HomeMy WebLinkAboutCOM2023-00091 Cellular Microwave Dish Addition - COM Inspections - 7/16/2024 INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncou ntywa.gov
PERMIT# COM2023-00091 PROJECT ADDRESS 6006 W SIMPSON 805 RD SHE,WA 98584
PARCEL# 521083000000 PROJECT DESCRIPTION ADDING VERIZON MICROWAVE DISH TOE STI G TOWER
OWNER GREEN DIAMOND RESOURCE COMPANY/ ADDRESS 8809 LENOX POINTE DR SUITE B PHONE
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
CTION INSP DATE Comments INSPECTION INSP I DATE Comments
�B �'G LD-Final Inspection
(
r ;(
A)ID
See u'c'k S d v�
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
F
3-00091 NEW COMMERCIAL PERMIT
ESCRIPTION: ADDING VERIZON MICROWAVE DISH TO ISSUED: 10/12/2023
OWER
ESS: 6006 W SIMPSON 805 RD SHE EXPIRES: 04/09/2024
PARCEL: 521083000000
APPLICANT: GREEN DIAMOND RESOURCE COMPANY/ OWNER: GREEN DIAMOND RESOURCE COMPANY/
VERIZON VERIZON
8809 LENOX POINTE DR SUITE B 8809 LENOX POINTE DR SUITE B
CHARLOTTE, NC 28273 CHARLOTTE, NC 28273
CONTACT: AMERICAN TOWER
10 PRESIDENTIAL WAY
WOBURN, MA 01801
1.205.545.5908
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 25000.00 $25,000.00 Building Permit Fee $414.97 $0.00
ESTIMATION..) Planning Commercial Review $380.00 $0.00
Fee
State Fee-Commercial $25.00 $0.00
Technology Surcharge $13.69 $0.00
Plan Check Fee $269.73 $0.00
Total: $25,000.00 Totals : $1,103.39 $0.00
REQUIRED INSPECTIONS
KNOX BOX VERIFICATION BLD-Final Inspection
CONDITIONS
All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
Printed by:Genie Mcfarland on:10/12/2023 01:20 PM
Page 1 of 3
l
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00091
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* WIND LOADS-Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic
wind speed for Mason County is 85 MPH.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357-2620, ext. 630.
* The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
Printed by:Genie Mcfarland on:10/12/2023 01:20 PM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00091
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries(L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* All property lines shall be clearly identified at the time of foundation inspection.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: VP
Contractor or Au t o ized Agent: / n l C,"rJ Date:
Printed by:Genie Mcfarland on:10/12/2023 01:20 PM Page 3 of 3