone:(_) "W 7 evening Planne
Email Address: is /p'7t"`l ai .t 4 `l lAzj�, SMP om .Planwcl
ype of Use
�If67 Water Body ` swmw
2. Parcel No. I
Parcel No.
Legal Description: AuE_/10/
3. Purpose of Pre-Inspection : ►`�i : _+ ^°� �
4-
5' �. .� erg. ^/ rho :11 1�C.T f
4. Use of building: ,.,"�" A'�-a.
5. Do any of the following exist on or adjacent to-property?: slope saltwater K') lake( ) river
pond( ) wetland( seasonal runoff "j other Mi stream seasonal creekYO
Directions to Site: ldfz"Th r— ( UTH
a t
If the information is incomplete, then Mason County must disclaim any errors resulting from deficiencies in the original
application. Pre-inspection reports remain valid only until development changes occur in the vicinity which affect the lot
evaluated in this inspection, or the laws regulating development of the site change after the time of inspection.
.a x
Applicant Signature: Date:/ y/ ,
If you would like to be on site during inspection,please check here:
Return application to: Department of Community Development, Planning Division
P.O.Box 186
Shelton, WA 98584
(360)427-9670
Please include a$205.00 check or money order payable to Mason County Treasurer
When completed,this form becomes part of the parcel file. �\
FOR OFFICE USE ONLY: Accepted by: ,i -' Date:
MORE ON BACK SIDE
Revised: 01/18/06
Please illustrate below the proposed building site in relation to critical areas(slopes, streams, lakes, wetlands, etc.)
existing improvements, as well as property lines. APPLICATIONS SUBMITTED WITHOUT ADEQUATE
ILUSTRATIONS WILL NOT BE ACCEPTED AND WILL BE RETURNED TO THE APPLICANT.
t,Care'.:"\° VV
-�
Q.
a a
Departmental Review
(For Office Use Only)
Planning Department Findings:
�✓ ffr
OAAAeAfi hM &1 91' t
cvU7v W
Y ,
4 &
, �
flu