Loading...
HomeMy WebLinkAboutCOM2013-00013 Foundation for Asphalt Plant Silos - COM Permit / Conditions - 3/8/2013 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar �='.O. Box 186 Phone: (360)427-9670, ext. 352 Shelton, WA 98584 1 COMMERCIAL BUILDING PERMIT COM2013-00013 OWNER: GRANITE CONSTRUCTION RECEIVED: 2/4/2013 CONTRACTOR: LICENSE: EXP: ISSUED: 3/8/2013 SITE ADDRESS: 100 NE PENINSULA BLVD (ASPHALT) BELFAIR EXPIRES: 9/8/2013 PARCEL NUMBER: 123214200090 LEGAL DESCRIPTION: TR 9 OF W1/2 SE; S 28/106 PCL 4 BLA#03-14(R)AF#1779502 PROJECT DESCRIPTION: DIRECTIONS TO SITE: FOUNDATION FOR SILOS FOR PORTABLE ASPHALT PLANT ST RT 3 TO BELFAIR, PAST MCDONALDS, TOP OF THE HILL TURN LEFT INTO MAIN ENTRANCE OF PENINSULA TOP SOIL, THEN TURN RIGHT General Information Construction &Occupancy Information Type of Use: ASPHALT PLANT Insp.Area: No. of Units: Type of Constr.: No. of Bathrooms: Occ. Group: Type of Work: ALT Fire Dist.: 2 Valuation: $ 50,000.00 No. of Stories: Exit Design. Load: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp. Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2013-00013 Please refer to the following pages for conditions of this permit. Page 1 of 5 Plumbing Fixtures Mechar;ical Fixtures FEES Type Qty. Type _ Qty. Type By Date Amount Receipt Plan Check Fee ("RAM ')iai9n1,.i UlA AA Simi inn Planning Review Fee ('hAhA )/A/?n1a a.A'An nn Gi?ni tnn EH Plan Review rnnnn 9ir,nnvi Gina nn Si?ni'Ann Building State Fee I AW 1)PJ51'Jn1 U x;n ci9mAnn Building Permit Fee I A%n/ 9/9rw9nia �Faa 7F si?ni Ann IFC Plan Check Fee I AIN 9i9Fr9MA .t?n4 99 S»mAnn Total $1,708.91 CASE NOTES FOR COM2013-00013 CONDITIONS FOR COM2013-00013 1) Appr Berjdimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 2) PER TITLE 14 MASON COUNTY BUILDING CODE-CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS - 14.17.110: Afire apparatus access road in excess of 14% grade and more than 150' to new residential or commercial structures will require an automatic fire sprinkler system installed. Contact the Mason County Fire Marshal at(360)427-9670, extension 352, for further information. x4�� 3) A knox_b6 j quired per section 506 of the 2009 IFC, please contact the local fire district for more information and inspections. X // Inst A4 ire extinguishers with a maximum travel distance in any direction of 75 feet and mounted no more than 42 inches above the grade. X A fire hydri�9required to be located within 400 feet of the furthest point of the plant. X 4) Cont actor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are pot@ tial risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800 The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. x/ 5) All approved pla ar required to be on-site for inspection purposes. If inspection is called for and Dians are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour b ged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X COM2013-00013 Page 2 of 5 6) Owner/ t is responsible to post the assigned ads; ess and/or purchase and post private road signs in accordance with Mason County Title 14.2�, X 7) The approved site plan is required to be on-site for iw pection purposes. If inspection is called for and the site plan is not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason Co y u Department prior to any further inspections being performed or approvals granted. 8) 30 P CONCRETE WILL REQUIRE SPECIAL INSPECTION IF THE QUANTITY E EDS 50 CUBIC YARDS< LESSER AMOUNTS WILL REQUIRE AN APPROVED CONCRETE SUPPLIER TO PROVIDE YOU WITH A C gI�KET THAT WILL BE REQUIRED TO BE SUBMITTED TO THE SITE INSPECTOR FOR THE VERIFICATION OF MATERIAL USED. 9) In addition to the inspections required in IBC, Section 109, the owner, the engine or arc itect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by the design professional. The special inspectors duties & responsibilities shall be as specified in Chapter 17. Special inspection reports shall be submitted to the Mason County Building Department, PO Box 186, Shelton WA 98584 and available for inspec " I pection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and fin oc �y inspections. 10) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are rem pve r val will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and �iec the Mason County Building Department prior to any further inspections being performed or approvals granted. 11) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 12) Cha to approved building plans that affect compliance to the current Washington State Energy Code(WSEC), ventilationrequirements), di ing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. 13) ONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in confor n ;with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a on y Building Inspector shall be made prior to requesting additional inspections. 14) property lines shall be clearly identified at the time of foundation inspection. X 15) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure ye aest a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being no o: with Mason County ordinances and building regulations. COM2013-00013 Page 3 of 5 16) All permits pire 180 days after permit is- ,ance, or 180 days after the last inspection activity is performed. The Building Official may extend the time f a for a period not exceeding 160 days, upon the receipt of a written extension request in6c,-Aing that circumstances beyond the control of e older have prevented acticr, from being taken. No more than one extension may be granied. 17) The Applicant shall be responsible for the,ollowing elements: 1) Compliance with the Construction Storm Water Plan (SWPPP No. WAG-50-0064)submitted on March 7, 2013, shall be subject to an on site inspection, or inspections, by the engineer of record or an authorized representative. Said inspection(s) shall be performed in accordance with the approved stormwater plan, and prior to any modification that would make a determination of compliance impossible. 2) The SWPPP shall be implemented as detailed in the WAG-50-0064 document; operations shall comply with the March 7, 2013 site plan, the stormwater monitoring plan, the erosion &sediment control best management practices, and the oil and fuels spill plan procedures for prevention, response and reporting. 3) Inspect" reports shall be submitted to verify all engineering requirements have been completed in accordance with the approved storm water plan. o all be submitted to the Mason County Department of Community Development prior to each corresponding inspection and final per it val. Copies of all special inspection reports shall be made available at time of inspection. 18) All construction and demolition debris must be removed from the work area after project completion. Proper pos ction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. 19) Prior to final approval, all upland areas disturbed or new 'cre -bby activities shall be seeded, egetated or given an equivalent type of erosion protection (silt fencing or straw matting) v 20) Temporary erosion control measures must be implem ted to prevent water quality degradation of adrce �fs'or properties. Silt fencing or straw matting must be installed and maintained until upland vegetation has become established -X This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if constr tion or work is suspended for a period of 180 days at any time after work is commenced. E ' of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuati of wor is bytes o progress ins ion.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of ason C my a_cE es_ h"e above d ed property and structure for rev" and ' spection. OWNER OR AGEN DATE: / COM2013-00013 Page 4 of 5 Case Activity Listing 3/7/2013 3:59:13PM Case #: COM2013-00013 1 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To BY Updated Updated ll� COMA010 Application Received 2/5/2013 None DONE G M M 2/5/2011 M N1 r COMB 150 Letter of Completeness 2/7/2013 None DONE AHB AHB 2/7/2013 AHB The SEPA environmental checklist is subject to a comment period that ends on Thurs.February 21,2013. Review of the project elements(buildings,layout of development,elements of operation)will continue. COMB009 Fire Marshal Review 2/25/2013 2/25/2013 None DONE LAW 2/25/2013 LAW COMB110 Building Plan Review 2/5/2013 2/25/2013 None DONE LAW LAW 2/25/2013 LAW WILL SEND PLANS TO EACH DEPT.WHEN DROPPED OFF. COMB200 Environmental Health Review 2/5/2013 3/6/2013 None DONE ADR 3/6/2013 ADR No plumbing COMB 130 Planning Review 2/5/2013 3/7/2013 None DONE AHB AHB 3/7/2013 AHB, All materials have been submitted on March 7,2013,including the Construction Storm Water Plan(SWPPP No.WAG-50-0064);operations shall comply with the March 7,2013 site plan,the stormwater monitoring plan,the erosion&sediment control best management practices,and the oil and fuels spill plan procedures for prevention,response and reporting. COMB 136 Stormwater Review 3/7/2013 3/7/2013 None DONE AHB AHB 3/7/2013 AHB Construction Storm Water Plan(SWPPP No.WAG-50-0064)submitted on March 7,2013,shall be implemented as detailed in the WAG-50-0064 document;operations shall comply with the March 7,2013 site plan,the stormwater monitoring plan,the erosion&sediment control best management practices,and the oil and fuels spill plan procedures for prevention,response and reporting. Page 1 of 1 CaseActivity..rpt MASON uOUNTY DCD PLANKNG SITE PLAN REQUIR-0 TO BE ON SITE CHANGES SUBJECT TO APPROVAL M . o.F. y . STD 1 FIRE HYDRAN TEE Zk/ 91 1 — FIRE HYDRANT SSEMBLY 41 - 95 CONCRtTE BLOCK" OO O CONCRE - PLANT \ �.�. 'DES #1, -000 0 ?\ i RIM 4h \ . y IE r i-321-43-00t( W WT BEGI. WATER mox CONSTRUCTION � ` q � gam ~ . / ,``�\S ' \r•~ ? T-,PHASE`-8` EXTENSION" t EX. BLIND Ft rNGE do THRUST BLOCK \aJ y CE ,,fT+ tio RIN 99.s9- 00 O ID 64.76 ST Q A ST SC 76 3344 T ' r W tx wl �. i4 cr Al s etry ! I 12321-43-6 �0 r. Business Licensing Service:License Query Search Page 1 of 1 • Contact us • Forms • About u • F=11T_e • „!1dtiUE'of update Your business Information • How to renew Your license Search Business Licenses License Information: Entity Name: GRANITE CONSTRUCTION COMPANY Business Name: GRANITE CONSTRUCTION COMPANY License Type: Washington State Business Entity Type: Profit Corporation UBI: 409023062 Business ID:001 Location ID:0007 Status: To check the status of this company,go to Secretary of State and Department of Rgy-em g. Location Address: Mailing Address: 2111 ROSS AVE 1525 E MARINE VIEW DR EVERETT,WA,98205-3207 EVERETT,WA,98201-1927 View Additional Locations Status Expires First Issued Licenses Held at this location Scale-Larae A tive 11/30/2013 07/06/2009 Governing People: Cl AES G BJORK PAVID H KELSEY GADOIVASQUEZ GARY M CUSUMANO JAMES H ROBERTS JAMES W BRADFORD,JR JAY L MCQUILLEN,JR JIGISHA DESAI JOHN A FRANICH KENT H MARSHALL LAUREL KRZEMINSKI MICHAEL F DONNINO REBECCA A MCDONALD RICHARD WATTS SCOTT D WOLCOTT THOMAS S CASE WILLIAM G DOREY WILLIAM H POWELL Information Current as of 03/07/2013 5:50AM Pacific Time .,New Search_,) This site is limited to searching for business licenses issued through the Washington State Business Licensing Service. • Contact us • Forms • About us • Privacy �:2011 Washington State Department of Revenue and its licensors.All rights reserved. http://bls.dor.wa.gov/LicenseSearch/lgsLicenseDetail.aspx?Ref D=210363 l 3/11/2013 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 426 West Cedar Street ♦ PO Box 186 ♦ Shelton,WA 98584 (360)427-967C EXT.352 FAX(360)427-7798 HOME PAGE—www.co.mason.wa.us Special Inspection Authorization Project Owner l ejgsV, 6'c^.s{-,, 1., Building Permit Number 0/z - 00 0 / Project Address On IV Engineer/Architect o' record In addition to IN,inspecv nstrec uired by Intemational Building Code (IBC) Section 109,the owner or the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide special Inspections during construction on the types of work listed under IBC Section 1704_ This form must t)e completed by-the owner or the engineer or architect of record,prior to permit issuance,indicating who will pel-forrn the required special inspections for this particular project_ The specified special inspectors)shall perform the required special inspections during construction of the project, submit ali inspection reports to the Building Department and provide a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge,In conformance to the approved plans and specifications and the applicable workmanship provisions of the IBC. The following checked items require special inspection: 1. Coi-icrete. During the t9king of test specimens and placing of reinforced concrete (fBC 1704.4) 2. Bolts installed in concrete. Prior to and during the placement of concrete around bolts when stress Increases permitted by Table 1912.2 and section 1912.5 are utifiz rd.(160 1704.4 3. Erection of precast concrete members. Periodic inspection per ACI 318: Ch 16.(IBC 1704.4) t3 J 4. Shotcrete. Continuous inspection per ACi 318,5.9,5-10 and iBC Chapter 19. (IBC 1704.4) S. Reinfou�.Ingj steerind-pMstressing steel tendons. Inspection of reinforcing steel Inciuding prestressing tendons, (IBC 1704.4) i4fihs 6. Welding of r ie of rcing steel. Inspection of the welding of reinforcing steel according to AWS D1.4,ACI 316:3.5.2, and IBC 1903.52(IBC 1704.4) 7. Structural welding. Welding inspection shall be in compliance with AWS D1.1 (IBC 1704.3.1) S. High-strength Bolting. The installation of high-strength bolts shall be periodically inspected In accordance 1 with AiSC LRFD Section M2.5. (IBC 1704.$.3) 9. Structural Masonry, Masonry construction shall be Inspected and evaluated with the requirements of IBC section*1704.5. -10. Soils. lnspections for fills 12 inches or greater to be performed In accordance with IBC Secti n '704.7, 2�11411. Pfl@;foundations. Inspector to be present when pile foundations are being installed and during tests.(IBC r 17Cr4-8) r"I 12. Pier foundations. Special inspection of pier foundations for buildings are required in seismic Zone D. (iBC 1704.9) �} 13. Spray-appiled fire resistant materials. Inspections shall be in accordance with sections 1704.11.1 through 1704.11.5. U. Exieria'insulation flnlsh system(EIFS). Special inspection shall be required for all EIFS systems, (IBC 1704.12) Continued on reverse,side ..... ..... ....�... �v...i •... ..v.. :... . . vv .w a.... . v.. auanaaa vaa� .0...... 15. Smoke-control system. Smoke control systems shall be tested by a special inspector per IBC Section 17C14.14. 16. Special cases. Special inspection shall be required for proposed work that is, in the option of the building official,unusual in its nature such as altemative methods and material o'construction, unusual design applications, and materlais and systems required to be installed in accordance with additional manufacturer's Instructions that prescribe mquiroments not contained In the IBC or referenced standards. ik InstaIlaation of structural epoxies t," k Installation of"high-load shear panels" tfAT Structural.observation (IBC1709) ia.l A Other; Special Inspei:tor Selection'. The special inspection agency a6d special inspector shall be registered by the Washington Association of Building officials(WA80)for the particular type of construction or operation requiring special inspection. Such inspector(s) shall be selected by the owner or the owner's agent and approved by the Building Official prior to Issuance of the building permit. The owner's agent shall not be acting as,or employed by the special inspection agency or the contractor for this project. Name of Spec]M inspector or Agency: Type of Inspection: Registration Number: Authorization: I hereby state that I am the legal owner of the project property,or that i am the legal owners agent who is not cmployed by a special inspection agency or contractor associated with this project. In addition, I agree to comply Wth the special inspedtion requirements established by Chapter 17 of the International Building Code as ty-' ado Masi un z, i tur Printed Name Ovvrik Agent Da e PURPOSE OF SPECIAL INSPECTION Special inspection Is the monitoring of materials and workmanship which are critical to the Integrity of the building structure to assure that the approved plans and specifications are being followed and that relevant Codes are being observed. : pedal Inspections are in addition to those conducted by the county building inspector and by the engineer or architect of record. Special inspectors furnish inspection at all times that their presence is required by the code,the plans and specifications,and the enforcing jurisdiction. Good communication between the special inspector and thi;designer,contractor,and building department is essential. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR: Special Inspectors are individuals with highly developed,specialized skills who observe those critical building or structural features which they are qualified to inspect. Duties of special inspectors and/or inspection agencies include the following: 1. General Requirements SpElcial Inspectors shall review approved plans and specifications for special Inspection requirements. SPE10I21 inspectors shall comply with the special inspection requirements of the enforcing jurisdiction. 2,Signify Presence at Job Sltei SpEicial inspectors should notify contractor personnel and the enforcing jurisdiction of their presence and responsibilities at the job�site. 3. Observe All Work for Which�hey Are Responsible Spuc,lal Inspectors shall inspect all work and perform or observe all tests requiring inspection and testing for conform knee with the building-department-approved(stamped) drawings,specifications and applicable provis+cois,of the code. 0 17 N CONCRETE MECHANICAL MANUFACTURED HOME C) Date w Footings /Setbacks G By as Piping Ribbons o Intenor Date By interior-Date By bate By m o w Exterior Date By Exterior-Date B n Set-up INSULATION z Point Load 1 Isolated Footings Date By Z Date By BG f SLAB INSULATION Data By FIRE DEPARTMENT —� � Foundation Walls Floors Date By n Date By Bata By DECKS FRAMING Walls Date By O Date By Data By Z PROPANE TANKS PLUMBING vault Date By Date _ By OTHER Groundwork Attic Type. Date By Date By Date By D.W.v DRYWALL Type O Int.Brace Wall Date By Date By ic Date By p FINAL INSPECTION Water Line Fire Seperation Date By Date By Date By O O Pass or Request Inspect. O Type of Insp. Fail Date Date Done By Comments i i v CD cn 0 CA WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200 Silverdale, WA 98383 360-692-3802 Special Inspections Report Granite Portable Asphalt Plant Mason Co Permit No. COM2013-00013 located in: MASON COUNTY prepared for: Granite Construction Company 1525 E. Marine View Drive Everett, WA 98201-1927 date: March 26, 2013 LA Contents: Table of Special Inspections (IBC 2012) ao Special Inspections Reports Concrete Inspection Reports 03-26-13 0 023 �600p v � ISTF ` SSj�NAL �Cs NOTE THIS DOCUMENT IS INSCRIBED NTH A DIGITIZED SIGNATURE & DATE THE ORIGINAL SIGNATURE DOCUMENT IS ARCHIVED IN THE ENGINEER'S OFFICE In reference to IBC Section 1705, the scope of this project required special inspection, as listed in this report. I certify that said special inspections have been performed, and that the work inspected is in conformance with the plans, specifications, and design analysis for the project. MFW Project Number: 578 03-29-13A07 : 34 RCVD ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 0 w N rV W Summary of Special Inspection Requirements per IBC 2009 a 0 w Note: Items not-applicable to this project contain strike-out 0 TABLE 1704.7 REQUIRED VERIFICATION AND INSPECTION OF SOILS VERIFICATION AND INSPECTION TASK Comments Date Inspected All weight bearing foundations excavated to 1.Verify materials below shallow foundations are adequate native soil.Soil verified by EnviroSound to 2-1 (2013) to achieve the design bearing capacity. meet required bearing capacity.(geotech report attached to final inspection report) 2.Verify excavations are extended to proper depth and have Excavations meet specified depths and 3-6,3-8,3-9(2013) reached proper material. materials. 3.Perform classification and testing of compacted fill Compacted fill meets specifications. 3-6,3-8,3-9(2013) materials. 4.Verify use of proper materials,densities and lift thicknesses during placement and compaction of compacted Compacted fill meets specifications. 3-6,3-8,3-9(2013) fill. 5.Prior to placement of compacted fill,observe subgrade Native soil was prepared properly prior to 3-6,3-8(2013) and verify that site has been prepared properly. placement of fill. 1 _ ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 TABLE 1704.4 REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION VERIFICATION AND INSPECTION Comments Date Inspected 1. Inspection of reinforcing steel,including prestressing All reinforcing steel met specifications. 3-6,3-8,3-9,3-12(2013) tendons,and placement. in aeeor-danee • T-��^ �,�� � �«�� �� Not Applicable NA with 3.Inspection of bolts to be installed in concrete prior to and during placement of concrete where allowable All bolts and placement met specifications. 3-12(2013) loads have been increased or where strength design is used. Not Applicable Higher strength concrete mix(than specified) 5.Verifying use of required design mix. was used to achieve required compressive NA strength by 7 day cure time. 6.At the time fresh concrete is sampled to fabricate specimens for strength tests,perform slump and air See test results from MTC-INC(attached to 3-9 3-12(201 3) content tests,and determine the temperature of the final inspection report) concrete. 7.Inspection of concrete and shoterete placement for All concrete was placed properly. 3-9,3-12(2013) proper a lication techniques. 8. Inspection for maintenance of specified curing Weather conditions allowed for normal curing. 3-9,3-12,3-20(2013) 0 temperature and techniques. lJJ in et: of prestressed ,ne ete. N Not Applicable NA � a of headed prestressing teadons w4pfeeast eetlefete members. Not Applicable NA ,-- Q 1 1 t situ roe Sreng _to � V 'F ' f t t ath r Not Applicable NA ;;0 12. Inspect formwork for shape,location and dimensions All formwork was constricted to specified 0 of the concrete member being formed. dimensions. 3-6,3-8,3-9,3-12(2013) 2' ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 0 �i TABLE 1704.3 REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION No VERIFICATION AND INSPECTION Comments l. Material verification of high-strength bolts,nuts and washers: a.ldeRt fieatialt RIB Not Applicable NA w \.-n 2. Inspection of high-strength bolting: �00 a.9RUg tightjoints. o if1,m}}at;9!i Not Applicable NA 3. Material verification of structural steel and cold-formed steel deck: R.r.,,-...-..,,.._,1 Steel.idef..fie6.:611..,..1.:......... ..lief-.,..,, A rcr un 4. Fef o t1,... .tee! :,1enti1:,atia.,H iarL'.,.,.to e.,.,!„-.,,to AST-44......,.I..-.1.. Not Applicable NA AA-....t.......-..:� ..:{:ell 4. Material verification of weld filler materials: Not Applicable NA 5. Inspection of welding: a.Structural steel and cold-formed steel deck: 3)Single-pass fillet welds>s/I6" Fillet welds on silo feet meet strength ") '518t •@'' requirements. 3-20(2013) 94 single pese fillet welds—11 6" 3 ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 6.Reinforcing steel: t. a ,PAF Not Applicable NA ],CI....._Fein f._,......e... n)n.,.___ein f._,,:..,.steel. 6. Inspection of steel frame joint details for compliance: h.Membef locations. Not Applicable NA 0 l,J N .. I W O hA A �7 n 4• WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale, WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/06/13 Time: 14:30 — 16:30 Weather: partly cloudy & cold. People on Site: Jason Styger (present for majority of site visit) Bill Brickey Matt (Concrete supervisor) First inspection of project site. To correlate reports to the construction plans, the following designations are used: Silo pad — main central silo foundation Scale piers —scale foundations; N = north of silo pad, S = south of silo pad; (N1-N3, S1-S3) #1 closest to silo pad. Washout slabs — (NW1-NW3, SW1-SW3) #1 closest to silo pad. Approach slabs (North, South) The project site was already excavated for formwork. Each pit was cleanly dug and filled with ballast in preparation for concrete pouring. Formwork was P P P 9 erected for scale pier S1 and the majority of the silo pad. The ballast had obvious compaction markings and proved well compacted with a probe test. (Figure 1) ,; { The subgrade below the fill was inspected and met j' - , the specifications required by the geotechnical documents and foundation plans. The fill material was also inspected Figure 1 Formwork and compaction to verify proper ballast material, compaction, placement. and thickness. The excavation was inspected to ensure that the proper depths and materials were reached. The subgrade material delineation is obvious upon visual inspection. (Figure 2) There are no shallow foundation elements that require inspection. w - Figure 2: Subgrade material at native by: ~ 6rames A7mi , E I T WNEK ENGINEERING_ Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale, WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/08/13 Time: 10:15 — 11:15 Weather: partly sunny. People on Site: Matt (Concrete supervisor) (Please refer to Inspection Report dated 3/6/2013 for naming conventions.) Matt was on site and walked the project during the �I inspection. The workers were finishing the formwork and guides for ensuring a level slab. The remaining piers formwork had been constructed since the site visit on 3/6/13. The majority of the reinforcing steel had been placed in the forms for the concrete pour on Saturday. The silo pad and each pier was inspected for proper spacing of rebar, rebar size and grade, and lengths. The silo pad and each pier was also inspected for proper depth, length and width. Unless stated in this report, all measurements met Figure 1:Reinforcing steel the specifications in the plans. As shown in figure 1, the reinforcing steel is #6 A615 rebar. Each size of rebar was inspected to ensure compliance with the plans. All washout slabs and the approach slabs were not formed or laid with reinforcing steel yet, they will be a later inspection. The main silo slab had only three formwork walls constructed for ease of steel installation, the fourth wall will be installed prior to concrete pour. The measurements for the silo slab were accurate, and the markings on the formwork for the fourth wall were accurate as well. (The fully constructed form will be measured prior to concrete pour to verify correct dimensions.) The steel reinforcement of the silo slab was changed :. per request to add #3 bar perpendicular to the plan design to PP provide support for the design bar. The pier S1 was P 9 measured and found to be V/2" short of the specified depth. The change in pier depth will change the factor of safety from 3.16 to 2.85 (1.5 min. required) and so will be allowed. Finally, the anchor bolts to be used in the weld-plate design were inspected to ensure they met the plan specifications. Figure 2: Silo slab rebar layout by: AA J m wit IT 03-29-13A07 : 34 RCVD WNEK _ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale, WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/09/13 Time: 07:00 — 10:00 Weather: mostly sunny. People on Site: Matt Sidwell(Concrete supervisor) s7. (Please refer to Inspection Report dated 3/6/2013 for naming conventions.) A Matt was on site and walked the project during the inspection. MTC was on site and preparing ng the first � set of concrete test cylinders. The concrete was manufactured by Hard Rock ,+ Inc., and placed via pump truck in each of the piers (N1, S1) and slab as shown in figures 1 and 2. F;,;; ,", F,f„ N1 The placement of the concrete was inspected according to ACI 318-11 C5. All concrete was thoroughly consolidated by vibration during placement. ;� - All concrete was thoroughly worked around' reinforcement and into corners of forms. k' by.- IT Fryure 2:Pier S f 03-29-13A07 : 34 RCVD WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale, WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/12/13 Time: 11:30 — 13:15 Weather: moderate rain People on Site: Matt Sidwell(Concrete supervisor) Bill Brickey (Please refer to Inspection Report dated 3/6/2013 for naming conventions.) " - Matt and Bill were on site and walked the - project during the inspection. MTC was on site and ; preparing to sample the concrete batch for test cylinders. 01 The formwork dimensions, depth and placement ,. �. were inspected and verified for the silo ad pedestals g Double p p P Figure f:Double Pedestals and and scale piers being poured. The dimensions on the Piers N2, N3 weld plate anchor bolts were also verified. The rebar for the pedestals (figure 3), the outwash slabs (figure 2, SW1, SW2 and SW3), and the remaining two piers (figure 1, N2 and N3) were inspected and verified. The placement of the concrete was inspected according to ACI 318-11 C5. All concrete was --= - ~- ' thoroughly consolidated by vibration during placement. Y All concrete was thoroughly worked around reinforcement and into corners of forms. The forms and rebar for the approach slabs �- were not built or placed as of 3-12-13. The forms and 7 ;-- rebar for washout slabs NW1, NW2 and NW3 were not Fiqure 2:Qutwash slabs placed as of 3-12-13. C7 i - 3•. by: JJ mes Armitage, IT 4 _ Figure 3:Anchor bolts and rebar ties 03-29-13A07 :34 RCVD WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale,WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/20/13 Time: 08:15 — 08:45 Weather: moderate rain, very windy People on Site: Matt Sidwell (Please refer to Inspection Report dated 3/6/2013 for naming conventions.) Matt Sidwell was on site and was working on �. the slat conveyor slab. The fillet welds on the silo feet were even and the correct size and thickness. (Figure 1) Figure 3:Silo foot fillet welds All concrete for the scales, approaches, and silo was in place during the site visit. The scales were resting on the foundation in preparation for assembly. (Figure 2) The joints between each concrete section were 1/2" impregnated fiber sheets. (Figure 3) r , <4 rmitage, Figure 1:Concrete joints 03-29-13A07 : 34 RCVD Materials Testing & Consulting, Inc. 11'r Geoteehnkal Engineering&Consulting•Special Inspection•Staterials Testing•Emironmental Consulting Engineered Assurance Sian 1981 ��2 Ao-++'•� Belfair Asphalt Plant - 13SO26 -Compression Test: Concrete: Report#C33157 CLIENT Granite Construction Co DATE 03/12/2013 PROJECT LOCATION ,MP 27.6 PERMIT# Belfair WA Inspection Information: Inspection Date: 03/12/2013 Time Onsite: l 1:30 AM Weather Conditions: Rain Inspection Performed: Compression Test:Concrete Field Data (ASTM C-31): Location of Placement: Silo leg pedestals Sample Location: Same as above Contractor:Granite Constriction Inc. Subcontractor: Supplier/Plant:Hard Rock Concrete-Belfair Qty Placed,Cu.Yd.: 4 of 4 Slump,Inches(ASTM C-143)or W/C Ratio: 4 1/4 Concrete Temp,IF(ASTM C-1064): 62 Delivery Ticket#: 145864 Job Spec.Slump: 5+/-I Ambient Temp,OF: 48 Truck#: 23 Air Content,%(ATSM C-231): Min Temp,OF: Batch Time: 1 1:40 Job Spec.Air: Max Temp,°F: Sample Time: 11:45 Mix#and Proportions: C50 Cement,lbs.: 658 Coarse Agg,lbs.: 3/4-1525 Admixture,oz./cwt: Poly997-26 Flyash,lbs.: Coarse Agg,lbs.: 3/8 Admixture,oz./cwt: Water,gals.: 31 Coarse Agg,lbs.: Admixture,oz./cwt: Fine Agg,lbs.: 1445 Coarse Agg,Ills.: Admixture,oz./cwt: Observations®Samples made by a MTC representative ®Samples picked up by a MTC representative ® Reinforcing steel was visually inspected and found to comply with project plans and specs Sample Type & Compression Test Results: Received 03/13/2013 Sample Set I of I Type of Compression Test: Concrete(ASTM C-39) Lab Tests: Test Total Sample Sample Comp. Break ASTM ASTM New Log# Age Date of Test Load Area(Sq. Strength Tested By (Days) (Lbs.) Dim.(In.) In) (PSI) Type C-617 C-1231 1310 7 03/19/2013 71.355 4.01 12.63 5,650 Josh Luck 2 0 1311 28 04/09/2013 0 13 13 1312 28 04/09/2013 0 0 0 1313 28 04/09/2013 0 0 0 1314 11 0 ❑ ❑ REQ'D 28 5000 Remarks: 03-29-13A07 : 34 RCVD A0 wr.M•rleh�b nxW Ycw.i+.W snwwsls sr+aJ M t swwd/nwn�a p dww+.4 h01K M ar.A,t..r wpm w cOrr/w Or twlW WI PWMO•1 sMw.M t►+narr/w�Orwo•A�rrtr.w+rA..ww,t nOf[r.lawwr,OrOrOar wprls,s *d pt•A"m.r eWpwrl t 2005 2012 Yaserl•ls Tts14*T A['96s•111•8.let. All rlg0rs rt strs e/ Corporate • 777 Chrysler Drive• Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1980 SW Region 2118 Black Lake Blvd. S.W.• Olympia. WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our website: bww.mtc-inc.nct Belfair Asphalt Plant-13S026,0311212013,#C33157,Page I oj2 Materials Testing & Consulting, Inc. Geolerhnical Engineering A Con.ulting•Special Impectim•!Materials Testing•Envilm netNal Consulting Engineered Assurance Since 1981 �~r"°'/• MTC rep on site at request of contractor for reinforced concrete special inspection on silo leg pedestals,wash out slabs,and scale footings. Reinforcing steel inspected by others(engineer).4 cubic yards was placed for silo leg pedestals of 5000 PSI mix.The slabs and footings were placed with 20 cubic yards of mix C30.No cylinders cast on this mix per contractor's request.(Granite) REPORTED BY:Alex Quiring REVIEWED BY:Mark Gordon,Technical Director 03-29-13A07 : 34 RCVD AI1n We.rlSt..nl.•.Mu.l hw,Y,r wH rM.ul•-4 A-...al^+..w.w•.Au.r..41'•�'�r.O.rvl.r..rA wPTMw..lrwNw4w�hM//re�Pp rlr4.r•.ol.xw....w+lw/Mnllwd.gr+...e.....tir......,. rrwca frog R�r,Lp,r.ry..,.,.rna+.N pro••/wr•n,w rp{v,.J • 1001 2011 Ma,rr,•I. 14011l•s a C••a•Irl•J.let. All r,/\Il rrae—J. Corporate • 777 Chr3sler Drive • Burlington, WA 93233 • Phone 366.755.1990 • Fax 360.755.1980 SW Region 2118 Black Lake Blvd. S.W.• Olympia. WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region 2126 East Baker%ieM Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our website: www.mtc-inc.ncl Beljair Asphalt Plant-13S026,03/1212013,#C33157,Page 2 of 2 Materials Testing & Consulting, Inc. Geotechnical M Engineering&Consulting•Special Inspection• aterials Ent Testing•Eironmental Consulting Engineered Assurance Since 1981 �~ Aa�'a Belfair Asphalt Plant - 13SO26 -Compression Test: Concrete: Report#C33225 CLIENT Granite Construction Co DATE 03/09/2013 PROJECT LOCATION ,MP 27.6 PERMIT# Belfair WA Inspection Information: Inspection Date: 03/09/2013 Time Onsite: Weather Conditions: Inspection Performed: Compression Test:Concrete Field Data (ASTM C-31): Location of Placement: Tower pad(4)scale peirs Sample Location: Tower pad east 10'second lift Contractor:Granite Construction Inc. Subcontractor: Supplier/Plant:Hard Rock-Belfair Plant Qty Placed,Cu.Yd.: l9. yards 0 of Slump,Inches(ASTM C-143)or W/C Ratio: 5 Concrete Temp,IF(ASTM C-1064): 54 Delivery Ticket#: 4968 Job Spec.Slump: Ambient Temp,IF: 50 Truck#: 12N Air Content,%(ATSM C-231): Min Temp,IF: Batch Time: 1125 am Job Spec.Air: Max Temp,IF: Sample Time: 1 L'45 am Mix#and Proportions: 6SK 4000psi N/A Cement,lbs.: 599 Coarse Agg,lbs.: 1756 Admixture,oz./cwt: Poly 997-23.2 oz Flyash,lbs.: Coarse Agg,lbs.: Admixture,oz./cwt: Water,gals.: 27 Coarse Aug,lbs.: Admixture,oz./cwt: Fine Aug,lbs.: 1518 Coarse Agg,lbs.: Admixture,oz./cwt: Observations N Samples made by a MTC representative N Samples picked up by a MTC representative Sample Type & Compression Test Results: Received 03/11/2013 Sample Set 2 of 2 Type of Compression Test: Concrete(ASTM C-39) Lab Tests: Test Total Sample Sample Comp. Break ASTM ASTM New Log# Age Date of Test Load Area(Sq. Strength Tested By (Days) (Lbs.) Dim.(]n.) In.) (PSI) Type C-617 C-1231 1236 7 03/16/1913 63,599 4.00 12.57 5,060 Josh Luck 4 0 ❑ 1237 28 04/06/1913 0 0 ❑ 1238 28 04/06/1913 0 0 ❑ 1239 28 04/06/1913 0 0 0 1240 H 0 ❑ ❑ REQ'D 28 3000 Remarks: 03-29-13A07 : 34 RCVD An rtWr,rN1}rl,o ra.wl 4rair►,sN rk..,l+t+N A.•wIM/roMrw.n<W+1+,wr yMYc W.r.A.r..�wr a rR,rOr4�w Yw a.wIM.NY IRP'�A c/.nl•.aM wlMmww�fa A1Acrt..A+wiiww.awlwK..o nrnrn fwr.ar etwfiy nrr nlnre.Nrnn.NreYrtar•nr•ypro.Y.r lost - 2012 Mr —I.1—I.S A I.,. All rll►„rr,rr.N. Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Pbone 360.755.1990 • Fax 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia. WA 99512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region • 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit out website: www.mtc-inc.nct Beljair Asphalt Plant-13S026,03A79/2073,#C33225,Page I of 2 Materials Testing & Consulting, Inc. Ceoteehnleal Entineering 81 Consulting•Special Inspection•1lateriah Testing•Emironmental Consulting Engineered Assurance Since 1981 Reinforcing steel free of frost,inspected by engineer. MTC rep verified this date. Placed by boom pump and mechanically vibrated for consolidation. No exceptions noted. REPORTED BY:Kam Binns REVIEWED BY:Mark Gordon,Technical Director 03-29-13A07 :34 RCVD AOwrltr gry•.Il watrwl la•Ikw.WrAararr.•nriN M•�Uwlf•rrlaww MdaMf.M pAlkWwrrA.•r.M wprFrw.rMrwr•wMa.wAA+M►pgnry•r�rr.h.W wiAn aw.fn rWr-wiw A.w..a.r..c.rcMn.... e�•rn bast e0rdrra w�wnwra.N r••a•0 orn•n�e•+//••� t N00 201I M••rulr 1•su•r l<'••uld•r,lu All rr►n r•a•r.N. Corporate • 777 Chrysler Drive • Burlington, WA 99233 • Phone 360.755.1990 • Fax 360.755.1980 SW RSglon 2118 Black Lake Blvd. S.W.• Olympia. WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647,6061 • Fax 360.647.8111 Visit our website: www.mtc-inc.net Belfair Asphalt Plant-135026,0310912013,#C33225,Page 2 of 2 Materials Testing & Consulting, Inc. CA GeLerteehnk-al Engineering h Conwhing•Special Inspection•Nlateriah Testing•Environmental Conwhing Engineered Assurance Since 1981 Belfair Asphalt Plant - 13SO26 - Compression Test: Concrete: Report #C33226 CLIENT Granite Construction Co DATE 03/09/2013 PROJECT LOCATION ,MP 27.6 PERMIT# Belfair WA Inspection Information: Inspection Date: 03/09/2013 Time Onsite: Weather Conditions: I nspection Performed: Compression Test:Concrete — Field Data (ASTM C-31): -�Location of Placement: Tower pad(F-G),(4)scale piers(F-B) Sample Location: i First scale pier west of tower pad, 10 yards of total placement Contractor:Granite Construction Inc. —-7 Subcontractor: Supplier/Planl:Hard Rock-Belfair Plant _JI Qty Placed,Cu.Yd.: 10 of 70 yds Slump,Inches(ASTM C-143)or W/C Ratio: 4-1/2 Concrete Temp,°F(ASTM C-1064): 53 Delivery Ticket#:4939 �' Job Spec.Slump: Ambient Temp,°F: 30j Truck#:129 Air Content,%(ATSM C-231): 5.2/o Min Temp,°F: Batch Time: 7:24 am Job Spec.Air:[ Max Temp,oF:j Sample Time: 8:00 am Mix#and Proportions: 16) 1(4000psi N/A Cement,lbs.: 61 - Coarse Agg,lbs.: 1261 Admixture,oz./cwt: MBAE90-2.8oz Flyash,lbs.: _ Coarse Agg,lbs.: 364 Admixture,oz./cwt: Poly997-26 oz Water,gals.: _T Coarse Agg,lbs.: Admixture,ozJcwt: Fine Agg,lbs.: 1476 j Coarse Agg,lbs.:: Admixture,ozJcwt: Observations to Samples made by a MTC representative 19 Samples picked up by a MTC representative Sample Type & Compression Test Results: Received 03/11/2013 Sample Set 1 of 2 Type of Compression Test: Concrete(ASTM C-39) Lab Tests: Test Total Sample Sample Comp. Break ASTM ASTM New Log# Age Date of Test Load Dim.(in.) Area(Sq. Strength Tested By Type C-617 C-1231- (Days) (Lbs.) In.) (PSI) 1231 7 03/16/1913 , 55,481 IF 3.99 1 12.50 1 4,440 Josh Luck ( 4 ❑ 1232 28 04/06/1913 LJ L� '— 0 ❑ ❑ 1233 28 04/06/1913-7F ��� —�. 0 ❑ ❑ 1234 28 04/06/1913 —� C 0 ❑ ❑ _1235 H ��r — �� ------ 0 ❑ ❑ REQ'D 28 3000 Remarks: 03-29-13A07 : 34 RCVD Al.,.•...,R.,.ol,..,,.,.,1 w,..-..a.N..per.a.r.rJ A.,.r.••,....r.rw..r..r....4OM`,MawM.r•.M.rl•...wd....dwW„.YI•.w/p.p.l�A,+,..r..waw.►„n.r.n.ln,W.cwr.ni....1�,..•-a.rN...w,. r.r-..Inw...,•rhy nw.rprn..rr.cnH prw.Apo•r•nr•a yp.•Y t ta•t - 7a1!Y..trl.l,le..l.t a C....1,1./.I., A11"ts.........4 Corporate • 777 Chrysler Drive• Burlington, WA 98233 • Phone 360.755.1990 • Fay 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia. WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our website: w%%%%.mtc-inc.net Bey'air Asphalt Plant-13S026,03/0912013,#C33226,Page I oj2 Materials Testing & Consulting, Inc. MTC Go-technical Engineering&Consulting.Special lnnpcction•%lairrial.Tt.ling•E.mimnmrnial Con.ulting Enginerredamtrance Since 1981 ar,` r l.•Ac..•'• Reinforcing steel inspected by engineer. MTC rep verified bar free of frost. Placed by boom pump and consolidated by mechanical vibrator. !W/C.43 REPORTED BY:Kam Binns REVIEWED BY:Mark Gordon,Technical Director 03-29-13A07 : 34 RCVD qll null.ytt...J�+.htu.l 4�.1..�.and w,yryl,KNJ A..�.n,.J{^.Inrr...t.n...4 p.Nn W.warl.t+ti Kr•R..lwn4i nW c.�rJtrl P^'In•b+r OM.h.wl MAv..Me.+(w y.Hrp�A..M..�Y,.c.�fiw�,.� Ytorl,Ironw nprJ..2 tr rry.n.nnv+.N ptwA+/w..ntln plv...J r 2009 2012 M.le—h lt.r108 A t-••.•1.1•j.I— All rq b........eJ Corporate • 777 Chrysler Drive Burlington, WA 98233 • Phone 360.755.1990 • Fos 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia. WA 99512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region • 2126 East BakcrvicA Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our Websit0: wwa.mtc-inc.ncl Bey'air Asphalt Plant-135026,0310912013,SC33226,Page 2 of 2 WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale, WA 98383 360-692-3802 (fax)-692-1051 LETTER OF TRANSMITTAL TO: Mason County DATE: March 26, 2013 Building Department P.O. Box 279 PROJ. NO 578 Shelton, WA 98584 RE: COM2013-00013 Granite Construction Belfair Asphalt Plant The following attached items, are submitted for your records. COPIES DATE NO. DESCRIPTION 2 03-26-13 - Special Inspections Report COMMENTS: The attached report completes the special inspections requirement for the subject project. BY: Michael F.Wnek, P.E. cc: File Bill Brickey, Granite 03-29-13A07 : 33 RCVD G:\CivilEng\578-Asphalt Plant Structural\Construction\Inspection Reports\Final Repo rt\201 3-03-2 7 TRANSMIT MC Special Insp Rep.docx WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200 Silverdale, WA 98383 360-692-3802 Special Inspections Report Granite Portable Asphalt Plant Mason Co Permit No. COM2013-00013 located in: MASON COUNTY prepared for: Granite Construction Company 1525 E. Marine View Drive Everett, WA 98201-1927 date: March 26, 2013 LA Contents: 0 Table of Special Inspections (IBC 2012) 'o Special Inspections Reports Concrete Inspection Reports 03-26-13 �0 023 60 oN 03 NOTE THIS DOCUMENT IS INSCRIBED N9TH A DIGITIZED SIGNATURE & DATE. THE ORIGINAL SIGNATURE DOCUMENT IS ARCHIVED IN THE ENGINEER'S OFFICE. In reference to IBC Section 1705, the scope of this project required special inspection, as listed in this report. I certify that said special inspections have been performed, and that the work inspected is in conformance with the plans, specifications, and design analysis for the project. MFW Project Number: 578 03-29-131t07 : 33 RCVD ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 0 w i w Summary of Special Inspection Requirements per IBC 2009 A O w l31 Note: Items not-applicable to this project contain strike-out 0 TABLE 1704.7 REQUIRED VERIFICATION AND INSPECTION OF SOILS VERIFICATION AND INSPECTION TASK Comments Date Inspected All weight bearing foundations excavated to 1.Verify materials below shallow foundations are adequate native soil.Soil verified by EnviroSound to 2-1 (2013) to achieve the design bearing capacity. meet required bearing capacity.(geotech report attached to final inspection report) 2.Verify excavations are extended to proper depth and have Excavations meet specified depths and 3-6,3-8,3-9(2013) reached proper material. materials. 3.Perform classification and testing of compacted fill Compacted fill meets specifications. 3-6,3-8,3-9(2013) materials. 4.Verify use of proper materials,densities and lift thicknesses during placement and compaction of compacted Compacted fill meets specifications. 3-6,3-8,3-9(2013) fill. 5.Prior to placement of compacted fill,observe subgrade Native soil was prepared properly prior to 3-6,3-8(2013) and verify that site has been prepared properly. placement of fill. 1 ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 TABLE 1704.4 REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION VERIFICATION AND INSPECTION Comments Date Inspected 1.Inspection of reinforcing steel,including prestressing All reinforcing steel met specifications. 3-6,3-8,3-9,3-12(2013) tendons,and placement. '.t,-r,.�.i., i one 3 itemcw Not Applicable NA 3.Inspection of bolts to be installed in concrete prior to and during placement of concrete where allowable All bolts and placement met specifications. 3-12(2013) loads have been increased or where strength design is used. Not Applicable Higher strength concrete mix(than specified) 5.Verifying use of required design mix. was used to achieve required compressive NA strength by 7 day cure time. 6.At the time fresh concrete is sampled to fabricate specimens for strength tests,perform slump and air See test results from MTC-INC(attached to 3-9,3-12(2013) content tests,and determine the temperature of the final inspection report) concrete. 7.Inspection of concrete and shotcrete placement for All concrete was placed properly. 3-9,3-12(2013) proper a lication techniques. 8. Inspection for maintenance of specified curing Weather conditions allowed for normal curing. 3-9,3-12,3-20(2013) o temperature and techniques. w i Na.Appheation Of PfeStfeSSifig fOFees. Not Applicable NA fb.GFouting ca prestressing tendens w Not Applicable NA n tendens in posttensionedNot Applicable NA w pr-iof to Femoval of share,-,and fofms from beams and 54 c_') 12.Inspect formwork for shape,location and dimensions All formwork was constructed to specified 3-6,3-8,3-9,3-12(2013) 0 of the concrete member beingformed. dimensions. 2 ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 o TABLE 1704.3 REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION t VERIFICATION AND INSPECTION Comments '0 1. Material verification of high-strength bolts,nuts and washers: 1 wappFRved 0 Not Applicable NA a o . 2.Inspection of high-strength bolting: kA Ul nmate o iJistRlkrFieir e e Not Applicable NA 3. Material verification of structural steel and cold-formed steel deck: a.i of st ettim!steel,id iiciiien•ncvticnrrtR••••••�r limigs to eani ofm to vA 19C 40. L 4For other-steel,ivc'J 'f n1afikitigs to eqnfoFFM A STAR.. ...J.._.J Not Applicable NA 4.Material verification of weld filler materials: Not Applicable NA 5. Inspection of welding: a.Structural steel and cold-formed steel deck: 2)Mul6rass fillet welds. 3)Single-pass fillet welds>s/,A" Fillet welds on silo feet meet strength d,Rog and.I...we,.,.. requirements. 3-20(20I3) 3 ASPHALT PLANT FOUNDATION CONSTRUCTION WNEK ENGINEERING Corbit Site, Belfair WA March 26, 2013 6. Reinforcing steel: 3e6,- 2)D C)Fe I g{le.,..el RRd a el C.....egiR imtPFmPdiH4P Not Applicable NA n)n.l.ef_e:..fO_..:..,.,..eel 6.Inspection of steel frame joint details for compliance: Not Applicable NA 0 w N w D O J W l rJ a c� 4 WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale,WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/06/13 Time: 14.30 — 16:30 Weather: partly cloudy & cold. People on Site: Jason Styger (present for majority of site visit) Bill Brickey Matt (Concrete supervisor) First inspection of project site. To correlate reports to the construction plans, the following designations are used. Silo pad — main central silo foundation Scale piers —scale foundations; N = north of silo pad, S = south of silo pad; (N1-N3, S1-S3) #1 closest to silo pad. Washout slabs — (NW1-NW3, SW1-SW3) #1 closest to silo pad. Approach slabs (North, South) The project site was already excavated for formwork. Each pit was cleanly dug and filled with ballast in preparation for concrete pouring. Formwork was erected for scale pier S1 and the majority of the silo pad The ballast had obvious compaction markings and proved well compacted with a probe test. (Figure 1) The subgrade below the fill was inspected and met the specifications required by the geotechnical documents and foundation plans. The fill material was also inspected Figure 1:Formwork and compaction to verify proper ballast material, compaction, placement, and thickness. The excavation was inspected to ensure that the ..g proper depths and materials were reached. The subgrade material delineation is obvious upon visual inspection. (Figure 2) There are no shallow foundation elements that require inspection. Figure 2: Subgrade material at native by: All )a4mesmi EIT 03-29-13A07 : 35 RCVD WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale, WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/08/13 Time: 10,15 — 11:15 Weather: partly sunny. People on Site: Matt (Concrete supervisor) (Please refer to Inspection Report dated 3/6/2013 for naming conventions.) Matt was on site and walked the project during the inspection. The workers were finishing the formwork and ` guides for ensuring a level slab. The remaining piers formwork had been constructed since the site visit on 3/6/13. The majority of the reinforcing steel had been .. placed in the forms for the concrete pour on Saturday. They- .::•. silo pad and each pier was inspected for proper spacing of s ,� 9• '; rebar, rebar size and grade, and lengths The silo pad and each pier was also inspected for proper depth, length and r_ ..'; a width. Unless stated in this report, all measurements met Figure 1: Reinforcing Steel the specifications in the plans. As shown in figure 1, the reinforcing steel is #6 A615 rebar. Each size of rebar was inspected to ensure compliance with the plans. All washout slabs and the approach slabs were not formed or laid with reinforcing steel yet, they will be a later inspection. The main silo slab had only three formwork walls constructed for ease of steel installation, the fourth wall will be installed prior to concrete pour. The measurements for the silo slab were accurate, and the markings on the formwork for the fourth wall were accurate as well. (The fully constructed form will be measured prior to concrete pour to verify correct dimensions.) The steel reinforcement of the silo slab was changed per request to add #3 bar perpendicular to the plan design - to provide support for the design bar. The pier S1 was measured and found to be 1'/2" short of the specified depth. The change in pier depth will change the factor of safety from 3.16 to 2.85 (1.5 min. required) and so will be allowed. Finally, the anchor bolts to be used in the weld-plate design _ were inspected to ensure they met the plan specifications. Figure 2: Silo slab rebar layout by: J m -A�t IT 03'-29-13A07 : 33 RUD WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale, WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/09/13 Time: 07:00 — 10:00 Weather: mostly sunny. People on Site.- Matt Sidwell(Concrete supervisor) (Please refer to Inspection Report dated 3/6/2013 for s- ` naming conventions.) Matt was on site and walked the project during the inspection. MTC was on site and preparing the first set of concrete test cylinders. ' The concrete was manufactured by Hard Rock .eilE Inc., and placed via pump truck in each of the piers ' (N1, S1) and slab as shown in figures 1 and 2. ` Figure 1: Pier NI The placement of the concrete was inspected according to ACI 318-11 C5. All concrete was thoroughly consolidated by vibration during placement. All concrete was thoroughly worked around reinforcement and into corners of forms. ` h by: IT Fiyure 2: Pier S1 03-29-13A07 : 35 RCVD _WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200. Silverdale, WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/12/13 Time: 11:30 — 13:15 Weather: moderate rain People on Site: Matt Sidwell(Concrete supervisor) Bill Brickey (Please refer to Inspection Report dated 3/6/2013 for naming conventions.) Matt and Bill were on site and walked the project during the inspection. MTC was on site and preparing to sample the concrete batch for test cylinders. The formwork dimensions, depth and placement were inspected and verified for the silo pad pedestals Figure 1:Double Pedestals and and scale piers being poured. The dimensions on the Piers N2, N3 weld plate anchor bolts were also verified. The rebar for the pedestals (figure 3), the outwash slabs (figure 2, SW1, SW2 and SW3), and the remaining two piers (figure 1, N2 and N3) were inspected and verified. The placement of the concrete was inspected according to ACI 318-11 C5. All concrete was thoroughly consolidated by vibration during placement. All concrete was thoroughly worked around - reinforcement and into corners of forms. The forms and rebar for the approach slabs were not built or placed as of 3-12-13. The forms and " rebar for washout slabs NW1, NW2 and NW3 were not Fiqure 2: Outwash slabs placed as of 3-12-13. v t J' by: J es Armitage, IT E Figure 3. Anchor bolts acid rebar ties 03-29-13P.Q7 : 344 RCVD WNEK ENGINEERING Consulting Civil Engineer 3388 NW Byron St., Suite 200, Silverdale,WA 98383 360-692-3802 (fax)-692-1051 Inspection Report Asphalt Plant Foundation Construction - Belfair, WA Date: 03/20/13 Time: 08:15 — 08:45 Weather: moderate rain. very windy People on Site: Matt Sidwell (Please refer to Inspection Report dated 3/6/2013 for , naming conventions.) ' Matt Sidwell was on site and was working on Al the slat conveyor slab :ter The fillet welds on the silo feet were even and the correct size and thickness. (Figure 1) Figure 3:Silo foot fillet welds All concrete for the scales, approaches, and silo was in place during the site visit. The scales were resting on the foundation in preparation for assembly. (Figure 2) The joints between each concrete section were 1/2" impregnated fiber sheets. (Figure 3) Fiqure 2:South Approach Slab b \ es Armitage, �+► Figure 1:Concrete joints 03-29-13A0? : 35 RCVD Materials Testing & Consulting, Inc. `�'` Geotechnieal Engineering&Consulting a Special Inspection•Materials Testing•Emlronaental Consulting Ewgiwremd A:rwrowct Since19d1 z r so„d+la� Belfair Asphalt Plant - 13SO26 -Compression Test: Concrete: Report#C33157 CLIENT Granite Construction Co DATE 03/12/2013 PROJECT LOCATION ,MP 27.6 PERMIT# Belfair WA Inspection Information: Inspection Date: 03/12/2013 Time Onsite: 11:30 AM Weather Conditions: Rain Inspection Performed: Compression Test:Concrete Field Data (ASTM C-31): Location of Placement: Silo leg pedestals Sample Location: Same as above Contractor:Granite Construction Inc. Subcontractor: Supplier/Plant:Hard Rock Concrete-Belfair Qty Placed,Cu.Yd.:4 of4 Slump,Inches(ASTM C-143)or W/C Ratio: 4 1/4 Concrete Temp,IF(ASTM C-1064): 62 Delivery Ticket#: 145864 Job Spec.Slump: 5+/- 1 Ambient Temp,°F: 48 Truck#: 23 Air Content,%(ATSM C-231): Min Temp,IF: Batch Time: 1 l:40 Job Spec.Air: Max Temp,°F: Sample Time: 11:45 Mix#and Proportions: C50 Cement,lbs.: 658 Coarse Agg,lbs.: 3/4-1525 Admixture,oz./cwt: Poly997-26 Flyash,lbs.: Coarse Agg,lbs.:3/8 Admixture,oz./cwt: Water,gals.: 31 Coarse Agg,lbs.: Admixture,oz./cwt: Fine Agg,lbs.: 1445 Coarse Agg,lbs.: Admixture,oz./cwt: Observations®Samples made by a MTC representative ®Samples picked up by a MTC representative ® Reinforcing steel was visually inspected and found to comply with project plans and specs Sample Type & Compression Test Results: Received 03/13/2013 Sample Set 1 of I Type of Compression Test: Concrete(ASTM C-39) Lab Tests: Test Total Sample Sample Comp. Break ASTM ASTM New Log# Age Date of Test Load Area(Sq. Strength Tested By (Days) (Lbs.) Dim.(In.) In) (PSI) Type C-617 C-1231 1310 7 03/19/2013 71,355 4.01 12.63 5,650 Josh Luck 2 0 1311 28 04,'09/2013 0 0 ❑ 1312 28 04/09/2013 0 0 ❑ 1313 28 04/09/2013 0 0 0 1314 If 0 ❑ ❑ REQ'D 28 5000 Remarks: 03-29-13A07 : 34 RCVD Au,..d...q/>Wl aanW Ycr�+W.w.N.M+N M•��p+ra•+aAwa..4MIKWu..1.,../wlsww.01.u0w Ow MM1la�.lp^1�9�/OA..WwOwrrfrMM�Ar�r..�.rAwMwo •.0•eah•��wray e..wpbl-u�wN0.M0r wr•r�n Wp-d t 2000 2012 Y•IenN,le.luj A C••nlU•0.I•.. All N20u/•.en N. Corporate • 777 Chrysler Drive • Burlington, WA 93233 • Phone 360.755.1990 • Fax 360.755.1930 SW Region 2118 Black Lake Blvd. S.W.• Olympia, WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our website: www.mtc-inc.net Belfair Asphalt Plant-13S016,0311212013,#C33157,Page 1 of 1 Materials Testing & Consulting, Inc. Geoteclul"Engineering&Consulting•Special Inspection•blaterials Testing•EavironmenW Cortsulling E*Z1wrredAssrrruee Skwe 1981 �`rr r•,y•c..+M MTC rep on site at request of contractor for reinforced concrete special inspection on silo leg pedestals,wash out slabs,and scale footings. Reinforcing steel inspected by others(engineer).4 cubic yards was placed for silo leg pedestals of 5000 PSI mix.The slabs and footings were placed with 20 cubic yards of mix C30.No cylinders cast on this mix per contractor's request.(Granite) REPORTED BY:Alex Quiring REVIEWED BY:Mark Gordon,Technical Director 03-29-13AO7 : 35 RCVD �n RW,.�ql,..J.•,ao•J 4a-sw�.rJ s,4ru1.•.•J A.s�M•11/n 7•�Y..Mer•.M Pak W.—h n.M.T•rf ne�wd w h e.�f l..r/P.7n+17 d a1..h.r4 w1►.Mwr 1.v/Win�.�A urs�e..mrw.�... evn,fn«•suyrJ.•j orn«aw.tnNpeYy.r+•na•ap+..,l t 2009 2012%lb-1016 11-16Ej A C••t•IflrS,Ist. All"Ib" „ .1-4 Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia. WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region • 2126 East Bakerview Road • Bellingham, WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our website: Beljair Asphak Plant-135026,0311212013,#C331 S7,Page 2 oj2 Materials Testing & Consulting, Inc. Nff` Geotechaical Engineering&Camping•Special Inspection•MaterWs Testing•En%keemental Consuhing Enain"md Assurance Since 1981 Belfair Asphalt Plant - 13SO26 -Compression Test: Concrete: Report#C33225 CLIENT Granite Construction Co DATE 03/09/2013 PROJECT LOCATION ,MP 27.6 PERMIT# Belfair WA Inspection Information: Inspection Date: 03/09/2013 Time Onsite: Weather Conditions: Inspection Performed: Compression Test:Concrete Field Data (ASTM C-31): Location of Placement: Tower pad(4)scale peirs Sample Location: Tower pad east 10'second lift Contractor:Granite Construction Inc. Subcontractor: Supplier/Plant:(lard Rock-Belfair Plant Qty Placed,Cu.Yd.: l9. yards of Slump,Inches(ASTM C-143)or W/C Ratio: 5 Concrete Temp,°F(ASTM C-1064): 54 Delivery Ticket#: 4968 Job Spec.Slump: Ambient Temp,°F: 50 Truck#: 12N Air Content,%(ATSM C-231): Min Temp,°F: Batch Time: 1125 am Job Spec.Air: Max Temp,IF: Sample Time: 1 1:45 am Mix#and Proportions: 6SK 4000psi N/A Cement,lbs.: 599 Coarse Ago,lbs.: 1756 Admixture,oz./cwt: Poly 997-23.2 oz Flyash,lbs.: Coarse Ago,lbs.: Admixture,oz./cwt Water,gals.: 27 Coarse Ago,lbs.: Admixture,oz./cwt: Fine Agg,lbs.: 1518 Coarse Ago,lbs.: Admixture,oz./cwt: Observations®Samples made by a MTC representative ®Samples picked up by a MTC representative Sample Type & Compression Test Results: Received 03/11/2013 Sample Set 2 of 2 Type of Compression Test: Concrete(ASTM C-39) Lab Tests: Test Total Sample Sample Comp. Break ASTM ASTM New Log# Age Date of Test Load Dim.(In.) Area(Sq. Strength Tested By Type C-617 C-1231 (Days) (Lbs.) In.) (PSI) 1236 7 03/16/1913 63,599 4.00 12.57 5,060 Josh Luck 4 0 0 1237 28 04/06/1913 0 ❑ 0 1238 28 04/06/1913 0 0 0 1239 28 04/06/1913 0 ❑ 0 1240 H 0 ❑ ❑ REQ'D 28 3000 Remarks: 03-29-13�07 : 34 RCVD an.,..n..Ar..el.•.wnW�.r--.Wry.,r.4+N A.r�wr✓1^Mafar'aWNr,�rwWwlaw.A.r..MwAti�••►.,w�wMw�.M.r//4M>ddMr..M�Miwwr�rw�rtwd.wrrw+..�4..-.0 Haan ln�«wrrdly er�pruwrrrmNpeMgar•—ppmi It lees 2012 M•Irnd,\rrury A t'••rdu•t.lu A11 n•►t,rran.N- Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia, WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region • 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our websile: www.nitc-mnc.net Belfair Asphalt Plant-I3S016,0310912013,#C33225,Page I of 2 Materials Testing & Consulting, Inc. Geotechnival EnRincering R Con ulting•Special Inspection•Material%Testing•Entlronmental Consulting Engineered Assurance Since 1981 einforcing steel free of frost,inspected by engineer. MTC rep verified this date. Placed by boom pump and mechanically vibrated for consolidation. No exceptions noted. REPORTED BY:Kam Binns REVIEWED BY:Mark Gordon,Technical Director 03-29-13A07 = 35 RCVD All—.1. R1..A...•nu.l 4�•ws.M.l..rtM.t.a.1 A.•.w•wPW.r•..,A.t....4N'nr..f.wwvl.�.M..1`m�.M.Y11N i.Mf �I.O�OdMn.•NWA.+rMrr l.�eytlh Y.wA W4wN..w.t'MM.�..t NYYul..rwwp..A.j.v nrpvn i,nr..•d{..wAne.w.nenn•ppn..r . 2003 7012 U-11.1.2-1.s A C....1.imS.1.1. All r2\...•.•..•� Corporate • 777 Chrysler Drive • Burlington. WA 98233 • Phone 360.755.1999 • Fax 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia. WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region • 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit out website: www.mtc-inc.net Belfair Asphalt Plant-135026,03A912013,#C33215,Page 2 of 2 Materials Testing & Consulting, Inc. `"�` Geoteehnieal Engineering do Consulting a Special Inspection•Materials Testing•Environmental Consulting Bngiaeered Assurance Since 1981 Z 1°�' � Belfair Asphalt Plant - 13SO26 -Compression Test: Concrete: Report#C33226 CLIENT Granite Construction Co DATE 03/09/2013 PROJECT LOCATION ,MP 27.6 PERMIT# Belfair WA Inspection Information: Inspection Date: 03/09/2013 Time Onsite: Weather Conditions: Inspection Performed: Compression Test:Concrete Field Data (ASTM C-31): Location of Placement: Tower pad(F-G),(4)scale piers(F-B) Sample Location: First scale pier west of tower pad, 10 yards of total placement Contractor:Granite Construction Inc. Subcontractor: Supplier/Plant:Hard Rock-Belfair Plant Qty Placed,Cu.Yd.: 10 of 70 yds Slump,Inches(ASTM C-143)or W/C Ratio: 4-1/2 Concrete Temp,IF(ASTM C-1064): 53 Delivery Ticket#:4939 Job Spec.Slump: Ambient Temp,°F: 30 Truck#: 29 Air Content,%(ATSM C-231): 5.2% Min Temp,°F: Batch Time: 7:24 am Job Spec.Air: Max Temp,IF: Sample Time: 8:00 am Mix#and Proportions: 6SK 4000psi N/A Cement,lbs.: 561 Coarse Agg,lbs.: 1261 Admixture,oz./cwt: MBAE90-2.8oz Flyash,lbs.: Coarse Agg,lbs.: 364 Admixture,oz./cwt: Poly997-26 oz Water,gals.:21 Coarse Agg,lbs.: Admixture,oz./cwt: Fine Agg,lbs.: 1476 Coarse Agg,lbs.: Admixture,oz./cwt: Observations N Samples made by a MTC representative N Samples picked up by a MTC representative Sample Type & Compression Test Results: Received 03/11/2013 Sample Set 1 of 2 Type of Compression Test: Concrete(ASTM C-39) Lab Tests: Test Total Sample Sample Comp. Break ASTM ASTM New Log# Age Date of Test Load Area(Sq. Strength Tested By (Days) (Lbs.) Dim.(1n.) In.) (PSI) Type C-6'17 C-1231 1231 7 03/16/1913 55.481 3.99 12.50 4,440 Josh Luck 4 0 1232 28 04/06/1913 0 0 0 1233 28 04/06/1913 0 0 0 1234 28 04/06/1913 0 0 0 1235 H 0 ❑ ❑ REQ'D 28 3000 Remarks: 03-29-13A07 : 34 RCVD Arnwln apyt•0 asfaawl YcMY..rM oar.r.ar+N A••�frN Away.Mdr-a•.4 pWaaMf�MMfa.Mwlera•flt wFrM wOr awA0n0J p.pwrdAnl•.M kf/,OeKrAa.d••w•rfftaar/wnw•. fawrb lrf�MMpNMj t•Iw/nn Mrr.fa•fOpnAy wr•Irn>♦pfe•a1 a 2001 2012 M.m—la Ifall•r l rs•a•Irl•t.I., All rlr•r•if aer•e1. Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1930 SW Region • 2118 Black Lake Blvd. S.W.• Olympia. WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region 2126 East Bakerview Road • Bellingham, WA 98226 • Phone 360.647.6061 Fax 360.647.8111 Visit our website: t Belfair Asphalt Plant-I3S016,031'9912013,#C33216,Page I of 2 Materials Testing & Consulting, Inc. Geolechnical Engineering&Con ulting•Special In.pection•Material.Testing•Ens Ironmental Con.ulting Engineered assurance Since 1981 �+r►2 �e�+s'sw Reinforcing steel inspected by engineer. MTC rep verified bar free of frost. Placed by boom pump and consolidated by mechanical vibrator. V/C.43 REPORTED BY:Kam Binns REVIEWED BY:Mark Gordon.Technical Director 03-29-13A07 : 35 AA wwll..IN).rl�•.Mwl k�a4.r.W•.pc...1.k�J M•r.qW 1^+nsr••clµv...4 O.N•c r0 wn.l....M wpT.R.M�.rrd H tlr c•rl.kMu/P.R^�A c4v..a.l rM6�.,Mwr l.a pWlwal.o.�.ucc..a+c.r.a.lw.r..r ec�ce lnwwntpnMy nr l'.P nn`n.N P•nAq.ti•nwn aryww.i c 7009 2012 M•1.1.•I. 1—.•r A('a•.•Il.•t.I., All..r•.."..—A Corporate • 777 Chrysler Drier • Burlington, WA 98233 • Phone 360.7SS.1990 • Fax 369.755.1980. SW Region 2118 Black Lake Blvd. S.H'.• Olympia. WA 98512 • Phonc .160.534.9777 • Fax 360.534.9779 NW Region 2126 East Bakerview Road • Bellingham. WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Visit our website: saws.mtc-inc.net Beyair Asphalt Plant-135026,0319912013,#C33126,Page 2 of 2 Page 1 of 1 Allan Borden.Link not working for Labor and Industries.Here is screen shot of Licence with L&I From: Trish Wooleft To: john@belfair.name Date: 3M 1/2013 9:11 AM Subject: Link not working for Labor and Industries.Here is screen shot of Licence with L&I CC: Allan Borden; Barbara Adkins . ............. ........... .. ........_.... _ _....... _..__ Reply Requested:When Convenient a- T I W https wa.gov a5ox ,} ' • iQ Identified by Ent-aIRAt1 .X 3 wa.oav i ' ® ) Page Safety Tools Waslutvqtori State Departruent of A-Z Ind" Hpip Labor& Industries r ce,F ghts 0 Trades Contractors or Tradespeople Detail Return to List> Start a New Search.: Q Printer friendly Verify Workers'Comp Premium Status Check for Dept.of Revenue Account About General/Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty.A General or construction Contractor must maintain a surety bond or assignment of account and carry general Ilabilitv insurance. r GRANITE CONSTRUCTION UBI No, i,409023062 .�`� Iry r 4)II l 'r�/ii jpbl�o w�ilv�fl: Name COMPANY Status ,i,,Active i Phone No. (509)248-8376 License No. GRANICC916DL Address BO Pond License Type iJ Construction Contractor [ Suite/Apt Effective Date 311312009 G City Yakima Expiration Date 10T8!2014 vj<Y'"I "•' a';Ife State WA Suspend Date Zip 98901 Specialty 1 jo General County Yakima Specialty 2 Unused Business Type Corporation Parent Company fileWCADocuments and SettingslAhblLocal SettingslTemplXPgrpwisel513D9FA6Masonmai11001626A6811D... 3/11/2013 MASO NOma6i�- � 3 BUILDING RMIT APPLICATION 426 W. Ced • P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-96 • Belfair (360) 275-4467 • Elma (360) 482-5269 O the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner_ Company Name van, Mailinn nririrAGcz _ Mailin Address 1J`23 E•�Qr��+ ���. .�i Cit) c+at� -Zip Code_ City State W A Zip Code 20/ Phone. —Other Ph. Phone %0 c/% d'//;z- Other Ph.yZSSS/3/� Lien/Title Holder Contractor Reg. # I Ex . E mail address E Mail Address PS i Ci t • a� Drivers Lic.# DOB Drivers Lic.# 9'5-S-T&JD2&UjPOB 3 ?s SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Water System Name of Water System ' PARCEL INFORMATION- 12 Digit Parcel No /232/ - YZ - 0 e 0 9 0 Fire District Legal Description i 9 W r/ S E Sec_2/ T 2 Site Address (Please include street name, street number and city) IZX) t1 E Q,f"N Directions to site S102,16e e 4 "/r i Will timber be cut and sold in parcel prepa ation. es ,,//__ Is property within 200'of Saltwater IVo Lake River/Creek X10 Pond Wetland V Seasonal Runoff-V�Stream o Slopes or Bluffs > 15% a Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No Q� TYPE OF JOB - New C Add Alt Re air_0ther PRIMARY ESIDE E SEA O AL P �C N Use of Building Describe Work �o�,. E"" Sig/or, - fiP1� for C'1�ISL. No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ Replacement Unit? Yes/No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF'9=INUATI F WOFjK IS BY MEANS OF A PROGRESS INSPECTION. X -- — - Date: ? Owner/Owners Rep resentat Contractor (indicate which one FOR OFFICIAL USE BEYOND THIS POINT Accepted b D Ej DEPARTMENTAL REVIEW A P OVED DENIED NOTES Building Department Planning Department Environmental Health Department Public Works Department Fire Marshal FEES Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing & Base Fee Planninq Review Fee Mechanical & Base fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation $ TOTAL FEES MASO NOr�a���" � 3 BUILDreBelfair MIT APPLICATION 426 W. ox 186, Shelton, WA 98584 Shelton (360) 427- (360) 275-4467 • Elma (360) 482-5269 ww.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION / Owner_ Company Name Mailinn Arlrlracc _ Mailin Address Cit\ c+n+� _Zip Code_ City c71 State w A Zip Code 2a/ Phone. —Other Ph. Phone.%% 1//6 8//;z- Other Ph.Y75SS/3/00 Lien/Title Holder Contractor Reg. # Ex . E mail address E Mail Address PS i Ci C • ai'7 Drivers Lic.# DOB Drivers Lic.# E53 ? OB 3 7S SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic Connect to Water System Name of Water System ' Well Water System Name of Water System PARCEL INFORMATION-12 Digit Parcel No 123 2/ - YZ - C'O O S n Fire District Legal Description 5 EF i 9 W '/ S E Src. 2/ 77 2 Site Address (Please include street name, street number and city) I LYE n E QI")i Directions to site S G,EQ t 27 er in � Will timber be cut and sold in parcel prep__ajjation. es ,,//__ Is property within 200'of Saltwater�Lake /vel River/Creek �0 Ponder Wetland Seasonal Runoff _AVcL_Stream Slopes or Bluffs > 15% ,-Va Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No Q� TYPE OF JOB - New < Add Alt Repair Other PRIMARY RESIDEPIC E ❑ SEA O AL E]Use of Building Describe Work �Pu^ �� ITIL S - tr1 D0r C_'_ lsZ. No. of Bedrooms No. of Bathrooms Square Footage- 1st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ Replacement Unit? Yes/No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF INUATI F WOF K IS BY MEANS OF A PROGRESS INSPECTION. X Lim-- Date: � — - Owner/Owners Re resentati Contractor (indicate which one FOR OFFICIAL USE BEYOND THIS POINT Accepted b D DEPARTMENTAL REVIEW APPROVED DENIED I NOTES Building Department Planning Department �Ol226 Environmental Health Department Public Works Department Fire Marshal FEES Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing & Base Fee Planning Review Fee Mechanical & Base fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee F Pre-Paid at Submittal Valuation $ TOTAL FEES