HomeMy WebLinkAboutBLD95-00804 SFR - BLD Permit / Conditions - 8/7/2024 ���rs ,�o� ,��s, cam,�pk �� 17 Case ActivityListing 1:07:12 M g 11:o7:12AM Case#: BLD95-00804 i� Parcel#: 423315002022 . Description: RESIDENCE Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDA010 Application received 6/15/1995 None 6/15/1995 KW BLDB135 Addressing 6/20/1995 None DONE GMM 6/20/1995 GMM BLDB134 RLC Checklist Review 7/17/1995 None DONE DB 7/17/1995 DMB Reviewed geotech report submitted for HPA by Bradley-Noble. SMP shoreline. BLD13130 Planning Review 6/15/1995 7/17/1995 None DONE DB 7/17/1995 DMB BLDB110 Structural Plan Review 7/17/1995 7/18/1995 None DONE DH 7/19/1995 DWH BLDB200 Environmental Health Review 7/24/1995 7/28/1995 None HOLD PSD 7/31/1995 PSD Need approved design.psd BLDB210 Water Adequacy 7/24/1995 7/28/1995 None HOLD PSD 7/31/1995 PSD They propose to use a surface water spring.According to the water adequacy requirements,they need a certificate of water right from DOE.I called the applicant and told her to call Sherry Fox at DOE.psd BLDB008 Variance Review 8/29/1995 8/30/1995 None DONE PSD 8/30/1995 KS The varaice to allow the release of the building permit prior to obtaining surface water rights was granted.psd BLDB200 Environmental Health Review 8/29/1995 9/30/1995 None DONE PSD 8/30/1995 PSD approved design plot plan matches.psd BLDB210 Water Adequacy 8/29/1995 8/30/1995 None DONE PSD 8/30/1995 PSD See the variance notes.They are going to use a surface water spring.psd BLDA100 Approved For Issuance 9/30/1995 None DONE KS 8/30/1995 KS Page 1 of 6 CaseActivity..rpt Case Activity Listing 10/27/2017 11:07:12AM Case#: BLD95-00804 Parcel#: 423315002022 Description: RESIDENCE Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDA500 (F)Issue building permit 8/30/1995 None DON1: KS 8/30/1995 KS BLDC110 Footing inspection 4/8/1996 4/9/1996 4/9/1996 None DONE MJB 5/2/1996 MJB pend photo per Rob Lum and Dana Herron.O.K. 4-9-96 M.BYRNE BLDC140 Fr/PI/MC/Pen Inspection 9/30/1996 10/3/1996 None FAIL RL 10/4/1996 RDL submit plan changes elect.not installed bath fans not installed fire blocking at stairs and landing blocking 2x12 mid span 1/2 air gap at beam ends post to beam connect nail floor joist to sill no upper venting stairs do not meet code vented windows window U-value? BLDC100 Inspection 7/8/1997 8/12/1997 8/12/1997 None DONE SKM 8/14/1997 SKM PROGRESS INSPECTION,ITEM#6&#9 HAVE BEEN COMPLETED.CABIN WILL BE POWERED BY LPG AND THE ENV FAN IN THE BATH WILL NOT BE REQUIRED IT WILL BE OK TO VENT OUT WINDOW.GAVE OK TO INSULATE ARES THAT DO NOT CONTAIN PLUMBING OR ELECT WIRING. --DO NOT ROCK--NEED DWV/SUPPLY/AND LPG TESTS. BLDB120 WSEC Compliance Review 7/18/1995 7/24/1995 None DONE TDH 10/13/1997 DLC Electric heat 30%glazing with backup heat. 10/13/97:CHANGED TO OTHER FUELS,r-19 WALL INSULATION,R-25 FLOOR,R-30 VAULT,CLASS 40 GLAZING BLDC140 Fr/Pl/MC/Pen Inspection 8/13/1998 8/13/1998 8/13/1998 None FAIL LAW 8/14/1998 KW NO ACCESS GATE LOCKED BLDC140 Fr/Pl/Mc/Pen Inspection 8/18/1998 8/18/1998 8/18/1998 None FAIL LAW 8/20/1998 KW 1.AN INSPECTION IS REQUIRED ON THE UNDERGROUND GAS LINE BEFORE IT IS BACK FILLED A 10 LB.AIR TEST IS REQUIRED ON THE LINE(WITH A GUAGE).QUESTION? WHERE IS THE SIDE PROPERTY LINE. 10'SET BACK IS REQUIRED TO THE TANK.2.PROVIDE THE APPROVED PLANS ON SITE AND THE INSPECTION CARD I NEED TO SEE WHAT CHANGES WERE MADE AND APPROVED.3.YOUR NOTE ON SITE STATES THAT YOU COMPLETED 4 CORRECTIONS FROM THE FIRST NOTICE,I CAN ONLY SEE THAT 2 WERE COMPLETED,PLEASE CALL INSULATION OK 8/18.98 PLEASE DO NOT SHEETROCK UNTIL ALL ITEMS ARE COMPLETED. BLDA920 Miscellaneous Action 3/2/2001 None DONE BLC 3/2/2001 BLC Reinstated. Mr.Haynie paid$117.50 to reinstate his permit. BLDC140 Framing/Plumbing/Mechanical 3/13/2001 3/13/2001 None FAIL GDR 3/21/2001 KLW 1.RESUBMIT APPROVED PLANS FOR CHANGES TO CONSTRUCTION,2.DO NOT SHEET ROCK INTERIOR OF STRUCTURE,3.NEED TO PROVIDE 1 TO 150 VENTING AT RIDGE OF ROOF,4.NEED SIGN OFF OF ELECTRICAL PERMIT AND APPROVAL OF BATTERY STORAGE WITHIN STRUCTURE,5.NEEDS TO INSPECT GAS LINE Page 2 of 6 caseActiviri..rpt Case Activity Listing 10/27/2017 11:07:12AM Case #: BLD95-00804 Parcel #: 423315002022 Description: RESIDENCE Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Cpdated By BLDC140 Framing/Plumbing/Mechanical 8/7/2001 8/7/2001 None PASS GDR 8/9/2001 KI.W BLDC145 Insulation Inspection 8/7/2001 8/7/2001 None PASS GDR 8/9/2001 KLW BLDC100 Inspection 8/7/2001 8/7/2001 None PASS GDR 8/9/2001 KLW BLDC100 Inspection 1/23/2002 1/29/2002 None FAIL MEC 1/30/2002 KLW TRIED TO GET TO SITE,GOT TO CLEAR CUT JUST PAST SEED ORCHARD TURN,TOO MUCH SNOW,SPOKE TO 3 GUYS FROM SIMPSON THEY SAID ONLY ONE SET OF TIRE TRACKS AND SOME SNOWMOBILE TRACKS AT SPILLAWAY,ABOUT 10/12 INCHES ON SIDES OF RD WHERE I TURNED AROUND. BLDC135 Mechanical Inspection 2/7/2002 2/7/2002 None FAIL GDR 2/8/2002 KLW DUE TO WEATHER DONDITION SNOWING LIGHTLY MIXED WITH RAIN GOT AS FAR AS GATE,FELT THAT I MAY NOT MAKE IT INTO SITE OR OUT. BLDC100 Inspection 7/19/2002 7/30/2002 None FAIL MEC 7/31/2002 KLW UNABLE TO GET IN GATE,WRONG KEY. BLDC 105 Progress Inspection 7/30/2002 8/8/2002 None PASS MEC 8/9/2002 KLW BLDA900 Telephone Call 8/23/2002 None DONE MEC 8/23/2002 MEC per phone messafe from Debra,she said that their ehat system had been changed&D.Coker had approved revised insulations values,check @ next inspection 8-23-02 MC BLDC105 Progress Inspection 2/27/2003 None DONE MEC 2/27/2003 MEC progress ok'd per photo's looks like new drywall in living room area 2-27-03 MC BLDC 105 Progress Inspection 9/2/2003 9/2/2003 None PASS MEC 9/3/2003 KLW PER PHOTOS SAME DRYWALL DONE,NO APPROVAL TO TAPE. Page 3 of 6 CaseActivity.rpt 10/27/2017 Case Activity Listing 11:07:12AM Case 4: BLD95-00804 Parcel #: 423315002022 Description: RESIDENCE Assigned Done Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By BLDC105 Progress Inspection 2/26/2004 None DONE RLS 2/26/2004 RLS Customer at counter made duplicate permit,Mark Core discussed with Cushman maintance and returned key to Mr.Haynie that county had in thier possesion for gaining access to west side of Cushman, Recieved photo's of 5/8"sheetrock installed under stairs informed customer not to mud and tape untill we can inspect and approve sheetrock this was a verbal from Mr.Core to Mr.Haynie whitnessed by Robert Shaw BLDC105 Progress Inspection 8/23/2004 8/27/2004 None PASS LAW 8/31/2004 PIB Per LW okay to"Progress"due to location and limited staff. BLDC105 Progress Inspection 2/25/2005 2/25/2005 None PASS LAW 3/1/2005 KLW PROGRESS OK BLDC105 Progress Inspection 8/25/2005 8/25/2005 None PASS TFR 8/26/2005 PIB Progressed over phone due to staff shortage. Customer said flooring done. BLDC105 Progress Inspection 3/6/2006 3/8/2006 None PASS MEC 3/9/2006 KLW PROGRESS PASS,BEDROOM DRYWALL HUNG,LIVING WALLS HUNG BLDC105 Progress Inspection 8/10/2006 8/30/2006 None PASS MEC 9/l/2006 KLW PROGRESS PASS,WAINS COAT AND GUARDRAIL,DRYWALL PASS. BLDC105 Progress Inspection 1/29/2007 2/28/2007 None PASS LAW 3/2/2007 KLW NOTE:A TREE HIT THE HOUSE IN THE FRONT,IT APPEARS TO ONLY HAVE BROKEN THE OVERHANG AND 2 OUT LOOKERS OK TO FIX AND TAKE PHOTOS BLDC105 Progress Inspection 2/1/2008 2/1/2008 None PASS PIB 2/22/2008 PIB Progressed over the phone: They have done sheetrockand taping.Note: Their road was washed out in the big December storm.The only access at this time is by boat. This has slowed their progess due to the inability to bring many supplies over. BLDC105 Progress Inspection 7/27/2007 8/1/2007 None PASS LDK 8/25/2008 PIB FIXED FRONT TREE DAMAGE BLDC105 Progress Inspection 8/25/2008 8/25/2008 None PASS PIB 8/25/2008 PIB Progressed over the phone: Sheetrock,mud&taped. Doors hung. Page 4 of 6 CaseActivity..rpt Case Activity Listing 10/27/201 11:07:12AM Case#: BLD95-00804 i� Parcel#: 423315002022 Description: RESIDENCE Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By BLDA900 Telephone Call 2/20/2009 None INFO PIB 2/20/2009 PIB Mrs Haynie called to alert us that her area is snowed in and they are accessing by boat. They are due for a progress inspection by Feb 25th. I told her to call when we could get access. (Their progress inspections have been consistent up to this time.) BLDC105 Progress Inspection 8/5/2009 8/20/2009 None PASS PIB 8/5/2009 PIB Progressed over the phone: They are almost done with the sheetrocking. BLDC105 Progress Inspection 8/12/2010 8/20/2010 None PASS PIB 8/12/2010 PIB Progress/Phone: Mudding and taping drywall BLDC105 Progress Inspection 2/20/2011 2/20/2011 None DONE PIB 2/28/2011 PIB Over Phone: Almost done with the last of sheetrock/taping. BLDC105 Progress Inspection 8/22/2011 8/22/2011 None COND PIB 8/22/2011 PIB Progress over the phone-Westside Cushman-put up pickets along deck. (Note: No way to put"DONE"in for progress inspection.) BLDC105 Progress Inspection 2/3/2012 2/3/2012 None DONE KS KS 2/26/2013 KS SHEETROCK BLDC 105 Progress Inspection 8/22/2012 8/22/2012 None DONE KS KS 2/26/2013 KS MORE SHEETROCK BLDC105 Progress Inspection 2/26/2013 2/26/2013 None DONE KS KS 2/26/2013 KS MORE SHEETROCK BLDC105 Progress Inspection 8/23/2013 8/26/2013 None DONE PIB 8/23/2013 PIB Progress/Phone: working on deck railing. BLDC105 Progress Inspection 8/20/2014 8/20/2014 None DONE MKW 8/20/2014 MKW Done sheetrock. Just needs slats on deck outside. Won't be ready for final until next summer. Says August of next year.Told caller to call in within the next 180 days so we can set her up for an onsite progress inspection. Page 5 of 6 CaseActivity..rpt Case Activity Listing l M 1117:07:12A2 07:1M Case#: BLD95-00804 �� Parcel#: 423315002022 Description: RESIDENCE .Assigned Done Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By BLDC105 Progress Inspection 3/9/2015 None DONE MJD 3/9/2015 M.ID Phone-Spoke to Deborah who said sheetrock is finished and will be ready for inspection soon.Advised inspection will need to be done even for progress next time. BLDA900 Telephone Call 8/7/2015 None DONE JBN 8/7/2015 JBN Deborah called and wanted to give a progress inspection over the phone,said they are still working on sheet-rocking. I advised her that they need to have an inspection this time around and will have the scheduler call them this afternoon to schedule that. BLDC105 Progress Inspection 8/12/2015 8/12/2015 None DONE MJD 8/12/2015 MJD Per LDK,did over the phone progress instead due to scheduling.Deborah said they are almost done with the deck railing and other interior projects.Should be ready for inspection within 6 mo. BLDC105 Progress Inspection 3/8/2016 None DONE MJD 3/8/2016 MJD Spoke to owner via phone who said they should he ready for an inspection this summer.Sheetrock is close to completion. BLDC105 Progress Inspection 9/9/2016 9/9/2016 None DONE MLW 9/9/2016 MLW PROGRESS/PHONE:SHEETROCK AND RAILING AROUND DECK BLDC105 Progress Inspection 3/6/2017 None DONE JAK 3/6/2017 JAK GETTING CLOSER,MORE SHEET-ROCK TO DO BEFORE NEXT INSPECTION(THIS FALL) &/-7 -f i S -jV,,'5 A� LP Page 6 of 6 CaseActivity..rpt CONCRETE MECHANICAL MANUFACTURED HOME Footings f Setbacks oattGas Piping By Ribbons tnteriorDate By Interior-Date By Date ay Exterior Date By Exterior-Date B Set-up Point Load!Isolated Footings INSULATION Date 13Y Date By Data SLAB INSULATION' By FIRE DEPARTMENT Foundation Wails Floors Date By Date By Data By DECKS FRAMING Walls Date By Date k3y Date + PROPANE TANKS PLUMBING Vault Data By Date By OTHER Groundwork Attic Type_ �( Date By Date By Date Ply D.W_V DRYWALL, Type- Int Brace Wall Date By Date By pate ey FINAL INSPECTION Water Line Fire Separation Date By Date By Date By m Pass or Request Inspect. ° Type of Insp. Fail Date Date Done By Comments CD a ' 0 CD rid) a- ► 13 3 z u e., 8 .� 0 � �►� Y•R tn _ -3 CD 0 1 <'%NI CRElT_ElT MECHANICAL MOBILE HOME i Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date Set UP date INSULATION dale by BCG/SLAB Insulation Floors Fuial Bale by date by date by FRAMING Walls FIRE DEPT. date _ by date by date by PLUhl.E ING Attic OTHER Groundwork ate by date by d dale . WALLBOARD NAILING date by date by Water Una — FINAL INSPECTION date by date by date by I _�Z ✓�J�I Z C ICJ, —�_ ` .4 -- ---C4A-,Q. — ��r—V�� CFO _�1 ' C].Clc�� (J�Nt- - :����Jl:,•'�— ---��/ � _9C. — 12 I •x GHQ S C/v� 5 i tlCC1J O,r`� j7-LOC)Z I5 tL ic�.t/ Mtz=`ii��q� our; o 6o; X-5 64X AS 0& du 8 z— Rioors- 4P� f]� n ow-o?7--0 4 ph o1r LW cute L - 2- �p� Ore S --:'Y! G ,✓ �s o k TFfZ �ov v Jane due fa l e — 0 to — — bi wAIA !AS C'OK1 Is • ' 1 p►^a+gr-rf� ok p,b —pvsr �d�e pkvwc. S{-a,.-E.r..j al,...-Irc,�C , 2. -1-oY .z- I- a rd .^D6//itSS �u .e. _ n,,.... o M d«,� 9 CG Y L ,t ntr ..•.+�,. _oa � u_-,�— File Edit [iptioril- ' indoor Help 1-* Exit I r!-•r+ op...n To Do QBE FEE t �Cle•:e Edit Prol«t Group Add Cron c P•,r A-t,,ity P.:aplc Fecc 'v�luation Cor ,jrtion. P7caee fJarrle: RICHARD HAYNIE Updated: 1'13f00 KW Address: 2800 N CUSHMAN RIDGE DR HOODSPORT Description: Pt.laster#.ISWG94-0 1 0 016 Project: CUSHMAN tv O:-tr.•° CC. ,area a _ Mobile Directions to Site: Plumbinq , if•1 THE •+-'.'E.,TSlDE OF 1_4 E ?Ih. P: I_1P•1 T11%.1BEP Ll)l,l,lfJ F'DS TOLA,l E Type of Use: _I l n f1e F a rn l l'y Mechanical Type ofV,%ark: 1,1P :3ticr elinc Inspection area: '- Finaled: _ I��ued: �`3U, 3 Fire District: 1;-1 Expiration: F-5p,77c, Received: ='!1�1"?h � Total Valuation: Printing Lase'SLin-irnary Report for BLD95-00804 ;Start ' A•iicrosoft Excei-WKSH01... PERMWPLAN k; -13 - ,.2WI P,M,,O LF,4 —n-,l &t44207 su.LA 7_/0" --� -c� � ��7 /r�►,�t/� ���T �','�,�1 �(l•yam ��� ..��'�� Copyright©1997-1999 Tidemark Computer Systems Inc. 312/01 All Rights Reserved. Building Permit # s=—bCy MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location A/ ea5l,," (6r- Z).2 This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance /1 i7 v��13 n, , a J.Zc�J. p Lt��l f y• C Lt �'l��j;f S jlJ L'0,&-is r!2 uC,TGl1 ' U O T -5#je-' % -/7:�>v< C i �,G i Dot= !��' ��"- its�L_ � i ce[���•r'L e/= You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection ❑ OK to ❑ This is not a complete inspection Department Date ' /3- G021 Inspector ■ os NnT MnV THI - TmL111141111111, ,�i2i01 Information Summary for Case #: BLD95-00804 3:19:52 PM Activity Hold Updated Activity Description Date 1 Date 2 Date 3 Disp. Level By Updated BLDA010 Application received 6/15/95 KW 6/15/95 BLDB134 RLC Checklist Review 7/17195 DONE DMB 7/17/95 Reviewed geotech report submitted for HPA by Bradley-Noble. SMP shoreline. BLDB135 Addressing 6/20/95 DONE GMM 6/20/95 BLDB110 Structural Plan Review 7/17/95 7/18/95 DONE DWH 7/19/95 BLDB130 Planning Review 6/15/95 7/17/95 DONE DMB 7/17/95 BLDB200 Environmental Health Review 7/24/95 7/28/95 HOLD PSD 7/31/95 Need approved design. psd BLDB210 Water Adequacy 7/24/95 7/28/95 HOLD PSD 7/31/95 They propose to use a surface water spring.According to the water adequacy requirements,they need a certificate of water right from DOE. I called the applicant and told her to call Sherry Fox at DOE.psd BLDB120 WSEC Compliance Review 7/18/95 7/24/95 DONE DLC 10/13/97 Electric heat 30%glazing with backup heat. 10/13/97:CHANGED TO OTHER FUELS, r-19 WALL INSULATION, R-25 FLOOR, R-30 VAULT,CLASS 40 GLAZING BLDB008 Variance Review 8/29/95 8/30/95 DONE KS 8/30/95 The varaince to allow the release of the building permit prior to obtaining surface water rights was granted.psd BLDB200 Environmental Health Review 8129/95 9/30/95 DONE PSD 8/30/95 approved design plot plan matches. psd BLDB210 Water Adequacy 8/29/95 8/30/95 DONE PSD 8/30/95 See the variance notes.They are going to use a surface water spring.psd BLDA100 Approved For Issuance 9/30/95 DONE KS 8/30/95 BLDA500 (F)Issue building permit 8/30/95 DONE KS 8/30/95 BLDC110 Footing inspection 4/8/96 4/9/96 4/9/96 DONE MJB 5/2/96 pend photo per Rob Lum and Dana Herron. O.K. 4-9-96 M. BYRNE BLDC140 Fr/PI/Mc/Pen Inspection 9/30/96 10/3196 FAIL RDL 10/4/96 submit plan changes elect. not installed bath fans not installed fire blocking at stairs and landing blocking 2x12 mid span 1/2 air gap at beam ends post to beam connect nail floor joist to sill no upper venting stairs do not meet code vented windows window U-value? BLDC100 Inspection 7/8/97 8/12/97 8/12/97 DONE SKM 8/14/97 PROGRESS INSPECTION , ITEM#6&#9 HAVE BEEN COMPLETED.CABIN WILL BE POWERED BY LPG AND THE ENV FAN IN THE BATH WILL NOT BE REQUIRED IT WILL BE OK TO VENT OUT WINDOW.GAVE OK TO INSULATE ARES THAT DO NOT CONTAIN PLUMBING OR ELECT WIRING. --DO NOT ROCK--NEED DWV/SUPPLY/AND LPG TESTS. BLDC140 Fr/PI/Mc/Pen Inspection 8/13/98 8/13/98 8/13/98 FAIL KW 8/14/98 NO ACCESS GATE LOCKED BLDC140 Fr/PI/Mc/Pen Inspection 8/18/98 8/18/98 8/18/98 FAIL KW 8/20/98 1.AN INSPECTION IS REQUIRED ON THE UNDERGROUND GAS LINE BEFORE IT IS BACK FILLED A 10 LB.AIR TEST IS REQUIRED ON THE LINE(WITH A GUAGE).QUESTION?WHERE IS THE SIDE PROPERTY LINE. 10'SET BACK IS REQUIRED TO THE TANK.2. PROVIDE THE APPROVED PLANS ON SITE AND THE INSPECTION CARD I NEED TO SEE WHAT CHANGES WERE MADE AND APPROVED. 3.YOUR NOTE ON SITE STATES THAT YOU COMPLETED 4 CORRECTIONS FROM THE FIRST NOTICE, I CAN ONLY SEE THAT 2 WERE COMPLETED, PLEASE CALL INSULATION OK 8/18.98 PLEASE DO NOT SHEETROCK UNTIL ALL ITEMS ARE COMPLETED. BLDA560 Permit cancelled 1/13/00 DONE KW 1/13/00 4ROA920 Miscellaneous Action 31ft DONE No Hold BLC 3/2/01 mod. Mr,,Haynie paid$117.50 to reinstate his permit. 3- 1 S, iti r zLJ ��!i.0 L ' L1r�.• r� 7� �cln.� c 4Qcm 2i8i01 Information Summary for Case #: BLD95-00804 7:50:03 AM Activity Hold Updated Activity Description Date 1 Date 2 Date 3 Disp. Level By Updated BLDA010 Application received 6/15/95 KW 6/15/95 BLDB134 RLC Checklist Review 7/17/95 DONE DMB 7/17/95 Reviewed geotech report submitted for HPA by Bradley-Noble. SMP shoreline. BLDB135 Addressing 6/20/95 DONE GMM 6/20/95 BLDB110 Structural Plan Review 7/17/95 7/18/95 DONE DWH 7/19/95 BLDB130 Planning Review 6/15/95 7/17/95 DONE DMB 7/17195 BLDB200 Environmental Health Review 7/24/95 7/28/95 HOLD PSD 7/31/95 Need approved design. psd BLDB210 Water Adequacy 7/24/95 7/28/95 HOLD PSD 7/31/95 They propose to use a surface water spring.According to the water adequacy requirements,they need a certificate of water right from DOE. I called the applicant and told her to call Sherry Fox at DOE. psd BLDB120 WSEC Compliance Review 7/18/95 7/24/95 DONE DLC 10/13/97 Electric heat 30%glazing with backup heat. 10/13/97:CHANGED TO OTHER FUELS, 09 WALL INSULATION, R-25 FLOOR, R-30 VAULT,CLASS 40 GLAZING BLDB008 Variance Review 8/29/95 8/30/95 DONE KS 8/30/95 The varaince to allow the release of the building permit prior to obtaining surface water rights was granted.psd BLDB200 Environmental Health Review 8/29/95 9130/95 DONE PSD 8/30/95 approved design plot plan matches.psd BLDB210 Water Adequacy 8/29/95 8/30/95 DONE PSD 8/30195 See the variance notes.They are going to use a surface water spring.psd BLDA100 Approved For Issuance 9/30/95 DONE KS 8/30/95 BLDA500 (F)Issue building permit 8/30/95 DONE KS 8/30/95 BLDC110 Footing inspection 4/8/96 4/9/96 4/9/96 DONE MJB 5/2/96 pend photo per Rob Lum and Dana Herron.O.K. 4-9-96 M. BYRNE BLDC140 Fr/PI/Mc/Pen Inspection 9/30/96 10/3/96 FAIL RDL 10/4/96 submit plan changes elect. not installed bath fans not installed fire blocking at stairs and landing blocking 2x12 mid span 1/2 air gap at beam ends post to beam connect nail floor joist to sill no upper venting stairs do not meet code vented windows window U-value? BLDC100 Inspection 7/8/97 8/12/97 8/12/97 DONE SKM 8/14/97 PROGRESS INSPECTION , ITEM#6&#9 HAVE BEEN COMPLETED.CABIN WILL BE POWERED BY LPG AND THE ENV FAN IN THE BATH WILL NOT BE REQUIRED IT WILL BE OK TO VENT OUT WINDOW.GAVE OK TO INSULATE ARES THAT DO NOT CONTAIN PLUMBING OR ELECT WIRING. --DO NOT ROCK--NEED DWV/SUPPLY/AND LPG TESTS. BLDC140 Fr/PI/Mc/Pen Inspection 8/13/98 8/13/98 8/13/98 FAIL KW 8/14/98 NO ACCESS GATE LOCKED BLDC140 Fr/PI/Mc/Pen Inspection 8/18/98 8/18/98 8/18/98 FAIL KW 8/20/98 1.AN INSPECTION IS REQUIRED ON THE UNDERGROUND GAS LINE BEFORE IT IS BACK FILLED A 10 LB.AIR TEST IS REQUIRED ON THE LINE(WITH A GUAGE).QUESTION?WHERE IS THE SIDE PROPERTY LINE. 10'SET BACK IS REQUIRED TO THE TANK.2. PROVIDE THE APPROVED PLANS ON SITE AND THE INSPECTION CARD I NEED TO SEE WHAT CHANGES WERE MADE AND APPROVED.3.YOUR NOTE ON SITE STATES THAT YOU COMPLETED 4 CORRECTIONS FROM THE FIRST NOTICE, I CAN ONLY SEE THAT 2 WERE COMPLETED, PLEASE CALL INSULATION OK 8/18.98 PLEASE DO NOT SHEETROCK UNTIL ALL ITEMS ARE COMPLETED. BLD=, Permit cancelled 1/13/00 DONE KW 1/13/00 ore Yz- DF Z)1Z1m1aL pzemtr fEt Foc ;iFE-up of PEe_"1i. Bt ildino Permit# _C11J5-os0`4 MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE _ Job Location CU s 1. �� �/� This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance G G S CJ Y- I- ) 1 re 4 dv You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection ❑ OK to ❑ This is not a complete inspection Department Date Inspector / - moos NOOT MOOV THU- T A