Loading...
HomeMy WebLinkAboutSPI2005-00094 - SPI Inspections - 4/25/2005 0%%-STATE MASON COUNTY BPS M c � DEPARTMENT OF COMMUNITY DEVELOPMENT 4 O S N = Planning Division z° N Y P 0 Box 279,Shelton,WA 98584 ti °� I'° (360)427-9670 1864 r Site Inspection April 25, 2005 MIKE BOWIE 335 HI CREST DR AUBURN WA 98001 Case No.: SP12005-00094 Parcel No.: 322282100050 Project Description: Feasibility Study Dear Applicant: Pursuant to your application, a site pre-inspection (SPI)was performed on your property. Below you will find comments made regarding the proposed development and its critical values. In some cases, setbacks for development from shorelines, steep slopes, streams, and wetlands must be included in your specific proposal; these setbacks are included as part of the comments listed below. This information is based on County and State regulations as they exist to date. These regulations may change and may affect the requirements for development of the subject property. Please contact me at(360) 427-9670, ext. 294 if you have questions. Sincerely, Charles Mead McCov III Land Use Planner Mason County Planning Department 4/25/2005 1 of 3 SP12005-00094 Site Inspection 4/25/2005 Case No.: SP12005-00094 Comments: A pre-site inspection was conducted 4/22/2005 at 15860 NE North Shore Road, Tahuya. The Applicant was present during the inspection. Several issues were discussed in the following summary. The Mason County zoning is "Rural Residental 5". Zoning Rural Residental 5 zoning requires that building height not exceed 35 feet. The Mason County shoreline designation is "Urban". Hood Canal is designated as a "Shoreline of Statewide Significance" by the Washington Department of Ecology. An existing bulkhead is in need of repair. The process would require a Building Permit, a SEPA Review and a Shoreline Exemption Permit under the Mason County Shoreline Master Program. Restoration of a marine rail system for an existing boathouse would be allowed under the Mason County Shoreline Master Program. "Design standards for boat ramps and marine railways are as follows: Ramps and railways shall not exceed 12 feet in width. Ramps and railways shall not exceed 50 in length, as measured from the line of ordinary high water. Marine railways shall not extend beyond MLLW (0.0). Ramps and railways shall not exceed 18 inches in height at the line of ordinary high water, or the toe of the bulkhead." The parcel has been "tagged" by the County as Bald Eagle Territory. Bald Eagles are protected by Federal and State Law. Requiring Agency review and comment. The Type 5 stream that passes through the property creates a vegetated conservation buffer of 75' and a building setback of 15' to equal 90' total distance from the stream's ordinary high water mark. Any new construction or expansion of the existing footprint in excess of"plus or minus 10%", and away from the resource, would require the applicant go through a resource ordinance variance process. Construction of new sanitary facilities in the accessry/boathouse structure would require the review of the County Environmental Health Department. A contact number they can be reached at is: Cindy Waite, tel: 427-9670 ext. 353. If you were to proposed new development on the parcel a Geological Assessment would be required due to slopes 4/25/2005 2 of 3 SP12005-00094 Site Inspection 4/25/2005 Case No.: SP12005-00094 immediately adjacent to the project to address slope stability and the other requirements. The assessment must state that the hazards of the landslide area can be overcome in such a manner as to prevent harm to property and public health and safety, and must also assure the project will cause no significant environmental impact per Mason County Code 17.01.100, E7. 4/25/2005 3 of 3 SP12005-00094