Loading...
HomeMy WebLinkAboutSHR2013-00004 JARPA - SHR Permit / Conditions - 7/8/2013 STATE o� Y a = x �SSt 1889 a�yn STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775• Olympia, Washington 98504-7775 • (360) 407-6300 July 8, 2013 Larry Peck WA Dept Of Fish And Wildlife 600 Capitol Way N Olympia, WA 98501 Re: Mason County Local Permit SHR2013-00004 WA Dept Of Fish And Wildlife - Applicant Filed Substantial Development and Approved Shoreline Variance Permits Dear Mr. Peck: On June 20, 2013 the Department of Ecology(Ecology)received the Mason County decision on your Shoreline Substantial Development and Variance Permits for construction of ADA restrooms with well and sewer connection; expansion of parking from 24 to 45 spaces, native plant restoration, and wetland and public access signage. The proposal is within shoreline jurisdiction of Case Inlet. By law, local governments must review all SDPs for compliance with: The Shoreline Management Act(Chapter 90.58 RCW) • Ecology's Substantial Development Permit approval criteria(Chapter 173-27-150 WAC) • The Mason County Local Shoreline Master Program _ Local governments, after reviewing SDPs for compliance, are required to submit them to Ecology. Your approved SDP has been received by Ecology. By law, Ecology must review Variance Permits for compliance with: • The Shoreline Management Act(Chapter 90.58 RCW) • Ecology's Variance Permit approval criteria(Chapter 173-27-170 WAC) • The Mason County Local Shoreline Master Program After reviewing Variance Permits for compliance, Ecology must decide whether to approvRECE1VED approve with conditions, or disapprove them. Our Decision: AIA w'CEDAR STi Ecology approves your Variance Permit provided your project complies with the conditio required by Mason County. Please note, however, that other federal, state, and local permits may be required in addition to this shoreline permit. b 10 Peck Larry July 8, 2013 2 of 2 What Happens Next? Before you begin activities authorized by this permit, the law requires you to wait at least 21 days from the date of this letter, which is the "date of filing". This waiting period allows anyone (including you)who disagrees with any aspect of this permit,to appeal the decision to the state Shorelines Hearings Board. You must wait for the conclusion of an appeal before you can begin the activities authorized by this permit. The Shorelines Hearings Board will notify you by letter if they receive an appeal. We recommend you contact the Shorelines Hearings Board before you begin permit activities to ensure no appeal has been received. They can be reached at(360) 664-9160 or http://www.eho.wa.gov. If you want to appeal this decision, you can find appeal instructions (Chapter 461-08 WAC) at the Shorelines Hearings Board website above. They are also posted on the website of the Washington State Legislature at: http://apps.leg.wa.gov/wac. If you have any questions,please contact Rick Mraz at(360) 407-6221. Sincerely, Paula Ehlers, Section Manager Shorelands and Environmental Assistance Program cc: Allan Borden, Mason County CERTIFIED MAIL: 7011 1150 0000 7881 7957 a3VID3� oN_srArF MASON COUNTY o P� A o N DEPARTMENT OF COMMUNITY DEVELOPMENT N Planning Division o Y Y P O Box 279, Shelton, WA 98584 of o (360)427-9670 1864 SHR2013-00004 NOTICE OF SHORELINE MANAGEMENT PERMIT Notice is hereby given that WASHINGTON DEPT FISH &WILDLIFE, who is the owner of the described property, has filed an application for a Shoreline Management Permit for the development of: Sub. Dev./Variance Proposed improvements to public access site along North Bay: 1) ADA access restrooms with available well water and sewer connection; 2) expand parking area from 24 to 45 spaces; 3) native plant restoration to replace lawn and around parking area; and 4) new wetland and area public information signage. Variance to 75-foot shoreline setback standard requested to allow location of parking area expansion to 68 feet from ordinary high water mark. Site Address: 3270 E STATE ROUTE 302 BELFAIR Parcel Number: 122167590041 Location of Project: From Allyn or Belfair on North Bay Rd. to State Route 302 to site near powerlines. Within: SW (quarter section)SAction: 16 Township: 22 N Range: 1 W, W.M. in , Mason County Washington. Said development is proposed within NORTH BAY and/or its associated wetlands. Any person desiring to express their view or to be notified of the action taken on the application should notify: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT P O BOX 279 SHELTON,WA 98584 in writing of their interest. The comment period is at least 30 days from the final date of publication given pursuant to WAC 173-14-020. The final date of publication, posting, or mailing of notice is 4/18/2013. Written comments will be accepted up to the date of the hearing. A public hearing will be held on this permit request. Contact this office at(360)427-9670, ext. 365 for date and time of hearing. A Determination of Nonsignificance was issued on 1/22/2013 under WAC 197-11-340. Written comments regarding this determination must be received by 2/5/2013. SHR2013-00004 Page I of I MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT PO Boz 279 Shelton, WA 98584 (360)427-9670 ADDITIONAL INFORMATION FOR SHORELINE VARIANCE The purpose of the Variance Permit is strictly limited to granting relief to specific r C bulk, dimensional, or performance standards set forth in the Master Program, oo r where there are extraordinary or unique circumstances relating to the property 1 such that the strict implementation of the Master Program would impose .. unnecessary hardships on the applicant or thwart the policies set forth in RCW 90.58.020. Variance Permits for development that will be located landward of the ordinary high water mark (OHWM), except those areas designated as marshes, bogs, or swamps, may be authorized provided the applicant can demonstrate all of the following: 1. Show that the strict application of the bulk, dimensional, or performance standards set forth in the Master Program precludes or significantly interferes with a reasonable use of the property not otherwise prohibited by the Master Program. DF,J Nbr-to A E14�1 ►4CLe55 5I-C'E 5 c�L I�� l ' vv�S�n < s � � � wl i rt l �v` S ZJe CL 2. Show that the hardship which serves as a basis for the granting of the Variance is specifically related to the property of the applicant, and is the result of unique conditions such as irregular lot shape, size, or natural features and the application of the Master Program, and not, for example from deed restrictions or the applicant's own actions.� Ce e C n � o rya, In ►1 �� S 3. Show that the design of the project will be compatible with other permitted activities in the area and will not cause adverse effects to adjacent properties or the shoreline environment. (-1 - AA"'�� C� S o o Lo ec. 0 S � l/Z Revised 1/95 R. ,.- horeline Variance Page 2 4. Show that the variance authorized does not constitute a grant of special privilege not enjoyed by other properties in the area, and will be the minimum necessary to afford relief. ra 05 r `e 5 G V - -6;6v� 1� C,L r -p c.J 5. Show that the public interest will suffer no substantial detrimental effect. roe 4om cIF Variance Permits for development that will be located either waterward of the ordinary high water mark or within marshes, bogs, or swamps, may be authorized provided the applicant can demonstrate, in addition to Items 1 through 5 above, that: 6. Show that the public rights of navigation and use of the shorelines will not be adversely affected by the granting of the variance. �CGTCIA Z /a `L Coo T can In granting of all Variance Permits, consideration shall be given to the cumulative impact of additional request for like actions in the area. For example, if variances were granted to other developments in the area where similar circumstances exist, the total of the variances should also remain consistent with the policies of RCW 90.58.020 and should not produce substantial adverse effects to the shoreline environment. Revised 1/95 t ► AGENCY USE ONLY M Date received: I " Us amy c " FEB 21 2013 WASHINGTON STATE S Joint Aquatic Resources Permit Agency reference#: k_2��5' H Application (JARPA) Form' 2 +Tax farcce�l#(s): -q5.e'JC�-4 1 : � CD rl 5 -e-GY)14 USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. � 1 i I L--------------------------------------I Part 1—Project Identification 1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) [help] North Bay Beach Access Improvements Part 2—Applicant The person and/or organization responsible for the project. [help] 2a. Name (Last, First, Middle) Washington Department of Fish and Wildlife, Capital and Asset Management Program 2b. Organization (If applicable) Washington Department of Fish and Wildlife 2c. Mailing Address (Street or PO Box) 600 Capital Way N. 2d. City, State, Zip Olympia, WA. 98501-1091 2e. Phone(1) 2f. Phone(2) 1 2 r( 360) Fax 2h. E-mail 360) 902-8376 ( ) 902-8367 LarryPeck@dfw.wa.gov Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at http://www nws.usace.army.mil/Missions/CivilWorks/Regulatory/PermitGuidebook/EndangeredSpecies.asl)x. • Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to htto://www.epermitting.wa.gov/site/alias resourcecenterharpa iarpa form/9984/iarpa form.asox. For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help .ora.wa.gov. JARPA Revision 2012.1 Page 1 of I� Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) [help] 3a. Name (Last, First, Middle) Larry Peck 3b. Organization (If applicable) Washington Department of Fish and Wildlife 3c. Mailing Address (Street or Po Box) 600 Capital Way N. 3d. City, State, Zip Olympia, WA, 98501-1091 3e. Phone(1) 3f. Phone(2) 3 . Fax 3h. E-mail ( 360 ) 902-8376 ( ) ( 360 ) 902-8367 Larry.Peck@wdf.wa.gov Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies) where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [heV X Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at(360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) 4b. Organization (If applicable) 4c. Mailing Address (street or Po Box) 4d. City, State, Zip 4e. Phone(1) 0. Phone(2) 4 . Fax 4h. E-mail JARPA Revision 2012.1 Page 2 of 197 Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. [help] ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) [help] ❑ Private ❑ Federal X Publicly owned (state, county, city, special districts like schools, ports, etc.) ❑ Tribal ❑ Department of Natural Resources (DNR) -managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) [help] 5c. City, P State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) [help] Located between the town of Allyn and Victor on US Highway 302 5d. County help] Mason 5e. Provide the section, township, and range for the project location. he[ el ] % Section Section Township Range 16 22 N 1 W 5f. Provide the latitude and longitude of the project location. [help] • Example:47.03922 N lat. /-122.89142 W long. (Use decimal degrees-NAD 83) 47.389856 N lat/-122.81184 W long 5g. List the tax parcel number(s) for the project location. h� elp] • The local county assessor's office can provide this information. 122167590041 1 �A I LP -' 5 j�`� a 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) [help] Name Mailing Address Tax Parcel #(if known) David Hawke (253) 853-5602 122163400040 Viola Smith 3241 State Route 302, Belfair, WA. 122164300050 Midwest Funding & Financial NA 122167590032 122167590032 Larry Haakenstad 3240 State Route 302, Belfair, WA. 122163400020 ....................................................................................__._.._..---.....................__..._..._.-......-.....---.._............I. �zzWW36 W ,; JARPA Revision 2012.1 Ll ��� ge 3 of l 5i. List all wetlands on or adjacent to the project location. h[ elp] Category 3 Wetland located approximately 32 feet south of existing access parking area. 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. h( ela] North Bay. 5k. Is any part of the project area within a 100-year floodplain? h[ elp] Yes X No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. h[ ei2i The upland property is approximately 50 percent developed beach access site, the other 50 percent is a undeveloped lot with existing fir, cotton wood and alder trees, a large grassy area and non-native weeds such as scotch broom, Japanese knotweed and blackberry bushes. 5m. Describe how the property is currently used. [Lei ] Property is currently and has been used as a public access site to public tidelands in North Bay since 2003. 5n. Describe how the adjacent properties are currently used. hei Rural residential, undeveloped state land and state owned public tidelands. City of Tacoma has a utility (power pole) ownership immediately on the south end of existing Beach access site. 5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. [help] No formal permanent building structures are on this site; approximately half of the existing site is a formal gravel parking area with trails leading down to the beach. Site includes access entry sign and Kiosk for providing public information. There is also an existing fence in the proposed work area that is planned for removal to expand the existing parking area.. The site is currently equipped with two portable toilets placed on a concrete pad. The site has been constructed with an asphalted entry way and an asphalt pad for ADA parking. Additionally the entry way has a gate structure to regulate access. 5p. Provide driving directions from the closest highway to the project location, and attach a map. h[ elp] The proposed project site is reached by turning east off of US Highway 3 north from the town of Allyn onto North Bay Road, turning right(east) onto US Highway 302, traveling to the large power poles, site is on the right, beach side of the highway. JARPA Revision 2012.1 Page4of 185' Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. [heirfl Proposed project consists of four primary elements: 1. Construct restroom facilities (flush) that are connected to the existing sewer treatment infrastructure, this element also includes the development of a small on site well to supply water to the new restroom facility. 2. Partially Clear and Brush, level and gravel existing undeveloped area to expand parking at the site by 20 additional parking spots. 3. Plant native plants around newly developed parking and access area. All related construction work will be outside the High Ordinary Water Mark. 4. Place additional signage for wetland information and additional user friendly information. 6b. Describe the purpose of the project and why you want or need to perform it. [help] The purpose of the proposed project is to fulfill the conditions of the original Shoreline Permit from Mason County, #SHR2002-00025 that specifically required the installation of a restroom facility that was connected to the existing sewage treatment facilities. WDFW has been operating the access site with the use of portable toilets. Additionally WDFW is proposing to increase public parking at the site from approximately 24 spaces to 45 spaces in an effort to ease parking constraints at this site. 6c. Indicate the project category. (Check an that apply) [tgjPJ ❑ Commercial ❑ Residential X Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (Check all that apply) [help] Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam/Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift ❑ Dock/ Pier ❑ Marina / Moorage ❑ Stairs ❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin X Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft X Other: Restroom facility upgrade construction, expanded parking area, landscaping and signage. JARPA Revision 2012.1 Page of 1F� 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. hell ] • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. The proposed project will include clearing of the lot removing medium sized firs approximately10 trees; and two clusters of small cotton wood colonies, leaving and protecting but limb up established larger trees on the bayside and road side of the site. Grubbing, excavating, filling and top casting gravel in the proposed new parking area. Establishing a new concrete ADA parking pad for access to the restroom facility and concrete pad to support new prefab restroom building. Construction of a new well water supply for the new restroom flush toilets (including a pressurizes tank), new utility lines to convey new water supply and waste water to existing sewage treatment line, new electric supply for the new well and restroom facilities. Removal of an existing chain linked fence (poor condition) that currently separates the existing parking area from the proposed new parking area. Planting of plants to establish a vegetated filter strip between the new parking area and the beach, and additional plantings to restore native shoreline habitat. Additional plantings will occur to provide for a 20 foot buffer between the proposed work site and WDFW's next door neighbor on the north side of the project. In the unlikely event that cultural resources are uncovered during construction, work in the immediate vicinity of the discovery will be halted, and WDFW will consult with the Washington State Historic Preservation officer. 6f. What are the anticipated start and end dates for project construction? (MonthNear) [help] • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Start date: summer/2013 End date: _summer/2013 ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. [help] $140,000 to $180,000 6h. Will any portion of the project receive federal funding? he[ el ] • If yes, list each agency providing funds. ❑ Yes X No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation X Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.)[help] 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. help] ❑ Not applicable The proposed project is proposing adding new parking area on the north side of the existing site, the category 3 Wetland A is located just over 30 feet from the south end of the existing parking area. The proposed project will require WDFW to secure a wetland buffer variance from Mason County. The proposed project will limit new construction activities to be placed outside the proposed 30 foot Wetland A buffer. New construction activities will occur well away from the proposed wetland buffer, the one exception will be the installation of the new well water supply which will be developed just outside the proposed wetland buffer. JARPA Revision 2012.1 Page 6of>r8�� 7b. Will the project impact wetlands? hel I ❑ Yes X No Don't know 7c. Will the project impact wetland buffers? [help] X Yes ❑ No ❑ Don't know Wetland A, project will not encroach existing 30 foot buffer 7d. Has a wetland delineation report been prepared? Lt@jpj • If Yes, submit the report, including data sheets, with the JARPA package. X Yes ❑ No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? [help] • If Yes, submit the wetland rating forms and figures with the JARPA package. X Yes ❑ No ❑ Don't know Category 3 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? [helgi • If Yes, submit the plan with the JARPA package and answer 7g. • If No,or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes X No ❑ Not applicable The proposed work closest to the wetland buffer will be the construction of a new small well to supply water to the restroom facilities, the well site was selected by consultants to improve the opportunity to secure ground water. The proposed well site is located on the existing developed parking area. The need for a water supply is required to meet the existing Shoreline Conditions placed on the original beach access site development in 2003. 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. hel i The proposed project was designed to develop additional parking opportunities away from the existing wetland buffer. A small portion of the existing graveled parking area, (the southeast corner) will be within the proposed 30 wetland buffer. Please see sheet 4 on attached permit drawings. 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below) where we can find this information in the plan. he[ eI 1 Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact' mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category2 Acres) acres) NA Category 3 buffer zone If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. Z Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter permanent"if applicable. Creation(C), Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P), Mitigation Bank/In-lieu fee(B) JARPA Revision 2012.1 Page7of 15, Page number(s) for similar information in the mitigation plan, if available.. 7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. he[ ei ] No filling in Wetland A proposed. 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. hl el No excavation in Wetland A proposed. Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hf�l X Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hf elpl ❑ Not applicable Proposed project will require the development of a pollution abatement plan; the selected contractor will also be required to fulfill all appropriate conditions identified in DOE's storm water manual. All construction to complete the overall project will be done outside/above the ordinary high water mark. No in water construction is associated with this project proposal. No sediment will enter the "water bodies" by incorporating Best Management Practices that includes the use of silt fences and hay bales. It is also anticipated that the short construction period to complete the proposed project could occur in a time frame to take advantage of or reduce the likelihood of weather related negative impacts. WDFW has also included a habitat restoration planting plan to restore native plants between the formal parking area and mean high water mark. Please see attached plans page 7 W2 for additional details. 81b. Will your project impact a waterbody or the area around a waterbody? hf eM JARPA Revision 2012.1 Page eof 1 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? [help] • If Yes, submit the plan with the JARPA package and answer 8d. • If No,or Not applicable,explain below why a mitigation plan should not be required. X Yes No ❑ Not applicable No in water work is associated with the proposed project. In an effort to minimize the potential risks of adverse impacts associated with site runoff see attached stormwater plan. The proposed project has been designed to ensure that during the construction period and long term use of the site will not result in untreated run off or sedimentation entering the watercourse. Please see attached plans for specific details for runoff and sediment control measures and planting plan to restore and enhance native plants along shoreline. 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. [help] Storm water plan and additional site planting plans for restoring and enhancing the buffer between the proposed new expanded parking area and the mean high water mark. Project will preclude the introduction of sediment and runoff from reaching North Bay waters. 8e. Summarize impact(s) to each waterbody in the table below. he[ ei ] Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact' (cubic yards) to be linear ft.) of drive, etc.) placed in or waterbody removed from directly affected waterbody N/A If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 'Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. [help] JARPA Revision 2012.1 Page q of 187 N/A 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. hf elpl Not applicable. Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. [hel Agency Name Contact Name Phone Most Recent Date of Contact Mason County Barbara Adkins ( 360) 427-9670 1/17/13 WDFW Robert Cannon ( 360) 249-1207 1/17/13 Mason County Allan Borden (360) 427-9670 2/11/13 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? ELLel • If Yes, list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: hftp://www.ecy.wa.gov/programs/wq/303d/. ❑ Yes X No JARPA Revision 2012.1 Page f oof{8) 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? (help] • Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC. HUC 17110019 9d. What Water Resource Inventory Area Number(WRIA#) is the project in? [help] • Go to http://www.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#. WRIA 15 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? rheipl • Go to http://www.ecy.wa.gov/programs/wq/swgs/criteda.html for the standards. ❑ Yes ❑ No X Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? [help] • If you don't know, contact the local planning department. • For more information, go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html. I X Rural ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? [help] • Go to http://www.dnr.wa.gov/BusinessPermitsfTopics/ForestPracticesApplications/Pages/fp watertyping.aspx for the Forest Practices Water Typing System. X Shoreline Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? rhelp] • If No, provide the name of the manual your project is designed to meet. X Yes ❑ No Name of manual:2005 DOE Stormwater Manual 9L Does the project site have known contaminated sediment? fheipi • If Yes, please describe below. ❑ Yes X No 9j. If you know what the property was used for in the past, describe below. [help] Property has been used as a Public Access point for North Bay since 2003, prior usage undeveloped residential lot. JARPA Revision 2012.1 Page 1{of 1137 9k. Has a cultural resource (archaeological) survey been performed on the project area? [help] • If Yes, attach it to your JARPA package. ❑ Yes X No, However WDFW has contracted for an Archaeological survey prior to disturbing the proposed new developed lot. i JARPA Revision 2012.1 Page d'Jof 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. hell ] No known Federally listed species known to occur in vicinity of project. 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. [help] Hard Shell Clams Surf smelt Estuarine zone Estuarine intertidal Bald Eagle nesting tree located outside impact area, closest documented nesting site over 3,000 feet away from proposed work site. Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/opas/. • Governor's Office of Regulatory Assistance at (800) 917-0043 or help(aD-ora.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) [help] • For more information about SEPA, go to www.ecy.wa.gov/programs/sea/sepa/e-review.html. X A copy of the SEPA determination or letter of exemption is included with this application. A SEPA determination is pending with _WDFW (lead agency). The expected decision date is _2/06/13_. ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1 ob.)[help] ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. JARPA Revision 2012.1 Page�f�of 1 Ob. Indicate the permits you are applying for. (Check all that apply.) [help] LOCAL GOVERNMENT Local Government Shoreline permits: X Substantial Development ❑ Conditional Use ❑ Variance Shoreline Exemption Type (explain): Other city/county permits: ❑ Floodplain Development Permit X Critical Areas Ordinance wetland variance/modification STATE GOVERNMENT Washington Department of Fish and Wildlife: ❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form Effective July 10, 2012, you must submit a check for$150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes: ❑$150 check enclosed. (Check# ) Attach check made payable to Washington Department of Fish and Wildlife. ❑Charge to billing account under agreement with WDFW. (Agreement# ) ❑My project is exempt from the application fee. (Check appropriate exemption) ❑ HPA processing is conducted by applicant-funded WDFW staff. (Agreement # ) ❑ Mineral prospecting and mining. ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use.) ❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012. (HPA# ) Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑ Section 401 Water Quality Certification FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) JARPA Revision 2012.1 Page jf of 18j Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. he[ ei l 11 a. Applicant Signature (required) h� eM I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related to the project. (initial) Wash.State Dept.of Fish and Wildlife Applicant Printed Name Applicant Signature Date 11 b. Authorized Agent Signature [help] I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. _Larry Peck wry W. 7>" Feb. 15, 2013 Authorized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant). help) Not required if project is on existing rights-of-way or easements. I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false, fictitious, or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fraudulent statement or entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both. If you require this document in another format, contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call (877)833-6341. ORA publication number: ENV-019-09 rev. 06-12 JARPA Revision 2012.1 Page I i �- r ALLITO PROPERTIES INC. RICHARD & LINH NAHUM PO BOX 26505 5022 35T" AVE NE FEDERAL WAY, WA 98093-3505 SEATTLE, WA 98105-3122 VU TRAN LARRY K. HAAKENSTAD ET UX 626 E PALMDALE AVE JILL HENDERSON HAAKENSTAD ORANGE, CA 92865-4450 534 10 AVE W KIRKLAND, WA 98033-4839 MICHAEL HAGAN DAVID & KOREEN HAWKE PO BOX 1369 3250 E STATE ROUTE 302 ALLYN, WA 98524-1369 BELFAIR, WA 98528 VIOLA SMITH LF. EST. STATE OF WASHINGTON 3241 E. STATE ROUTE 302 DEPT. OF FISH & WILDLIFE BELFAIR, WA 98528-9368 600 CAPITOL WAY N OLYMPIA, WA 98501-1076 CITY OF TACOMA MIDWEST FUNDING & FINANCIAL PO BOX 11007 28015 SMYTH DR TACOMA, WA 98411-0007 VALENCIA, CA 91355-4023 ROBERT SHIN STEVE CASE PO BOX 169 PO BOX 812 SNOQUALMIE PASS, WA 98068-0169 HILLSBORO, OR 97123-0812 JAY & KALENE YANAMURA MIYOKO GOTOH'COX 29708 226T" AVE SE 3410 E STATE ROUTE 302 BLACK DIAMOND, WA 98010-1277 BELFAIR, WA 98528-9370 TSP INVESTMENTS LLC 2001 CENTER ST TACOMA, WA 98409 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Planning Division P.O. Box 279, Shelton,WA 98584 (360)427-9670 SHR2013-00004 NOTICE OF SHORELINE MANAGEMENT PERMIT. Notice is hereby given that Washington Dept. of Fish and Wildlife who are the owners of the described property below,has filed an application for a Shoreline Substantial Development Permit and Variance for the development of: Proposed improvements to public access site along North Bay: 1) ADA access restrooms with available well water and sewer connection; 2) expand parking area from 24 to 45 spaces; 3) native plant restoration to replace lawn and around parking area; and 4) new wetland and area public information signage. Variance to 75-foot shoreline setback standard requested to allow location of parking area expansion to 68 feet from ordinary high water mark. Parcel Number: 12216-75-90041, 12216-75-90042, and 12216-75-90043. Site Address: 3270 E State Route 302, Belfair WA. Location of Project: Along North Bay/Case Inlet 3.5 miles east of Allyn WA.; within the southwest 1/, of Section 16, Township 22 N., Range 1 W. in Mason County Washington. Said proposed development is subject to shoreline management permit review(M.C.C. 17.50)and associated Mason County Development Regulations standards. Any person desiring to express their view or to be notified of the action taken on the application should notify in writing of their interest to: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT PO BOX 279 SHELTON,WA 98584 The comment period is at least 30 days from the final date of publication given pursuant to WAC 173- 14 020. The final date of publication,posting or mailing of notice is April 18,2013. The proposal was subject to environmental review by WA. Dept. of Fish& Wildlife; a Determination of Non-significance was issued on January 22, 2013 under WAC 197-11-340. Written comments will be accepted up to the date of the Hearings Examiner public hearing Tuesday May 28, 2013; 1:00 PM. Contact this office at(360)427-9670, ext. 365 for further information. r l p2w one Lci WiFA- 5f, 5(�e� SRE LOCATION e� s rn .e.a N STATE MAP N p 1 0 SITE LOCA71ON { Z ImJT a nDfan " uLwa visfi r o VICINITY MAP PERMIT DRAWINGS °BAR MEASURES NORTH BAY ACCESS SITE PROJECT NO. ONEINCH MN:A671:13-1 PARKING AREA EXPANSION ORIGINAL AiE REVISION DESCRIPTION BY DE9pJED V, RLO SHEET OF APPROVED AND RELEASED FOR CONSTRUCnON CHECKED SWK EXISTING SITE BT RLO AND VICINITY MAP 2 13 .........CARE.__ DATE 03/15/2013