Loading...
HomeMy WebLinkAboutBLD2007-01089 Cancelled Revised SFR - BLD Permit / Conditions - 4/14/2021 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMIJKTY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III �N C E L L E� 426 W. Cedar Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT, _. BLD2007-01089 OWNER: FAWCETT ENTERPRISES LLC RECEIVED: 6/19/2007 CONTRACTOR: LICENSE: EXP: ISSUED: 2/26/2008 SITE ADDRESS: 180 E WINTERWOOD DR GRAPEVIEW Gj EXPIRES: 6/19/2015 PARCEL NUMBER: 121181100030 LEGAL DESCRIPTION: PCL 1 BLA#98-40 &TAX 1082 PTN G.L.1 PROJECT DESCRIPTION: DIRECTIONS TO SITE: NEW SFR- HWY 3 NORTH, R ON GRAPEVIEW LP RD, R ON E LOMBARD RD S RIGHT Revision February 2014 to reduce dwelling from 4462 sf to 3246 sf ON E PIRATES COVE RD, LEFT ON E WINTERWOOD DR, PROPERTY IS AT 180 General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 4 Type of Constr.: VB Type of Use: SF Insp. Area: No. of Bathrooms: 5 Occ. Group: R3/U Lot Size: Deck: 400 Type of Work: NEW Fire Dist.: 3 No. of Stories: 2 Occ. Load: Building:3,246 Garage-Attached 936 Valuation: $ 281,335.64 Building Height: 28 Occ. Status: Seasonal Basement: cov porch 738 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: N 390.0 Ft. Shoreline: 100.0 Ft. Water Body: CASE INLET Rear: S 100.0 Ft. Slope: 80.0 Ft. SEPA?: Unkn Model: Width: Ft. Side 1: E 50.0 Ft. Shoreline Desig.: UnNnown Year: Serial No.: Side 2: W 112.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Water Closets (Toilets) 4 Furnace<100K 1 Plan Check Fee KS 6/19/2007 $ 1,625.10 S120070000000( Lavatories 5 Ventilation Fan 4 Planning Review Fee KS 6/19/2007 $ 170.00 S120070000000( Bath Tubs 1 Fireplace 1 Building State Fee MAL 7/10/2007 $4.50 S220080000000( Showers 2 Exhaust Hood 2 Building Permit Fee MAL 7/10/2007 $2,500.15 S220080000000( Water Heaters 2 Dryer Vent 2 Mechanical Fee MAL 7/10/2007 $291.75 S220080000000( Clothes Washer 2 Mechanical Base Fee MAL 7/10/2007 $25.30 S220080000000( ::: Kitchen Sink 2 Prop ne Tank 1 Plumbing Fee MAL 7/10/2007 $ 198.00 S220080000000( Dishwasher 2 Gas Outlets 5 Plumbing Base Fee MAL 7/10/2007 $22.00 S220080000000( Hosebibs 4 Fire Warden Review DHS 7/23/2007 $64.00 S220080000000( Heat Pump 2 Geotechnical Asses. Repoi BKD 8/9/2007 $480.00 S220080000000( Geotechnical Asses. Repoi BKD 8/28/2007 $320.00 S220080000000( EH Plan Review TW 10/3/2007 $75.00 S220080000000( Plan Check Fee DLC 2/10/2014 $999.02 S220140000000( r _. Total $6,774.82 BLD2007-01089 Please refer to the following pages for conditions of this permit. Page 1 of 6 y Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT dd Cv�` Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 �rT Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT / BLD2007-01089 OWNER: FAWCETT ENTERPRISES LLC RECEIVED: 6/19/2007 CONTRACTOR: LICENSE: EXP: ISSUED: 2/26/2008 SITE ADDRESS: 180 E WINTERWOOD DR GRAPEVIEW EXPIRES: 8/26/2008 PARCEL NUMBER: 121181100030 LEGAL DESCRIPTION: TRACT 3 OF GOUT LOT 1 &TAX 1082 PCL 1 OF BLA#98-40#668407 PROJECT DESCRIPTION: DIRECTIONS TO SITE: NEW SFR HWY 3 NORTH, R ON GRAPEVIEW LP RD, R ON E LOMBARD RD S RIGHT ON E PIRATES COVE RD, LEFT ON E WINTERWOOD DR, PROPERTY IS AT 180 General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: 4 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 5 Occ. Group: R3/U Lot Size: Deck: 1,013 Type of Work: NEW Fire Dist.: 3 No. of Stories: 2 Occ. Load: Building:4,462 Garage-Attached 936 Valuation: Building Height: 28 Occ. Status: Seasonal Basement: Manufactured Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: N 390.0 Ft. Shoreline: 100.0 Ft. Water Body: CASE INLET Rear: S 100.0 Ft. Slope: 80.0 Ft. SEPA?: Unkn Model: Width: Ft. Shoreline Desig.: U sknown Side 1: E 50.0 Ft. Year: Serial No.: Side 2: W 112.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 2 Exhaust Hood 2 Plan Check Fee KS 6/19/2007 $1,625.10 S12007000 Hosebibs 4 Furnace<100K 1 Planning Review Fee KS 6/1 912 0 0 7 $170.00 S12007bbb Kitchen Sink 2 Gas Outlets 2 Building State Fee MAL 7/10/2007 $4.50 s2200s000 Laundry Tray 1 Propane Tank 1 Building Permit Fee MAL 7/10/2007 $2,500.15 S22008000 Lavatories 6 Ventilation Fan 7 Mechanical Fee MAL 7/10/2007 $291.75 s22oos000 Showers 4 Woodstove 2 Mechanical Base Fee MAL 7/10/2007 $25.30 S22008000 Water Closets (Toilets) 5 Dryer Vent 2 Plumbing Fee MAL 7/10/2007 $198.00 S22008000 Water Heaters 2 Plumbing Base Fee MAL 7/10/2007 $22.00 S220080b0 Bath Tubs 2 Fire Warden Review DHS 7/23/2007 $64.00 S22008600 Clothes Washer 1 Geotechnical Asses. Report BKD 8/9/2007 $480.00 s2200s000 Geotechnical Asses. Report BKD 8/28/2007 $320.00 S22008000 EH Plan Review TW 10/3/2007 $75.00 S22008000 Total $5,775.80 i BLD2007-01089 Please refer to the following pages for conditions of this permit. 1 of 6 CASE NOTES FOR BLD2007-01089 CONDITIONS FOR BLD2007-01089 1) Note;called.LO-&1( message-R�g; cable chain— bloek way(0800-7/19/07) N9fe ;t�O left cable Low��ed and able t�"ss-f 1 issue was because of driveway length Chapter 14.17080 and 090 should be installed. a d be � . 2) By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your"Approved Site Plan" to ensure thesexitructures meet the setback conditions listed. X ... 3) Own ent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X er; Ag 4) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County Xrdin� or gulation, must be reviewed and approved by Mason County prior to construction. 5) Activity is,s bje t to the conditions of the Eagle Management Plan, dated 8/10/07. X 6) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged ! shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 7) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the intern tional codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector�hallbe-Fnade prior to requesting additional inspections. x fil 8� THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X L`�t BLD2007-01089 Please referto the following pages for conditions of this permit. 2 of 6 1 9) Ali building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Counp4rdinances and building regulations. X 10) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access ro Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roa s ct with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 11) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspect►o the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not be used he final inspection has been performed and approved by a Mason County building inspector. X 12) The approval of this project is subject to the recommendations and specifications outlinpd in the attached geotechnical report or assessment. Structures and /or land modifications (grading, cuts, fills, etc.) required in the geotechnical /assessment, may require a seperate permit. The geotechincal report/assessment shall remain attached to the approved building plans. X 13) All site work is subject to the conditions and recommendations made in the Getechnical Report prepared by Geotechnical Testing Lab, dated July 23, 2007. X 14) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Si ensure these structures are shown and meet the setback conditions listed. X 1 15) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X �l 16) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X 17) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a perio t Scceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have pre a action from being taken. No more than one extension may be granted. X BLD2007-01089 Please referto the following pages for conditions of this permit. 3 of 6 18) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for • action for a period no exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have pre nt action from being taken. No more than one extension may be granted. X 19) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit it holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of \0dd6cuments will result in failure of required building inspections. X ! k 20) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In dd'ition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department pr' r t y further inspections being performed or approvals granted. X 21) Pressure treated„wood-�manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, analla ing. Install metal connectors approved for contact with the new types of pressure treated material. X 22) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks between 125 and 500:gallons must be located a minimum of 10'from any building, property line, public way, possible source of ignition (electrical outlets, electrical fixture c pressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. If a propane tank is exposed to probable v/*, ul amage, protective bollards must be installed. X 23) All property lines shall be clearly identified at the time of foundation inspection. X 24) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks `nd monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The;perpon "igning this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X I V 25) Retaining walls needed to suppgit a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining' Retaining Retaining wall plans and calculations shall be prepared by and stamped by a Washington State licensed design professional. X i- 26) Per 200 C -SECTION f;�905- REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accord nc ,/wit he applicable provisions of this section and the manufacturer's installation instructions. X , 27) Per 2003 IRC -SECTION 1609 -WIND LOADS- 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wipA loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BASIC WINl PE ,J( -SECOND GUST)the wind speed for Mason County is 85 MPH. X v BLD2007-01089 Please referto the following pages for conditions of this permit. 4 of 6 28) due to the complex nature of this structure Mason County will require a separate shear inspection. This inspection will include all of the hold downs and traps the by the engineer of record. Please call for this inspection prior to the cover of these items (ie: any exterior co ng). `lieu of the inspection by Mason County a letter from the engineer of record approving all shear via his observation will be accepted.X tz 29) The proposed project must be consistent wit Jrp licable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program.X 30) Any above g d structure(including overhangs and decks) must be at least 100 feet from the Ordinary High Water mark of Pickering Passage. X ` 31) International Building Code. In addition to the inspections required by Chapter 1 of the International Building Code, the owner or the engineer or architect of record acting as th tiwner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under I tion 1704. The special inspectors' duties & responsibilities shall be as specified in Chapter 17. X 32) Temporary erosion control measures must be implemented to prevent water quali r ation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X Ll 33) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to Planning Department regulations. Such regulati•ns prim,arily consist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think such featuf,�as on or nearby your property, please contact the Planning Department so that exact setback • requirements can be determined. X ! C. 34) Washington State Energy Code Compliance has been approved using the following: Heat Type: Electric or other fuels, Compliance Method: IV, Window(Max U-Factor):0.40, Skylight(Max U-Factor):0.58, Doors(Type/Max - actor):0.40 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-30, Slab Insulation R-10. X 35) Installation of heating equipment in single family residences shall meet the requirement of the current WSEC. The furnace to be installed shall not exceed 200% of the heating design load or prescriptive requirements of Chapter 9. Furnace efficiency shall be .78 AFUE or higher or rated 80% combustion efficiency. All ducts shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes installed in accordance with m-anu cturers installation instructions. Duct tape is NOT permitted as a sealant on any ducts. Ducts in unheated spaces shall be insulated to R-8. X An inspection performed by a representative of the Geotechnical Testing Laboratory shall be performed on-site prior to the footing pour to verify that earthwork and foundation installation activities comply with geologist recommendations. In addition a final inspection report, prepared by a representative of the Geotechnical Testing Laboratory shall be required to verify that erosion control, drainage and final work is completed in accordance to geologist recommendations. Reports shall be bmitted to the Mason County Building Dept., PO Box 186, Shelton, WA 98584, prior to the footing and final inspection and available on site for inspe i X BLD2007-01089 Please referto the following pages for conditions of this permit. 5 Of 6 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a pro ress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described pr 6rty and structure for review and imp ction. OWNER OR AG DATE: _ y BLD2007-01089 Please referto the following pages for conditions of this permit. 6 of 6 M- o CONCRETE MECHANICAL MANUFACTURED HOME a Date a Footings!Setbacks Gas PiA y� gy Ribbons n o Interior Date By Interior-Date By Date Fly M 00 Exterar Date By Exterior-Date By set-up m Point Load!Isolated Footings INSULATION Date By Z 'Q ^ BG 1 SLAB INSULATION 4 Date fs By Data <� L y_�.1� By r`L FIRE DEPARTMENT m Foundation Wails Floors ��� Date By M Date_ By Data - 2-& W By DECKS X FRAMING Walla Date By N Date _ to/d BYT Data By PROPANE TANKS r PLUMBING Vault Date By r- Date a OTHER Groundwork �� "�' Attic Type.. Date �!" [ �, By / Date - By Date J /UL- 2 - o q By h o.w.v DRYWALL Type- Date J Int Brace Wall Date By W Date `�`�� By Date By FINAL INSPECTION p fD CD Water Line 1 By l / Fin Seperation IVO I�j l�Y[/ Date Date By Date By O ID V Pass Or Request Inspect. c Type of Insp. Fail Date Date Done By Comments _ o ed SS 1-7 CD _ / �d�1 /Ile o y o vy� /"�✓�G'CT/ CD f %LG (_7 f XX %f/l �YJ► T/(%� � � l� �� fr� 'j(,fI�t'tG� S�� ! k CSC-�'�'j�- O ITF 47e) ( Uiy ' Tbi c,�l cS,E T /Yo ✓ilia-/jr S XT F/�tSfl .4PiPv� 9� /gib !.-tii9/3.o I_ y``� i CONCRETE MECHANICAL MANUFACTURED HOMIE CQdie [3y , Footings!Setbacks Gas Piping R.ibbctts. Interior Date By Interior-Date By Data By Exterior-Date • By Exterior-Date ! Sat-up Point mad!isolated Footings INSULAT10N We � Date By Data SLAB INSULATION �� FIRE DEPARTMENT Faundatlon Walls Floors Dale By Dwite By Data BY DECKS FRAMING wall't. Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date ly OTHER Groundv.vrk Attic Date _ Type. Date By Date By D1yV.V. DRYWALL Type: � Date ey Int Brace Wall Date y Date Dy FINIAL INSPECTION Water Una Fire 5 ape ration Cute By Date By Dates By Pass:or Request Inspect. y Type of Insp. Fail Date [date Done By Comments _ _ _ fL�� H�,�,o c.rn�,p•�r,E r to CD — 8 ti ?3 rc CDC-Oia- 2<Z" C-C, /0 gottrw^0 teras iy Will O A? 4 G. y � a0,-Cdw— %!VICtwm f, rr�,t c f7 iYe i•� ���• Lforn�n/ .Zcx2� G . ........... T ............ 1 N f CONCRETE MECHANICAL MANUFACTURED HOME Footings 1 Setbacks to ' 13Y Ribbons Gas Piping t(�� Interior Date By Interior-Date 9 I A-> BY 1,P Date Sy \ Exterior-Datek-/3.Y $Y Exterior-Date ,I D Set-up Point Load t Isolated Footings INSULATION, Date, By BG I SLAB INSULATION Date BY Data By FIRE DEPARTI1:ENT Foundation Walls Floors Date By 7` Date /G' Data 4 Z-(,V DECKS FRAMING wails Dane By Date �y Data BY PROPANE TANKS PLUMBING vault Late By _ E DAto By OTHER Grotnd rk Air. Tp fi C/� Dates By We Date D,YV 1r DRYWALL Type: 1� Int.Braoa Wall Date ! y Date Da te DY -n F[tt[A!'_.INSPEC'F1CS,fit Water Una Fire Separation Date icy 1/ Date _ By Grata By _ f V Cu s Pass or Request Impect. Type of Insp. Fail Da Date Done By comments , _� a CD cc CD v 8 �' ►u`^ '� r-,n'LGr.L I�xa2 Q '-j-C)kcl 1AJ M LA � FtOC�q 7 o ,e• c I 41P/) CD 1 7 7 1'S A4,+" 5e,,, A?T I<^01 OUP �A�Jt`c vW (l_ y3 7G � Llf`24Gc-� c,�c'�' -4ttC C� fitf vC� &"0 AT Trbr�s®lam ���/?�! 7 CONCRETE Gas¢ipi°g MANUFACTURED HOME {rderkyr-Date, By Footings/Setbacks Fa arr _[late r Ribbons Dame By INSULATION Date Foundation Wafts BG 1 SLAB I NSU LAT ION "fit-up Date B}• Date By Date By MMINC Floors FIRE DEPARTMENT t5ate � Date Sy l at i' Walls DECKS PLUMBING late Dy - Date By Groundwork vault TANKS cute ` Data _ _ BY €7a:te Bye Attic La.'Vw.�F IDate E3y OTHER Date BY DRYWALL Tape, Late E3y Wafer Line pate By Type Data. By In�t;Sr 11 Daie By MECHANICAL _ Date _ BY FINAL INSPECTION Fire Sepemtcn Data B> Date BY Gate By Pass or ' Request Inspect'. Tie of insp. Fail Date Date Done By Comments i � �� Qrc�•y ' I i C _ E ,. .Building Permit # MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 ORRECTION NOTICE Job Location 4� -7-AC,1 P4 This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items L�4d below must be corrected to gain code compliance ley You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection ❑ OK to This is not a complete inspection Department Ac-G' Date Z Inspector u4s N44T ran- M4 4V , THIC TAU" Permit# -v 7 MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location 1��-' ��^j=�7r�/vr�o ?92 This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been f und: Items listed below must be corrected to gain compliance -r,� /v d I AO kAAC-�,47— r, „S poi E� /' / �✓ O /. CL You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK Call for re-inspection when corrections are made before continuing ❑ please contact our office Make corrections, items will be checked on next inspection regarding possible structural ❑ OK to damage incurred by recent "natural/man made" ❑This is not a complete inspection disasters.This is NOT Date !2/6 le" Department 9t CORRECTION NOTICE. Inspector 7W DO NOT R, 'MOVE THIa TAG From: "Len Williams" <len@fosterwilliams.com> To: "Debbera Coker" <Dlc@co.mason.wa.us> Date: 5/23/2013 9:51 AM Subject: Greg and Debbie Fawcett Residence Attachments: Len Williams.vcf Hi Debbera, I don't have the permit number, but there is an existing permit open for the above residence. We did the drawings in 2007, and the owner has built the garage portion, but has not started the main part of the residence yet. They are now considering some changes to the residence and asked me to talk with you about how that might work under the existing permit. When it is convenient for you, can you give me a call so we can discuss it? Thanks, Len Williams Foster&Williams Associates, P.S. 360-426-0511 1� looe . � Permit# 1' -Old MASON COUNTY BUILDING III 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location /50 Z25 This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been ,found: Items listed below must be corrected to gain compliance o la ZZ Js r m_ ti,y H •7�..rs ��\ You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office ❑ Make corrections, items will be checked next inspect" n regarding possible structural OK to f� damage incurred by recent "natural/man made" ❑This is not a complete inspection disasters.This is NOT a j� CORRECTION NOTICE. Date �-2-1� Department Inspector ?&ZW D* ,# N* ,0T , I '���/� ��� ' ' TH[ io TAFM * Request To Revise An Approved Plan Permit Number: BLD - Name Parcel Number 12 11 - // - 0 Phone Number daytime (200 67Qe!5 Project Address 196 e W'IttAfr"Wogc)4"• Mailing Address 90977 Znct iL7a,c�.,Sc� ' Please provide a complete, detailed description of the proposed revisions to the approved plans: rezk&t.cA 51 Ze, o+ .411 Are two sets of the revised plans or addendum indicating the changes included? V Yes ❑ No Are the approved site plans included? ❑ Yes ❑ No Are the revisions clearly and accurately identified on the plans or addendum? ❑ Yes ❑ No Does the plan contain an engineer's or architect's lateral or vertical analysis? ❑ Yes ❑ No If Yes, Has the engineer or architect approved this revision? ❑ Yes ❑ No Is a stamped and signed approval included with this request? ❑ Yes ❑ N (Note:No structural changes to a"designed"plan will be a roved without the written consent of the engineer and/or architect of re rd Does the proposed revision modify the footprint or location of the structure? El Yes ElNo If Yes, Is a revised site plan, with all new setback dimensions included with this request? ❑ Yes ❑ No Addit'onal Info]�}ation: 79 Applicant's signature 4 Date: � Office Use Only Received by: Date Sent Assigned To Approved By Date B rtginal Valuation: $ 3 �o S �15. 1 �5 � 2 ��� �� Additional Valuation: $ Sq. Ft. $ ❑ P. (l U f Zell Sq. Ft. $ Elyl 3 E.H. e ,hz K i Y1 C. ()f Total New Valuation $ n Addition Fees: ❑ P•W• Additional Planning Dept. $ Additional Plan Review $ qq Addi 'onal Conditions/ Comments: Additional Building Permit $ Additional Plumbing $ •, . L L4&-, Ck, Additional Mechanical $ Additional E.H. Dept. $ Cato-(I ��S Other $ Total Amount Due: $ Amount To Be Paid Up-Front$ � a `�q� 133FO�j 5c+ UPh .� � v 756 3 � = G3 � I- 15x aC. �+8----- g4 5a 5 I �, x ICo �qa 1 � 7s� 7 - � �'' � X To: Mr. Greg Fawcett, July 31, 2009 I received your request to construct the garage portion of your home as phase I. This can be accomplished, however you must continue to show progress on the house portion of your permit during this process. This can easily be obtained by continuing to work on the residence and receiving a progress inspection every 180 days. The building code only allows for a one-time extension of the permit when no progress has been made. Your one-time extension has been granted, so to keep your permit from expiring you must show activity on it and have the activity documented by means of an inspection. Since the garage and the home are connected it is considered to be one permit. Activity and inspections on the garage will keep the permit valid as long as the 180 days is not exceeded between inspections. If you are looking to occupy the living quarters of the garage prior to completion of the home side or"phase 11" it will need to meet all life/safety requirements of the building codes. Your inspector can go over the requirements in detail with you during the course of construction. If you have any additional questions please feel free to call: (360) 427-9670 Ext. 357 Thank you, Mark Core Manger/Building Official Department of Community Development 426 W. Cedar, Shelton WA. 98584 Jul 30 Q9 11:03a debbie 206 8787998 p.1 Mason County Building Department July 30, 2009 Via fax 360-427-7798 To: Mr. Mark Core Re: Permission to phase construction of house Permit number 2007-01089 - (OF? Fawcett Enterprises LLC Parcel # 12118-11-00030 180 E Winterwood Drive Grapeview, WA 98546 Dear Mr. Core, We ask permission to start construction for this permit by constructing the garage and above apartment this year. This will allow us to have a fully functioning location with power, septic, water etc. while waiting for a better economy early next year. As a 60 plus year old, our funds have been significantly depleted these past several years; additionally my mother died last month which put a strain on my time as I am executor of her will. Although our permit is intact, Phil Chamberlin who would be doing our foundation work thought it best to make sure the partial construction is acceptable before Greg Waltric finishes the ground work and Septic Construction as permitted. This would greatly help our cause and allow us to construct the house in a better time frame. Please advise and thank you for your assistance. Sincerely, Greg raweett 1 ACCESS & GRADE INSPECTION PERMIT A D D RE S ( ,, C— SPELT RYA ,Z U 7 DRIVEWAY,ACCESS Len the < Width: Surface: ? Size of turn-aound: Cn :of ,- onditiohoulders: Vertical clearance: 1____ ) need post at end of driveway with reflective address numbers GRADE�OF DRIVEWAY % OF ROAD ROAD ACCESS Length: Width: Surface: Condition of shoulders: Vertical clearance: BURN PERMIT REQUIRED FOR LAND CLEARING FIRE. LOT INSIDE SMZr 4X4 FIRES ONLY. LOT INSIDE UGA, NO OUTDOOR BURNING PERMITTED. LOT TOO SMALL FOR:_ BURN PERMITS _ FIRES. REMARKS r continue remarks on back 4/25/2014 Conditions Associated With 10:18:38AM Case #: BLD2007-01089 Permit Condition Status Updated item# Code Title Status Changed By Tag Date By Installation of heating equipment in single family residences shall meet the requirement of the current WSEC. The furnace to be installed shall not exceed 200%of the heating design load or prescriptive requirements of Chapter 9. Furnace efficiency shall be .78 AFUE or higher or rated 80%combustion efficiency.All ducts shall be securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in accordance with manufacturers installation instructions.Duct tape is NOT permitted as a sealant on any ducts. Ducts in unheated spaces shall be insulated to R-8.X 35) 1000 SPECIAL INSPECTION BY GEOLOGIST NOT MET 10/9/2007 DLC An inspection performed by a representative of the Geotechnical Testing Laboratory shall be performed on-site prior to the footing pour to verify that earthwork and foundation installation activities comply with geologist recommendations. In addition a final inspection report,prepared by a representative of the Geotechnical Testing Laboratory shall be required to verify that erosion control, drainage and final work is completed in accordance to geologist recommendations. Reports shall be submitted to the Mason County Building Dept.,PO Box 186, Shelton, WA 98584,prior to the footing and final inspection and available on site for inspection. X 36) 1000 SINGLE FAMILY DWELLING UNIT NOT MET 2/10/2014 DLC This permit is approved to construct a single family dwelling unit with attached garage. The floor area above the garage shall remain accessible to the main dwelling with a doorway accessing the floor area above the garage from the upper floor loft area located in the main dwelling. A 2-family dwelling unit shall be approved by Mason County Department of Community Development for compliance to development regulations and the building code. X 74 Page 5 of 5 CaseConditions..rpt 2/10/2054 3:00PM Fees Associated With Case#: BLD2007-01089 e . Description Revenue Account Number Date Paid By Fe a Histo PLCK Plan Check Fee 00 1.000000.125.140.345.83.30C 6/19/2007 KS 1,625.10 1,625.10 0.00 Plan Check Fee 00 1.000000.125.140.345.83.30C 6/19/2007 KS 0.00 0.00 PLRV Planning Review Fee 00 1.000000.125.145.345.83.303 6/19/2007 KS 170.00 170.00 0.00 Planning Review Fee 00 1.000000.125.145.345.83.303 6/19/2007 KS 0.00 0.00 STFE Building State Fee 650.170010.000.000.386.00.305 2/26/2008 KKK 4.50 4.50 0.00 Building State Fee 650.170010.000.000.386.00.305 2/26/2008 KKK qS��• 0.00 0.00 PRMT Building Permit Fee 00 1.000000.125.140.322.10.30C 2/26/2008 KKK lo�� 2,500. 2,500.15 0.00 Building Permit Fee 00 1.000000.125.140.322.10.30C 2/26/2008 KKK 0.00 0.00 MCH Mechanical Fee 00 1.000000.125.140.322.10.300 2/26/2008 KKK ��� �� .29175 291.75 0.00 Mechanical Fee 00 1.000000.125.140.322.10.30C 2/26/2008 KKK &d� 0.00 0.00 MCHB Mechanical Base Fee 00 1.000000.125.140.322.10.30C 2/26/2008 KKK • 25.30 25.30 0.00 Mechanical Base Fee 00 1.000000.125.140.322.10.30C 2/26/2008 KKK 0.00 0.00 PLM Plumbing Fee 001.000000.125.140.322.10.300 2/26/2008 KKK 00 198.00 0.00 Plumbing Fee 00 1.000000.125.140.322.10.300 2/26/2008 KKK 0.00 0.00 PLMB Plumbing Base Fee 00 1.000000.125.140.322.10.30C 2/26/2008 KKK 22.00 22.00 0.00 Plumbing Base Fee 00 1.000000.125.140.322.10.30C 2/26/2008 KKK 0.00 0.00 FWRR Fire Warden Review 00 1.000000.125.140.342.40.30C 2/26/2008 KKK 64.00 64.00 0.00 Fire Warden Review 00 1.000000.125.140.342.40.300 2/26/2008 KKK 0.00 0.00 BGAR Geotechnical Asses.Report Rev 00 1.000000.125.145.345.83.304 2/26/2008 KKK 480.00 480.00 0.00 Geotechnical Asses.Report Rev 00 1.000000.125.145.345.83.304 2/26/2008 KKK 0.00 0.00 BGAR Geotechnical Asses.Report Rev 00 1.000000.125.145.345.83.304 2/26/2008 KKK 320.00 320.00 0.00 Geotechnical Asses.Report Rev 00 1.000000.125.145.345.83.304 2/26/2008 KKK 0.00 0.00 EHPR EH Plan Review 150.000000.300.000.346.20.354 2/26/2008 KKK 75.00 75.00 0.00 EH Plan Review 150.000000.300.000.346.20.354 2/26/2008 KKK 0.00 0.00 Total Fees:$5,775.80 Paid:$5,775.80 TOTAL REMAINING DUE: $0.00 Page I of 1 CaseFees.rpt Valuation For 2/10/2014 Case#:BLD2007-01089 2:50:45 PM Moto Multiplier: 1.00 Item Grade Rate Rate Item Item:; Code Code Description Amount Quantity Valu DWO1 AV Dwell R-3 73.00 4,462 325,726.00 KS 6/19/2007 GARS' AV Private Garage 26.35 936 24,663.60 KS 6/19/2007 DKCV AV Cover d DeA 8�15 1,013 18,385.95 KS 6/19/2007 Total : 368,776.00 1 Page 1 of 1 CaseValuation.rpt 7-orc�� MASON COUNTY (360)427-9670 Shelt(i n ext.352 DEPARTMENT OF COMMUNITY DEVELOPMENT tiacO� °papa � p OPMENT (360) 275 .467 Belfair ext. 352 y BUILDING• PLANNING•FIRE MARSHAL (360)482-5269 Elm@ e 352 Mason County Bldg. 111, 426 West Cedar Street eY(� Z o2�J L PO Box 279, Shelton, WA 98584 www.co.mason.wa.us 1R54 - PLUMBING & MECHANICAL PERMIT APPLICANT INFORMATION / CONTRACTOR INFORMATION Owner Company Name Mailing Address Mailing Address City S to ad City State Zip Code Phone th r Ph. Ph e Other Ph. Lien/Title Holder Contractor Reg. # Exp. E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC INFORMATION - Connect to New Septic Existing Septic Connect to Sewer System Name of Sewer System PARCEL INFORMATION- 12 Digit Parcel No Fire District Legal Description Site Address(Please include street name, street number and city) Directions to site Is property within 200' of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% TYPE OF JOB - New Add Alt Repair Other Use of Building Location of Fixtures/Units- 1 st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES- Show Number o ench) MECHANICAL UNITS Type of Fixture N Fees Fuel Type:Electric_LPG Natural�A6(4_,�Heat Pump_ Toilets �3 T= Tvpe of Unit No.offs '-'1 � Fees Bathroom Sink a s Furnace Bath Tubs I 13L - I Heatpumps / = Showers I =oZ Spot Vent Fan / Water Heater Propane Tank Clothes Washer / = a Gas Outlets Kithen Sinks =a Wood/Gas/Pellet Stove 4 qW / Dishwasher t = Kitchen Exhaust Hood Hosebibs 3 Dryer Vent Other Other Base Fee Base Fee TOTAL PLUMBING— , TOTAL MECHANICAL OWNER/BUQDEIR Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. X— Date: Owner/Owners Representative/Contractor (indicate which one) FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bid Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Occ Group T De Constr. Planning Department Environmental Health Department FEES Plumbing & Base Fee Site Inspection Mechanical-&Base fee UFC Plan RevieLwf&iLa Wood/Gas/Pellet Stove Fee Other Violation Fee I TOTAL FEES 6/11/2015 Case Activity Listing 2:07:41PM Case #: BLD2007-01089 P14 Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By. Updated Updated By BLDA010 Application Received 6/19/2007 6/19/2007 None DONE KS 6/19/2007 KS BLDB201 More Info Letter-EH 7/5/2007 None DONE I'W 7/5/2007 TW W/IN PREVIOUS 12 MONTHS BLDB110 Building Plan Review 6/19/2007 7/10/2007 None DONE MAL 10/9/2007 DLC / Done and sent to case manager,MAL 07/10/2007,also sent letter to owner RE field welding"special inspection form". Attached geotech report to approved plans and added conditions.do 10/9/2007 BLDB120 WSEC Compliance Review 7/10/2007 None DONE MAL 7/10/2007 MAL Done and sent to case manager,MAL 07/10/2007 BLDB500 Fire Warden Review 6/25/2007 7/23/2007 None DONE DHS 7/23/2007 DHS Note;called LO&left message Reg;cable chain blocking driveway(0800-7/19/07) Note,L/O left cable lowered and able to access-found 1 issue was because of driveway length Chapter 14.17080 and 090 should be installed. BLDB210 Water Adequacy 6/19/2007 8/6/2007 None DONE TW 8/6/2007 TW W/IN PREVIOUS 12 MONTHS 08.06.07 WATER SAMPLE RESULTS RECEIVED BLDA800 Documents Received 8/22/2007 None DONE KS 8/22/2007 KS COPIES OF GEOTECH GIVEN TO RDH.8/22/07 KS BLDB130 Planning Review 6/19/2007 10/1/2007 None DONE RDH RDH 10/1/2007 RDH Development complies with the eagle management plan. During my site visit,the house location was not staked. r Forwarded July2007 Geo Report to consultant on August 23,2007.OK'd. Static safety factor of slip surfaces at 80 foot setback appears from the first geo report t be greater than 1.5 percent. BLDB200 Environmental Health Review 6/19/2007 10/3/2007 None DONE TW 10/3/2007 TW 07.05.07 NEED APPROVED 4 BEDROOM DESIGN.SEE SWG CASE FOR DETAILS 10.03.07 PER AMANDA REYNOLDS,DESIGN APPROVED. Page 1 of 5 CaseActivity..rpt Case Activity Listing 6/11/2015 2:07:41 PM Case #: BLD2007-01089 IF, Assigned Done Acti%ity Description Date I Date 2 Date 3 hold Disp To By Updated Updated 13). BLDA100 Approved for Issuance 10/9/2007 None DONE C MI 1 10/9/2007 CMH Notified applicant that permit is ready for pickup. BLDA500 Issue Building Permit 2/26/2008 None DONE KKK 2/26/2008 KKK BLDA540 Print Inspection Card 2/26/2008 None DONE KKK 2/26/2008 KKK BLDA900 Telephone Call 8/22/2008 None DONE MEC 8/22/2008 MEC went over correction notice with owner on the phone told him permit is extended for 180 days,8-22-08 Mec BLDCI IO Footing Inspection 8/18/2008 8/22/2008 None FAIL TFR 8/25/2008 KDM 1)POST ADDRESS @ HEAD OF DRIVE MIN 4"TALL 1/2"WIDE 2)NOT READY FOR INSPECTION,NO FORM INSTALLED ECT 3)NO PLANS ONSITE 4)PRIOR TO INSPECTION READ CONDITION#36 ON PERMIT. **CALL FOR RE-INSPECTION WHEN CORRECTIONS ARE MADE BEFORE CONTINUING****THIS IS NOT A COMPLETE INSPECTION**** BLDC250 Permit Extension 2/20/2009 2/22/2009 None EXTD PIB 7/15/2009 PIB Extended 6 months from 2-22-09 to 8-22-09 per faxed request. BLDA920 Miscellaneous Action 7/31/2009 None DONE MEC 7/31/2009 MEC sent fax to owner&spoke on phone,went over requirements for keeping permit active and doing job in 2 phases.copies of fax in field inspection card.7-31-09 Mec BLDC115 Foundation Wall Inspection 8/14/2009 8/17/2009 None PASS TFR 8/20/2009 MEC stemwall-pass BLDC120 Underground Plumbing 8/28/2009 9/1/2009 None FAIL TFR 9/4/2009 PIB At head of driveway stapled business card to tree above padlock on chain gate. No access. No inspection. Will note:"no access-no inspection T.R." BLDC 12O Underground Plumbing 9/4/2009 9/8/2009 None COND TFR 9/14/2009 PIB Conditional pass-garage add lower bath to permit. i Pagq 2 of 5 CaseActivity..rpt Case Activity Listing 6/11/2015 2:07:41 PM Case #: BLD2007-01089 IF, Assigned Done Activity Description Date I Mite 2 Date 3 Ifold Disp To By Updated 11p(lated By BLDC 116 Below Grade Insulation 9/22/2009 9/22/2009 None PASS I 1 K 10/2/2009 PIB below slab insulation-pass. BLDC100 Inspection 10/20/2009 j.10/22/2009 None PASS TFR 10/23/2009 PIB Witnessed 7 epoxy bolt hole etc.-Pass. J BLDC140 Framing/Plumbing/Mechanical 4/15/2010 °4/16/2010 None FAIL TFR 4/21/2010 PIB F/P/M/P-Fail: 1.) Provide test on DWV&supply. 2.) Have L&I inspect and accept electricial. 3.) Strap all non lapped top plates ie where vaults return to level wall-or provide photo's. 4.) Install full caulk and seal. 5.) Install all exhaust ducting. 6.) Install smoke detector in down stairs future living space. 7.) Install all missing nail plates. 8.) cap heat in chase for future heated space next to garage. 9.) Strap top plates notched more than 50%. Strap to be 1 1/2"wide and long enough to get 6- 16d each side of split. Call for re-inspection when corrections are made before conitnuing. BLDC140 Framing/Plumbing/Mechanical 4/23/2010 4/26/2010 None PASS TFR 4/27/2010 GMM BLDC145 Insulation Inspection 7/21/2010 7/26/2010 None PASS TFR 7/27/2010 PIB Wall-Ceiling-Floor Insulation-Pass. BLDA910 Meeting 8/4/2010 None DONE DLC 8/4/2010 TW ADDED WALL BETWEEN GARAGE CREATING A HEATED STORAGE ROOM. SLAB INSULATION R-10 OR BETTER,GLAZING U-35 OR LESS,r-38 CEILING,WALLS R-21,DOORS INSULATED FOAM CORE. DC 8/4/2010 BLDC 100 Inspection 8/2/2010 8/4/2010 None DONE LDK 8/6/2010 PIB Int BWP-Done. No GWB-verified 5/8 in garage. BLDC105 Progress Inspection 2/1/2011 2/4/2011 None PASS PIB 2/1/2011 PIB Progress/Phone: Finished outside-now working on electrical. Has been waiting over 2 months for th�flooring to come in. Page 3 of 5 CaseActivity..rpt Case Activity Listing 6/11/2015 2:07:41 PM Case#: BLD2007-01089 lip, Assigned Done Activity I)escription Dote I Date 2 Date 3 Hold Disp To By Updated t'pdated By BLDC 105 Progress Inspection 8/4/2011 j 8/5/2011 None PASS TFR TFR 8/5/2011 KS UPSTAIRS LOOKS ABOUT 100%,DOWN STAIRS TOILET SET,NOT VANITY.EXT FINISH APPROX 90%NO GUARD RAILS OR HANDRAILS.STILL NEEDS BACK FILL BLDC105 Progress Inspection 1/27/2012 2/5/2012 None DONE PIB 1/27/2012 PIB Phone: Beams are now up BLDC105 Progress Inspection 8/5/2012 8/5/2012 None DONE PIB 11/1/2012 PIB Progress-working on hand rail. BLDC157 Final Inspection-Failed 1/14/2013 1/14/2013 None FAIL TFR TFR 1/16/2013 KS PHASE I FINAL. TEMP OCC.PASS COND.NO SLEEPING ON LOWER FLOOR.HEATED STORAGE SMOKE DETECTOR INSTALLED IN THIS AREA BUT DID NOT RING OUT.IT COULD BE WRIRED CORRECTLY AND A WIRE OUT OF A WIRE NUT OR BAD ORIENTED CIRCUIT PLUS. 1.CAULK EXTD.PENETRATIONS 2.CAULK EXT PEN ON EXXT WALL 3.EXT P&T RELIEF TO EXT 4.INSULATE WATER HEATER,WATER LINES. 5.RANGE HOOD BACK DRAFT DAMPED DOESN'T CLOSE FULLY 6.POST ADDRESS AT HEAD OF DRIVEWAY AND AT ANY Y'S NUB 4"TALL 1/2"WIDE ON CONTRASTING BACKGROUND 1 BLDA900 Telephone Call 5/23/2013 None DONE DLC 5/23/2013 DLC May alter phase 2 plans. Told archt to submit as a revision to the active permit. fee would be as a new plan review.Also reminded to keep permit active with an inspection within 180 days of last inspection (7/14/2013)-do 5.23.2013 BLDC105 Progress Inspection 7/1/2013 7/14/2013 None DONE PIB 7/1/2013 PIB Progress/Phone: Working on water heater. BLD13007 Plan Revisions Submitted 1/9/2014 None DONE DLC 2/7/2014 DLC NEW PLAN,REDUCTION IN SIZE OF PHASE II PORTION,SFR SUBMITTED BYARCHT F&W. I Phase 1,2-story garage with R3 space above,is complete with temporary occupancy granted by TFR cdnditionally. BLD13007 Plan Revisions Submitted `1/15/2014 None DONE GMM 1/15/2014 GMM } Reducing size of structure. Page 4 of 5 CaseActivity..rpt Case Activity Listing 6/11/2015 2:07:41PM Case #: BLD2007-01089 IF, Assigned Done Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By BLDB400 Building Review Revision 1/15/2014 2/11/2014 None DONE DLC DLC 2/11/2014 DLC PHASE 2 ONLY REVISES AND REDUCE SIZE OF SFR. Refers to original plans for additional requirements. Conditions apply,welding requires inspection or provide information demonstrating that welding performed in certified shop and certified welder.Field welding requires special inspection report.Note on sheet S3,design professional provide doc prepared by and signed that ID's the structural member at entry that support PL from adjacent roof.do BLDA150 Revisions Approved for Iss. 2/12/2014 None DONE GMM 2/12/2014 GMM CALLED GREG FAWCETT,LET HIM KNOW REVISIONS ARE READY TO BE PICKED UP,ALSO GAVE HIM THE REMAINING AMOUNT DUE. BLDC110 Footing Inspection 6/10/2014 6/13/2014 None PASS MAU 6/16/2014 MKW BLDA540 Print Inspection Card 6/16/2014 None DONE GMM 6/16/2014 GMM BLDC115 Foundation Wall Inspection 7/16/2014 None PASS MAU 7/18/2014 MKW Stem Wall e BLDC100 Inspection '7/16/2014 None PASS MAU 7/18/2014 MKW Plinths Walls -BLDC100 Inspection 7/30/2014 7/31/2014 None DONE LDK 8/1/2014 MKW Wanted under floor.Told him under floor not done. BLDC105 Progress Inspection 12/19/2014 12/19/2014 None DONE AMP 6/11/2015 AMP Progress/Phone:Framing complete and as well as roof. BLDA510 Reprint Building Permit K:5/26/2015 None DONE JBN 5/26/2015 JBN a� Page 5 of 5 CaseActivity..rpt