HomeMy WebLinkAboutMEP2014-00013 Trees, Bulkhead, Beach Stairs - MEP Permit / Conditions - 9/2/2014 SpN.S7_A MASON COUNTY
A o N DEPARTMENT OF COMMUNITY DEVELOPMENT
S N =_ Planning Division
�o o r oy P O Box 279, Shelton, WA 98584
1864 Ir" f ffl
(360)427-9670
MASON ENVIRONMENTAL PERMIT
September 02, 2014
VENTURE PROPERTY MANAGEMENT LLC
P O BOX 556
ALLYN WA 98524
Parcel Number: 122324091062
Issued: 9/3/2014
Case Number: MEP2014-00013
Project Description:
Proposal in front of two parcels (PN: 12232-40--91062 and -91063); design includes removal of overhang
dangerous trees and some roots and soil on slope at the north end, replacing 113 ft. of 166 ft. long by 4-5 ft.
high failed concrete bulkhead, additional two inset steps to beach, and future 18 ft. tall staircase down to
level area above the bulkhead.
The following critical areas are present on this property:
Long-Term Commercial Forest XX FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands XX Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01
MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local
statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee
fails to complete the projec as proposed or fails to comply with the standards of this ordinance.
t(_ 646k —%V_ � I ?Vff
Authorized Local Government Official 1 Date
Mason Environmental Permit
9/2/2014 Case No.: MEP2014-00013
Conditions:
1.) Site Plan
Approved per dimensions of structures and setbacks on submitted site plan; the May 5, 2014 plan has the
configuration of bulkhead, paths, two sets of steps, staircase, and areas of soil /root/tree removal that are
subject to this review.
X
Resource Ordinance
The applicant acknowledges that the project will be completed as proposed, so that the project will be
consistent with all applicable standards of the Mason County Resource Ordinance. Future work within the
vegetation buffer and shoreline critical area will be reviewed by the Dept. of Community Development prior to
starting such work
X
Shoreline Management Act
The proposed project must be consistent with all applicable policies and other provisions of the Shoreline
Management Act, its rules, and the Mason County Shoreline Master Program.
X
WDFW Hydraulic Project Approval
A Hydraulic Project Approval from the Washington State Department of Fish Wildlife must be granted prior to
construction. For more information contact Habitat Biologist Margie Bigelow(Saltwater) at (360) 427-2179.
X
U.S. Army Corps of Engineers Review
Section 10 (Rivers and Harbor Act) or Section 301/404 (Clean Water Act) compliance must be demonstrated
through permit or authorized exemption by the Army Corps of Engineers prior to work within navigable waters
or wetlands under Corps jurisdiction. X
2.) Construction Debris Removal
All construction and demolition debris must be removed from the shore area after project completion. Proper
disposal of construction debris must be on land in such a manner that debris cannot enter or cause water
quality degradation of State waters. X
Surface Water Control
All surface water and potential runoff from the proposed development will be controlled on site and shall not
adversely affect any adjacent properties, cause sediment deposits, nor increase the velocity flow entering or
abutting to any state or county culvert or ditch system or road way.
X
Concrete Leachate
Concrete leachate and wash water must be contained during construction pouring, such that water quality
degradation of adjacent waters does not occur.
X
Work must be done in the dry time periods or low tide to help prevent disturbance of unstable soil layers and
uncontrollable mass wasting in work area.
X
3.) The approval of this project is subject to the recommendations and specifications outlined in the attached
geotechnical report or assessment. All applicable recommendations and specifications shall be applied to the
development on this site. Any deviation requires stamped written approval from the registered design
professional responsible for the report/assessment, and may require special inspection by same. Structures
and /or land modifications (grading, cuts, fills, etc.) required in the geotechnical report/assessment, may
require a separate permit. The geotechnical report/assessment shall remain attached to the approved building
plans.
X
9/2/2014 Page 2 of 2 MEP2014-00013
.;MASON ENVIRONMENTAL PE ($630 ol $380 w/other permit) Mason County Permit Center Use:
❑ CONDITIONAL USE($1520) MEP-1 n 1 � - odn 13
❑ HABITAT MANAGEMENT PLAN REVIEW($445) l
Date Rcvd 5'Jr-Za i'�1
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Resource Ordinance(Chapter 17.01 MCC)
ENVIRONMENTAL PERMIT APPLICATION
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is
under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW.
PLEASE PRINT
1. PROPERTY OWNER
Name: V - r
Mailing Address: c —2.
Work Phone: 3. Z� , 3 , LI`1 Email Address:
Home/Cell Phone: 3L,,,0 _Z-) _Llk-;ei Fax#.
If an agent is acting for the property owner during the permit process, complete#2.
2. AUTHORIZED AGENT
Name:
Mailing Address:
Work Phone: Email Address:
Home/Cell Phone: Fax#
3. PROJECT SITE
Site Address: -j ZE.
Lot z- o F S P 0►ZU r r`'TN
Parcel#: - - Legal Description:
3' � C c Lo,fi c ►Z,;r P i —tL a G 3
Directions to Site:
Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences,
Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed
Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram.
�4.pr,,ifI 1C' 1 P isle 1 of_'
1 ,
4. State which section requires permit:
❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090
❑ Mineral Resource Lands,Chapter 17.01.066 'b Landslide Hazard Area,Chapter 17.01.100
❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102
❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Fish&Wildlife Habitat Conservation Areas,Chapter
❑ In-Holding Lands,Chapter 17.01.062 17.01.110
❑ Wetlands,Chapter 17.01.070
5. Identify current use of the property with existing fimprovements:
`
6. Identify and describe the proposed project, including the type of materials to be used,construction methods,
principle dimensions, and other pertinent information(attach additional sheets, if needed):
J
c 2I'a C r-k-sS S 1'-L1a S
7. Describe why the action requiring this permit cannot be avoided.
���>, ��� �.c=`•� � �� ,>-.-.fit i�.�.,-�-*J �'�" �•.�c"ti�i.%l; �f�'
8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes �No
9. Identify any surface water on or adjacent to property (circle one):
Saltwater Lake Stream Pond Wetland Drainage Ditch
10. Identify existing septic/sewer connection(circle one): If septic is located on project site, include records.
Connected to Septic Connected to Community Septic
11. Identify existing water supply(circle one): Public Water Supply Well
11. Type of Job (circle one):
New Add Alteration Repair' Demolition Other:
Print Name Signature Date
1:CommUnih, Develonrlent\PAOMEP Page 2 of 2 Re.iced.lun:210 t
Lot 1 Lot �
�3 X 3zUl 'x 3FO
O Well
Drain Feild
VV�
Driveway
Shed Garage
------ — --------------i
i
t i
i Future Home
Site
House Septic
OTanks
Top of Bluff
Bulk Head Landing
Beach
— Concrete Sea Walls in Good Condition
Venture Property Management ance' off — Broken and Leaning Sea Wall
332 Cronquist Rd. Allyn, WA 98524 -Ow Eroded Bank of Concern
Parcel # 12232-40-91062 and 12232-40-91063 == Med/Large Fir Trees
Property Lines
`\
` N � ��� �, Exsiting Trail to Bulkhead
Proposed Tree Removal
and Bank Repair .,
Proposed Top Bluff -
Wood Stairs to Bulkhead
Bulk Hea Landing
Proposed Concrete
Steps to Beach Proposed Concrete
Beach Steps to Beach
Lot 1 Lot 2
23 ' x
Future Home Site
House
Whead
Proposed Concrete Proposed Concrete
Steps to Beach Steps to Beach
Beach _ Proposed storm water drain to beach
Exsiting Bulkheads in Good Condition
Venture Property Management/Vance Hoff Repaired Bulkhead and Step Additions
332 Cronquist Rd. Allyn, WA 98524
Parcel # 12232-40-91062 and 122324-91063 -- Bank Repair
- Property Lines
2; Cronquist Road
a
CEMP
I
Lot 3
3 � �
— _ Driveway
`, Lot 1 Lot 2
0Well
.� _
Drain F ild
i
Shed , Garage
Taft
I I
House I Future Home I Schaffer
House l LS.ptlo I Site i House
OTanks ���N - -- --- --
vk
-}-- o
Top of Bluff 7
Bulk Head Landing 1
Beach
Venture Property Management/Vance Hoff
332 Cronquist Rd. Allyn, WA 98524
Parcel # 12232-40-91062 and 12232-40-91063 Row
A. Shared driveway easement with Taft.
B. Driveway easement for Lot 2.
1. Storm water ditch along upland side of Cronquist Rd. excepts runoff from multiple(5+),
single family residences.
2. County road culvert.
3. Private driveway culvert and standard runoff route from county culvert.
4. Storm water overflow route.
5. Historical storm water route blocked by fill of neighboring lots development in early to
mid- 1990's.
6. Storm water route created by neighboring development.
7. Failed bulkhead due to created storm water route.
8. Under eroded bank with over hanging fir trees and exposed root systems are unaffected
by storm water route.
9. South boundary 3' wire and steel stake fence.
10.North boundary 3' wire and steel stake fence.