Loading...
HomeMy WebLinkAboutSPI2005-00095 - SPI Inspections - 4/20/2005 r P" oN_STgT� MASON COUNTY o Py A o N DEPARTMENT OF COMMUNITY DEVELOPMENT o N Planning Division 7 N Y t) P O Box 279, Shelton, WA 98584 0 °~ (360)427-9670 1864 Site Inspection April 20, 2005 Case No.: SP12005-00095 Parcel No.: 122195000079 Project Description: Feasibility/ Construction of SFR Dear Applicant: Pursuant to your application, a site pre-inspection (SPI)was performed on your property. Below you will find comments made regarding the proposed development and its critical values. In some cases, setbacks for development from shorelines, steep slopes, streams, and wetlands must be included in your specific proposal; these setbacks are included as part of the comments listed below. This information is based on County and State regulations as they exist to date. These regulations may change and may affect the requirements for development of the subject property. Please contact me at(360) 427-9670, ext.294 if you have questions. Sincerely, Charles Mead McCov III Land Use Planner Mason County Planning Department 4/20/2005 1 of 2 SP12005-00095 Site Inspection 4/20/2005 Case No.: SP12005-00095 Comments: Lakeland Village 7 Lot: 79 251 E. Westlake Drive S. A field inspection of the subject property was conducted on 1/27/05 pursuant to an application for a site pre-inspection. The parcel contains steep slopes and a Type III stream per Washington Department of Natural Resources stream typing criteria. A steep slope trends downward away from the building site at an angle in excess of 21.8 degrees. This area meets the criteria for a Landslide Hazard Area per the provisions of the Mason County Resource Ordinance No. 77-93. Any site work or application for development within 300 feet of a Landslide Hazard Area requires a geotechnical report to assess slope stability and address specific efforts to remediate the hazard. Enclosed is a copy of the Landslide Hazard Areas chapter of the Resource Ordinance. Please note the distinction between a geologic assessment and a geotechnical report. This project will require a geotechnical report. The report must state that the hazards of the landslide area can be overcome in such a manner as to prevent harm to property and public health and safety, and must also assure the project will cause no significant environmental impact. The required buffer for a Type III stream is 150 feet plus a 15-foot building setback for a total distance of 165 feet from the stream. A variance from the Fish and Wildlife Habitat Conservation Areas chapter would be necessary to pursue this project if the applicant proposed to build inside the combined 165 foot buffer and setback. A copy of the Fish and Wildlife Habitat Conservation Areas chapter is enclosed. There maybe an area outside the buffer that allows for building without a resource ordinance variance. If the the lot is of proper depth, for example 200' deep, that would allow for 45' to build in outside the buffer. An additional lose of builing space would result from front-yard setback requirements in the R-1 P zoning of the Allyn Urban Growth Area Interim Zoning Map of 10 feet on cul-de-sacs. Therefore, that would leave only a 35' area to build in outside the buffer and combined building setbacks of 150'+15'+10'. THIS PARCEL IS LOCATED IN THE REQUIRED NORTH BAY SEWER CONNECTION. PLEASE CONTACT, DEPT. OF UTILITIES AT EXT 296 OR 270, WHEN ANY PERMIT IS APPLIED FOR. 4/20/2005 2 of 2 SP12005-00095