HomeMy WebLinkAboutBLD2007-01820 Final SFR DDR2007-00323 - BLD Permit / Conditions - 8/26/2008 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext. 352
Mason County Bldg. III 426 W. Cedar P.O. Box 186 s
IF Shelton, WA 98584
P14
RESIDENTIAL BUILDING PERMIT BLD2007-01820
OWNER: KAESTNER/DOWNING RECEIVED: 10/18/2007
CONTRACTOR: HILINE HOMES LICENSE: HILINH*981 BT EXP: 2/10/2008 ISSUED: 11/29/2007
SITE ADDRESS: 23 NE DUSTY RD BELFAIR EXPIRES: 5/29/2008
PARCEL NUMBER: 123094190190
LEGAL DESCRIPTION: LOT: 2 OF SP#431 PTN TR 19 OF NE SE
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
New SFR, Hiline Homes 2006-0003 St Rt 3 to Belfair, L on St Rt 300, Straight onto Old Belfair Hwy, R on Dusty Rd
to site address
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: 3 Type of Constr.: VB
Type of Use: SF Insp.Area: No. of Bathrooms: 2 Occ. Group: R-3U Lot Size: Deck:
Type of Work: NEW Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building:1,716 Garage-Attached 484
Valuation: Building Height: 15 Occ. Status: Primary Basement:
Manufactured Home Information Setback Information Shoreline& Planning Information
Make: Length: Ft. Front: S 30.0 Ft. Shoreline: Ft. Water Body:
Rear: N 100.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: E 10.0 Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: W 10.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Dishwasher 1 Exhaust Hood 1 Plan Check Fee GMM 10/18/200 $787.90 B12007000
Hosebibs 3 Furnace<100K 1 Planning Review Fee GMM 10/18/200 $170.00 612007000
Kitchen Sink 1 Ventilation Fan 3 Address Fee BLF 10/19/200 $154.00 b12007b00
Lavatories 2 Heat Pump 1 Fire Warden Review DHS 10/22/200 $64.00 612007000
Water Closets(Toilets) 2 Dryer Vent 1 ADJUST--Plan Check Fee ARC 11/20/200 -$545.47 612007000
Water Heaters 1 Building State Fee ARC 11/20/200 $4.50 612007000
Bath Tubs 2 Building Permit Fee ARC 11/20/200 $1,212.15 612007000
Clothes Washer 1 Mechanical Fee ARC 11/20/200 $76.20 612007000
Mechanical Base Fee ARC 11/20/200 $25.30 612007000
Plumbing Fee ARC 11/20/200 $82.50 612007000
Plumbing Base Fee ARC 11/20/200 $22.00 612007000
EH Plan Review TW 11/20/200 $75.00 612007000
Total $2,128.08
BLD2007-01820 Please referto the following pages for conditions of this permit. 1 of 5
CASE NOTES FOR
BLD20�7-01820
CONDITIONS FOR
BLD2007-01820
1) Prior to final approval, all upland areas disturbed or newt created by construction activities shall be seeded, vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting). X
is
2) Approved_ per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X L-
3) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
;Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
4) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure
these structures meet the setback conditions listed.
X c
5) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project.
X
6) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Depa nt prior to any further inspections being performed or approvals granted.
X
7) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
8) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
re I of approved documents will result in failure of required building inspections.
X
9) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
BLD2007-01820 Please refer to the following pages for conditions of this permit. 2 of 5
10) The "approved" site plan is required to be on-site for inspection purpose;. If an inspection is requested and the "approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to cdAent fe2 schedule, minimum 1 hour) will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
X
11) Washington State Energy Code Compliance has been approved using the following:
Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window (Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors
(Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab
Insulation R-10.
Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the
underside of the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation.
X `]�
12) Per 2003 IRC - SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609
BA WIND SPEED (3-SECOND GUST) the wind speed for Mason County is 85 MPH.
X
13) Per 2003 IRC - SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS- R905.1 Roof covering application. Roof coverings shall be applied in
accordance with the applicable provisions of this section and the manufacturer's installation instructions.
X
14) Stock Plan Identification number: 2006-0003
This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by the Planning Department,
original building plans, and all attachments approved by the Mason County Building Department shall be available for the Mason County Building
Xspector�required inspection.
15) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X
16) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour) will be
char ed an be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
17) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
pew voc
BLD2007-01820 Please referto the following pages for conditions of this permit. 3 of 5
18) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwatelf"Ordintince, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X
19) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance regulation ust be reviewed and approved by Mason County prior to construction.
X
20) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shalLbe made prior to requesting additional inspections.
X
21) All property lines shall be clearly identified at the time of foundation inspection. X
22) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Xa ount ordinances and building regulations.
o
23) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
hold vented action from being taken. No more than one extension may be granted.
X
24) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
cgnueetef lashing. Install metal connectors approved for contact with the new types of pressure treated material.
25) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X
26) This I is to ted in a smoke management zone. Please contact a fire warden at(360) 427-9670 ext. 459 for further information.
X
27) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Ap d Site Plan"to ensure these structures are shown and meet the setback conditions listed.
X
BLD2007-01820 Please referto the following pages for conditions of this permit. 4 of 5
28) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan to ensure
these structures meet the setback conditions listed.
X
This permit becomes null and void if work orconstruction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owneror the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described pro d structur or review and inspection.
OWNER OR AGENT: DATE Z-7—
BLD2007-01820 Please referto the following pages for conditions of this permit. 5 of 5
�o
o CONCRETE MECHANICAL MANUFACTURED HOME
> Data .S6.,09 M. By
C) Footings/Setbacks 11N'�>3 T/ Gas Piping Ribbons C/)
Interior Date By Interior-Date By Date By. Z
co j rn
No Exteroi Date By Exterior-Date By
Set-up
INSULATION
Point Load i'Isolated Footings BG I SLAB INSULATION Date By O
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Date By Z
Date-3/a rig By /2y Data gy DECKS Z
FRAMING c ._ Walls
Date By
o if- j. _/,S�dB' By—.7 Data �}'�- By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Data By Date By Type:
Date By
o.w.v DRYWALL Type:
Date By Int Brace Wall Date Sy W
Dale By FINAL INSPECTION p
v water Line ' Fire Seperation IN)
Date �f- By Date By Date L6�� By R CD
m 4
Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments N
cSG7% C3 O
7-Fl?
7,F4
a
CA -5--
/l ♦ �/yt/( �f�6 �% 'S� ��� ��—•sue y
CD
l ► 2/to� 12 2,ag'
►
o
i
J
ACCESS & GRADE INSPECTION PERMIT #-.5L7�ZZo7
ADDRESS
INSPECTOR DATE:
DRIVEWAY ACCESS
Length: Width: Su rW ce:
Size of turn-around: �j
Condition of shoulders:
Vertical clearance:
1 ) need post at end of driveway with reflective address numbers
GRADE,OF DRIVEWAY % OF ROAD %
ROAD ACCESS
Length: Width• Surface:
Condition of shoulders:
Vertical clearance:
( ) BURN PERMIT REQUIRED FOR LAND CLEARING FIRE.
( ) LOT INSIDE SMZ, 4X4 FIRES ONLY.
( ) LOT INSIDE UGA, NO OUTDOOR BURNING PERMITTED.
LOT TOO SMALL FOR: BURN PERMITS 4X4 FIRES 2x3 FIRES.
REMA KS c
(continue remarks on back)
s
6x
�f
y
• 11: •n - Insulation 001.jpg Page
s--
I
3J1130 111,'_q738
Mason County Planning Intake Checklist 100Z 8 T ljp
Owners Na dbue--' MAPS+rl ear'- Date: 10 - 18-0 3
Project: Reviewed By: (r4A-n ") ,.f
Commercial Developme S No Comments: no+ �Q s'�-r- P(A C
PLANNER: GBM TSC CMM PBC RDH REC
Sitq Plan:
North Arrow
Property Dimensions: Id 5 XO
Streets and Driveways Shown. Road name:
x ng tru re own s acks vs
W II Locati n, epti and Drain-field own with setbacks o,r,S 91,6
'W"'M urf nds, shoreline, wetlands, natural or historic drainage,
defined drain itches)
Topography (slopes) (20VT-)M unc�_- TWA J e,
Proposed Structure Setbacks (Direction/Setback): i
F: 3o' 5 R: 160 1 1: I/ EE S2: I0 Q
Utility and Drainage Easements: Yes No (if yes enter condition #5022)
Other Easements
ccessory Appurtenances: Propane He tpum
�Does site plan show 5ed
s at all exits.
❑ Variance applied for: y
No - parking spaces allotted? Yes No
❑ County Access Permit (add condition #0010) QrIL)
❑ State Access Permit Needed (add condition #0020)
Standard Conditions to be added to all Building per its that planning reviews: #5019 and #0700
Site Access: Are there any impediments (dogs/gates) that my restrict access to your site?
no
Is the site clearly marked? How? Address DrtU,P,,W,4y EA5,P_ iLA_f-
❑ Name
Critical Areas: ❑ Other:
Setbacks: Shoreline: Slope:
Shpreline Designation: Comprehensive Plan: Rural Zonin
)71 Not Applicable ❑ Agricultural RR 2. 5 20
❑ Urban ❑ In-holding ❑ RMF
❑ Rural ❑ LTCFL ❑ RC 1 2 3
❑ Conservancy Ja' Rural ❑ RI
❑ Natural ❑ RAC ❑ RNR
❑ Unknown ❑ RCC-Hamlet ❑ RT
❑ Urban Growth Area ❑ MPR
❑ Unknown ❑ Unknown
Water Body (type if unnamed): no
SEPA: Yes/ No Unknown Flood Plain: YES/N Unknown ap#
Aquifer Recharge: YE fUnknow�nap#
Tags/Cases:
RLC/SPI Case: no 6-Year Dev. Moratorium: YES
Eagle Nest Tag: YE Other YE �NO
Revised: 07-10-2007
MASON COUNTY RESIDENTIAL PLANS SUBMITTAL CHECKLIST
Owner's Name: 106 Date: Reviewed By: Lt_�
Documents:
_ZBBuilding Permit Application Completed 3:)1330 NVA138
✓P arming Intake Checklist Completed, LOOt g j 130
Site plan includes:Allowable building area,r overhangs,decks,etc.
___-Fire Apparatus Access Road info required? Yes I No q 3 A 13 J 3❑
—Energy Code Application Form-O Electric wall heater O Electric central furnace O LPG Furnace
O Heat pump with electric furnace O Heat pump with LPG furnace O Boiler(heat type_ )
/ O Other:Specify:
v Mechanical/Plumbing Application-WATER HEATER FUEL TYPE f
Engineering? Yes (Need 2 sets of calculations)No _ Geotechnical report or assessment? Yes No
Snow load:_ ac- Seismic Zone(circle one): D1 r D2
Constru Plans: V 3 COMPLETE SETS
7 /
_Plans Legible _Recognized Scale _Elevation Views ✓Cross Section
_ undation Plan _Roof Framing Plan Floor Plan—Use of rooms noted(all floor levels)
Floor Framing Plan-all floor levels represented? Loft,crawlspace,etc.
_Deck Framing Plan,including covered.porch framing
Plan Details:
`oof framing details,truss lay-out may be needed,truss or stick framed? 1Yl F�
t-Wall Framing-Does bearing-wall height exceed 10'?(Engineering may be required)
—Floor framing: Floor joists: 9 /,Z` .1. ��TO I� }— Floor beams: \1 ► nC1L !yt �OY1
_Window headers marked on plans: Typical header: to X
_✓Foundation: footing size,reinforcement
M Concrete Walls-Does Concrete Wall Height Excee '?(Engineering may be required)
✓Landings at all exits? Less than 30"above grade? ( )/ N
✓Heated By Furnace-Location of Furnace _ (�&,I a
no Location(s):
Window Sizes Marked on Plans
P ✓Braced wall panels(shear walls)marked on plans or lateral engineering?
P (Plans may not be approved if not provided.)
_ -SteryGarag�? (Engineering may be required) R602.10.1, 0 story of a two-story D 145%,D2—55%
COMMENTS:
ENGINEERING REQUIREDnll�,_��
Braced wall panels/braced wall lines are not marked on plans(R602.10)
Amount and location of brac
ing does not meet minimum required in Table R602.10.1
IRREGULAR BUILDINGS(Irregular Shape)R301.2.2.2.2
Irregular portions of structures shall be designed in accordance with accepted engineering practice. A portion of a building shall be
considered to be irregular when one or more of the following conditions occur:
1)Exterior braced wall line or BWP cantilevered or offset by more than 4'
2)Roof or floor is not laterally supported on all edges
2A)Portion of roof or floor extend more than 6 ft.beyond the braced wall line.
3) End of BWP extends more than 1 ft.over an opening more than 8 ft in width below.
4) Opening in a floor or roof exceed the lesser of 12 ft.or 50%of the least floor or roof dimension.
5) Portions of floor level are offset vertically
6) Shear wall lines do not occur in two perpendicular directions.
7) When a story above grade is includes masonry or concrete construction(exc: fireplaces,chimneys,and veneer).
When this applies the entire story shall be designed. In accordance with accepted engineering practice.
DESIGN CRITERIA: Wind 85 mph exp B(unless proven otherwise), Seismic Zone: , Snow: psf
2003 IRC Plans submittal checklist simplified/WORD
l i
MASC,t 1 COUNTY PERMIT NO.-3IGIo1001 IAW
BUILDING PEt MIT APPLICATION
426 W. Cedar• R.O. 96x 186, Shelton, WA 98584
Shelton (360) 427-9670• Belfair (360) 275-4467• Elma (360) 482-5269 *C1
On the web www.co.mason.wa.us
APPLICANT INFORMATION IN�FORMATION CONTRACTOR INFORMATION
Owner� 1 )w _ Company Name li N�e-S
Mailing Address %J5712 Mailing Address Act &s,s
City ffi9dQ..:1L State��• Zip Coe City 2 m State L)A • Zip Codeq 8 S 2$
Phoned L7S Other Ph. 1E L.JkA71.I Phone 34P 0Z1S7 Other Ph.
Lien/Title Holder Contractor Reg. # Exp.O 4 016
E mail address E Mail Address
Drivers Lic.#KAf!STfWa4 WO DOB 10 C Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic VC-5 Existing Septic
Connect to Water System �JPS Name of Water System Lcss l2S w e c 1
Well Water System Name of Water System
PARCEL INFORMATION- 12 Digit Parcel No Fire District
Legal Description_f- nr � Z n l P-TIIJ i(L t"t of Q F_
Site Address(Please include street name,street number and city) X X)-( i>u t-,r s:n� Vj t,✓A - 9£SZ$
Directions to site lUr+(lcu bw To �17vs;ti V,A -
Will timber be cut and sold in parcel preparation?Yes/
Is property within 200'of Saltwater_.L L_Lake Q c� River/Creek 'n d Pond ►'�n
Wetland n c� Seasonal Runoff Stream_t[]_L_Slopes or Bluffs ] 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Y No
TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE P4^ SEASONAL ❑
Use of Building Describe Work
No. of Bedrooms 3 No. of Bat rooms `Z-- Square Footage- 1 st Floor 1 nd Floor
3rd Floor Basement \ Deck�—Covered Deck —Other Sq.ft. ar
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that 1 am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate ano grants employees of Mason County acc�to the above described property and structure for review and inspection.
PROOF OF CO N TION OF WORK IS BY N9 9FA PROGRESS INSPECTION.
X Date
ner/Owners Representative/Contractor indicate which one
FOR OFFICIAL USE BEYOND THIS POINT Accepted by422h Date I O
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Planning Department
Environmental Health Department , dQL,p
Public Works Department
Fire Marshal
FEES
Buildinq Permit Fee 75 Site Inspection
Plan Review Fee • 4-1 EH Review Fee
Plumbing& Base Fee lo4. 211— Planning Review Fee
Mechanical &Base fee /d/. 2� Other
Wood/Gas/Pellet Stove Fee I State Fee
Violation Fee �� CA)/ Pre-Paid at Submittal
Valuation $ /3 OZ/ TOTAL FEES
10/15/2007 08:21 FAX 360 127 7798 MASON CO PERMIT CTR 2001
FORM MUST BE COMPLETED IN INK PERMIT NO..
PLEASE PRESS HAND MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W. Cedar•PO.Box 186,Shelton,WA 96584
Shelton (360) 427-9670-Belfair(360)275-4467•Elma(360)482-5269
On the we www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFQRTATION
Owner �C- L� w r Company Name -1-!t t vt.L� -
Mailin Ad ess Mailing Address
3tate_L f�zi Code !18< 22 City Mate Zip Code
Phone Other Ph Phone Other Ph.
Contractor Reg. Exp.
E Mail Address
fSE�PTIC
ris Lic.# _ " " Pc� D013 o Drivers Lic.# DOB
INFORHIAT'ION -Connect to New Septic Existing Septic Connect to Sewer System
aof Sewer System
PARCEL INFORfJIA7,IION- 12 Digit Parcel No. Fire District
Legal Description_L�r''� S # F
Site Address (Ple€Ise include street name, street number and city) `
Directions to site_.�.
Is property wilthin'?00'of Saltwater -River/Greek t o Pond NO
Wetland. "vu -Serisonal Runoff Stream--LIcl—Slopes or Bluffs > 15% AJO_
TYPE OF JOB - New,. Add Alt Repair Other Use of Building
Location of FixturEis/Ur,its- 1st Floor 2nd Floor Basement Garage Closet
PLUMBING FIT U i;ES(Show Number of each) MECHANICAL UNITS
Type pf Fixture N:). of Fixtures Eees Fuel Type:Electri�_ LPG_ Natural Gam_ Heat Pump_
Toilets _, 2- TTyg_e of Unit No_of Units Fees
Bathroom Sink T, '2- Furnace
Bath Tubs Z Heatpumps
Showers _, 2- Spot Vent Fan
Water Heater _, _ Propane Tank
Clothes Washer f Gas Outlets
Kithen Sinks Wood/Gas/PelletStave
Dishwasher Kitchen Exhaust Hood
Hosebibs _, Z Dryer Vent �—
Other -, Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
O YNER/BUL.DER Acknowledges submission of Inaccurate information may result in a stop work order or permit revocation.)%imowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the wq�rk a.-1,proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easomenl holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to aplAy for this permit and conduct the work proposed.The owner or agent on owners behalf,represents that the information
p vAded is accurate Rind grunts employees of Mason County access to the above described property and structure for review and inspection.
PROOF NUkTI iN OFW0aK4&8YMEANS OF A PROGRESS INSPECTION.
X Date:
Owner/Owrgrs Fiapresentative/Conractor (indloate which one)
FOR OFFICIAL USE BEYOND THIS POINT
Accepted b _Planning Pd Ck# Date_10-1-1-071-131d Pd Receipt No.
DEPARTMONTAL REVIEW APPROVED DENIED NOTES
Building D 4,drtment
Oce Grou TiMe CCons r
Plannin Departm+;snt
Environmental Health Department
FEES
Plumbing& Base Fee Site Ins ection
Mechanical&Bas,i,fee UFO Plan Review Fee
Wood I Gas/Pelleit Stove Fee Other
Violation Fee TOTAL FEES
- Plot Map Drawn To Meet
a}i Une Homes Specifications.
Arvy Revisions To M Made
Icy The Home Owner. ,
Xx X 1\1E ,Oks>-y L Al_
S
APPROVED
PLANNING
MASON COUNTy DGD BE ON SITE '
IRED TO
AP�OVAI
a glJg1ECT�
By
pLANNNG
PLANNING: '-
a
ALL SETBACKS ARE MEASURED N
FROM THE FURTHEST I!�
PROJECTION OF THE BUILDING 1001A3
z2x xL I`11C� S.FT,
�a evE
Ar3A is A
W) �-�-
30� 4V�
D
— — lay'
u n
pN-STATE MASON COUNTY
c DEPARTMENT OF COMMUNITY DEVELOPMENT
o A ° N Planning Division
�? P O Box 279, Shelton, WA 98584
of Doti (360)427-9670
1864
NOTIFICATION OF INCOMPLETE APPLICATION
November 13, 2007
KAESTNER/DOWNING
120 NE DUSTY RD
BELFAIR WA 98528
Parcel No.: 123094190190
Project Description: New SFR, Hiline Homes (plan has not been stocked)
Dear Applicant:
You have submitted a permit application (case no. BLD2007-01820) for proposed
construction or development in the county. Upon review of your application, I have
determined that the contents of the application are incomplete or do not provide
enough detail for review.
Therefore, review of your application will not proceed until the necessary information
is provided (see the comment section of this letter for details.) Once the information
is submitted and the application is complete, I will continue to process your
application accordingly. If the additional information is not provided to the County
within 180 days of this request, the application shall expire and no further action on
the proposed development shall take place.
Please contact me at (360) 427-9670, ext. 294 if you have questions.
Sincerely,
Charles Mead McCoy III
Land Use Planner
Mason County Planning Department
Comments: Please contact me and describe the location of your property, so I may
re-schedule a site visit to determine Code requirements.
11/13/2007 1 of 1 BLD2007-01820
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
411 N. Fifth Street/ P.O. Box 186, Shelton WA 98584
360.427.9670 ext. 352
DDR ao01- 00323
Rec'd b
Request for q�l��
Administrative Variance for Reduction in the Required Setbacks ($100.00)
For administrative review, the minimum variance on a setback request is 5 feet
from the side yard lot lines and 10 feet for front and rear lot lines or any access
easement. Request for further reduction requires a standard variance.
Setbacks are measured from the furthest protection of the structure including
roof eaves.
« Applicant/Owners:71 ffl-T 41Z- e62 Z'gA
v
• Mailing Address: V20
Telephone : `3 G�� l"� -�`-,-7
City: State: Zip: Cl'B 5'?
If this reduction is tied to a building permit, please give permit
case number. BLD db0^1 - O IS2.0
Parcel Number(s): 3CL(g 15 019 CD Zoning i"�
Address:
Site A i -
Requested variance: Front/ Rea(Side DYar (please circle all that apply)
tAs4-
Requested setback variance: ID W Ls� ft.
An illustrated site plan is required.
Your site plan must show the following: north arrow, abutting street or
easements, set backs to all property lines and existing buildings, slopes, surface
water, wetlands, critical areas, septic, well and driveway. Show all proposed new
development. —�
O
The following circumstances must apply: CD
FRONT AND OR REAR YARD REQUIREMENTS: �
1) Existing lots of record as of March 5, 2002; m ITI
You must meet one of the following: (Please circle all that apply) r -p
2) One of the following exists on the lot:
a) steep slopes, wetlands, or streams present; Z
b) soils that restrict building or septic development; �"'
c) lot width at the front yard line of no more than 50 feet; M X
d) lot size of no more than one-fourth acre;
e) existing improvements of buildings, septic systems, and well areas.
\\CLUSTERI HOME SERVER\HOME\COMMON\PLANNING\PAC\FORMS\DDR.doc Created or
SIDE YARD REQUIREMENTS:
1) Existing lots of record as of March 5, 2002;
You must meet one of the following. (Please circle all that apply)
2) One of the following exists on the lot:
a) steep slopes, wetlands, or streams present;
b) soils that restrict building or septic development;
c) lot width at the front yard line of no more than 50 feet;
0 lot size of no more than one-half acre;
M existing improvements of buildings, septic systems, and well areas.
Explain how these circumstances preclude a reasonable development proposal
from meeting the setback standard for Rural Residential 2.5, 5, 10, or 20 zones.
Owner/Agent (please indicate)
Signature and date
�r
- • Official Use Only
Approved Date
Denied Date
Reason for denial:
\\CLUSTER I_HOME_SERVER\HOME\COMMON\PLANNING\PAC\FORMS\DDR.doc Created on