Loading...
HomeMy WebLinkAboutBLD9282 Mobile Home - BLD Permit / Conditions - 5/6/1976 Sharp, Paul #9282 5-6-76 1 i E. 165' Tract 16, SEµ, NW4, SE4, 9-23-1 Mobile Home - l � 30� r BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 DATE ISSUED PERMIT NO. OWNER }NAME MAIL ADDRESS CITY&STATE ZIP PHONE ur a DIRECTIONS i TO JOB SITE LEGAL c7 (❑SEE ATTACHED SHEET) DESCR. CR NAME MAIL ADDRESS dITY&STATE LICENSE NO. PHONE USE OF BUILDING Class of work: ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: PLACE I40 ,Z�rLC- Valuation of work: $ PLAN CHECK FEE PERMIT FW .20 0 SPECIAL CONDITIONS: APPLICATION ACCEPTED BY, PLANS CHECK BY APP9PVED FOR ISSUANCE Type of Occupancy Division e-e-sc-ey Const. / Group Size of Bldg. No. of Max. (Total) Sq. Ft. Stories Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor in RESIDENCE the State of Washington and I am aware of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. Firm PUBLIC WORKS By ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIREDFOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. which this permit is issued and that all work done will be in conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED kl--o is NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS � JSUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owner + �1 Date WORK IS COMMENCED. PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH