Loading...
HomeMy WebLinkAboutBLD2019-00046 Final Woodstove - BLD Permit / Conditions - 1/29/2019 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us BLD2019-00046 MECH/PLUMB - RESIDENTIAL PROJECT DESCRIPTION: NEW WOODSTOVE ISSUED: 01/16/2019 SITE ADDRESS: 92 NE BEAR CREEK DEWATTO RD, BELFAIR MASON COUNTY EXPIRES: 07/15/2019 PARCEL: 123094190023 APPLICANT: ALLAN CARSTENSEN OWNER: ALLAN CARSTENSEN PO BOX 2813 PO BOX 2813 BELFAIR,WA 98528-2813 BELFAIR,WA 98528-2813 i FEES: Paid Due State Fee-Residential $6.50 $0.00 Mechanical Fees $80.00 $0.00 Final Inspection $80.00 $0.00 Mechanical Base Fee $30.00 $0.00 Totals : $196.50 $0.00 FIXTURES (W Mechanical Fixtures 1 Wood/Gas/Pellet Stove(s) REQUIRED INSPECTIONS Mechanical Inspection BLD-Final Inspection CONDITIONS Printed by:Ariane Paysse on:01/16/2019 11:27 AM Page 1 of 3 1 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MECH/PLUMB - RESIDENTIAL BLD2019-00046 * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions f any other state/local law regulating construction or the performance of construction. Issued By. Contractor or Authorized Agent: Date: ' Printed by:Ariane Paysse on:01/16/2019 11:27 AM Page 2 of 3 Mason County MASON COUNTY Mason County Community Services Qo COMMUNITY SERVICES 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MECH/PLUMB - RESIDENTIAL BLD2019-00046 Printed by:Adana Paysse on:01/16/2019 11:27 AM Page 3 of 3 INSPECTION CARD MASON COUNTY Mason County COMMUNITY SERVICES 615 W. Alder St. Bldg. 8, Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us PERMIT# BLD2019-00046 PROJECT ADDRESS 92 NE BEAR CREEK DEWATTO RD, BELFAIR MASON COUNTY, WA 00000 PARCEL# 123094190023 PROJECT DESCRIPTION NEW WOODSTOVE OWNER ALLAN CARSTENSEN ADDRESS PO BOX 2813 PHONE CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP D TE Comments INSPECTION INSP.j DATE Comments Mechanical Inspection Z. 701 �BLD-Final Inspection luartZeL