Loading...
HomeMy WebLinkAboutSEP2018-00085 Pier, Float - SEP Determinations - 11/14/2018 ^`*tSATE'o F f. G _ 1 �2 V (7 9� lass r STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360) 407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 November 14, 2018 Marissa Watson, Planner I Mason County Department of Community Services Planning Division PO Box 279 Shelton, WA 98584 Dear Marissa Watson: Thank you for the opportunity to comment on the determination of nonsignificance for the Tuke Replacement Pier, Ramp, and Float Project(SEP2018-00085, SHX2018-00061, BLD2018- 00990)located at 55 Northeast Mountain Lake Drive in Belfair as proposed by Larry Tuke. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): SOLID WASTE MANAGEMENT: Derek Rockett(360) 407-6287 The applicant proposes to demolish an existing structure that may contain treated wood. Please refer to Ecology's publication"Focus on Treated Wood Exclusion," available at: hops://fortress.wa. og v/ecy/publications/publications/0304038.pdf, for suggested best management practices and disposal requirements for treated wood. WATER QUALITY: Chris Montague-Breakwell(360) 407-6364 Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles,and soil will damage aquatic habitat and are considered to be pollutants. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Marissa Watson, Planner November 14, 2018 Page 2 Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments, please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (MLD:201806088) cc: Derek Rockett, SWM Chris Montague-Breakwell, WQ Larry Tuke(Applicant/Proponent) oN_STATE MASON COUNTY �P5 C ° Department of Community Services S N Planning Division r O T n 615 W Alder St, Shelton, WA 98584 P J } �0 (360)427-9670 1864 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2018-00085 Description of Proposal: SEPA SUBMITTED FOR BLD2018-00990 REPLACEMENT OF PIER, RAMP AND FLOAT Proponent: LARRY TUKE Location of Proposal: 55 NE MOUNTAIN LAKE DR BELFAIR Parcel Number: 123051190032 Legal Description: TR 3-13 OF GOVT LOT 1 EX TR 2 OF SP #2468 Directions to Site: ST RT 3, TO BELFAIR, L ON ST RT 300, FOLLOW TO OLD BELFAIR HWY, L ON BEARCREEK DEWATTO RD, R ON TIGER MISSION RD, L ON MOUNTAIN LAKE DR TO SITE ADDRESS Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Marissa Watson at ext. 367 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by 11/14/2018. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authoriz Local Government Official Date PLANNING SEPA Environmental Checklist Mason County Permit Center Use: Single Family DNS: $600.00 SEP 2-01 b - 60095 ❑ Other DNS: 0 to 9.99 acres: $730 Parcel #: (o�3OS l0 to 20 acres: $880 Date Revd: Over 20 acres: $1100 RECEIVED ❑ DS/EIS: $5000+ $90 per hour SEP 1 1 2018 615 W. Alder Street Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: Lh This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects.of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. A. BACKGROUND 1. Name of proposed project, if applicable: LtLeM I Wo 6A 2. Name of applicant: 3. Address Od phone number of applicant and contact person: me. L T14 -- 39 O 6 z/- 3 SEPA Environmental checklist(VXC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11 4. Date checklist prepared: 1qgjpj { -I I— 16 5. Agency requesting checklist: jtj, � m 1q�w- CDL)n fq 6. Proposed timing or schedule (including phasing, if applicab(j): Ihel ,bpnr) '1' 0 19 7. Do you have any plans for futurelditions, expansion, or further activity related to or connected with P Y this proposal? If yes, explain. helj; A/- 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 1 Nop e, 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. hey xy e 10. List any government approvals or permits that will be needed for your proposal, if known. Lei] 11. Give brief, complete descri tfon of our proposal, including the proposed uses and the size of p P Y p P � 9 P P the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project des iptior�) hei L-a. . Cu ry r2 c% k' qx// �� saute_ Z�V � ' rN�ago ,� / C ter" OC. � / Ife-s r0be 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. heel_] Parcel (s)- / Address: p4ou4 iz) �'►-� L.al� Legal Description: TA 3-- ( ,I��o7~! FXT1Q Z0F2- SP # Zq691 Tp/Range/Secti n and/or GPS location: SEPA Environmental checklist(WAC 197-11-960)(Mt version-non project portion omitted): 2016 Page 2 of 11 B. ENVIRONMENTAL ELEMENTS nei 1. Earth a. General description o9i; (circle one): Flat, ly, steep slope mountainous, other. b. What is the steepest slope on the site (approximate percent slope)? h( eir,, c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. !Le _ 0 d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. iij!�L �Jcr e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. ltjei ' A4111w— f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Lqpjpj kv g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? (he11p] JJ�y�j h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: nI m 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. `nei kmt"' b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe ineiol p 0�� c. Proposed measures to reduce or control emissions or other impacts to air, if any: Jbei A- SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11 3. Water a. Surface Water. Le1,,. 1) Is there any surface water body on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. m.� 10 tfC r 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. i� �f-5 1 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material Lheld 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 1nei /V or 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. in ,, b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. 1ngi N 0 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. Jnel vyL� � Water rl inoff (inch idinn stormwater)v 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. lLel N/� SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2015 Page 4 of 11 2) Could waste materials enter ground or surface watf rs?I If so, genera y describe. [help wo6 Wl l k LC ' ro 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the sitedf so, describe. N d. Proposed measures to reduce or control surface, ground, and runoff water, a d drainage pattern impacts, if any: �u-� q �'�IJ w i I/ ►'tC'i Olr� �' �'� wu)4e-'- *-rwoot'-d so n',rr �O ro� u� 4. Plants a. Check the types of vegetation found on the site: hgjpj x deciduous tree: alder, maple, aspen, other A evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain orchards, vineyards or other permanent crops wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? tqg_!pjNCAvI-� c. List threatened and endangered species known to be on or near the site. hei AlOwli d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Frier, Alau/ e. List all noxious weeds and invasive species known to be on or near the site. 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: hei_i birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 11 b. List any threatened and endangered species known to be on or near the site. lbgM vu R� ,, C V,-O", r, Lr-exw h ✓}vtR k-e-D I f v 2 y b'-t�, "d--le-)He4 2 fv l,e 4(4 u Y r e l 7l� Ir�'Gi.e,G t� S Ury J ACd Deck e l w to l I moo( C -t� C. ISVe site part of a migration route?`i so, explain. LhzipjA, d. Proposed measures to preserve or enhance wildlife, if any: help] e. List any invasive animal species known to be on or near the site. /4 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. � NA b. Would your project affect the poten ial use of solar energy by adjacent properties? If so, generally describe. rqeLL::� N c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: jhe 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. Lrjeip 1) Describe any known or possible contamination at the site from present or past uses.Alan, 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity.M d j 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. M 0 vie-., 4) Describe special emergency services that might be required. /Vxte,,-� SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11 5) Proposed measures to red ce or contrgl environmental health haza ds, if any: �ti, l c� clad c� e,a"J kd wt�fe-I/ , b. Noise V 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Lqgjpj 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. 1nei yaw & 6-,4m CLZ++t"P SG'-t; go 1 b 10; lC�' d►'�VR'A'­ 3) Proposed measures to reduce or control noise impacts, if any: ne( Alo ele 8. Land and shoreline use 14 a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. [new iX;S k)v Aoc)� b. Has the project site been used as working farmlands or working forest lands? If so, describe. /I1 J How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? N oyLt�_, If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? 1n� 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: /f/Pyte.,- c. Describe any structures on the site. Ind d. Will any structures be demolished? If so, what? mf�1,1 a/g e. What is the current zoning classification of the site? f. What is the current comprehensive plan designation of the site? n[ e "(17* SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 7 of 11 g. If applicable, what is the current shoreline master program designation of the site? rhhalpi j eiff--s'i Deti►T1 Az-L— h. Has any part of the site been classified as a critical area by the city or county? If so, specify. i. Approximately how many people would reside or work in the completed project?Lnei j. Approximately how many people would the completed project displace? (heipi poxe-, k. Proposed measures to avoid or reduce displacement impacts, if any: JnLei NIA A L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: [nem Alo ff/ m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any:Ad/W 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. feel A//,.f b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. mel A1114 c. Proposed measures to reduce or control housing impacts, if any: nt e►p1,�J 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? nei 2 / 2 W� 1 � b. What views in the immediate vicinity would be altered or obstructed? 1rhelpi Amlell c. Proposed measures to reduce or control aesthetic impacts, if any: IjLei 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur. b. Could light or glare from the finished project be a safety hazard or interfere with views? bgio /Y or- SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11 c. What existing off-site sources of light or glare may affect your proposal? In�A d. Proposed measures to reduce or control light and glare impacts, if any: [help] 12. Recreation a. What designated and informal recreational opportunities are in the imm diate vicinity? [Help] �tA'�60':J, S wrmm1 fey, i-7 ►� �j ' J b. Would the proposed project displace any existing recreational uses? If so, describe. ht If/o c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: lbei 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. ;heyo'VQ b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. Ilo c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. [help] */4 d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system Show on sate plans, if any pn r�� / � �l t" 'tom,l'10) SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 9 of 11 b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop?1tg!pj c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? 111 l /V//' d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). Lt jejpl Al J e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. Le-L21 Alo f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates?[, Z g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. Ala h. Proposed measures to reduce or control transportation impacts, if any: ttiem N/19 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? �If/so, generally describe. Lip1 b. Proposed measures to reduce or control direct impacts on public services, if any. nel 16. Utilities a. Circle utilities current) available at the site: LeLp] electricit , atural gas water, refuse service, telephone, sanitary sewer, septic system; other SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11 b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. C. SIGNATURE -�rE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Signed: Print Name of Signee: If applicable, Position andAgency/Organization: Date Submitted: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11