HomeMy WebLinkAboutMEP2009-00010 - MEP Permit / Conditions - 7/10/2009 STgre MASON COUNTY
Py O,e
IS N DEPARTMENT OF COMMUNITY DEVELOPMENT
o N Z Planning Division
7 N Y ti P O Box 279, Shelton, WA 98584
1864 (360)427-9670
MASON ENVIRONMENTAL PERMIT
July 10, 2009
Please
JOHN VANHORN
390 E CRONQUIST RD
ALLYN WA 98524 I
Parcel No.: 122324001040 To:J - --�---
Issued: 7/10/2009
Case No.: MEP2009-00010
Project Description: --
Construct the expansion of an existing single use 100' long pier, ramp and float to a
115' long, joint-use pier, ramp and float. The expansion includes an 8'X7' float as an
extension of an existing 8'X24' float and construction of an 8'X32' float at an "L" to the
8'X7' float extension. Install 3 chemonite treated wood piling.
The following critical areas are present on this property:
Long-Term Commercial Forest QFrequenl
Ch. 17.10.060;
Mineral Resource Lands ded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance
excuse the applicant from compliance with
1 MCC. Nothing in this permit shall ex pp P
(Chapter 17.0 ) g
any other federal, state, or local statutes, ordinances, or regulations applicable to this project.
This permit may be rescinded if the permitee fails to complete the project as proposed or fails
to comply with the standards of this ordinance.
Authorized Local Government Official Date
1
Mason Environmental Permit
7/10/2009 Case No.: MEP2009-00010
Conditions:
1.) All construction and demolition debris must be removed from the beach after project
completion. Proper disposal of construction debris must be on land in such a manner that
debris cannot enter or cause water quality degredation of State waters.
2.) Water quality is not to be degraded to the detriment of the aquatic environment as a result
of this project.
3.) Recreational piers shall be no higher than 11 feet above MHHW. Floatation for the
structure shall be entirely enclosed and contained to permanently prevent the breakup or
loss of the floatation material into the water. Orient the floatation so that it does not
obstruct the grating.
4.) Pressure treated wood must be completely dry prior to placement in water. Use of
creosote or pentachlorophenol is prohibited. Install plastic wear strips between the float
and the pilings to reduce treated wood chafe.
5.) Any discharge of sediment-laden runoff or other pollutants to waters of the state is in
violation of Chapter 90.48, Water Pollution Control and WAC 173-201A, Water Quality
Standards for Surface Waters of the State of Washington and is subject to enforcement
action.
6.) Proper erosion and sediment control practices must be used on the construction site and
adjacent areas to prevent upland sediments from entering shoreline waters. Erosion
control measures must be in place prior to any clearing, grading, or construction. These
control measures must be effective to prevent soil from being carried into surface water by
stormwater runoff. Sand, silt, and soil will damage aquatic habitat and are considered
pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of
the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC
173-201A, Water Quality Standards for Surface Waters of the State of Washington, and
is subject to enforcement action. Any work in or adjacent to waterways that will adversely
affect water quality must receive specific prior authorization from the Department of
Ecology pursuant to WAC 173-201A-110. A short-term water quality standards
modification may be issued if the proponent agrees to a number of specific construction
practices and techniques designed to minimize water quality impacts. All areas disturbed
or newly created by construction activities must be revegetated using bioengineering
techniques, clean durable riprap, or some other equivalent type of protection against
erosion when other measures are not practical.
7.) Temporary erosion control measures must be implemented to prevent water quality
degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained
until upland vegetation has become established.
8.) All trenches, depressions or holes created in the intertidal area shall be backfilled prior to
inundation by tidal waters. All stormwater discharges must be constructed in a manner
that will not cause scouring on the beach.
9.) Best management practices are to be implemented.
10.) All facilities are to be constructed and maintained in a safe and sound condition.
Abandoned or unsafe docks and piers shall be removed or repaired promptly by the
owners. Where any such structure constitutes a hazard to the public, the county may,
following notice to the owner, abate the structure if the owner fails to do so within a
reasonable timeand may impose a lien on the related shoreline property in an amount
equal to the cost of the abatement.
11.) All mitigation proposed by both applicants within the habitat Managment Plan prepared by
Marine Surveys and Assessments and dated 2/9/09 must be implemented and maintained
on the structure and the uplands.
12.) The submitted joint-use agreement between the adjacent property owners must be
recorded within the Mason County Auditor's Office under each applicant's parcel. A copy
of the recorded title notification must be submitted to the Mason County Planning Dept
prior to issuance of the Building Permit for the structure.
7/10/2009 Page 3 of 4 MEP2009-00010
t
Mason Environmental Permit
7/10/2009 Case No.: MEP2009-00010
13.) Approved per dimensions and setbacks on submitted site plan.
14.) Title notification of Habitat Management Plan (HMP) must be recorded with the Mason
County Auditor and a copy submitted to the Planning Department prior to work being
started.
15.) All other necessary permits trom Mason County, Washington State,and federal agencies
that are required for this project must be obtained prior to development and construction
and adhered to upon completion of the project.
7/10/2009 Page 4 of 4 MEP2009-00010
PERMIT NO.: —
DATE RECEIVED:
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
RESOURCE ORDINANCE (Chapter 17.01 MCC)
411 N. 5TH Street/P.O. Box 279, Shelton, WA 98584
ENVIRONMENTAL PERMIT APPLICATION
MASON ENVIRONMENTAL PERMIT CONDITIONAL USE ❑ VARIANCE ❑
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical
areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58
RCW.
PLEASE PRINT
1 +l wner Mailing Owner: ��Ufiq 6tn b1j,4"+ �5� g Address: -
�t1�c:-tl- �lu 3 i L'l• �.y tt�; (]ctl< �r ►J+?
Site Address: nn
3�L) 3S3() E6 s+ l_t'l>r1�iL2 + !'Lyic� City Q,R�A C1Ar , State: 014A ZiA13.21
City: 41 `W State L&*) _Zip.q&'�,?L�L.ien/Title Holder
Phone: Daytime( ru
Address:
Fire District#:
City: State: Zip:
Signature:
2. Parcel Number: / 3 -.�y�0 -_/L y Legal description: S}- 3_;, a,2 /V j
/ 2;L3409 /0 /
Parcel Size: , P.3 and . A actr�_S
3. Directions to site:
ROPA iNw3 Eas� -. f-urn V140- 6n E f:. ►—ancuttW Loon Qoad . turh •ICft en y
E CYahaIAjJ+- lzoad .
State what sections require a permit: In-Holding Lands,Chapter 17.01.062 ❑
4' Long-Term Commercial Forest,Chapter 17.10.060 ❑ Wetlands,Chapter 17.01.070 ❑
Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑
Aquifer Recharge Areas,Chapter 17.01.080 ❑ Landslide Hazard Areas,Chapter 17.01.100 ❑
Erosion Hazard Areas,Chapter 17.01.104 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑
Fish and Wildlife Habitat Conservation Areas, Chapter 17.01.110 q
5.
Identify current a of property with existing improveme ts:
S ►na le uS a 11)D' c'1nr1L
6.
Identify and describe the proposed project,including the type of materials to be used, construction methods,principle
dimensions and other pertinent information(Attach additional sheets if ^ `
needed):-Tn r. n,�Arucr� 0. �rt� S a v1. 'Q' J.-V � CLrt e*"s_iQA Q_�_ "I -e1-1ST1A
$1-L,24' 1t�a�1-,1 d C v n sl rocA art W -A- 73 2' : ll p,+ as"L-!� ,k-h�
`h' IL7' -� loa� .e,�Lr,<t��1. \v�S�a\1 �'i 1 C hnmoniln" +-rP,Jed
4�noc�. T t I ins ,
?. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No
8. Any water on or adjacent to property:
Saltwater Lake ❑ River ❑ Pond ❑ Wetland ❑ Seasonal Runoff ❑
Other
9. If septic is located on project site,include records. 1J I�}-
Connect to septic? ❑ Community Septic? ❑ Public Water Supply? ❑ Well? ❑
10.
Type of Job: New C AddKAlt ❑ Repair ❑ Demolition ❑ Other
This permit is granted pursuant to the Resource Ordinance(Chapter 17.01 MCC)and nothing in this permit
shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or
regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be
rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance.
MASON ENVIRONMENTAL PERMIT: $510.00/$305.00(with another permit)
MASON CONDITIONAL USE ENVIR.PERMIT: $1,225.00
MASON RESOURCE ORDINANCE VARIANCE: $1,225,00
HEARINGS EXAMINER: $490.00
1APLANNING\R&GPACENVIR0NMENTAL REVISED 014"5
�X 3
v -
� h J Ira �tisc
1
fT xf
6le
Ilrr t
Il �
t {
I
S 302,i 1 L1 `
390 E Cronquist Rd
Ally
ios. ry' J
1 d _ k
J
J
1 SeerK '144th St KP
--
` �� � `�'" -EForx''uisf�
Ictot' — � j `vg � � q
res Beach
390 E Cronquist Rd
Allyn,WA 98524 1 E 1 } L302;
l
DetGOlt-6r-1 l:� _ 4
�'. !S/ f_ � � l� ? �,. � ` , � �.? � � y33y�,: Y �� .`c� �� ____ ;''�c.t�'3 r�,y�t l` z :{ u✓ .3`� rk
3
-. ,: - �1� - � �;� •�. r- :., .t ., t,y,�� � Lj�; - v`,:.a'' 4t�„ ' 'AM
.-F'
T /jy/f , / �' - O � fr". y �N�E cSat.C'`,fY„A l .:?� �.'.� S %,.{ S.�:t�tl "�.v* .✓,:' y
7 ' � J n.N
x,� K> Y:l 'k
f 1 / Fair Harbor c - K
t
' I`}— r crape iew
�Fiir/AsJ�
l r
�n
r
� 4
/y �. � � �� � ~:�v ,.a �` 1,�y,'�•'�'ai ,�-x"�*3tir,x.`'.'�,ya�,�`�,Ys st°�''r' ;« a I ���t�K��"t�z.�€ c; ;f�>aa'�.e�,
SL
3._;,
�' ,t ✓'- �i :a,, 'i-,'' r 3."�'i < t*F'�?Z t :i? +,"' '' �'i5 s a $! 's
ey
r
7 j -
y ".r� -,.�./ /. 'ZJ ��+.{�[.y# :.2 � '>�9`"(Zt'f �,x-,y �,.r• l ,t `r s �z'�Ma r� �t 3 _�n� ��'-',-a�wE.-._s:,�'//J/j ay OI �, �� 4'� •- `"'y. 'x�r .,}+�-f,- :ra -Kr:.4:�'t'T,s,°-_..',',..�'..i:� �I �.:; � °t. >>r$ �," 'y�3,.z.-.
-
f
0
,
t� �! 3
ys�4. ti�'xx�"rs"�r�r*..... ...�
f
Harts ene � kierron 4 y.
r h -d
Hni tstd��e
�' � ' Marine Floats' �-r- -
1208 East D St-Tacoma-WA 98421 -253-383-2740
I
SCALE: NTS APPROVED BY: DRAWN BY
1 Point ft AB/WB
.-( '_. L-_ ty-'✓�\Oa� �`(�"' �jF �.5'_l DATE: 7�30/OU REVISED
VICINITY MAP
JACK VANHORN AND DWIGHT SASTEN DRAWING NUMBER
CASE INLET
. �K3
14.16' 12' ill 10, 9` 8' 7' 1156 5' 4 3` 2' ?' 0.0'
100, 3
J
40' 36' 24' I 7' 8'
4'X ' 4' AL MINUM RA P
EX STI G DOCK
3 �
3
PLAN VIEW (3) NEW GALVANIZED STEEL PILING
u u Z-\-A
MHHW 14.16'
M H W 13.23'
MHHW 1.5' UP
3' CONCRETE BULKHEAD
DATUM: 0.5'
ON SEPTEMBER 14, 2005, MARINE MLLW 0.0'
SURVEYS AND ASSESSMENTS DETERMINED
THE MHHW TO BE 1.5' UP THE BULKHEAD EXISTING FLOAT STOPS
NOAA BENCHMARKS THE _MHHW AT Marine Floats
14.16' FOR A L L Y N. FLOAT S T❑P S 1208 East D St-Tacoma-WA 98421-253-383-2740
SECTION AT HIGH AND LOW WATER SCALE: 1"=10' APPROVED BY: DRAWN BY
DATE: 9/3 0/08 REVISED
PROPOSED FLOAT ADDITION
JACK VANHORN �,Ow i+T J14jTEj,4 DRAWING NUMBER
CASE INLET
-EXISTING ROCK BULKHEAD
JOHN AND DONNA FETCH
1811 LINCOLN CIRCLE SE o
RENTON WA 98055 `D
EXISTING ROCK BULKHEAD
HOWARD AND BRENDA RIGGLEMAN I
400 EAST CRONQUIST ROAD
ALLYN WA 98524 $8 0
fU
CASE INLET
1 9' 12' 111 10' 9' B' 716, 5' 4' 3' 211'
496.05' , 1
- - - —- - -- - -- - - - - -- —- - -- —- -
100' 1 1 1 1 1 J
I
I — I I —
,JACK VANHORN
PO BOX 226 z o
ALLYN WA 98524 M cu
NI M
L -- EXISTING DRIVEWAY
EXISTING CONCRETE BULKHEAD
491.30' I
EXISTING CONCRETE BULKHEAD
0
o
0
DVIGHT AND ELLEN SASTEN w
1827 ROLLING HILLS AVE SE n
RENTON VA 98055
hv
Marine Floats
I7AYMOND L JUDITHJUDITH SCHAFER EXISTING CONCRETE BULKHEAD 1208 East D St-Tacoma-WA 98421-253-383-2740
1912 ROLLING HILLS AVE SE
0 10 20 40 RENTON WA 98055 " ' APPROVED BY:SCALE: =4O DRAWN BY AB/WB
SCALE: 1'=40'
DATE: 9/3 0/0 8 REVISED
SITE PLAN AND ADJACENT STRUCTURES
JACK VANHORN DW►bHT f14lTEN DRAWING NUMBER
CASE INLET