Loading...
HomeMy WebLinkAboutMEP2016-00007 - MEP Permit / Conditions - 3/31/2016 �ON_sTATFO MASON COUNTY o P A o N DEPARTMENT OF COMMUNITY DEVELOPMENT o NUZ Planning Division 7 N T 615 W Alder St, Shelton, WA 98584 �0 1864 (360)427-9670 MASON COUNTY ENVIRONMENTAL PERMIT March 31, 2016 WILLIAM ROOT P O BOX 1959 SILVERDALE WA 98383 Parcel Number(s): 122205017003 Expiration Date: 3131/2018 12:00:OOA Date Issued: 3/31/2016 Case Number: MEP2016-00007 Project Description: MEP SUBMITTED FOR DRIVEWAY ACCESS INTO PROPERTY WHICH WILL INCLUDE CULVERT AND DRAINAGE PLAN The following critical areas are present on this property: Long-Term Commercial Forest XX FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; XX Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete th roject as proposed or fails to comply with the standards of this ordinance. &f� 313//2_eiZ Authorized Local Government Official Date Conditions: 3/31/2016 Page 1 of 2 MEP2016-00007 MASON COUNTY ENVIRONMENTAL PERMIT 3/31/2016 Case No.: MEP2016-00007 1.) Site Plan Approved per dimensions of structures and setbacks on submitted site plan; the March 14, 2016 plan has the configuration of catch basin and culverts, fill ramp for access, and drainage to north to maintain existing wet areas that flow to North Bay, that are subject to this review. X Resource Ordinance The applicant acknowledges that the project will be completed as proposed, so that the project will be consistent with all applicable standards of the Mason County Resource Ordinance. Future work within the vegetation buffer and shoreline critical area will be reviewed by the Dept. of Community Development prior to starting such work X Shoreline Management Act The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program. X 2.) Construction Debris Removal All construction and demolition debris must be removed from the shore area after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X Temporary Erosion Control Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or properties. Silt fencing, straw, or surface matting must be installed and maintained until upland vegetation has become established. X 3.) All surface water and potential runoff from the proposed development will be controlled on site in catch basins and culverts, and shall not adversely affect any adjacent properties, cause sediment deposits, nor increase the velocity flow entering or abutting to any state or county culvert or ditch system or road way. X 4.) Following the placement of the access path from North Bay Rd., the owner or agent shall request a Planning Dept. site inspection to determine setbacks on the property prior to any further work undertaken on the development of the property. X No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showing good cause, may extend the initial two year period by one year. No permit shall be extended unless the applicant has requested such review and extension prior to the exporation date. Signature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 3/31/2016 Page 2 of 2 MEP2016-00007 MASON ENVIRONMENTAL PERMIT($630 o $380 /other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP 2LO 11,0 - 6 ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd -(q — ZD!(o C � MAR 14 2016 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMW.Alder Street Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: t Mailing Address: t3n n ^6-fee- ee- 4, Cq—) Work Phone: /�� Z-77I Lf7 Email Address: t�l cs �,�� l�l�tc�c Home/Cell Phone: Fax#: If an agent is acting for the property owner during the permit process, complete 92. 2. AUTHORIZED AGENT Name: Mailing Address: i © l U-e 3d Work Phone: 362 ok 7 ^j 7 7 Email Address: Home/Cell Phone: Fax# 3. PROJECT SITE fa� �/� j Site Address: 1lJ (�/ .I7�Iv � 2 m Parcel#: t ZZZ'L V- © - 7� Legal Description: Direc ions to Site: Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans, Shorelines, Septic System,Topography,Proposed Improvements,Easements,North Arrow, and Scale. Also draw a separate topography diagram. (:'-Community Deac1opmcn1TAC`A1FP Pa-gc I oft neviscd Iunw 2010 lfJ MASON ENVIRONMENTAL PERMIT $630 or$380 w/other permit) Mason ermi r ( P ) ❑ CONDITIONAL USE($1520) ME 2015 _ �� ❑ HABITAT MANAGEMENT PLAN REVIEW 445) _ Date Rcvd C � Cep( MASON COUNTY r RTMENT OF COMMUNITY DEVELOPMENT RECEIVED JUL 0 6 2015 Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION 4 2 W CEDAR S T. The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A,39.34, 58.17,76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: E 1/� per) Mailing Address: Po Boy ti S r U.Q C40- k-"J q 0 Work Phone: 6CD Email Address: Home/Cell Phone: Fax#: If an agent is acting for the property owner during the permit process, complete #,'2. 2.AUTHORIZED AGENT Name: Mailing Address: NV V Work Phone: Email Address: Home/Cell Phone: Fax# 3. PROJECT SITE ' / /1 Site Address: V�A(uf- �`-" Parcel#: 2� '�� - - j �00 Legal Description: 12, 13 Directions to Site: / in,��� �;n L, cd i VN cclL Av odc0 il 1ce Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow, and Scale. Also draw a separate topography diagram. 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Fish&Wildlife Habitat Conservation Areas,Chapter ❑4'etlands, Holding Lands,Chapter 17.01.062 17.01.110 Chapter 17.01.070 5. Identify current use of the property with existing improvements: LUe- C-"'�'-C C©c 1 cG- +0 �*-;,C"c [' 6. Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets, if needed): r CU7 C w, [ ( (%-� CCvS Ci2cy 6e ►� 7. Describe why the action requiring this ermit cannot be avoided. CPri Ian 60rc en) 8. Will there bean alteration of a wetland and/or wetland vegetation area(circle one)?( _yet ) No 9. Ide surface water on or adjacent to property (circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection (circle one): If septic is located on project site,include records. Connected to Septic Connected to Community Septic 11. Identify existing water supply(circle one): Public Water Supply Well 11. of Job(circle one): Ne Add Alteration Repair Demolition Other: Print Name Signature Date �ji \pppl / 200 / I yggyRD I i I � E ST A?,' ADS PIPE I / NEW TYPE Imo. I / �•�`• / 2q / / IE W=EXIST ♦�• 1 4 a/ j IE E = IE S MINUS 05-KT,`_ ��•� I ry Q / mom/ STUB ADS N-12 OUT ON RIP RAP PAD I� 56'1 -41 1 APPROX FLOW LINE /OF EXISTING DRAINAGE / NEW ROAD APPROACH..` S0'1�006 / / Q/ 47': / 56 LFt NEW 12' ADS N12 PIPE S=1% TO N I NEW TYPE 1 CB ti ��•� ; I IE N = EXIST IE W �•�`, o EXISTING 12' ADS PIPE % `�•� NpCC / / �•� `�R20,so 1 / % / o/ / �•�` 003 pqR Cf4 l I r I A laf I 2 L-JN,L.0Ison&Assoc iates,Inc, ~ / �'��•_ I / TITLE, SITE PLAN—DRAINAGE IMPR❑VEMENTS NOTE, THIS IS NOT A SURVEY PROJECT PARCEL #12220-50-17003 ELEVATI❑NS ARE FOR REFERENCE ONLY DATE SCALE I DRAWN BY, MMZ 8/28/15 V = 40' ICHECKED BY- MMZ I SHEET I OF I MASON ENVIRONMENTAL PERMIT($630 o $380 /other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP 2.0 1 ZP -=_ ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd , 1 q - �U�(O PM MAR 14 2016 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMO 'Alder Street Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: L a Vl/L �� �—Zzo-1� Coo(c� c.+` Mailing Address: )C) f3d 5, / U 7 � 1--e- (fL) Work Phone: z77` Lf7 Email Address: Ll C �,g� J c Home/Cell Phone: Fax#: If an agent is acting for the property owner during the permit process, complete 92. 2. AUTHORIZED AGENT Name: ( , ) J Ce-v_ Mailing Address: ( 0 ` U--P d Work Phone: 3�00 ^l 77 Email Address: Home/Cell Phone: Fax# 3. PROJECT SITE !V(Dc�k ��� n j Site Address: /� /0 0 Parcel#: �Z Z - O - ` 7� Legal Description: Direc ions to Site: Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures, Fences, Water Lines,Driveways,Drainage Plans, Shorelines, Septic System,Topography,Proposed Improvements,Easements,North Arrow, and Scale. Also draw a separate topography diagram. !''Ccmmunit T?crciopm�nP•PAC: 11 P I a-- I of-- Rc'ri,ed Jung 21 1i' 4. State which section requires permit: ❑ Long Term Commercial Forest, Chapter 17.10.060 ❑ Frequently Flooded Areas, Chapter 17.01.090 ❑ Mineral Resource Lands, Chapter 17.01.066 ❑ Landslide Hazard Area, Chapter 17.01.100 ❑ Aquifer Recharge Area, Chapter 17.01.080 ❑ Seismic Hazard Areas, Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Fish & Wildlife Habitat Conservation Areas, Chapter ❑ In-Holding Lands, Chapter 17.01.062 17.01.110 XWetlands, Chapter 17.01.070 5. Identify current use of the property with existin improvements: 16,lit c- C '(f C"') O `2 c, (& (n. uUG 6. Identify and describe the proposed project, including the type of materials to be used, construction methods, principle dimensions, and other pertinent information (attach additional sheets, if needed): T4SQ1 quko-ect 7. Describe why the action requiring this permit cannot be avoided. /� C�6,� �vt % AD 7- Ct 0->2 YLt&kD P_ I'D C W CO C� Cc� 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Identify any surface water on or adjacent to property(circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection (circle one): If septic is located on project site, include records. Connected to Septic Connected to Community Septic 11. Identify existing water supply(circle one): Public Water Supply Well 11. T of Job (circle one): New Add Alteration Repair Demolition Othe . ��vtl Coy Ivy ?/ 00f Print Name Signature Date F'Comniunin UevelopmeniTAC'MLP P:t'_or2 Revised.lune20i0 4. State which section requires permit: ❑ Long Term Commercial Forest, Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area, Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Fish &Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 X Wetlands, Chapter 17.01.070 5. Identify crurrent use of the property with exist11in improvements:&,o 4-o to < oc c,) go/k,--e_ d (_& C lsv 6. Identify and describe the proposed project, including the type of materials to be used,construction methods, principle dimensions, and other pertinent information(attach additional sheets, if needed): dzua Zzi 9 Z) 7. Describe why the action requiring this permit cannot be avoided. CGS 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Identify any surface water on or adjacent to property (circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection (circle one): If septic is located on project site, include records. Connected to Septic Connected to Community Septic 11. Identify existing water supply(circle one): Public Water Supply Well 11. T of Job (circle one): r New Add Alteration Repair Demolition Othe . �nvGw�`i Print Name Signature Date L"Community Developmenr,i'1CNLP Pa_z 2 of 2 Revisad.fungi 2U10 MASON COUNTY ENVIRONMENTAL PERMIT 3/31/2016 Case No.: MEP2016-00007 1.) Site Plan Approved per dimensions of structures and setbacks on submitted site plan; the March 14, 2016 plan has the configuration of catch basin and culverts, fill ramp for access, and drainage to north to maintain existing wet areas that flow to North Bay, that are subject to this review. X Resource Ordinance The applicant acknowledges that the project will be completed as proposed, so that the project will be consistent with all applicable standards of the Mason County Resource Ordinance. Future work within the vegetation buffer and shoreline critical area will be reviewed by the Dept. of Community Development prior to starting such work X Shoreline Management Act The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program. X 2.) Construction Debris Removal All construction and demolition debris must be removed from the shore area after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X Temporary Erosion Control Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or properties. Silt fencing, straw, or surface matting must be installed and maintained until upland vegetation has become established. X 3.) All surface water and potential runoff from the proposed development will be controlled on site in catch basins and culverts, and shall not adversely affect any adjacent properties, cause sediment deposits, nor increase the velocity flow entering or abutting to any state or county culvert or ditch system or road way. X 4.) Following the placement of the access path from North Bay Rd., the owner or agent shall request a Planning Dept. site inspection to determine setbacks on the property prior to any further work undertaken on the development of the property. X No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showing good cause, may extend the initial two year period by one year. No permit shall be extended unless the applicant has requested such review and extension prior to the exporation date. Signature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 3/31/2016 Page 2 of 2 MEP2016-00007 pqR f I �� / o ��•� 1 0-So-I �•``2poot % % e00 e I ry Bq y I l RD i l E ADS PIPENE ' I ( i IE W IE E = IE S 1 % STUB ADS N-12 0 RAP `AD APPROX FLOW LINE OF EXISTING DRAI►VAGE �eC i l I NEW ROAD APPROACH.•` So`t)0p6 I / Q/ 47•1 / 56 LF* NEW 12' ADS N12 PIPE S=1% TO;N / I NEW TYPE 1 CB IE N = EXIST IE W EXISTING 12' ADS PIPE l O� i �•� ! l I ! / l / \ \\ ��• pgRCf • / / l �1�� 3ot;lo l ! nc/ / / / gRCF� l `•��. l I / / w I A!-`JN,L,Olson&Associates Inc, ~ / / / •`�• `�•�� _ I ! TITLE, , SITE PLAN-DRAINAGE IMPROVEMENTS N❑TEi THIS IS NOT A SURVEY PROJECT PARCEL #12220-50-17003 ELEVATIONS ARE FOR REFERENCE ONLY DATE- SCALE I DRAWN BY NNz 8/28/15 1 1' = 40 ICHECKED BY: NNZ I SHEET I OF 1