Loading...
HomeMy WebLinkAboutStormwater Site Plan for GRD2020-00005 - GRD Engineering / Geo-Tech Reports - 2/16/2021 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER > Shelton, Washington 98584 DATE: February 16, 2021 INTER-DEPARTMENTAL COMMUNICATIONS TO: Trish Woolett PARCEL # 12328-24-00000 / 21-00000 FROM: Fred Perryman — E&C Asst Manager PERMIT #: GRD2020-00005-2 SUBJECT: Stormwater Site Plan (SSP) NAME: Overton & Associates Trish: The stormwater site plan and narrative for the Overton & Associates second phase was received and reviewed by Public Works. The plan notes the grading will add any 17.1 acres of new impervious surfaces but will disturb 30.9 acres. 13.8 acres of disturbed area will be planted into lawn area. The permanent stormwater facilities include a detention pond, which will discharge to the existing storm conveyance system. The stormwater plan is considered acceptable with the following conditions: • A Declaration of Covenants Associated with Privately Maintained Storm Drainage Facilities (O&M) should be executed and recorded with Mason County prior to permit being finalized. • The stormwater drainage plan should be incorporated into the site-plans and be a condition of permit issuance. • Record drawings shall be drawn and recorded with the county at the completion of the project Adequate erosion and sediment control features need to be implemented during land disturbing activities to protect neighboring properties and State waters from adverse stormwater runoff impacts. The migration or release of silty water or mud from the applicant's property will be considered a violation of County and State water quality protection regulations. Please feel free to contact me at 625 if you have any questions. Sincerely, Fred Perry an E&C Asst Manager I