Loading...
HomeMy WebLinkAboutDDR2007-00236 Consistency Statement - DDR Reports - 6/12/2007 i Chandler L. Odell, P.E. 5706 90tt' Street Court East Puyallup,WA 98371 Telephone: 253-845-1230 June 12, 2007 ° C 4= Robert Fink, County Planner AI N 1 2007 Mason Co. Community Dev., Planning Dept. u4S0;V CO.PLANNING DEPT PO Box 279 Shelton, WA 98584 Subject: Belfair Water District No. I Draft Water System Plan for Mason County Determination of Planning Consistency Dear Mr. Fink: Enclosed is the first draft of the 2007 Water System Plan Update for Belfair Water District No. 1. It is being sent to you at this time in compliance with Washington State Municipal Water Law requirements. It is sent in order for you to determine that the document is, or is not, consistent with Mason County's planning efforts. To that end, I have also enclosed the necessary form to be completed and signed by an official of Mason County . If there are any questions regarding the request, please do not hesitate to contact me or Jerry Hukill, District Manager. Jerry can be reached at 360-275-3008. My phone number is shown above, but I can also be reached at chanodell@a,comcast.net. Very Truly Yours, v �rhL1" Chandler L. Odell, P.E. Enclosure: Draft 2007 Water System Plan Update Municipal Water Law Attachment 5 t•SON COQ� MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg. 1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 1854 July 2, 2007 Chandler L. Odell, P.E. 5706 901h Street Court East Puyallup, WA 98371 Dear Mr. Odell, I am writing in response to your letter of June 12, 2006, and your request for a water system consistency review. In order for the county to be able to complete the review, you need to submit an application and$115 fee to the Mason County Permit Assistance Center, PO Box 186, Shelton WA 98584 or in person to 426 W Cedar St. in Shelton. You have already submitted an "Attachment 5" and a system plan, so you will only need to submit the completed application form and fee. You might include a copy of this letter so that the Permit Assistance Center does not return the application as incomplete. I have attached a water system review form for your use. Please let me know if you have additional questions. Sincerely, Robert D. Fink, AICP Planning Manager HAWPTROJECTS\2007proTelfair WS-Odell.doc Copes MASON COUNTY � rA Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg.1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 >854 August 24, 2007 Chandler L. Odell, P.E. 5706 901h Street Court East Puyallup, WA 98371 RE: Belfair Water District#1 Review, DDR2007-00236, DOH ID# 053500 Dear Mr. Odell, Please find enclosed a signed Attachment 5, Consistency Statement Checklist, for the above water system. The consistency determination is based on the draft materials provided by you for the review. Resolution of the inconsistencies can be achieved by updating information regarding existing zoning and county plans referenced in the water system plan. Specific comments to follow under separate cover. If you have additional questions or concerns regarding this matter,please contact me at (360)427-9670 ext. 366. Sincerely, 4�. 0 �U- Robert D. Fink, AICP Planning Manager HAWP\PR0JECTS\2007pro\Belfair WS-Odell.doc I Attachment 5: Water System Plan and Small Water System Management Program Consistency Statement Checklist This checklist is intended to ensure consistency of water system planning documents with adopted local comprehensive plans and development regulations. Each local planning jurisdiction in which the water utility provides service will review the relevant water system planning information and provide a signed consistency statement to the utility for submittal to the Department of Health. If the local planning agency will not respond, the highest authority within the utility (chair of governing body, executive director of private companies, etc.) must sign to verify consistency of the plan information. Water System Name: Belfair Water District No. 1 PWS ID: 053500 Planning Document Title: 2007 Water System Plan Update Plan Date: June 11, 2007 Local Planning Jurisdiction: Mason County Page(s)in Consistency Statement Planning Reference Municipal Water Law Section 5 and 8, Document Yes-No-Nat ( pal Applicable amendment to chapter 90.03.386 and chapter 43.20 RC W) (completed by The retail service area,and any other areas not served by a separate public water system, and land use identified in the WSP is consistent with the adopted Chap. I A'® comprehensive plan and adopted development regulations and policies. For WSPs only: The growth projection used to forecast water demand for the retail service area is consistent with the adopted city/county's population growth projections(and commercial development projection if applicable). If a different Chap. 11 growth projection was used,the alternative growth projection and methodology proposed is acceptable based on explanation given. For WSPs only: New potential large water users(that may have a significant impact on the water system)that the city/county is aware of have been identified None Known S in the WSP. For city-owned systems only: All policies regarding water service outside the corporate boundaries are included in this WSP_ These policies are consistent r/ with the adopted comprehensive plan and development regulations. Where the local planning agency is unable to sign a Consistency Statement: Provide documentation of efforts to coordinate with local agencies n I with a 60-day timeline for local agency to respond Include:name of contact, date,type of effort attempted,and response from local agency. 1 certify that the above statements are true to the best of my knowledge and that these statements support the conclusion that the subject-planning document is consistent with adopted comprehensive plans, development regulations, and other policies. Signature Datq �o be r f �- �'l Ag"i k? M-4 t4 ct C , C u, o h Printed Name, Title, & Jurisdic ton **For any issues of inconsistency, please provide comments on how they can be resolved. ** Attachment 5 1 March 2004 Revision Attachment 5: Water System Plan and Small Water System Management Program Consistency Statement Checklist This checklist is intended to ensure consistency of water system planning documents with adopted local comprehensive plans and development regulations. Each local planning jurisdiction in which the water utility provides service will review the relevant water system planning information and provide a signed consistency statement to the utility for submittal to the Department of Health. If the local planning agency will not respond,the highest authority within the utility (chair of governing body, executive director of private companies, etc.) must sign to verify consistency of the plan information. Water System Name: 8e. Q I r W 44Cr Dt -/. No. I PWS ID: O Planning Document Title: 2067 W*f rSys-kii P44 aoa&Plan Date: Sept ,2do7 Local Planning Jurisdiction: M4s6m Couh�y Page(s)in - Consistency Statement Planning 3 Yes-No-Not (Reference Municipal Water Law Section 5 and 8, Document Applicable 0111, amendment to chapter 90.03.386 and chapter 43.20 RCW) (completed by utilit The retail service area,and any other areas not served by a separate public water system,and land use identified in the WSP is consistent with the adopted L14y4r-P comprehensive plan and adopted development regulations and policies. For WSPs only: The growth projection used to forecast water demand for the retail service area is consistent with the adopted city/county's population growth projections(and commercial development projection if applicable). If a different C h4 p 40-2. !e C growth projection was used,the alternative growth projection and methodology proposed is acceptable based on explanation given. For WSPs Only: New potential large water users(that may have a significant impact on the water system)that the city/county is aware of have been identified el°$ in the WSP. For city-owned systems only: All policies regarding water service outside the corporate boundaries are included in this WSP. These policies are consistent NA with the adopted comprehensive plan and development regulations. Where the local planning agency is unable to sign a Consistency Statement: Provide documentation of efforts to coordinate with local agencies ^t with a 60-day timeline for local agency to respond. Include:name of contact, 0 V date,type of effort attempted,and response from local agency. I certify that the above statements are true to the best of my knowledge and that these statements support the conclusion that the subject-planning document is consistent with adopted comprehensive plans, development regulations, and other policies. ��f,,� /J OC.4k 45�a00? Signature ,�A Date ��N? T7H�� 1'KkiM/vac W 4 N pe e, 144-- /0'n �4. Printed Name, Title, &Jurisdiction **For any issues of inconsistency, please provide comments on how they can be resolved. ** Attachment 5 1 March 2004 Revision 1 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING P.O. BOX 279 SHELTON, WASHINGTON 98584 • (360) 427-9670 APPLICATION FOR A WATER SYSTEM PLAN REVIEW FOR CONSISTENCY WITH THE MASON COUNTY COMPREHENSIVE PLAN The purpose of this application is to provide a means for review of a public water system plan for consistency with the county comprehensive plan as provided to Section 90.03.386 and Chapter 43.20 RCW. APPLICANT INFORMATION Name: J e r r y A H u k i l l Signature: Mailing Address: P . O . Box 5 6 3 / Belfair , WA 98528 Phone Number(s): ( 3 6 0 ) 2 7 5-3 0 0 8 PERMIT INFORMATION Water System Name: Belfair Water District # 1 PWSID: 053500 _ Tax Parcel Number(s) for location of wells: 123282 - 21 - 00000 12332 - 50 - 00108 12206 - 12 - 6OI I n (Attach additional parcel numbers if necessary) Please submit a draft water system plan or an abstract of the plan with sufficient information for evaluation of consistency, a map of the service area, and a"Attachment 5: Water System Plan and Small Water System Management Program Consistency Statement Checklist." Application Fee: $115.00 Submit to the above address or to the Permit Assistance Center,426 W Cedar St., Shelton,WA H:\WP\A,k4]N\P,IROGRAMS\form-watersystem.doc Chandler L. Odell, P.E. 5706 90th Street Court East Puyallup, WA 98371 Telephone: 253-845-1230 September 18, 2007 Robert Fink, Planning Manager Mason Co. Community Dev., Planning Dept. 426 W. Cedar St. PO Box 279 Shelton, WA 98584 Water Subject: Draft Water System Plan Update for Belfait ate District s ct No. 1 Dear Mr. Fink: Transmitted herewith on behalf of Belfair Water District No. 1 is a copy of the Draft Water System Plan Update. Both the District and I would appreciate any comments you may have. If you have any questions, please contact Dave Tipton, District Manager, or me at your convenience. The District's phone number is 360-275-3008. I may be reached at 253-845-1230 of via e-mail at chanodell@comcast.net. . Very Truly Yours, Chandler L. Odell, P.E. Enclosures: Copy of WSP Update cc: Dave Tipton R E C E I _V_F 0 SE 2 `7 MCCD - PLArvM,, , �80 °pO�,A MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg. 1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 1854 October 4, 2007 Chandler L. Odell, P.E. 5706 901h Street Court East Puyallup, WA 98371 RE: Belfair Water District#1 Review, DDR2007-00236, DOH ID # 053500 Dear Mr. Odell, Please find enclosed a signed and approved Attachment 5, Consistency Statement Checklist, for the above water system draft plan dated September 2007. The consistency determination is based on the draft materials provided by you for the review. If you have additional questions or concerns regarding this matter, please contact me at (360) 427-9670 ext. 366. Sincerely, .V'"'g ��- Robert D. Fink, AICP Planning Manager P/easA FILE To: 4P3";1 0d000 Date SeM to File: HAWP\PR0JECTS\2007pro\Be1fair WS2-Odell.doc Robert Fink - Belfair WD#1 Interzone Connection Pa e 1 From: "Meriwether, Frank (DOH)" <Frank.Meriwether@DOH.WA.GOV> To: <dtipton57@yahoo.com> Date: 6/11/2008 4:30 pm Subject: Belfair WD#1 Interzone Connection CC: <matt@masonedc.com>, <Rdf@co.mason.wa.us>, "Klo... Hi Dave, oC Karen and I reviewed the Ironhorse Crossing project paperwork that was given a mitigated DNS in its SEPA review back in 2001. Unfortunately C that approval date is too far in the past to apply to, or use for, the Water District's proposed interzone connection project. However, '�►� relevant information from the past project and its review process can be used in the new SEPA application for the interzone connection,which may save the water district some time and effort. Similar to the Ironhorse Crossing SEPA review, the county would be the SEPA review agency for the proposed Interzone Connection. Although the project is pretty straight forward and away from shorelines, that project triggers SEPA because of the installation and use of 12-inch pipe. We (ODW)support the interzone connection (ODW Project#08-0404) because it will provide more reliability and additional fire flow capacity to the Belfair WD#1's water system. That project is also included in the most recently approved Water System Plan and in the existing draft Water System Plan for the water system. Please let me know if I can provide additional information in this \�� to 01 00 matter. � \ -f�Q 4� 3 Frank Meriwether (J 60 Regional Engineer Washington State Department of Health Office of Drinking Water Southwest Drinking Water Operations 243 Israel Road SE PO Box 47823 Al \ Olympia, WA 98504-7823 +� Phone: (360)236-3036 C�:) Fax: (360)664-8058 email: Frank.Meriwether@doh.wa.gov Cj Website: www.doh.wa.gov/ehp/dw Public Health -Always Working for a Safer and Healthier Washington