HomeMy WebLinkAboutBLD2479 Garage - BLD Permit / Conditions - 6/26/1978 Hervol, J. #2479
9-23-1 Tr. 23 W 1/2 GE 1/4 6-26-78
c
Garage
Contractor
Burlingame Blders
$7,500.00
a
I
Ii
II
I
I
L J
F A
IWO. BUILDING PERMIT APPLICATION
t
MASON COUNTY
w
P.O. Box 186 Shelton, Washington 98584
DATE ISSUED_3
6 ^R IT NO. 2"9 7
OWNER ✓ T IL DR SS CTY& TATE ZIP PHONE
o "7a�► me - w4 5'31 f
DIRECTIONS
TO JOB SITE �� } OJ7� O 4G✓C �d t SL r O �� �+/TY/L �" f�, s
LEGAL (❑ SEE ATTACHED S ET)
DESCR. 5�t t- /YY /' -2 577 9'v:7-3—/ 7-.'e—o- a,,5
NAME ZIL ADDRESS . 7�-97 CITY&STATE LICENSE NO. PHONE
CONTRACTOR
USE OF
BUILDING O IfX y
Class of work: NEW DDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE
Describe wor
cony � z 3a ' ya ' czft
rO m V�-O uI G' 40',(."tic //Q, T i c/Ytt [�l n z .
.I
osA-S 0h,,atic'4- -If1v Cum l
Valuation of work: $ PLAN CHECK FEE PERMIT FEE
,ODeUQ el,
SPECIAL pG
SPECIAL CONDITIONS:
APPLICATION ACCEPTED BY PLANS CHECK BY APP VED FOIR ISSUANCE Type of Occupancy Division
BY Const. Group
CCyy�� l
Size of Bldg. No. of Max.
(Total) Sq. Ft. 1e., Stories Occ. Load
CONTRACTOR AFFIDAVIT
PERMANENT SEASONAL E.D.NUMBER
I certify that I am a currently registered contractor In RESIDENCE
the State of Washington and I am aware of the MOBILE HOME
ordinance requirements regulating the work for which
the permit is issued and all work done will be in Special Approvals Required Received Not Required
conformance therewith. ZONING
HEALTH DEPT
Firm o"` �' ���5 r'�' ' PUBLIC WORKS
By
ROAD DEPT.
P.
Lic. No. U la k�"73 J-7 Date
OWNERS AFFIDAVIT
I certify that I am exempt from the requirements of the N O T I C E
contract or registration law RCW 18.27, and am aware
of the Mason County ordinance requirements for SEPARATE PERMITS ARE REOI FOR ELECTRICAL, PLUMBING, HEATING,
VENTILATING OR AIR CONDITIONING.
X which this permit is issued and that all work done will
be In conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED
IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS
SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER
Own r Date. WORK IS COMMENCED.
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH
G>...Tf Tc 7ic�
5 dy
r
3
9 - o�
3
10
12 -- — -- —
13
14
15 —
16 1- —
1 0 70
7a
18 —
19 —
1
20 --
C1k5 t-
21
22
23
24
25
i
26
i
27 -
28 --
29 —
30 — —
31 ---
I
32 —
33
34 —
I
40
i
4,
_
Y 7