Loading...
HomeMy WebLinkAboutGEO2022-00037 for BLD2022-00445 - GEO Geological Review - 3/3/2021 PLANNING RECEIVE a APR 2022 615 w 41der Street Geological Assessment Bear Valley Enterprises Single Family Residential Property 470 E Hardings Hill Road, Allyn Parcel No. 12232-23-90020 Mason County, Washington March 3, 2021 Project#2147 Prepared For: Bear Valley Enterprises, LLC 16516 119''Ave CT E Puyallup, Washington 98374 Prepared By: Envirotech Engineering PO Box 984 Belfair, Washington 98528 Phone: 360-275-9374 " d' WA. sr-fj tom, n. r z�' 3/3/2021 MASON COUNTY 7 S *; ! COMMUNITY SERVICES Geological Assessment Build ng,Phnning Envunnmentel Health.Cnmmuntly Health Instructions: This checklist must be submitted with a Geological Assessment and completed,signed,and stamped by the licensed professional(s)who prepared the Geological Assessment for review by Mason County pursuant to the Mason County Resource Ordinance. If an item is found not applicable,the report should explain the basis for the conclusion. McfL:Unless specifically documented, this report does not provide compliance to the International Residential Code Sections R403.1.7 for foundations on or adjacent to slopes, Section R403.1.8 for expansive soils or section 1808.7.1 of the International Building Code Section for Foundations on or adjacent to slopes. "pplicant;'Ovrrer Sear Valley Enterprises Parcel# 12232-23-90020 Site Address 470 E Hardings Hill Road (1) A discussion of the geologic conditions in the general vicinity of the proposed development,with geologic unit designation based on referenced maps. Located on page(s) 5 (2) (a) A discussion of ground water conditions, Located on page(s) 6 (b) A discussion of the estimated depth to water, Located on page(s) 6 (c) A discussion of the quantity of surface seepage, Located on page(s) 6 (d) A discussion of the upslope geomorphology, Located on page(s) 3 (e) A discussion of location of upland waterbodies and wetlands. Located on page(s) 3 (3) The approximate depth to hard or dense,competent soil,e.g.glacial till or outwash sand. Located on page(s) 5 (4) A discussion of any geomorphic expression of past slope instability(presence of hummocky ground or ground cracks,terraced topography indicative of landslide block movement,bowed or arched trees indicating downslope movement,etc). Located on page(s) 4 (5) A discussion of the history of landslide activity in the vicinity,as available in the referenced maps and . records. Located on page(s) 7 (6) An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. Located on page(s) 7 (7) A recommendation by the preparer whether a Geotechnical Report should be required to further evaluate site conditions and the proposed development of the subject property. Located on page(s) 11 (8) If the presence of a hazard is located within 300 feet of the proposed development,then the following are delineated on a geologic map/site map: (a) The area of proposed development, Located on map(s) n/a (b) The boundaries of the landslide hazard area(top,both sides,and toe), Located on map(s) n/a (c) The associated buffers(top,both sides,and toe), Located on map(s) n/a (d) Building or other setbacks(top,both sides,and toe), Located on map(s) n/a (9) A site map drawn to scale showing the property boundaries,scale,north arrow,and the location and nature of existing and proposed development on the site. Located on Map(s) Site Plan (Appendix A) I, Michael Staten,hereby certify under penalty of perjury that I am a civil engineer licensed in the State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering geologist licensed in the State of Washington with special knowledge of the local conditions. I also certify that the Geological Assessment s. ihr''r.cfl(e+!:4EnF�rnno••*3r March 3 2021 and entitled Bear Valle Enterprises Single F..::'E.. .... .... .. ... _.. - dated y p q meets all the requirements of the Mason County Resource Ordinance,Geologically Hazardous Areas Section,is complete and true,that the assessment demonstrates conclusively that the risks posed by the landslide hazard can be mitigated through the included geotechnical design recommendations,and that all hazards are mitigated in such a manner as to prevent harm to property and public health and safety. C1: 4.3,045 P.; Disclaimer:Mason County does not certify the quality of the work done in this Geological Assessment. Page 2 of 2 TABLE OF CONTENTS 1.0 INTRODUCTION.................................................................................................................................1 1.1 PROJECT INFORMATION.................................................................................................................... 1 1.2 PURPOSE OF INVESTIGATION AND SCOPE OF WORK........................................................................ 1 2.0 SURFACE CONDITIONS....................................................................................................................3 2.1 GENERAL OBSERVATIONS..................................................................................................................3 2.2 TOPOGRAPHY.....................................................................................................................................3 2.2.1 Upslope Geomorphology............................................................................................................3 2.3 SURFACE DRAINAGE..........................................................................................................................3 2.3.1 Upland Water Bodies.................................................................................................................3 2.4 SLOPE AND EROSION OBSERVATIONS...............................................................................................4 3.0 SUBSURFACE INVESTIGATION.....................................................................................................5 3.1 FIELD METHODS,SAMPLING AND FIELD TESTING...........................................................................S 3.2 GEOLOGIC CONDITIONS....................................................................................................................5 3.3 SPECIFIC SUBSURFACE CONDITIONS.................................................................................................6 3.3.1 Groundwater............................................................................................................................... 7 4.0 ENGINEERING CONCLUSIONS......................................................................................................8 ^.1 L iVDSLIDE HAZARDS.........................................................................................................................R 4.1.1 Landslides and Slope Stability Analysis...................................................................................10 4.1.2 Surface and Subsurface Drainage...........................................................................................10 4.2 EROSION HAZARDS..................................................._...................................................................... 10 4.3 SEISMIC HAZARDS.............................................................................................................................11 1.4 OTIIDR CONSIDERATIONS.................................................................................................................11 5.0 CLOSURE.............................................................................................................................................12 Appendix A-Site Plan _ Appendix B-Soil Information 1.0 INTRODUCTION Envirotech Engineering, PLLC. (Envirotech) has completed this geological assessment for a residential property located at 470 E Hardings Hill Road, identified as parcel number 12232-23- 90020 in Mason County, Washington. As presented herein,this assessment includes information pertaining to the Project in this Introduction Section; observations of the property and surrounding terrain in the Surface Conditions Section; field methods and soils descriptions in the Subsurface Investigation Section; and, assessments for landslides, erosion, seismic hazards, and other considerations in the Conclusions Section. An initial geological/ geotechnical evaluation of the project was conducted by Envirotech on February 10, 2021. It was determined that natural slopes between 15% and 40% were present within 300 feet of the project. Due to these slope grades, a geological assessment is required pursuant to landslide hazard areas of the Mason County Resource Ordinance(MCRO). During the evaluation and site visit by Envirotech, surface and subsurface conditions were assessed in order to determine if further geotechnical studies are required.After completion of the field work and applicable Project research,Envirotech prepared this geological assessment. 1.1 Project Information Information pertaining to the project was provided by the proponent of the property, and observations from a field visit by Envirotech.The proposed development is expected to consist of a new single family residence, on-site septic system, and other ancillary features typical of this type of development. Approximate site development with relation to existing site features are illustrated in the Site Plan in Appendix A of this report. 1.2 Purpose of Investigation and Scope of Work The purpose of this geological assessment was to evaluate the project in order to confirm that the proposed development is outside of any landslide hazard area and its associated buffers and setbacks as determined in the MCRO. The investigation included characterizing the general project surface and subsurface conditions, and evaluating the suitability of the soils to support the planned site development. In order to fulfill the purpose of investigation, the geological/ geotechnical program completed for the proposed improvements of the Project include: • Review project information provided by the proponent of the project; • Conduct a site visit to document the site conditions that may influence the construction and performance of the proposed improvements; • Define general subsurface conditions of the site by observing soils within test pit excavations, review well logs from existing wells near the Project, and evaluate geological and hazard maps depicting the site geology for the vicinity of the project; Pr-form soils testing,such as visual classifications,to determine selected index properties of the soils; + Complete an engineering assessment supported b planned site alterations and the surface P � g PP Y and subsurface conditions that were identified by the field investigation, soil testing, and applicable ro'ectresearch;and, PP project • Establish engineering conclusions based on findings s and anticipated development. Envirotech Engineering Geological Assessment PO Box 984 page 1 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 N . i eet C'r 0j:� # :- ' f UAL .. W, .. -71 Vicinity Map from Mason County Website Envirotech Engineering Geological Assessment PO Box 984 page 2 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 2.0 SURFACE CONDITIONS Information pertaining to the existing surface conditions for the project was gathered on February 10,2021 by a representative with Envirotech. During the site visit,site features were documented that may influence construction or reveal potential geological hazards. This Surface Conditions Section provides information on general observations, vegetation, topography, drainage and slope/erosion conditions for the project and surrounding areas. 2.1 General Observations The property is currently vacant land with few improvements and surrounded by residential development.East Hardings Hill Road extends along the north side of the property.Vegetation on and near the property consists primarily of firs and other trees and shrubbery common to this area of the Pacific Northwest.An aerial photo of the Project and immediate vicinity is provided on the following page. I 2.2 Topography The topographic information provided in this section was extrapolated from a public lidar source, and incorporated observations and field measurements. Where necessary, slope verification included measuring slope lengths and inclinations with a cloth tape and inclinometer. See the Site Plan in Appendix A for an illustration of the general slope indicators with respect to the planned development. Descending slopes exceeding 15% are located on and beyond the property.Average slope grades are approximately 14%with a vertical relief of approximately 35 feet. 2.2.1 Upslope Geomorphology Ascending grades are generally located to the southwest of the planned development. This slope is relatively minor within 300 feet of the Project, with no apparent slope grades of at least 15%.The upland area of the property is situated on a hillside and crest. Landforms are primarily of glacial origin with centuries of weathering overburden. Additional geomorphology that is pertinent to both upslope and downslope areas are provided in the Subsurface Investigation Section of this report. 2.3 Surface Drainage The majority of the stormwater runoff originating upslope from the anticipated development is expected to be minimal to moderate. Significant scour, erosion and sediment transport was not apparent near the project. 2.3.1 Upland Water Bodies There are no apparent water bodies or wetlands located upslope from the planned development that would significantly influence the Project. Envirotech Engineering Geological Assessment PO Box 984 page 3 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 2.4 Slope and Erosion Observations The existing moderate slopes near the Project signal a potential landslide or erosion hazard area. Some indicators that may suggest past slope movements include: • Outwash of sediments near the bottom of the slope, • Fissures, tension cracks or naturally stepped land masses on the face or top of the slope, and parallel to the slope, • Fine,saturated subsurface soils, • Old landslide debris, • Significant bowing or leaning trees,or, • Slope sloughing or calving. The above mentioned indicators, or other signs of significant mass wasting on the property or within the general vicinity of the Project were not observed or discovered during research. Indications of past landslides, current unstable slopes, deep-seated slope problems, or surficial slope failures were not observed during the site visit. N aa. Aerial Photo from Mason County Website Envirotech Engineering Geological Assessment PO Box 984 page 4 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 3.0 SUBSURFACE INVESTIGATION Information on subsurface conditions pertaining to the project was gathered during research and a site reconnaissance. The site visit was accomplished on February 10, 2021 by a representative with Envirotech. Specific information on field methods, sampling, field testing, subsurface conditions,and results from soil testing are presented in this section of the report.Appendix B has pertinent information on subsurface conditions for the Project, including test pit log(s) representative of the site soils,and water well report(s) originating from the subject property and/ or nearby properties. 3.1 Field Methods,Sampling and Field Testing Information on subsurface conditions for the Project was accomplished by probing anticipated foundation areas with hand tools, and observing soils within test pit excavations and/ or earth cuts. Information on subsurface conditions also included reviewing geological maps within the Project vicinity, and water well reports originating from nearby properties. No soil samples were collected for this Project.Envirotech measured the relative density of the in-situ soils by gauging the resistance of hand tools. 3.2 Geologic Conditions In general, soils at the project are composed of materials from glacial advances. The geologic conditions as presented in the "Geologic Map of Washington," compiled by J. Eric Schuster, 2002 indicates Quaternary sediments, Q8. Quaternary sediments are generally unconsolidated deposits, and dominantly deposited from glacial drift,including alluvium deposits. This project is located within the Puget Lowland. Typically, "lower tertiary sedimentary rocks unconformably overlie the Crescent Formation."as revealed in the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and coal deposits from rivers. During the Quaternary period, the Puget Lowland was covered by numerous ice sheets,with the most recent being the Fraser glacier with a peak of approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by glacial erosion glacial drift deposits. The "Geologic Map and Cross Section of the Kelso 7.5-minute Quadrangle" by Vaughn E. Livingston,JR., 1966,provides the following caption(s)for the project area: Envirotech Engineering Geological Assessment PO Box 984 page 5 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 Alluviurn, -Silt, ;and.and gra,cl dt x+•sled an-irc.tnt.:nuy include some lacu,trtnc,hpo�lt, and orgumc rnat%rials,such as peat. Vasbon till- -Unatralitied to moJ natcly stratified,campact,umoned mixture of clay.silt.sand. .trtd pravel dgositcd dtrmily by ltiacaal we.pay to tan.nr'arly ner%x,here tit%harp contact with underlying units:does not drain w-eli as pernt:abiltt} and;,+rosily arc to v-.,and and tinrr_tarn., in matrit arc-,ray angular:pchhlo-to houhlcr-,r,e etas,,arc cuannumly strtuml and Iaixtcd. having angular and(or)rounded elites;t> Nedra we ut aurally t"euut sud and r,;Wt%cl) rare. may contain iru nbcda of nand lard growl.-fhc surface of thie mill is clutaclerutal by str.ntrttlincd drumlins.>trration%,staid flute-that arc gencrully hundred;to thou.and.,of Sect lung.Angular to .-uhiminded elaciul errau:t+uuiJer-,coacraing rrn+atly ofpiutome or nactanwrphic ruck,are ,'ontmmit Mu di,!,emnlatcd on the aurfacc of tlu.un►t Unit may he cupped by it fcu-feet of tw.orted and<wmA uhlaaa+n,a W and srctwl of by unit Qgos.V.Ou n till hwilly:ru+xut.ol,ler wdamentc,forming angular unconformities.Drag folding and horizontal shcannr may occur at the base of the till or internally between layer,of till.csprcrailly in thick deposits.Unit Qgt rantm;in thickness from 0 to at Nast 50 ti. 3.3 Specific Subsurface Conditions The following subsurface conditions are estimated descriptions of the project subgrade utilizing information from the depth of penetration at all testing, sampling, observed and investigated locations. Soils for this project were described utilizing the Unified Soil Classification System (USCS). Using the USCS in conjunction with estimated relative densities and other anticipated engineering properties of the soil, susceptibility for potential landslides, erosion and seismic hazards may be assessed. The project is primarily composed of undisturbed, native soils, without indications of substantial fill. Competent bearing soils were encountered at 12 inches below the existing native ground surface in locations where the ground was probed. For engineering purposes, these native soils consist of distinguishable layers,as presented below. Soils within the upper 6 feet of natural ground were observed to be primarily poorly graded with gravel (SP). Expanded and specific subsurface descriptions, other than what is provided in this section,are provided in the soil logs located in Appendix B of this report. According to the "Soil Survey of Mason County," by the United States Department of Agriculture, Soil Conservation Service (SCS), the site soils are described as Alderwood gravelly sandy loam, Ab, with 8% - 15% slopes. See the soil map below, and the applicable SCS soil profile(s)in Appendix B of this report. Envirotech Engineering Geological Assessment PO Box 984 page 6 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 AR r Soil Survey From USDA Natural Resources Conservation Service 3.3.1 Groundwater From the water well report(s)and knowledge of the general area,permanent groundwater is at least 100 feet below the current ground surface. Surface seepage or perched groundwater at shallow depths was not observed on-site, nor indicated on the well reports. However, some seasonal groundwater is expected to flow directly above the hardpan on occasion. Envirotech Engineering Geological Assessment PO Box 984 page 7 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 4.0 ENGINEERING CONCLUSIONS The following sections present engineering assessments and conclusions concerning the project. These conclusions have been made available based on the planned construction activities as outlined in the Introduction Section of this report; general observations of drainage and topography as summarized in the Surface Conditions Section; and, soil conditions that were identified by the field investigation and soils testing as outlined in the Subsurface Investigation Section. Conclusions for the Project that is provided herein, includes pertinent information for landslide,erosion and seismic hazards. 4.1 Landslide Hazards For the planned development, as provided in the Introduction Section of this report, it is Envirotech's opinion that the proposed development is not subjected to or cause adverse impacts to a landslide hazard area or its associated buffer or setback as defined in the MCRO. This conclusion is based on the contents provided in this report. Landslides are natural geologic processes, and structures near slopes possess an inherent risk of adverse settlement, sliding or structural damage due to these processes. Geotechnical engineering cannot eliminate these risks for any site with sloping grades because gravity is constantly inducing strain on the sloping soil mass. Excessive wet weather and/ or earthquakes will exacerbate these strains. Geotechnical engineering considers excessive wet weather and `design' earthquakes in order to provide an acceptable factor of safety for developing on or near sloping terrain.These factors of safeties are based on engineering standards such as defining engineering properties of the soil,topography,water conditions,seismic acceleration and surcharges. Surface sloughing or other types of surficial slope movements usually do not affect the deep- seated structural capability of the slope. However, excessive and/or repeated surficial slope movements, if not repaired, may represent a threat to the structural integrity of the slope. Maintenance of the slope should be completed if the situation does arise in order to prevent the possibility of further surficial or deep seated slope movements that may be damaging to life or property. According to the Coastal Zone Atlas of Mason County, Washington, the Project is within and near terrain labeled `Stable' and `Intermediate' regarding potential landslide activity. Stable slopes are generally not prone to landslides due to small grades and accommodating geology. Historically, intermediate terrains have no known landslides. A site specific analyses and conclusions concerning the slopes are presented herein. A Stability Map from the Coastal Zone Atlas for the general area of this Project may be found below. Envirotech Engineering Geological Assessment PO Box 984 page 8 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 Yi 2 Project ' `- 1 4 II Ra o.}iti e± 1 c1 /. Is 74 ' �^.•art 5fa It . �.,_Y � ; �� - „to-i i:. , ` • I 7u�3}i_ _ ,.. 1 U 0.5 11111 YI Map from Washington State Department of Ecology Website According to the Department of Natural Resources (DNR) "LHZ—Final A-1 Map —Landslide Inventory—Mason Watershed,by Sarikhan,et. al.,May 2007,"previous landslide activity is not recorded near the project. Per the Resource Map from DNR, the Project is not within terrain labeled `highly unstable' or `highly erodible' relating to soils. DNR labeled portions of this project as medium to high slope instability with relation to slopes. This delineation is primarily dependent upon slopes and convergence. Secondly, lithology and precipitation are modeled within this delineation. In summary, this designation is based on mapping without field observations or knowledge of the specific site geology or soils. A resource map from DNR is provided below: Envirotech Engineering Geological Assessment PO Box 984 page 9 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 ..� Project Sods-Hydric Soils )t ry - ! r , Soils-Highly Unstable Soils 3! Soils �� -Highly Erodible Soils I LU ---� Westside Slope Stability Model(FP) G /� Moderate Slope Instability 11:18,0560 i 1-i mi ,r High Siupe instabFlay Map from Washington State Department of Natural Resources Website 4.1.1 Landslides and Slope Stability Analysis Past landslide activity or high slope instability indicators near the proposed development was not revealed during the project research.In addition,detrimental landslide activity or potential high landslide indicators were not observed during the site visit as outlined in the Surface and Subsurface Conditions Sections of this report. Due to these factors, and existing/proposed conditions,a slope stability analysis was not deemed necessary for this project. Considering the planned construction as summarized in the Introduction Section of this report; the aforementioned surface and subsurface conditions for the project; the slope stability assessment provided herein; and the Engineering Conclusions provided later in this report,it is our opinion that the project is not within a landslide hazard area, and that the proposed site alterations will not encourage a landslide hazard. 4.1.2 Surface and Subsurface Drainage This project does not appear to experience significant subsurface drainage or surface runoff. It is our opinion that groundwater or surface drainage is not a limiting factor for this Project. 4.2 Erosion Hazards Based on the USCS description of the Project soils, the surface soils are considered moderately erodible. According to the Resource Map from the Washington State DNR, as provided above, the Project is not within terrain labeled `highly erodible.' This Project is not within an erosion Envirotech Engineering Geological Assessment PO Box 984 page 10 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 hazard area as defined by the MCRO. Erosion hazard areas are those with USDA SCS designations of River Wash (Ra), Coastal Beaches (Cg), Alderwood Gravelly Sandy Loam on slopes 15% or greater (Ac and Ad), Cloquallum Silt Loam on slopes 15% or greater (Cd), Harstine Gravelly Sandy Loam on slopes 15% or greater (Hb), and Kitsap Silt Loam on slopes 15%or greater(Kc). Temporary and/or permanent erosion control measures may be required for any site when land disturbance is involved. Erosion control will mostly depend on the timeliness of construction, moisture content of the soil,and amount of rainfall during construction.Soil erosion typical to the existing conditions and planned disturbance of this Project include wind-borne silts during dry weather, and sediment transport during prolonged wet weather. Sediment transport of disturbed soils could be from stormwater runoff or tracking off-site with construction equipment. Although an engineered erosion control plan is not warranted for this project, Best Management Practices (BMP's) should be employed during and after construction. Ordinary BMP's includes silt fencing,protection of drainage outlets and vegetating denuded areas. Erosion control information and specifications may be found in the applicable "Stormwater Management Manual for Western Washington,"prepared by the Washington State Department of Ecology Water Quality Program. 4.3 Seismic Hazards Soils immediately below the expected foundation depth for this Project are generally Type D, corresponding to the International Building Code (IBC) soil profiles. According to the IBC, the regional seismic zone is 3 for this Project. The estimated peak ground acceleration ranges from 0.50g to 0.60g.This estimation is based on the United States Geological Survey(USGS)National Seismic Hazard Project in which there is an estimated 2% probability of exceedance within the next 50 years. There are no known faults beneath this project. The nearest Class `A' or 'B' fault to this property is the Tacoma Fault Zone.This fault is a Class `A', and is located approximately 1 mile to the north of the Project. This information is supported by the USGS Quaternary Fault and Fold Database for the United States. The potential for liquefaction and other earthquake induced hazards are believed to be low for this project. This is based on subsurface conditions such as soil characteristics and the lack of a permanent and substantial shallow water table. Subgrade characteristics that particularly contribute to problems caused by seismic events include submerged and confined, poorly-graded granular soils. Although gravel- and silt-sized soil particles could be problematic, fine and medium grained sands are typically subjected to these types of seismic hazards. 4.4 Other Considerations If foundations are located on slopes exceeding 30%,we recommend the foundation is extended at least 2.5 feet below the ground surface as measured on the downslope side of the excavation. Conclusions in this report are based on the type and location of the anticipated development, and existing on-site and off-site conditions. Site development that significantly deviates from the anticipated improvements presented in this report, or nearby development that influences this Project may require geotechnical design recommendations. Envirotech Engineering Geological Assessment PO Box 984 page 11 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 5.0 CLOSURE Based on the project information and site conditions as presented in this report,it is Envirotech's opinion that additional geotechnical studies are not required to further evaluate this project. Due to the inherent natural variations of the soil stratification and the nature of the geotechnical subsurface exploration, there is always a possibility that soil conditions encountered during construction are different than those described in this report. Therefore, it is recommended that Envirotech is promptly notified if project and subsurface conditions found on-site are not as presented in this report so that we can re-evaluate our recommendations. This report presents a geological/geotechnical assessment, and is intended only for the owner, or owners' representative. Furthermore, this report is only valid for the project information and location described herein. The services described in this report were prepared under the responsible charge of Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate education and experience in the field of geotechnical engineering in order to assess landslide hazards, earthquake hazards, and general soil mechanics. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Sincerely, Envirotech Engineering Jessica Smith,M.S. Michael Staten,P.E. Staff Geologist Geotechnical Engineer Envirotech Engineering Geological Assessment PO Box 984 page 12 Parcel 12232-23-90020 Belfair,Washington 98528 Mason County,Washington Ph. 360-275-9374 March 3,2021 APPENDIX A SITE PLAN SCALE. I INCH-80 FEET 0 0 ♦0 0 J E HARDINGS HILL ROAD 26_it PROPERTY LINE EXISTING TRAIL PO 6i= r Pp APPROXIMATE «� TOP OF SLOPE PO PROPOSED DRAINFIELD 29X* TPIe PROPOSED PO BUILDING AREA 3qy= � PROJECT/ OWNER/ LOCATION, SINGLE FAMILY PROPERTY GEOLOGICAL ASSESSMENT BEAR VALLEY ENTERPRISES LLC NO, 47D E HARDINGS HILL ROAD L SLOPE INDICATORS WERE FIELD YEASUREO BY ENMIROTECH,ANTI/OR PARCEL 12232-23-90020 EXTRAPCLATEB MM A PUBLIC LIDAR SNIBACE WHERE APPROPRIATE M INGTON 2 91MARIE4 ON THIS SITE PLAN WERE NOT PREPARED 3Y A LICENSED ENGINEER, SURVEYDR.LOCATTOHS C A URA F STTE FE AND GEO[XIMA /SDBSURFACE LEGEND ENVDffiT'C.ENGINEERING Dic'STBNAInm AS SHUWN HERS,WITH RLLArEm ITI 11t PRWOTY LINES PO BOX 964 MMT BC VCVr=8Y TAE MOM TAE CONCLUMONS AM --aft a gLpp3 XMVATM gQ�VA24m-py'ssm =Ogoft- W MV=DD lK$EITECFBWU GM Mr-4 MgWr tK SAMW M OtSm:mm R AM FFAIU FD:THAT MY (� �Ol RISITSC OFF w r L aA "m no WE v a 'Esr Mr SITE PLAN APPENDIX B SOIL INFORMATION TEST PIT LOG TEST PIT NUMBER TP-1 PROJECT: SFR Geological Assessment DATE OF LOG: 02/10/2021 PROJECT NO: 2147 LOGGED BY: MCS CLIENT: Bear Valley Enterprises LLC EXCAVATOR: NIA LOCATION: Parcel 12232-23-90020 DRILL RIG: None Mason County,Washington ELEVATION: N/A INITIAL DEPTH OF WATER: NIA FINAL DEPTH OF WATER: NIA STANDARD PENETRATION TEST SOIL STRATA DEPTH SAMPLERS USCS DESCRIPTION LL PI DEPTH N CURVE AND TEST DATA 1 70 30 50 0 ... ........ .... SP Poorly graded sand.Sand is primarily medium.Non plastic. 2 3 4 5 6 Excavation terminated at approximately 6.0 feet 7 8 9 10 I No Groundwater Encountered ENVIROTECH ENGINEERING This mf nwbon pertams ordy to this bonng and should not be Geotechntcal Engineering interpreted as bchg irxbat vv of the entce sde. Map Unit Description:Aldenvood gravelly sandy ban%,8 to 15 percent slopes--lrlason County, Washington Mason County, Washington Ab—Alderwood gravelly sandy loam,8 to 15 percent slopes Map Unit Setting National map unit symbol: 21626 Elevation: 50 to 800 feet A4ean annual precipitation: 20 to 60 inches Mean annual air temperature: 46 to 52 degrees F Frost-free period. 160 to 240 days Farmland classification: Prime farmland it irrigated Map Unit Composition Aldenvood and sinular soils.85 percent Adinor components:15 percent Estimates are based on observations,descriptions,and transects of the mapunit. Description of Alderwood Setting Landform:Ridges,hills Landform position(ttvo-dimensional):Shoulder Landform position(three-dimensional):Nose slope,tall Dotvn-slope shape.Linear,convex Across-slope shape:Convex Parent material:Glacial drift and/or glacial outwash over dense glactomarine deposits Typical profile A-0 to 7 inches. gravelly sandy loam Bwl-7 to 21 inches- very gravelly sandy loam Bw2-21 to 30 inches: very gravelly sandy loam Bg-30 to 35 inches: very gravelly sandy loam 2C.dl-35 to 43 inches: very gravelly sandy loam 2Cd2-43 to 59 inches: very gravelly sandy loam Properties and qualities Slope:8 to 15 percent Depth to restrictive feature:20 to 39 inches to densic material Drainage class:Moderately well drained Capacity of the most limiting layer to transmit%voter(Ksory:Very low to moderately law(0 00 to 0 06 in/hr) Depth to water table:About 18 to 37 inches Frequency of flooding.None Frequency of ponding:None Available%voter capacity:Very low(about 2.7 inches) Interpretive groups Land capability classification(irrigated): None specified Land capability classification(nonirngated). 4s Hydrologic Soil Group: B tiny Natural Resources Web Sod Survey 321N)21 � Conservation Service National Cooperative Soil Survey page 1 of 2 Map UM Descncoon Aidervood gtaw)ly saney bam,a to 15 Priam slopes--Mason County, 4 ashmgtw Forage suitatNtity group. Limited Depth Soils(G002XN302WA). Limited Depth Soils(G002XS301WA).Limited Depth Soils (G002XF303WA) Other vagelaWe dassnccabai Limited Depth Sods (GO02XN302WA).Limited Depth Soils(GO02XS301WA), Limited Depth Sods(GO02XF303WA) Hydric sal rating: No Minor Components Indianola Percent of map and 5 percent Lendform.Eskers,kames.terraces Landform position(three-(limensional):Tread Down-slope sheipe.Linear Across-sfope shape:Linear Hydric sal rating No Everett Percent of map unit'S percent Landform-Kames,eskers,moraines Land,`omi position(two-dimensional):Shoulder,tootslope Landlorrri position(unree-dunensionaO.Crest,base slope Down-slope shape.-Convex Across-slope shape:Convex Hydric snit rating, No Shalcar Percent of map unit 3 percent Landfonn Depressions Landform position(three-dimensional) Dip Down-slope shape:Concave Across-slope shape Concave Hydric sod roring� Yes Norma Percent of map un&2 percent Landhaan:Depressions,dratnageweys taWl'ban position(three-dimensional) Dip Down-slope shape.Concave.6neer Across.-slope shape:Concave Hydric roil rating Yes Data Source Information Soil Survey Area Mason County,Washington Survey Area Data. Version 16,Jun 4,2020 t-.i Natural Resouices Web Sod 9urvep 3rL'[02 i i9a conservation service Na5ona1 Coopetal,ve Sod Surrey Page 2 of 2 WATER WELL REPORT CURRENT oekt..lareaFr-E<�^er.r'<^Pr-o.r»ns"<aM-arwer Notice of Intent No.VOE05574 t " t ALJ519 I t e c t Unique Ecology Well ID Tag�o. Construction/Decommission(':'<"in circle) Construction Water Right Permit No.EXEMPT WELL ❑Decommission ORIGINAL INSTALLATION Notice Property Owner Name KRIS KLUSMAN S-370 of intent Number Well Street Address HARDING HILL PROPOSED USE: mDanmie ❑Industrial City GRAPEVIEW County MASON ❑MWxcr ❑Imgaoon ❑T iWell 0(hha Location SW 1I4.1I4 NW 114 Sec 32 'I'.22N R1W EQ" ❑ ae� TYPEOF1s'ORR: O^na'snumhaof.dI fmorethanune) ww•>1 ❑ ^* ON—ell ❑Recmtdilioned i*0 d'❑Dug ❑Based ❑nri.m (Lot/Long(s,t,r Lat Deg Lat Min/See ❑Deepened ❑Cable m Rotay ❑felled DIMENSIONS:Dianaanfweo 6 mches.d.4d 180 _8 Still REQUIRED) Long Deg_Long Min'Sec :7mlh ref sutnp,aed wr11.�.�Q.�.-_a• i rf>rsrRunavnicaus — Tax Parcel No.122322304010 e^r+c 0W44ed A.—, tx�n.trnt�_ttta f$p a saiuraee: ❑Laac.inilx{hd "vicar.rrom� - -�i.to ----,,,,�,,,s8. i'<),�YAL°CT10K(ik8EC051M1�(QFI£itQC6DLIA�: ' L-7 ThirylrL "';hnm.L•;::n� fl.ro� R 1 Pert ndnra: Ya No Folmmian'Ct,arbe by rotor,ehancfv,sirs 0fmcieriaF ud ser.rn.r.and the LLW:md �•__•� nmoe d,he mareial in each steam pmor-A with a lean orre may far each chmS,of Ttye ofpaforaa used_-_ inna foanon. USE ADDITIONAL StIECTS IF NECESSARY) SIZE ofpeds__--in.by in.and no,orperfs__from_a. MATERIAL MATERIAL FROM 1 10 Scrarts: OYes ONO X-Pe Locmron_ BROWN SILTY CLAY,SOME GRAVEL 0 Ili Mortar nmcr',Nsm< BLUE CLAY 11 28 TYpe Model N. BLUE SILT,GRAVEL 28 41 Diam.__Slot aim S'o,n fL to 0. Diary. slnt,ix _tan •-�fl.to It. BLUE CLAY 41 71 C.-Itilterivided: Yes Vo SiW-1`9la.A/fslld REDPETE 71 76 Materials placed from a 10 ___8 _G_RAY SILT•GRAVEL _76 87 i snefn04eo'(ltn (RO, 18ts1r4t4epd..7 sR�,,,�.,,,.T..,,�. ;GRECNIS BKorvN 59TY SA'.0,GRAV)2 87.� 98y t".t-tr1•a tial<ry 1 t 4t; . .tJP ...�..�._._...._...._..�_.... tBROM SILT$DUhtL1SAtV,MVEL se t85 0,f s..VMQu t..tA 0--o0zc*Abel T„ rvs m+a f BROwy4 &`YS0NA,45RAVEL 63$ 4E8 iisFeOrw.atar __ ,_,•,nCtahOfs;rald.,d,,,,�,,,_,,,- IirPAVtj,sow$AND,WATER 1138 S$0 tf ttNrt tltscslll11:9uii a9', Y1;51f:htwrfaaura ahaawe� - -_- t iiaTF,Ri.TsVEf1i )and.wrl'uc da<Yteal e4rrod¢s.9dct3nu•)ti.,,eVfJA•,,,,.,,A I� stare te.a 11 n.txtaw lap arwal Dxe 1R�1Ql� ? As1,sesnpox re___ ___11,s r—quareinch Date Artesian water it cnntrollcd by__ lea,vahe.elc W ELL 1 tSTS:Dtuw•duwn is wraunt water lccN,s Iowelea Ddow sake Inel Was a Dump lest -k?❑yes ON. Ifym by whom? Yield peal/min.with - fl.dnwdnwa fter _hrs. YadE ,:al rmin.wirA fl.d-4—ana hrs. Y,cIE._ yl./min.with_ n dnw&—fla hts. .�!A•tntry.l.rn lnm,xeArn a•:rm vhcn p:.nry.rvrmrli�(v uHr lr,Yl mrn.mvJfromvef! - - __ YyG t�r lw:+fJ - Uada mu gavnrin.wnh it dmwdown antt___hrs CSP[lIS II JLdCE urrt,zo Sall rin.w;h,em,ela 17 ata�,n.. De Ancaen now._.- ___�gp.m.DAIe Tcmperatuta of-•peel N'as a ehttaint walysis made•❑Yes ON— start Dole 10110/O6 Canpdated Date 10/11/06 WF,LL CONSTRUCTION CERT'IFICAI'ION: t constructed and/or accept responsibility for construction of this Well,and its compliance With all Washington.roll construction standards. Materials used and the information reported above are true to my bat knowledge and belief. 0 Drina 0Ent ineer 01',3inee N ONE SO _ 0,06.8 Con>pany ARCADIA DRILLING INC. . Drina/11.4nen?rainec Sifmmur Address PO BOX 1799. _ D63—trance Llanse No 1886 Cary,state.t,p SHELTON WA 98584 trTRA1NF,P Contr ra's oeutr',LRe peed xa aegisaaron Na ARCADD1098KI nor 1 D/16/06 ecY 050.1-:0(Re.Vi s) Ecology,.,-tlqua c>,,IKv„mny En,plosa.