HomeMy WebLinkAboutGeological Assessment for GRD2008-00001 - GEO Geological Review - 5/6/2008 FR E C E I Vlf "l LEE� CCD - PLANNING KENNETH NEAL & ASSOCIATES CONSULTING ENGINEERING GEOLOGISTS 3314 Gibraltar Ct. S.E.,Olympia,WA 98501-3968 Telephone: (360)352-5125 Fax: (360)236-0201 e-mail: kengneal�aJaoLcom was May 6,2008 a �o MEMORANDUM TO: Mason County Department of Community Development ATTENTION: Robert D.Fink,AICP,Planning Manager Engineering Geolo t 100 FROM: Kenneth G.Neal,L.G.,L.E.G.,Principal Engineering Geologist c��sed SUBJECT: Review Comments—GRD 2008-00001 KENNETH G. NEAL "Geological Assessment for S & J Johnson Industrial Property, Parcel No. 12321 34 00030, Mason County, Washington, Mason County, Washington," report, dated April 9, 2008, to S & J Johnson, Inc., and "Geological Assessment Addendum #1 for S&J Johnson Industrial Property, Parcel No. 12321 34 00030," letter, dated April 29, 2008, to S&J Johnson, LLC, both written by Envirotech Engineering The addendum letter was written to provide a site plan with a north arrow pointed in the correct direction rather than east as shown on the site plan in the original report. We recommend this assessment be approved, in that there was no evidence of slope movement or erosion identified by the consultant. We did identify several deficiencies in the report that should be noted: 1. The soil classifications presented in the report on Page 6 do not match the percentages provided with the soil descriptions. Both soils were described on Page 7 as having less than five percent fines, giving them both Unified Soil Classifications of SP rather than SM. 2. The site plan appears to have been drafted at a larger sheet size and then reduced. This renders the notations for the test pit locations barely visible, and the symbols used for test pit designation invisible even under magnification. 3. The property lines on the site plan for the west half of the parcel are, with the exception of the north property line, incorrectly scaled. Using the 1-inch equals 200-foot scale shown on the drawing, the west property line measures 778 feet, not the 770.98 shown, and the south property line measures 512 feet, not 517.18. The locations for building and drainfield placement shown on this site plan should be considered suspect. None of these issues adversely affects geotechnical considerations for site development. If you have any questions, please call. I can most easily be reached on my cell phone at 360-280-6180. 2 copies submitted KENNETH NEAL & ASSOCIATES CONSULTING ENGINEERING GEOLOGISTS 3314 Gibraltar Ct.S.E.,Olympia,WA 98501-3968 Telephone: (360)352-5125 Fax: (360)236-0201 e-mail: kengnealaa aoGcom o{ May 6,2008 aye MEMORANDUM TO: Mason County Department of Community Development ATTENTION: Robert D.Fink,AICP,Planning Manager n;inee ,9 , gist 100 x FROM: Kenneth G.Neal,L.G.,L.E.G.,Principal Engineering Geologist SUBJECT: Review Comments—GRD 2008-00001 KEN:NETH G. NEAL "Geological Assessment for S & J Johnson Industrial Property, Parcel No. 12321 34 00030, Mason County, Washington, Mason County, Washington," report, dated April 9, 2008, to S & J Johnson, Inc., and "Geological Assessment Addendum #1 for S&J Johnson Industrial Property, Parcel No. 12321 34 00030," letter, dated April 29, 2008, to S&J Johnson, LLC, both written by Envirotech Engineering The addendum letter was written to provide a site plan with a north arrow pointed in the correct direction rather than east as shown on the site plan in the original report. We recommend this assessment be approved, in that there was no evidence of slope movement or erosion identified by the consultant. We did identify several deficiencies in the report that should be noted: 1. The soil classifications presented in the report on Page 6 do not match the percentages provided with the soil descriptions. Both soils were described on Page 7 as having less than five percent fines,giving them both Unified Soil Classifications of SP rather than SM. 2. The site plan appears to have been drafted at a larger sheet size and then reduced, This renders the notations for the test pit locations barely visible,and the symbols used for test pit designation invisible even under magnification. 3. The property lines on the site plan for the west half of the parcel are, with the exception of the north property line, incorrectly scaled. Using the 1-inch equals 200-foot scale shown on the drawing, the west property line measures 778 feet, not the 770.98 shown, and the south property line measures 512 feet, not 517.18. The locations for building and drainfield placement shown on this site plan should be considered suspect. None of these issues adversely affects geotechnical considerations for site development. If you have any questions, please call. I can most easily be reached on my cell phone at 360-280-6180. 2 copies submitted Envirotech Engineering 74 NE Hurd Road, Belfair, WA 98528 April 30, 2008 R CEIVED Att. James Scholz 'yY i. 1 7(In-8 1 Mason County Department of Community Development PO Box 279 Shelton, Washington 98584 RE: Geological Assessment Addendum for Parcel# 1232134 00030, Mason County, Washington Dear Mr. Scholz, Envirotech Engineering (Envirotech) has completed comments and revisions to the referenced geological assessment. Three original copies are enclosed. Please contact Michael Staten at 360-275-9374 if you have any questions or require additional information. Yours Truly, Envirotech Engineering 7w 5A; Michael Staten, P.E. Project Director OFFICE: 360-275-9374 CELL: 360-689-6045 FAX: 360-275-4789 EMAIL: envirotech@geotechnicalinfo.com Envirotech Engine Bring Qom,, 74 NE Hurd Road, Belfair, WA 98528 April 29, 2008 � Z3ik p S&J Johnson, LLC. PO Box 488 Belfair, Washington 98528 RE: Geological Assessment Addendum #1 for S&J Johnson Industrial Property, Parcel No. 12321 34 00030, Mason County, Washington Envirotech Engineering (Envirotech) has completed this geological assessment addendum for the above referenced property. The original report, dated April 9, 2008, was prepared by Envirotech (Project #0837). This addendum was prepared in order to provide additional information requested by Keneth Neal & Associates concerning the project and the aforementioned geological assessment. The Site Plan in the original geological assessment depicts an incorrect north arrow and title block. All directional observations provided in the original assessment provide correct information. A revised Site Plan is attached to this addendum, and site features with relation to the proposed development are shown on this Site Plan. Envirotech is pleased to submit this addendum for the S&J Johnson industrial property. This addendum provided corrections and/ or additional information concerning the project. Conclusions and/ or recommendations did not change from the original geological assessment. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Best Regards, Envirotech Engineering CLYD �`G F NVASy� 9jF P � 43045 ct� �SS�UNAL E�G1 EXPIRES JAN 10,2009 Michael Staten, P.E. Project Manager Envirotech Engineering Geological Assessment Addendum#1 Ph. 360-275-9374 Page I of 1 S&J Johnson Industrial Property Fax 360-275-4789 Parcel 1232134 00030 April 30,2008 ATTACHMENTS 1. SITE PLAN 1 I ' SCALE, I INCH 2W FEET I �TF 3 XISTING ACCESS ROA D (NE PENINSULA PLACE) APPRX• EXISTING NURSERY EXISTING SCALE HOUSE Z� WETENRETEN POND w 17y� fr� IFIEL N 21•48 U.S. NAVAL RR ROM J NJ� "✓ DRADF EXISTING STING L-619.45' R-1229,37, BUILDING CENTERLINE EXISTING Hm wG al I smwc ce PARKING d y1� Syr D EXISTING at FILL DRAINFTELD SLOPES (SEE REPORT) � PRtiO�ED IIm.DUG p ,�. i1 Y q ELEV.R4IA • 2 CR fP2 Sd PAt>PDSED n KM9M M APPROXIMATE PAD LOCATION O ELEVAMIA 4OFT UTILITY AND ACCESS PROPOSED RETENTION RD POND h�E j�yIO1 TEN '•. M •,. p _...............N RTY LINE 770.96' N 00'57 07E PROJECT/ OWNER/ LOCATIONi S&J J❑HNS❑N GE❑L❑GICAL ASSESSMENT SiJ JOHNSON, LLC PARCEL NO 12321 34 00030 MASON COUNTY, WASHINGTON ENGINEER LEGEND ENVIROTECH ENGINEERING 2/* 74 NE HURD ROAD SLOPE DIRECTION BELFAIR, WASHINGTON 98328 TPI r36TEST PI7 0-275-9374SITE PLAN P� I2,S -3`-l - o ()® 3/0 RECEIVED APR 11 cJLid MASON COUNTY RECEIVED Geological Assessment MAY 0 7 2008 for NICCD - PLANNING S & J Johnson Industrial Property Parcel No. 1232134 00030 Mason County, Washington April 9, 2008 Project#0837 Prepared For: S & J Johnson, Inc. CLYDFST PO Box 488 C�,Pti w,Asy, gT Belfair, Washington 98528 Prepared By: Envirotech Engineering �43045� ww� 74 NE Hurd Road �FSS/ 'ISTIE Belfair, Washington 98528 Phone: 360-275-9374 F EXPIRES JAN 10,200s Fax: 360-275-4789 TABLE OF CONTENTS 1.0 INTRODUCTION...........................................................................................................................1 1.1 PROJECT INFORMATION............................................................................................................... 1 1.2 PURPOSE OF INVESTIGATION........................................................................................................ 1 1.3 SCOPE OF WORK........................................................................................................................... 1 2.0 SURFACE CONDITIONS..............................................................................................................3 2.1 GENERAL OBSERVATIONS............................................................................................................ 3 2.2 TOPOGRAPHY...............................................................................................................................3 2.2.1 Upslope Geomorphology....................................................................................................... 3 2.2.2 Downslope Geomorphology.................................................................................................. 3 2.3 SURFACE DRAINAGE.....................................................................................................................4 2.4 SLOPE AND EROSION OBSERVATIONS...........................................................................................4 3.0 SUBSURFACE INVESTIGATION.................................................................................................5 3.1 FIELD METHODS,SAMPLING AND FIELD TESTING........................................................................5 3.2 GEOLOGIC CONDITIONS...............................................................................................................5 3.3 SPECIFIC SUBSURFACE CONDITIONS.............................................................................................5 3.3.1 Groundwater......................................................................................................................... 6 3.4 SOILS TESTING.............................................................................................................................6 3.4.1 Visual Classification............................................................................................................. 7 4.0 ENGINEERING CONCLUSIONS..................................................................................................8 4.1 LANDSLIDE HAZARDS................................................................................................................... 8 4.1.1 Septic Drainfield Impacts...................................................................................................... 9 4.1.2 Surface and Subsurface Drainage........................................................................................ 9 4.1.3 Off-site impacts................................................................................................................... 10 4.2 EROSION HAZARDS..................................................................................................................... 10 4.3 SEISMIC HAZARDS...................................................................................................................... 10 4.4 OTHER CONSIDERATIONS........................................................................................................... 11 5.0 CLOSURE..................................................................................................................................... 12 Appendix A- Site Plan Appendix B - Soil Information Soil Logs Well Reports 1.0 INTRODUCTION Envirotech Engineering (Envirotech) has completed this geological assessment for a partially developed industrial property identified as parcel number 12321 34 00030 located in Mason County, Washington (Project). As presented herein, this assessment includes information pertaining to the Project in this Introduction Section; observations of the property and surrounding terrain in the Surface Conditions Section; field methods and soils descriptions in the Subsurface Investigation Section; and, assessments for landslides, erosion and seismic hazards in the Conclusions Section. An initial geological/geotechnical evaluation of the Project was conducted by Envirotech without the property owner, on April 7, 2008. It was previously determined that slopes between 15% and 40% were present within 300 feet of the planned development, and subsequently will require a geological assessment pursuant to landslide hazard areas of the Mason County Resource Ordinance (MCRO). During the evaluation and site visit by Envirotech, surface and subsurface conditions were assessed. After completion of the field work and applicable Project research, Envirotech prepared this geological assessment. 1.1 Project Information Information pertaining to the Project was provided by the property owner, S & J Johnson, Inc., and general assumptions typical of this type of development. The Project is accessed from NE Peninsula Place connecting State Highway 3. See the vicinity map on the following page of this report. The new development is expected to consist of approximately 32,700 cubic yards of grading for building pads, access and stormwater management. Building construction is not anticipated at this time. However, buildings will be part of the long range development of this parcel. Approximate site development with relation to existing site features are illustrated in the Site Map in Appendix A. 1.2 Purpose of Investigation The purpose of this geological assessment was to evaluate the Project in order to confirm that the proposed development is outside of any landslide hazard area and its associated buffers and setbacks as determined in the MCRO. The investigation included characterizing the general Project surface and subsurface conditions, and evaluating the suitability of the soils to support the planned site development. 1.3 Scope of Work In order to fulfill the purpose of investigation, the geological/ geotechnical program completed for the proposed improvements of the Project include: • Review project information provided by the Project owner/developer; • Conduct a site visit to document the site conditions that may influence the Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 1 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9,2008 i construction and performance of the proposed improvements; • Define the general subsurface conditions of the site by observing several existing excavations within the Project, and review well logs from existing wells near the Proj ect; • Perform soils testing to determine selected index properties of the soils that includes 2 visual classifications; • Complete an engineering assessment supported by planned site alterations, and the surface and subsurface conditions that were identified by the field investigation, soil testing, and applicable Project research; and, • Establish engineering conclusions based on findings and anticipated development. 0 48 17 CL 24 19 ZD �NENHNKRKRD` T231 IRZW � 121.4111 Ns WAY ■ - eL` 29 '� 28i�y Pro ect m� 31 HOOD CAN ' 32 33 0 1 4961h Vicinity Map from Mason County Website Envirotech Engineering Geological Assessment Ph 360-275-9374 page 2 Parcel 1232134 00030 Fax:360-275-4789 Mason County,Washington April 9,2008 a, 2.0 SURFACE CONDITIONS Information pertaining to the existing surface conditions for the Project was gathered on April 7, 2008 and prior visits by Michael Staten, geotechnical engineer with Envirotech. During the site visit, site features were documented, soil samples were collected from This Surface selected locations, and near-surface soils were visually classified. Conditions Section provides information on general observations, vegetation, topography, drainage and slope/ erosion conditions for the Project and surrounding areas that may impact the Project. 2.1 General Observations i currently partially developed land as previously mentioned and The Project s p y , Y P Y P surrounded by commercial, industrial and residential development. A Navy railroad ROW extends in a north-south direction through the middle of the property. A portion of the property is used for construction materials such as sand and gravel, another area is designated as a nursery, and another building used as a mechanic shop, staging and storage. Vegetation on the property consists of firs, madronas, blackberry, and other trees and shrubbery common to this area of the Pacific Northwest. An aerial photo of the project and immediate vicinity is provided on the following page. 2.2 Topography The Project is situated within and near moderate terrain. The topographic information provided in this section was extrapolated from a public lidar source, and incorporated observations and field measurements. See the Site Map in Appendix A for an illustration of the general slope indicators with respect to the planned development. 2.2.1 Upslope Geomorphology Ascending grades are located to the east of the planned development. These slopes are generally 10 to 15 percent. Structural fill with approximate 2:1 inclinations exist for the railroad foundation, and the existing building/ parking foundation. There are no apparent natural water bodies or wetlands located upslope from the planned development. A retention pond is located to the east of the railroad, and the railroad embankment serves as a dam with a culvert for overflow. 2.2.2 Downslope Geomorphology Descending grades of up to approximately 25% exist near the west property line in the middle of the property. To the west, this slope ranges from 20% to 25% with a vertical relief of nearly 200 feet. Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 3 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9,2008 2.3 Surface Drainage The majority of the stormwater runoff originating upslope from the anticipated development is expected to be minimal due to the railroad embankment directing water to the retention pond. Surface water to the east of the railroad appears to mostly sheet flow towards the west. Excessive scour, erosion or other indications of past drainage problems were not observed at or near the planned development. 2.4 Slope and Erosion Observations The existing moderate slopes near the Project signal a potential landslide or erosion hazard area. Some indicators that may suggest past slope movements include: • Outwash of sediments near the bottom of the slope, • Fissures, tension cracks or naturally stepped land masses on the face or top of the slope, and parallel to the slope, • Fine, saturated subsurface soils, • Old landslide debris, • Significant bowing or leaning trees, or, • Slope sloughing or calving. Significant mass wasting on the property or within the general vicinity of the Project were not observed or discovered during research. Indications of past landslides, current unstable slopes, deep-seated slope problems, or surficial slope failures were not observed during the site visit. pt 5 496ft Aerial Photo from Mason County Website Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 4 Parcel 1232134 00030 Fax:360-275-4789 Mason County,Washington April 9,2008 3.0 SUBSURFACE INVESTIGATION Information on subsurface conditions pertaining to the Project was gathered during research and site visits on February 26, and April 7, 2008 by Michael Staten, geotechnical engineer with Envirotech. Specific information on field methods, sampling, field testing, subsurface conditions, and results from soil testing are presented in this section of the report. Appendix B has pertinent information on subsurface conditions for the Project, including two test pit logs representative of the site soils, and one water well report. 3.1 Field Methods, Sampling and Field Testing Information on subsurface conditions for the Project was accomplished by observing soils within several existing test pit excavations of up to approximately 7 feet below the existing ground surface. Information on subsurface conditions also included reviewing water well reports originating from nearby properties. No soil samples were collected for this Project. Envirotech measured the relative density of the in-situ soils by gauging the resistance of hand tools. Field testing results generally indicated loose to medium dense soils in the upper 12 inches, medium dense soils from 12 inches to 30 inches below natural ground, and medium dense to dense soils within the testing locations from 30 inches below natural ground to the depth of terminous. 3.2 Geologic Conditions In general, soils at the project are composed of materials from glacial advances. The geologic conditions as presented in the "Geologic Map of Washington," compiled by J. Eric Schuster, 2002 indicates Quaternary sediments, Qg. Quaternary sediments are generally unconsolidated deposits, and dominantly deposited from glacial drift, including alluvium deposits. This project is located within the Puget Lowland. Typically, "lower tertiary sedimentary rocks unconformably overlie the Crescent Formation." as revealed in the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and coal deposits from rivers. During the Quaternary period, the Puget Lowland was covered by numerous ice sheets, with the most recent being the Fraser glacier with a peak of approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by glacial erosion glacial drift deposits. As previously mentioned, the Project is located in the Puget Lowland with sedimentary rocks dominated by glacial drift. The NRCS soil type is of the Indianola series, and according to soil mapping, is considered loamy sand. 3.3 Specific Subsurface Conditions The following subsurface conditions are estimated descriptions of the Project subgrade Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 5 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9,2008 utilizing information from the depth of penetration at all testing, sampling, observed and investigated locations. Soils for this project were described utilizing the Unified Soil Classification System (USCS). Using the USCS in conjunction with estimated relative densities and other anticipated engineering properties of the soil, susceptibility for potential landslides, erosion and seismic hazards may be assessed. The Project is composed of mostly native soils beneath an organic/ soil mixture of about 6 to 8 inches, with indications of borrowed fill. The fill beneath existing building and parking areas are reportedly structural fill. The fill beneath the railroad tracks that divide the property is assumed to be structural fill. For engineering purposes, these native soils consist of distinguishable layers, as presented below. Soils within the upper 3 to 4 feet of natural ground are primarily moist, loose to medium dense brown poorly graded sand with gravel (SM) and few silts. Gravels are primarily well-graded, and subrounded. Sand content was primarily fine to medium, and the fines content exhibited none to low plasticity. Soils beginning at 3 feet to 4 feet below the ground surface to an unknown depth is medium dense to dense, moist, brown poorly graded sand with gravel (SM). Gravel content is primarily subrounded and coarse. Sand content was primarily medium. Only a trace of fine soils were exhibited within this strata. According to the well reports, the sand and gravel soils may extend to depths of over 140 feet below the ground surface. 3.3.1 Groundwater From the water well report and knowledge of the general area, permanent groundwater is expected to be greater than 100 feet directly below the property near the existing building pad location. Seepage or other perched groundwater was not observed or indicated on the well report. Overall, the upper subsoil consists of a high permeable stratification due to the soil classification and relative density. 3.4 Soils Testing The soil samples obtained at the Project site during the field investigation were preserved and transported for possible laboratory testing. Visual classification of soils was performed in the field. The following soil tests were performed in accordance with the American Standards for Testing and Materials(ASTM): 2 Visual Classifications (ASTM D2488) Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 6 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9, 2008 3.4.1 Visual Classification The general results from the visual classification are presented above in the Subsurface Conditions Section at depths of up to 7 feet below the natural ground surface. Specifically, soils within the upper 3 to 4 feet in many test pits consisted of approximately 35% gravel, 60% sand-sized soils, and less than 5% silts. Soils below the previously referenced strata consisted mostly of about 20% gravel, 80% sands, and 0% to a trace of silts. Minor variations observed during the visual classification of particle size content (i.e. gravel, sand, fines), or isolated pockets within the soil stratification were insignificant in relation to the overall engineering properties of the soil. Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 7 Parcel 1232134 00030 Fax: 360-275-4789 Mason County,Washington April 9,2008 4.0 ENGINEERING CONCLUSIONS The following sections present engineering assessments and conclusions concerning the proposed development of the Project. These conclusions have been made available based on the planned improvements as outlined in the Introduction Section of this report; general observations of drainage and topography as summarized in the Surface Conditions Section; and, soil conditions that were identified by the field investigation and soils testing as outlined in the Subsurface Investigation Section. Conclusions for the Project that is provided herein, includes pertinent information for landslide, erosion and seismic hazards. 4.1 Landslide Hazards Landslides and erosion are natural processes, and structures near slopes possess an inherent risk of adverse settlement, sliding or structural damage due to these processes. These risks cannot be eliminated for any site with moderate to steep sloping grades. Geotechnical and geological engineering provides an acceptable factor of safety for building near sloping site conditions. These factor of safeties are based on engineering judgment, and engineering standards accumulated from years of academic and professional research by individuals in the field of geotechnical and geological engineering. Surface sloughing or other types of surficial slope movements usually do not affect the deep-seated structural capability of the slope. However, excessive and/or repeated surficial slope movements, if not repaired, may represent a threat to the structural integrity of the slope. With appropriate drainage and erosion control provisions for this Project during and after construction, it is unlikely that this Project will experience excessive surficial movements. However, maintenance of the slope should be completed if the situation does arise in order to prevent the possibility of further surficial or deep seated slope movements that may be damaging to life or property. It is Envirotech's opinion that the proposed development is not within 300 feet of a landslide hazard area or its associated buffer or setback as defined in the MCRO. According to the Resource Map from the Washington State Department of Natural Resources (DNR), the Project is not within terrain labeled `highly unstable' or `highly erodible' relating to soils. In addition, DNR did not indicated previous landslide activity near the Project. DNR labeled portions of this project as medium and high slope instability with relation to slopes. This delineation is primarily dependent upon slopes and convergence. Secondly, lithology and precipitation are modeled within this delineation. In summary, this designation is based on mapping without field observations or knowledge of the specific site geology or soils. A resource map from DNR is provided on the following page of this report. Past landslide activity near the proposed development was not revealed during the Project Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 8 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9, 2008 research. In addition, detrimental landslide activity was not observed during the site visit as outlined in the Surface Conditions Section of this report. Considering the planned construction as summarized in the Introduction Section of this report, it is our opinion that the proposed site alterations will not encourage a landslide hazard. NJ p(I IN J '1 F F 17 16 rw 15 T t 709608 997 rW - r W 17077 r AA , AA pM A YA.•1."r� AA A! 4 a' 170 17 7087&0 !2 (AAA to F,. A/ 20 , u A _ ,g A vdv .y vitr ' 7 . �170 17W7 170V02 Project F 1 y 6 . F t t7 17WI40 17W742 L e Map from Washington State Department of Natural Resources Website 4.1.1 Septic Drainfield Impacts The approximate locations of the planned septic drainfields are presented on the Site Plan in Appendix A of this report. The drainfields are not expected to adversely influence moderate slopes within the vicinity of the septic components. This determination is partly based on the behavior and characteristics of the Project soils under saturated conditions, in addition to the relatively moderate grades located immediately upslope and downslope from the proposed drainfield locations. 4.1.2 Surface and Subsurface Drainage This Project does not appear to experience significant subsurface drainage or Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 9 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9, 2008 surface runoff. It is our opinion that groundwater or surface drainage is not a limiting factor for slope stability for this Project. This is based on the deep, high permeable soils, topography, and the immediate planned development. 4.1.3 Off site impacts Potential off-site impacts are limited for this Project. It is Envirotech's opinion that adjacent properties, both upslope and downslope from the planned site alterations, should not be negatively impacted. Existing stable slopes, good stormwater collection systems downslope from the property, and anticipated stable slopes after construction does not warrant off-site concerns for this Project. 4.2 Erosion Hazards Based on the USCS description of the Project soils, the upper soils are considered to have a low erodibility factor. However, due to the excessive earthmoving operation for this Project, temporary and/ or permanent erosion control measures are warranted. The type and extents of erosion control should be provided in the stormwater management plan. Erosion control information and specifications may be found in the applicable "Stormwater Management Manual for Western Washington," prepared by the Washington State Department of Ecology Water Quality Program. 4.3 Seismic Hazards Soils immediately below the expected foundation depth for this Project are generally Type D, corresponding to the International Building Code (IBC) soil profiles. According to the IBC, the regional seismic zone is 3 for this Project. The estimated peak ground acceleration ranges from 0.50g to 0.60g. This estimation is based on the United States Geological Survey (USGS) National Seismic Hazard Project in which there is an estimated 2% probability of exceedance within the next 50 years. There are no known faults beneath this Project. The nearest Class `A' or 'B' fault to this property is the Tacoma Fault Zone. This fault is a Class `A,` and is located approximately 7 miles to the south of the Project. This information is supported by the USGS Quaternary Fault and Fold Database for the United States. The potential for liquefaction and other earthquake induced hazards are believed to be low for this Project. This is based on subsurface conditions such as soil characteristics and the lack of a permanent shallow water table. Subgrade characteristics that particularly contribute to problems caused by seismic events include submerged and confined, poorly-graded granular soils. Although gravel- and silt-sized soil particles could be problematic, fine and medium grained sands are typically subjected to these types of seismic hazards. Significant `submerged and confined' sand stratifications are not anticipated to be within the upper 50 feet of the subsoils. Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 10 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9,2008 5.0 CLOSURE Based on the project information and site conditions as presented in this report, it is Envirotech's opinion that additional geotechnical studies are not required to further evaluate this Project. Due to the inherent natural variations of the soil stratification and the nature of the geotechnical subsurface exploration, there is always a possibility that soil conditions encountered during construction are different than those described in this report. Therefore, it is recommended that a qualified engineer observes and documents the construction, or Envirotech is promptly notified if project and subsurface conditions found on-site are not as presented in this report so that we can re-evaluate our recommendations. This report presents a geological/ geotechnical assessment, and is intended only for the owner, or owners' representative. Furthermore, this report is only valid for the project information and location described herein. The services described in this report were prepared under the responsible charge of Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate education and experience in the field of geotechnical engineering in order to assess landslide hazards, earthquake hazards, and general soil mechanics. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Sincerely, Envirotech Engineering Michael Staten, P.E. Geotechnical Engineer Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 12 Parcel 1232134 00030 Fax: 360-275-4789 Mason County, Washington April 9,2008 r APPENDIX A SITE PLAN SCALE- 1 INCH 200 FEET 00 F� l� XISTING ACCESS ROAD (NE PENINSULA PLACE) APPRX. \ \ EXISTING NURSERY EXISTING SCALE FUSE 2 i o✓ RE EN�� EXISTIp RETEN ION POND "�rN •EXISTI N 21, U.S. NAVAL RR ROW DRALNFIEL 48' to DR�AINF LA' EXISTING XISTING L=619.45' R=1229.57' EXISTBUILDING j CENTERLINE BUILDDC PROP13SED.1 PRO-=EDP PARKING PAD Pw ELEV.-266.0 ELEV-239D PROPOSED EXISTING 2-1 FILL DRAINFIELD SLOPES (SEE REPORT) > PROPOSED 3 BUILDING 83 r PAD h ELEV.-24L0 OD OD o a O y�6g�{ y� O w CD 1*P2 _ W n IJ m 1W V ID n BUD_DDG H APPROXIMATE PAD LOCATION OF ,� ELEv.-224D PROPOSEn 4DFT UTILITY/ AND ACCESS PROPOSED RETENTION D POND ETEN I@! .N OND ......_ RTY LINE 91 770.98' N 00.57'03'E PROJECT/ OWNER/ LOCATION, H❑LMES GE❑L❑GICAL ASSESSMENT DAVID HOLEMS PARCEL NO 22223 51 02057 MASON COUNTY, WASHINGTON ENGINEER- LEGEND ENVIROTECH ENGINEERING 27# 74 NE HURD ROAD _ SLOPE DIRECTION BELFAIR, WASHINGTON 98526 TPI e TEST PIT 360-275-9374 SITE PLAN APPENDIX B SOIL INFORMATION TEST NT LOG TEST Pff NUMBER TP-1 PROJECT: Industrial Site Geological Assessment DATE OF LOG: 02/26/2008 PROJECT NO: 0837 LOGGED BY: MACS CLIENT: S&J Johnson EXCAVATOR: N/A LOCATION: Parcel 1232134 00030 DRILL RIG: None Mason County,Washington ELEVATION: N/A INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A sTANDNW PENETMTM TEST STRATA, DEPTH solL SAMPLERS uses DESCRIPTION LL PI DEPTH N CURVE AND TEST DATA 10 30 50 0 SP Brawn,moist,loose to medium dense POORLY GRADED SAND with GRAVEL and few slits.Gravel Is welHpuded and 1 subrounded.Sand Is primarily mdium. None to Low plastidty. Medium Dense Density Increases with depth 3 Medium sand only 4 5 Excavation terminated at approxdrtelely 52 feet 6 7 8 9 =10 No Groundwater Encountered ENVIROTECH ENGINEERING Th*M m on pwtaha a*to M ba ft era Mxx&nor be Geotschnical Engineering lnlerpreerd es eehp(r►dcNJre dme erMlne eMa. TEST RT LOG TEST Pof NUMBER TP-2 PROJECT: Industrial Site Geological Assessment DATE OF LOG: 02/26/2008 PROJECT NO: 0837 LOGGED BY: MCS CLIENT: S&J Johnson EXCAVATOR: N/A LOCATION: Parcel 1232134 00030 DRILL RIG: None Mason County,Washington ELEVATION: N/A INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A solL STRATA. sri NWO PENETMronr TEU DEPTH SAMPLERS USCS DESCRIPTION LL PI DEPTH ICURVE AND TEST DATA N 10 30 50 SP Brown,moist,loose tD medNm dense POORLY GRADED SAND wkh GRAVEL Gravel Is mostly ooarse and subrounde& 1 Sand Is primarily medium. Medium Dense Density Increases with depth 3 Decreasing gravel, Increasing medium sand 4 5 8 - E=gwW n terminated at q)proximabely 6 feet 7 8 9 110 No Groundwater Encmuntensd ENVIROTECH ENGINEERING rwt brbMMWDn pwtsr►a 0*s'MYa borht and aba&nor be Geotechnical Enginwdng hdwp►asd as bent ixgm of e»w0v Alta. Start card 013092 File Original and rind Copy with Appil"tion No. Departin"t of,r=,copy WATER WELL REPORT Second copy— Thtrd Copy-Driller's Copy ffAIR (W WASM79OWN Peradt No. j (I) OWNER: Name.-Continetal Floral Greens_-__......... Add....&Y.3.-NQr01 .9.f-.30f air WA.985Mg. .. T. 23N..vt....1W w.m. (2) LOCATION OF WELL. county .... ...... Sawing and disteivem free emetbe or mbdkv%-Mn___ (3) PROPOSED USE: Desmedw a loduatrist 13 "O"Pal 13 (10) WELL 'AG: jee:J)ewroe co1w cleeperser, an as mentema And scrueem".40011 DTWadm 13 ?*A WeU 0 00— a Zrw add ean..1 a- 'd lent me an"for am*chmme of foroudba. owner's umber of W80 ram TO (4) TV OF WORK: 1,j man nbm eme)- - Mar won CK lilcumd: 13-- IN Drivel, jewnrate 0 85 0 becoadMomed Rub"13 JOUM 0 r- (5) DnUCNMNS: mummew 91 wou m — m]0 mawa.. 222-.-.. _.n. Depm emd _ -- -S-m- od A VMMI with mater_ E (6) coNsTRucTw ,&-x MTAU CuSiM Fim smd & silts-Vidi mAter- to 190-.— Threaded from_ ft. Weld" IL sm4 with water 190 222__ Perferademiim rw a No m Type of paterahm mood - Silts bdth 1611mm clay 729 2 0 a=at in.by Clse. ft. 9L to ft. Sere"m Ties m no a mmw_Xook T;q.__staJn1ass ­­,- uma ri mmm .___5_ma mite 42-_ Pro-212__&to fL _j=_ Mum -------- SW im- ---trm---ft to fL ir Gravel pocksk Yes o N.ID stme,ago-v a m I Gravel pieced Erma Surface Seel: Twat mou Towbot material Used in emd_Betcuite_ -------low Did a03P MMMM eootatn uwtta.bie Mart You(3 M&CL Type of _aja Daplb of mbuft--- Method Of mosim strata (7) PUMP: Type:..-- (9) WATER LEVELS: static W.W ___118 __ .._.gL boo.*W ce well DM.- Artellum PrefiNUMM- ­ per momm back AT1221AD water Is cowtron"by M WELL TESTS: is npA N Lowered below ataua level Work amtmL--- C Was a VRDW tsa mesda? Yea 0 NOZ) U Yes.IMY I I Yield: _gmLAMbL MOM fL-drawdown ever bra. MLL DRELIJUM STATEMOMT6. Tbim Wdl Well drilled MY jwftdktbm and this man in trom to the bed of my k=--.. and belief.W C. Recovery data Man :=IPMW "Usad 0M C EM kvd"red nom w=lo . ........... Time w4rwr LAMM9 Time wager Lead rilme MOM Level (Perma dram.or corporation) f7mm or prW) Ral f Ai-r IJA CJR528 Addkoa ............... ........ -V Date Of zo;j-.. -,­ ....................... Bmumr bat -AL-492114ftftwatt-- Arlemim r4w__ Temperelum ej waver— We,a Omeal=&agaftak mom Tea[) we CK Licallilill 160­0M........ Dale I USZ ADDITIONAL=XM Er NZCXWARY) ECY OW 1-20